HPSEBL Form CS-1 (a)
HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED
                                                       (A STATE GOVERNMENT UNDERTAKING)
                          Application and Agreement Form for Domestic Electricity Connection.
                     Application No.         Connection No.          Date of Receipt          Signature of HPSEBL Official
(Note:- The applicant should hand over this A&A form to local office of HPSEBL in the area in which the
supply is required along-with a non-judicial stamp paper of Rs. 50/- dully crosses with words “Agreement for
supply of Electricity/Power” on stamp paper)
The Assistant Engineer/Assistant Executive Engineer/Executive Engineer,
Electrical Sub- Division, HPSEBL Limited,
Sub:-   Application and agreement for new connection/revision of load/change of name for
        domestic electric connection.
A)      Particulars of Applicant/Consumer & premises
        i)         Name of applicant..................................
        ii)        S/o, D/o, W/o..........................................age...........
        iii)       Adhaar No(optional)…………………..
        iv)        Mobile No…………………………… Tel. No…………………………
        v)         Email………………………………………………………………….
        vi)        The wiring work will be/has been carried out by (Name                                               of   licensed
                   contractor/wireman)............................................................
                  Full Address of Premises where connection is required:
                  House /Plot No.                                              Village /Town/City
                  Floor No                                                     District
                  Landmark                                                     Pin Code
                  Sector/Colony/Street                                         Whether MC/NP/TCP
                                                                               area (Y/N)
                  Description of premises [ No of rooms,
                  floors, other area where supply of to be
                  given]
B)      Details of load/class of application etc.
        i) Schedule of energy consuming apparatus to be connected:
               Description     Lamps, Tubes etc.               Fans Heaters and                                 Motors
                   of                                          Refrigerators etc.
               apparatus
                              No.                 Total      No.                  Total       No.         h. p. each         Total KW
                                        Wattage
                                                                       Wattage
                                                  kW                               kW
                                                                                                          1-Ø    3-Ø        1-Ø        3-Ø
                   1            2         3        4          5            6         7         8          9       10         11        12
                 Total
                                       [In case of Extension in load, the existing & additional Load is to be indicated separately]
        ii)       Total Connected load(kW) of above installation (4+7+11+12) .......................... kilowatts
                   Existing ……………………………(kW)                    Addl./New......................... (kW).
        iii)      Voltage at which supply would be preferred ....................... kV
        iv)       Details of other connections existing in the name of the applicant
                       a) Account No. ……………………………….b) K. No………………………………………….
                       c) Category……………………………………………………………………………………………
        v)        Type of Application:
                   (a)       A new connection: ............................................
                  (b)        An extension to my/our existing installation (connection A/C No ......................... )
                   (c)       A re-connection (the previous consumers' name is .............................................
                             and his connection A/c No. is .................................................................. )
                                                                                                                             P.T.O.
                                                                    [2]-CS-1(a)
                     (d)       A change of name/title                 from      Shri..................................Connection        A/C
                               No..........................
                     (e)       Change of  Supply voltage                              for       existing         connection             A/C
                               No……………………………………….
                     (f)       Other(please mention)…………………………………………………………
          vi)        Approximate date from which connection is required........................................
     C)      I/We do hereby solemnly affirm /declare and agree as under:-
          i)    That I/We am/are the legal owner(s)/occupier of house/plot/premises mentioned at Sl. No. A(vi) (
                hereinafter referred to as ( “The Premises”), in support of which the applicant(s) has enclosed proof of
                occupancy/ownership.
          ii) That I/We have applied to Himachal Pradesh State Electricity Board Ltd. (HPSEB Ltd.) ( “ The Licensee”) for
                electricity connection at the above mentioned premises for the purpose mentioned above and I /We agree
                to take supply of electricity for the domestic purpose only.
          iii) That I/We undertake to pay Security as per HPERC(Security Deposit)Regulations,2005, the charges towards
                Recovery of Expenditure for supply of Electricity as per HPERC(Recovery of Expenditure for supply of
                Electricity) Regulations,2012 and its amendments issued from time to time with the time period as
                mentioned in the regulations and further undertakes to pay all energy charges and other service charges as
                per tariff order determined by Himachal Pradesh Electricity Regulatory Commission(HPERC) applicable from
                time to time. That in case I/we fail to deposit the charges within stipulated period, HPSEB Ltd. is at liberty
                not to release the electric connection/not to allow the extension of load/disconnection of supply to the
                above mentioned premises.
          iv) That I/We undertake to accept and abide by the provisions of Electricity Act,2003, all applicable laws,
                conditions of supply, General Conditions of Tariff and Schedule of Tariff, Supply Code, rules, regulations
                including Safety Regulations by CEA, orders, Directives, Notifications issued and enforced under applicable
                laws by HPERC/CEA/Govt. of India/Govt. of HP and any other instructions/circulars issued by HPSEB Ltd.
                from time to time, and as amended from time to time, for equitable and efficient distribution of electric
                energy. These are also available on website of HPSEBL and HPERC i.e. www.hpseb.com & www.hperc.og.
          v)    That I/we shall be solely held responsible for contravention, if any, of Act/ Law of any statutory authority/
                Central/ State Government Department and HPSEBL shall not be made party on any omission/
                contravention by me/ us. Any loss on this account shall be my/ our liability.
          vi)   That I/We undertake to indemnify the licensee against any loss accrued to the Licensee if the
                declaration/undertaking furnished by me/us prove to be false/incorrect or are unfulfilled. I/We further
                undertake to indemnify the licensee of any harm/loss to the Licensee’s property for any loss/harm to any
                third party on account of any fault in the electric work at my /our premises. Further, applicant agrees that if
                there is any harm/loss to the property of the Licensee, due to the fault of the electrical network within the
                premises of the Applicant, all the liabilities shall have to be borne by the applicant.
          vii) That the Licensee shall have the right to supply electricity to other consumers from the service line or
                 apparatus installed on my/our premises as per Supply Code/HPERC Regulations.
           viii) That grant of the applied electricity connection will not confer any legal right for regularization of
                 building/land use in respect to the electricity connection provided at the Applicant’s premises. Further, it
                 shall also not confer any right in favour of Applicant to have permanent electricity connection.
           ix) That the applicant would allow clear and unencumbered access to all authorized officials of the Licensee to
                 the premises of the Applicant for the purpose of meter reading, maintenance, inspection, checking, testing
                 etc.
           x) That I/We have clearly understood that if the above statements prove to be false or incorrect or on receipt
                 of a reference/notice from concerned statutory authority/ law enforcing agency of State /Central Govt.
                 regarding sealing/demolition/vacation of the premises/ contravention of any of the bye laws, the electricity
                 connection can be disconnected and the meter /service line can be removed by HPSEB Ltd. without any
                 further notice to me.
           This agreement for the connection shall be effective from the date the connection is released and shall remain
effective till such time as it is either replaced by fresh agreement or it is terminated as per provisions of H.P. Electricity
Supply Code.
Date: - - /- -/- - - -/                                                                              Signature of Applicant
                                         Signature of Witness
                                         Name of witness............................A/c No..............................
                                         Address of Witness             .............................................................
                                         …………………………………………………………………………………………………
Signature on behalf of HPSEBL
Name & Designation………………………………………………………………………….
(To be signed by load sanctioning authority)
Note: The consumer who intends to apply for Net Metering , the application shall be made on Form-1 and
agreement shall be executed on Form-2 of HPERC(Rooftop Solar PV Grid Interactive Systems based
on Net Metering)Regulations,2012. The agreement executed on Form-2 shall be supplementary to the
agreement on A& A form.
                                                                [3]-CS-1(a)
                                                       (FOR OFFICE USE ONLY)-Domestic
                       Name of Consumer:
                1)     a) Standard Supply Voltage .............................. Volts   b) Availed Supply Voltage…………..
                       c) Metering Voltage……………………………………………….
                2)     Name of Feeding Sub-Station………………………………………..
                3)     Category applicable as per Tariff Order : Domestic
                4)     Details of Amount deposited by the applicant:-
                       a) Security deposit
                          Sr.      Amount    Receipt       Dated        Purpose[New load/addl. Load/revision     Signature of
                          No.                No.                        of security based on average tariff]     official
                          i)
                          ii)
                       b) Normative IDC
                          Sr.      Amount    Receipt       Dated     Purpose[New load/addl. Load/revision of     Signature of
                          No.                No.                     security based on average tariff]           official
                          i)
                          ii)
                       c) Cost of Service line/Estimate
                          Sr.    Amount Receipt       Dated          Purpose[New load/addl. Load/revision of     Signature of
                          No.              No.                       security based on average tariff]           official
                          i)
                          ii)
                5)     Accepted/Sanctioned/ Recommended[ Please Tick ]                         Signatures……………….
                       Comments/recommendations                                                 Designation AAE/AE/AEE
                                                                                                Dated:……………………….
                6).    Sanctioned /Recommended[ Please Tick ]                                   Signatures…………………
                       Comments/recommendations                                                 Designation Sr.EE/ASE
………………………………………………………………………………………………Cut here…………………………………………………………………………………………………………………..
                                                          ACKNOWLEDGEMENT
                                                              HPSEB Ltd.
                Date            Name of Applicant             Tariff Category        Application No.           Load(kW)
                                                              Domestic(DS)
(Signature of Authorized person of HPSEBL)
                                   Checklist for Domestic Consumer[CS-1(a)]
Sr. Description                                                                           Please
No.                                                                                       Tick 🗸
A)   General
     i)  Application and Agreement Form (A&A Form) duly completed and signed by the
         applicant.
     ii) Test Report duly filled and signed by licensed Electrical Contractor.
     iii)        Crossed Non-Judicial Stamp paper of Rs.50/- attached with A&A form
B)   Identity/Ownership
        i)   Identity Proof ( any one of the documents given below)
                    PAN
                    Adhaar Card
                    Driving License
                    Passport
                    Voter ID Card
            ii)     Proof of Ownership outside TCP/MC/NP/ other ULB areas ( any one of
                    the documents given below)
                       Revenue Papers for Land/Building/premises
                       Sale Deed
                       Lease Deed
            Proof of Ownership within TCP/MC/NP/ other ULB areas
               NOC from TCP/MC/NP/other ULBs
C)   Charges to be deposited[Ref. HPERC Regulations 419/2012,HPERC Security Deposit
            Regulations,2005] and their amendments from time to time.
            i)         Initial Security
            ii)        Normative IDC
            iii)       Cost of Service Line or Departmental Charges as the case may be.
                                                                                  HPSEBL Form CS-10( Page-1)
                   HIMACHAL PRADESH STATE ELECTRICITY BOARD LIMITED
                                         (A STATE GOVERNMENT UNDERTAKING)
                                    WIRING CONTRACTOR'S TEST REPORT
                                                  AND
                                    HPSEBL'S INSTALLATION TEST ORDER
                   Name and Address of Premises where connection is required:
                   Name of Applicant ………………………Address ............................................................ Description
                   of Premises………………………………………………………………………………………………………………..
From               (Wiring Contractor)
                   Name and Address:……………………………………………………………………..
                   ……………………………………………………………………………………………….
                   License No…………....... Dated --/--/---- Valid up to --/--/----.
To
                    The AE/AEE/EE/ ESD, HPSEBL ………………….
                    REPORT
                 We hereby inform that Electrical Installation at the premises belonging to the
above consumer, as detailed on page 2(backside) is now ready for your engineer to test and
connect up with your mains. The installation was tested by me/us on.......................................
(date) and the insulation resistance was as shown at page 2.
Dated:_ _/_ _/_ _ _ _/                            Wiring Contractor's signature..............................
                                 HPSEBL’S INSTALLATION TEST ORDER
                                                            (A)
                   The Junior Engineer/ Addl. A.E, Electrical Section, HPSEBL
                    Please test the installation detailed on pages 2, fill in columns 18 to 22 and report as
below. It may, however, be ensured that the intimation regarding the date on which you intend to visit the
consumer’s premises for the above said purpose is given to the consumer or his representative well in
advance, so as to enable him to be present at the time of Inspection. Also please ensure that for any
subsequent visit for testing of the said installation necessitated by the consumer on the previous visit or due
to defective installation, the consumer is asked to pay the requisite charges as per the schedule of general &
service charges and receipt No./date vide which the charges are paid by him is quoted in the report.
                                                          Assistant Engineer /Assistant Executive Engineer
                                                          Dated       ………………………….
                                                    (B) REPORT
(1)      Above installation was tested by me on (date) .................................. in the presence of consumer (or
         his representative) and the insulation Results were as shown on page 2. The following defects were
         found in the installation.
         i)        Whether Insulation Resistance Satisfactory…………………………………
         ii)       Other Defects, if any (a)…………………………………………………….
                                              (b)……………………………………………………
                                              (c)……………………………………………………
(2)      (a)       The above installation was tested by me on my first visit.
                                                      OR
         (b)       The installation was tested by me on my subsequent visit for which the consumer
                   deposited the amount of Rs .......................... as per the schedule of general & service charges
                   vide Receipt No……………………….Date………………
         Signature of Consumer
         Name( in case of representative): ………………
         Dated:_ _/_ _/_ _ _ _/                                                   Signature
                                                                                  Junior Engineer/Addl. A.E.
                                                                                  Dated:_ _/_ _/ _____ /
                                                                                                                      P.T.O.
                                                                                        SCHEDULE OF ENERGY CONSUMING APPARATUS TO BE CONNECTED                                                                                                               HPSEBL Form CS-10( Page-2)
                                                                                        Description   Lamps /            Fans, Heaters,                     Motors                                                                   INSULATION RESISTANCE [MEGA-OHMS]
                                                                                                                                                                                                                                                                                                                                                                                   Earth Resistance(in Ohms)]In case of Medium, HT&EHT
                                                                                                      Tubes Etc.         Cookers,
                                                                                                                         Refrigerators etc.
No. of Circuits (left to Right) on Distribution Board
                                                                                                      No.        Total   No. Watts Total       No.   h.p/             Total kW                                                        Wiring Contractor’s                                                            HPSEBL Test
                                                                                                                 kW             each      kW         kW each                                                                                 Test
                                                                                                                                                                                      Total connected load of each circuit (in kW)
                                                                                                                                                     1-Ø 3-Ø          1-Ø   3-Ø
                                                                                                                                                                                                                                                                & earth
                                                                                                                                                                                                                                                                                                                                        & earth
                                                                                                                                                                                                                                       Between
                                                                                                                                                                                                                                                               Between
                                                                                                                                                                                                                                                                                                              Between
                                                                                                                                                                                                                                                                                                                                       Between
                                                                                                                                                                                                                                     Conductors
                                                                                                                                                                                                                                                                                                            Conductors
                                                                                                                                                                                                                                                             Conductors
                                                                                                                                                                                                                                                                                                                                     Conductors
                                                                                                                                                                                                                                         lamp or apparatus
                                                                                                                                                                                                                                                                 lamp or apparatus
                                                                                                                                                                                                                                                                                        lamp or apparatus
                                                                                                                                                                                                                                                                                                                lamp or apparatus
                                                                                                                                                                                                                                                                                                                                        lamp or apparatus
                                                                                                                                                                                                                                                                                                                                                               lamp or apparatus
                                                                                                                                                                                                                                                                                     After connecting any
                                                                                                                                                                                                                                                                                                                                                            After connecting any
                                                                                                                                                                                                                                     Before connecting any
                                                                                                                                                                                                                                                             Before connecting any
                                                                                                                                                                                                                                                                                                            Before connecting any
                                                                                                                                                                                                                                                                                                                                    Before connecting any
                                                                    Size of Conductor
                                                                                                                                                                                                                                                                                                                                                                                   installations
                                     1                                           2          3          4           5      6      7       8      9     10     11        12        13                         14                         15                        16                    17                     18                      19                      20                   21                                                    22
                                    No.1
                                    No.2
                                    No.3
                                    No.4
                                    No.5
 And so
on ……..
                                                        Load verified for ............................... (kW)                         The Size of connecting wires
                                                                                                                                       Between Meter Board &                                                                                                  Dated Signatures of the
                                                        Dated Signature of Verifying Officer/Official                                  Distribution Boards ……………                                                                                              .Wiring Contractor ………………..
                                                        Name & Designation of Verifying Officer/Official……………….
                                                        …………………………………………………………………………..