This document contains a bill of quantities for the construction of a residential building for Rutayisire J. Claude located in Kigali, Rwanda. It provides a breakdown of costs for various construction elements including: site clearance, foundation, masonry work, windows and doors, roof and ceiling, plastering and floor finishing, painting, electrical and water installation, and fence construction. The total construction amount is listed as RWF 6,125,000. The bill of quantities was prepared in April 2023 by Kwizera Viateur of Build Beast Construction Company Ltd.

Uploaded by

kwizeraviate
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
196 views2 pages

Labour Cost R

This document contains a bill of quantities for the construction of a residential building for Rutayisire J. Claude located in Kigali, Rwanda. It provides a breakdown of costs for various construction elements including: site clearance, foundation, masonry work, windows and doors, roof and ceiling, plastering and floor finishing, painting, electrical and water installation, and fence construction. The total construction amount is listed as RWF 6,125,000. The bill of quantities was prepared in April 2023 by Kwizera Viateur of Build Beast Construction Company Ltd.

Uploaded by

kwizeraviate
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

OWNER:RUTAYISIRE J.

CLAUDE

Bills of quantity for construction of residential building of RUTAYISIRE J. CLAUDE,located in Kigali city,kicukiro
district,Kanombe sector,Busanza cell,Antene village,UPI:1/03/05/01/5641
KANOMBE-CITY OF KIGALI
BUILDINGS
I GENERAL WORKS UNITE QTE UP TP
1 Site clearance Is 1 300000 300000
2 Foundation excavation ff 1 150000 150000
SUB TOTAL 450000
II FOUNDATION
Stone foundation:Well selected hard clean stonwork
ff 1 350000 350000
1 in cement mortar(1:5)
2 Damp proof coarse ff 1 25000 25000
SUB TOTAL 375000
III MASONRY WORK
1 walling internal and external wall ff 1 1200000 1200000
2 Beam ff 1 60000 60000
SUB TOTAL 1260000
IV WINDOW AND DOORS
1 Windows and Doors ff 1 200000 200000
SUB TOTAL 200000
V ROOF AND CEILING
1 Roof and ceiling ff 1 700000 700000
SUB TOTAL 700000
VI PLASTERING&FLOOR FINISHING
1 Plastering and floor finishing ff 1 1100000 1100000
2 skirting ff 1 40000 40000
SUB TOTAL 1140000
VII PAINTING

1 Wall,ceiling,door and window painting ff 1 450000 450000


SUB TOTAL 450000
VIII ELECTRICAL AND WATER INSTALLATION

1 Installation of electricity ff 1 150000 150000

Installation of water(the price includes all plumbing


2 ff 1 200000 200000
works)

IX fence construction+pavement in the ground ff 1 1200000 1200000

SUB TOTAL 1550000

TOTAL CONSTRUCTION AMOUNT 6125000

Six million,one hundred twenty five thousand rwandan franc


6125000frw
Doneon April/2023 by KWIZERA VIATEUR
BUILD BEAST CONSTRUCTION COMPANY LTD