                                         Johann Bergmair
                 Profactor, Austria      Steven Trogisch
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 2
Biogas towards Fuel Cells
Fuel cell scenario – clean energy future
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 3
Biogas – renewable energy
Advantages
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 4
      Why MCFC?
High temperature versus low temperature
                                                                                                  H2O                            CO2
                       MTUs
                       Hot Module Stack                                                           Operating temperature MCFC: ~ 650 °C,
                       (250 kW el)                                                                enabling internal CH4 reforming
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 6
     Synergies MCFC - Biogas
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 7
     Contents
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 8
     The EFFECTIVE project
Biogas usage in fuel cells
                                                                           EFFECTIVE
              Holistic integration of MCFC technology towards a most EFFECTIVE systems
                         compound using biogas as a renewable source of energy.
                                                                 Gas upgrading is
                                                                   a key issue
 3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
 © PROFACTOR 2006 Page 10
     EFFECTIVES approach
Biogas usage in fuel cells
       • Development and construction of 2 gas purification
         systems for H2S removal
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 12
     EFFECTIVES gas upgrading
Biological gas upgrading: basic concept
BASIC PROBLEMS:
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 13
     EFFECTIVES gas upgrading
Biological gas upgrading: EFFECTIVES design
                                                                                                  BUBBLE
                                                                                                  COLUMN
                                                                                                                  Air
                BIOGAS
                                         BIOTRICKLING                                                             Air
                                            FILTER
                      Fresh
                     Medium
                                                                                                  CLEANED
                                                                                                    GAS
             NaOH
                                                                                                   Recirculated
                                                                                                     Liquid
                                  Used Medium
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 14
     EFFECTIVE                                                                                                                                                                                                        Test Periode 2003
Biofilter performance
1000
800
700
600
500
400
300
200
100
                            120
                            110
                                                  Biogas out of Small                                 Stack 1 in operation                             Big                         Stack 2 in operation
     H2S Clean Gas [ppm]
                                                                                                                                                                                                                       6
                  .0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
.0
                                                                                                                                                                                                                    .0
               01
11
21
31
10
20
02
12
22
01
11
21
01
11
21
31
10
20
                                                                                                                                                                                                                 30
                                                                                                                January - June 2003
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 15
     EFFECTIVE                                                                                                             Test Periode 2003
Biofilter performance
Biological PPU – Biotrickling Filter at Biogas Plant Kolinany / Nitra - period 2003
         Month      H2S raw gas                  H2S cleaned gas              H2S loading rate      Elimination capacity
                    [ppm]          [ppm]         [ppm]          [ppm]        [gH2S/m³h]             [gS/m³h]
                    average        max.          average        max.          average        max.   average    max.
         Feb 03     587            796           1              1             2,3            6,6    4,6        6,2
         Mar 03     410            868           0              3             4,2            7,2    4,0        6,8
         Apr 03     44             257           0              1             0,6            3,4    0,5        3,2
                                                                     *)
         May 03     132            811           4              109           0,7            5,1    0,4        3,7
         June 03    92             291           2              32**)         1,2            3,6    1,1        3,4
         July 03    75             168           2              7             1,2            2,6    1,1        2,5
         Aug 03     46             186           1              1             0,7            2,8    0,6        2,8
         Sept 03    59             315           1              1             0,8            3,7    0,7        3,5
         Oct 03     1              24            0              0             0              0      0          0
         Nov 03     828            4212          11 *)          64***)        3,3            9,7    3,1        0,9
         Dec 03     189            621           1              1             2,3            9,8    2,1        9,1
    *)
        Too quick change of H2S loading rate switching from the big to the small fermenter
    **)
         Surrounding temperature of measurement instrument very high (summer period) – failure possible
    ***)
         In November 2003 the FC test bed was out of operation
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 16
      EFFECTIVES gas upgrading
 Site for long term endurance tests
 3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
 © PROFACTOR 2006 Page 17
     EFFECTIVES gas upgrading
Biological gas upgrading: EFFECTIVES design
   Gas analytic for raw gas & cleaned gas,                                                        Biotricklingfilter coupled with MCFC
   Micro GC for MCFC gas analytics                                                                testbed
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 18
     EFFECTIVES gas upgrading
Chemical gas upgrading
• Chemical H2S-filter,
  based on Ironoxide,
  built by Seaborne:
• 6 month endurance
  operation in Germany and
  2 months in Austria, also
  achieving the aim of less
  than 10 ppm H2S in the
  outlet gas
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 19
     EFFECTIVES gas upgrading
Chemical gas upgrading: test cycle in Asten
                                                                                                  MCFC
                                                                                                  Testbed
                                                                                                  and
                                                                                                  chemical
                                                                                                  biogas filter
                                                                                                  in Asten
                                                                                                  2003
                                                                                                  (Austria)
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 20
     EFFECTIVE
MCFC Testbeds
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 21
     EFFECTIVE
MCFC Stack used for the project (300W)
  • 300 W stack
  • With 10 cells each
  • Six units available for
    the project
  • After each of the 6
    test cycles the used
    stacks are removed
    and undergo a series
    of material analysis                                                                EFFECTIVES 300W Stack, manufactured by MTU
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 22
     EFFECTIVE
The process of the MCFC test bed
                                                                                                  Screenshot of
                                                                                                  control unit
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 23
    Locations for Biogas – MCFC test
    EFFECTIVES approach
          cycles in EFFECTIVE                                                                                      Test locations for the
Chemical gas upgrading                                                                                             EFFECTIVE Testbeds in:
                                                                                                                                    •Slovakia:
                                                                                                                                    agricultural biogas
                                                                                                                                    •Germany:
             Owschlag, Germany,
             2.200 hours operation
                                                                                                                                    industrial waste
             (Industrial research                                                                                                   biogas
             center, Seaborne GmbH)
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 25
     EFFECTIVE
General conclusions
 •The synergy potential for biogas and fuel cell systems seems to
 be enormous with view of an sustainable energy supply
 •Using biogas as renewable fuel for FC is a very promising clean
 application. A specific legal framework should promote this
 technology.
 •Biogas - MCFC technology for CHP is in competition with gas
 engines. Justification must be found in environmental issues.
 •Demonstration sites should be set up in different sectors.
 Today a proximity to R&D locations as well as transfer points to
 modern business is preferable
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 26
… EFFECTIVE publishes a book !
                                                                                 •ISBN 3-85487-626-2
 3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
 © PROFACTOR 2006 Page 27
     Contents
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 28
     Biogas – Fuel Cell applications
Several European demonstration activities…
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 30
     Biogas – Fuel Cell applications
Main applications:…
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 31
     Biogas – Fuel Cells EU RTD projects
MCFC other renewable fuels…
                                                                               BioVision
           Energy supply in form of electricity, heat and cold using high temperature fuel cells
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 32
     Biogas – Fuel Cells EU RTD projects
MCFC other renewable fuels…
                                                                               BioVision
           Energy supply in form of electricity, heat and cold using high temperature fuel cells
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 33
     Biogas – Fuel Cells EU RTD projects
Different biogas qualities for testing a SOFC…
                                                                                BioSOFC
             Design and demonstration of 4 CHP Plants using two 5 kW Solid Oxide Fuel Cells
                  (SOFC) working with landfill gas and biogas from anaerobic digestion
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 34
     Biogas – Fuel Cells EU RTD projects
Different biogas qualities for testing a SOFC…
                                                                                BioSOFC
             Design and demonstration of 4 CHP Plants using two 5 kW Solid Oxide Fuel Cells
                  (SOFC) working with landfill gas and biogas from anaerobic digestion
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 35
     Biogas – Fuel Cells EU RTD projects
Biogas cleaning and reformer for PEM…
                                                                       Bio-Hydrogen
            Development of a Biogas Reformer for Production of Hydrogen for PEM Fuel Cells
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 36
     Biogas – Fuel Cells EU RTD projects
Biogas cleaning and reformer for PEM…
                                                                       Bio-Hydrogen
            Development of a Biogas Reformer for Production of Hydrogen for PEM Fuel Cells
                         biological                                 steam
                        H2S- removal                               reformer
                            biological
                            siloxane                               CO-shift
                             removal
                           activated                           CO-removal
                          carbon filter                                                                 5 kW biogas reformer Uni Duisburg
3rd International Workshop on Fuel Cells, WICaC 2006, Campinas/SP/Brazil, October 18 – 19, 2006
© PROFACTOR 2006 Page 37