TM10 Evaluating and Selecting

This document provides a curriculum for a module titled "Estimating cost for Web and database projects". The module aims to guide trainees through understanding project requirements, factors influencing cost estimation, employing various cost estimation methods, breaking down cost components, and using tools to estimate costs for website and database projects. The curriculum covers these topics over 6 units spanning 60 hours. It was prepared by the Ministry of Labor and Skills of Ethiopia in November 2023.

Uploaded by

Cherinet dubale
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
65 views94 pages

TM10 Evaluating and Selecting

This document provides a curriculum for a module titled "Estimating cost for Web and database projects". The module aims to guide trainees through understanding project requirements, factors influencing cost estimation, employing various cost estimation methods, breaking down cost components, and using tools to estimate costs for website and database projects. The curriculum covers these topics over 6 units spanning 60 hours. It was prepared by the Ministry of Labor and Skills of Ethiopia in November 2023.

Uploaded by

Cherinet dubale
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 94

Web Development and Database

Administration Level IV
Based on November, 2023 Curriculum Version-II

Module Title: Estimating cost for Web and database


projects
Module code: EIS WDDBA4 10 0323
Nominal duration: 60 hours

Prepared by: Ministry of Labor and Skill

November, 2023

Addis Ababa, Ethiopia


Table of Contents
Acknowledgment.................................................................................................................................... 1

Acronym ................................................................................................................................................. 1

Introduction to the module .................................................................................................................... 2

Unit One: Introduction to Project Cost Estimation ................................................................................ 4

1.1. Overview of Project Cost Estimation ........................................................................................................ 4

1. 2 Understanding Project Requirements ...................................................................................................... 5

1.3. Key Components of Project Scope Definition: ......................................................................................... 6

Self –check 1 ......................................................................................................................................... 13

Unit Two: Basics of Website and Database Projects .............................................................................. 1

2.1 Understanding Project Scope .................................................................................................................... 2

2.2 Types of Website and Database Projects .................................................................................................. 4

2.3 Differentiating Between Website and Database Components ................................................................. 6

2.4 Project Life Cycle Overview ....................................................................................................................... 9

Self-check 2........................................................................................................................................... 12

Unit Three: Factors Influencing Cost Estimation .................................................................................. 13

3.2. Functional Requirements ......................................................................................................................... 6

3.3. Technology Stack .................................................................................................................................... 10

3.4. Resource Requirements (Human, Technological) .................................................................................. 13

3.5. External Dependencies ........................................................................................................................... 18

3.6. Project Risks and Contingencies ............................................................................................................. 21

Self-check 3........................................................................................................................................... 24

Unit Four Cost Estimation Methods ....................................................................................................... 2

4.1. Expert Judgment ....................................................................................................................................... 2

4.2. Analogous Estimation ............................................................................................................................... 5


Ministry of Labor and Estimate cost for Web Version-II
Page 2 of Skills and database
94 Author/Copyright projects November,
2023
4.3. Parametric Estimation .............................................................................................................................. 8

4.4. Three-Point Estimation ........................................................................................................................... 11

4.5. Bottom-Up Estimation ............................................................................................................................ 14

Self-check 4........................................................................................................................................... 16

Operation sheet 4.1 Cost estimation ..................................................................................................... 2

Unit Five Cost Components Breakdown ................................................................................................. 5

5.1. Development Costs ................................................................................................................................... 6

5.2. Infrastructure Costs .................................................................................................................................. 8

5.3. Maintenance and Support Costs............................................................................................................. 10

5.4. Contingency Costs ................................................................................................................................... 11

Self-Check 5 .......................................................................................................................................... 13

Unit Six Cost Estimation Tools and Techniques...................................................................................... 2

6.1. Project Management Software ................................................................................................................ 3

6.2. Cost Estimation Tools ............................................................................................................................... 4

6.3. Version control system ............................................................................................................................. 5

Self-check 6............................................................................................................................................. 8

Operation sheet 6.1 Cost estimation using Microsoft project ............................................................... 1

Reference ............................................................................................................................................... 4

Developer’s Profile ................................................................................................................................. 6

Ministry of Labor and Estimate cost for Web Version-II


Page 3 of Skills and database
94 Author/Copyright projects November,
2023
Acknowledgment
Ministry of Labor and Skills wish to extend thanks and appreciation to the many representatives
of TVT instructors and respective industry experts who donated their time and expertise to the
development of this Teaching, Training and Learning Materials (TTLM).

Acronym
WBS …………………………………………………Work Breakdown Structure
EVM …………………………………………………Earned Value Management
SLOC …………………………………………………Source Lines of Code
SLA ……………………………………………………Service Level Agreement
SDLC ………………………………………………….Software Development Life Cycle

Ministry of Labor and Estimate cost for Web Version-II


Page 1 of 94 Skills and database projects
Author/Copyright November, 2023
DBMS …………………………………………………Database Management System
HTML …………………………………………………Hypertext transfer protocol
CMS ……………………………………………………Configuration Management System

Introduction to the module


This module explores the intricacies of cost estimation specifically tailored for website and
database projects. It will guide trainees through the process of understanding project
requirements, identifying influencing factors, and employing various estimation models. It
will also provide practical insights into resource and time estimation, different estimation
models, and strategies for monitoring and controlling costs throughout the project lifecycle.
This module covers the units:
 Introduction of Project Cost Estimation
 Basics of Website and Database Projects
 Factors Influencing Cost Estimation
 Cost Estimation Methods
 Cost Components Breakdown
 Cost Estimation Tools and Techniques
Learning outcome
 Understand Project Dynamics
 define Project Scope and Requirements
 Identify Cost Components and Factors:
Ministry of Labor and Estimate cost for Web Version-II
Page 2 of 94 Skills and database projects
Author/Copyright November, 2023
 Break Down Costs into Components:
 Evaluate Technology Stack Impact
 Apply Estimation Methods Effectively
 utilize Tools for Cost Estimation
 Develop Proficiency in Cost Estimation
 Enhance Decision-Making Skills
Module Instruction
For effective use this modules trainees are expected to follow the following module instruction:
1. Read the information written in each unit
2. Accomplish the Self-checks at the end of each unit
3. Perform Operation Sheets which were provided at the end of units

Ministry of Labor and Estimate cost for Web Version-II


Page 3 of 94 Skills and database projects
Author/Copyright November, 2023
Unit One: Introduction to Project Cost Estimation

This unit is developed to provide you the necessary information regarding the following content
coverage and topics:
 Overview of Project Cost Estimation
 Understanding Project Requirements
 Key Components of Project Scope Definition:
 Importance of Accurate Cost Estimation
This unit will also assist you to attain the learning outcomes stated in the cover page.
Specifically, upon completion of this learning guide, you will be able to:
 Identify and comprehend the various components contributing to project costs
 Communicate effectively to collaborate with team members and stakeholders
 Identify project goals, deliverables, constraints, and success criteria.
 Determine the necessary personnel, technology, and other resources needed to meet project
objectives.
 Identify potential risks early in the planning phase.
 Align project deliverables with client expectations, ensuring that the final outcome meets or
exceeds quality standards.

1.1. Overview of Project Cost Estimation


Website project cost estimation involves the process of predicting and calculating the expenses
associated with the development, launch, and maintenance of a website. Accurate cost
estimation is crucial for project planning, budgeting, and ensuring that the project is

Ministry of Labor and Estimate cost for Web Version-II


Page 4 of 94 Skills and database projects
Author/Copyright November, 2023
completed successfully within financial constraints. The overview of website project cost
estimation encompasses various factors and considerations:
Certainly, understanding project requirements is a crucial initial step in the cost estimation
process. This phase involves gathering, analyzing, and documenting the needs and
expectations of stakeholders to form a clear project scope. Here's a detailed description of this
important aspect:

1. 2 Understanding Project Requirements


1.2.1 Gathering Client Requirements
Before any project begins, it's essential to engage in comprehensive discussions with the client or
stakeholders to elicit their expectations and objectives. This involves conducting interviews,
surveys, workshops, and other methods to gather both functional and non-functional
requirements. Functional requirements describe what the system should do, while non-
functional requirements specify how it should perform. Once the requirements are gathered,
the project scope must be defined. This involves outlining the boundaries of the project, what
will be included and excluded, and any constraints that may impact the project's execution. A
well-defined project scope serves as a roadmap for the entire project team, guiding their
efforts and minimizing scope creep.
1.2.2 Identifying Stakeholders
Understanding the various stakeholders involved in the project is crucial. Stakeholders can
include clients, end-users, project managers, developers, and other individuals or groups
affected by the project. Identifying stakeholders and understanding their perspectives helps in
managing expectations and ensures that all relevant voices are considered during the
requirement analysis phase.

1.2.3 Establishing Clear Objectives


Clear and measurable project objectives are essential for successful cost estimation. Objectives
should align with the overall goals of the organization and provide a basis for evaluating
project success. Establishing SMART (Specific, Measurable, Achievable, Relevant, Time-
bound) objectives helps in creating a shared understanding among team members and
stakeholders.
1.2.4 Documenting Requirements
Ministry of Labor and Estimate cost for Web Version-II
Page 5 of 94 Skills and database projects
Author/Copyright November, 2023
Thorough documentation of gathered requirements is a critical aspect of this phase. This
documentation becomes the basis for all subsequent project activities, including cost
estimation. Requirements documents typically include a detailed description of functionalities,
user stories, use cases, data models, and any other relevant information. This documentation
ensures that all team members have a common understanding of the project's goals.
1.2.5 Iterative Nature of Requirement Analysis
Requirements analysis is often an iterative process. As the project progresses, new insights may
emerge, and adjustments to the initial requirements may be necessary. Therefore, it's
important to recognize that the understanding of project requirements may evolve, and the
documentation should be flexible enough to accommodate changes while maintaining clarity
and alignment with project objectives.
Understanding project requirements lays the groundwork for accurate cost estimation by
providing a clear picture of what needs to be achieved. The subsequent chapters will build
upon this foundation, exploring how these requirements influence project complexity,
resource allocation, and ultimately, cost estimation.

1.3. Key Components of Project Scope Definition:


1.3.1 Project Objectives:
The project objective related to a website outlines the overarching goal or purpose of the website
development project. It serves as a guiding principle that directs the efforts of the project team
and aligns the project with the broader organizational or business objectives. Here's a detailed
explanation of the elements and considerations associated with defining project objectives for
a website:
 Clarity and Specificity:
 Importance: The project objective should be clear, specific, and easily understood by
all stakeholders.
 Example: "Develop an e-commerce website to facilitate online sales of our product
catalog."
 Alignment with Organizational Goals:
 Importance: Ensure that the website project aligns with the overall goals and strategic
objectives of the organization.

Ministry of Labor and Estimate cost for Web Version-II


Page 6 of 94 Skills and database projects
Author/Copyright November, 2023
 Example: "Increase online sales by providing a user-friendly platform that enhances
the customer shopping experience."
 Target Audience and User Experience:
 Importance: Identify the intended audience for the website and emphasize the
importance of a positive user experience.
 Example: "Create a website that caters to our target demographic, offering intuitive
navigation and a visually appealing interface."
 Measurable Outcomes:
 Importance: Define specific, measurable outcomes that will indicate the success of
the project.
 Example: "Achieve a 20% increase in online sales within the first year of the website
launch."
 Functionality and Features:
 Importance: Clearly outline the desired features and functionalities of the website.
 Example: "Implement a product catalog, user account management, secure payment
gateway, and real-time order tracking."
 Timeline and Deadline:
 Importance: Specify the timeframe for the project and the deadline for the website
launch.
 Example: "Complete website development within six months, with a launch
scheduled for [end date]."
 Scalability and Future Growth:
 Importance: Consider the scalability of the website to accommodate future growth
and additional features.
 Example: "Design the website architecture to easily integrate new products and
features as the business expands."
 Brand Image and Messaging:
 Importance: Address how the website contributes to the organization's brand image
and conveys key messaging.
 Example: "Ensure that the website reflects our brand identity, values, and
communicates our commitment to quality."

Ministry of Labor and Estimate cost for Web Version-II


Page 7 of 94 Skills and database projects
Author/Copyright November, 2023
 Mobile Responsiveness:
 Importance: Acknowledge the prevalence of mobile users and emphasize the
importance of a responsive design.
 Example: "Optimize the website for mobile devices to provide a seamless experience
across different screen sizes."
 Compliance and Security:
 Importance: Highlight the need for compliance with industry standards and the
implementation of robust security measures.
 Example: "Ensure that the website adheres to relevant data protection regulations and
incorporates SSL encryption for secure transactions."
 Analytics and Performance Metrics:
 Importance: Emphasize the importance of implementing analytics tools to track
website performance and user behavior.
 Example: "Integrate Google Analytics to monitor website traffic, user engagement,
and conversion rates."
 Collaboration and Communication:
 Importance: Stress the need for effective collaboration and communication among
team members and stakeholders.
 Example: "Establish regular communication channels and collaborative tools to
ensure transparency and timely feedback throughout the project."
Defining project objectives related to a website is a critical step in providing a clear direction for
the project team and aligning the website development effort with broader organizational
goals. These objectives guide decision-making throughout the project lifecycle and help
measure the success of the website upon completion.
 Deliverables:
 Enumerate the tangible outputs or results that the project will produce.
 Example: "Website with product catalog, user registration, shopping cart functionality,
and secure payment gateway."
Features and Functionality:
 Specify the features and functionalities the final product should have.

Ministry of Labor and Estimate cost for Web Version-II


Page 8 of 94 Skills and database projects
Author/Copyright November, 2023
 Example: "User account management, product search, order tracking, and mobile
responsiveness."
 Project Exclusions:
 Define what is explicitly not included in the project to manage expectations.
 Example: "Social media integration and third-party API connections are not within the
scope of this project."
 Constraints:
 Identify limitations or restrictions that may impact the project.
 Example: "Budget constraints limit the use of premium third-party plugins; the website
must be compatible with current browsers."
 Assumptions:
 Document assumptions made during project planning.
 Example: "It is assumed that the hosting provider will maintain 99.9% uptime for the
website."
 Acceptance Criteria:
 Clearly define the criteria that must be met for the project to be considered successful.
 Example: "Website performance must meet or exceed industry standards, and all
features should be bug-free."
 Stakeholder Identification:
 Identify and list all stakeholders involved in or affected by the project.
 Example: "Stakeholders include the project sponsor, end users, marketing team, and IT
support."
Project Timeline:
 Outline the project schedule, including key milestones and deadlines.
 Example: "The project is scheduled to start on [start date] and conclude with the
website launch on [end date]."
1.3.2 Importance of Project Scope Definition:
 Clarity and Understanding:
 Provides a clear and shared understanding of what the project aims to achieve.
 Scope Control:
 Helps prevent scope creep by defining what is and isn't part of the project.

Ministry of Labor and Estimate cost for Web Version-II


Page 9 of 94 Skills and database projects
Author/Copyright November, 2023
 Risk Management:
 Facilitates the identification of potential risks and uncertainties early in the project.
 Resource Planning:
 Enables effective resource allocation and planning based on project requirements.
 Communication:
 Serves as a communication tool to align all stakeholders on project expectations.
 Baseline for Measurement:
 Establishes a baseline for project success and criteria against which performance can
be measured.
Project scope definition is typically documented in a project scope statement, a formal document
that outlines the project's boundaries and parameters. It should be reviewed and agreed upon
by all relevant stakeholders to ensure a shared understanding and commitment to the project's
goals. Regular updates may be necessary as project requirements evolve during the course of
the project.
1.4 Importance of Accurate Cost Estimation
Accurate cost estimation is crucial for the success of website and database projects. It serves as a
foundational element in project planning, allowing organizations to allocate resources
effectively, manage budgets, and make informed decisions throughout the project lifecycle.
Here are several key reasons highlighting the importance of accurate cost estimation:
 Budget Planning and Allocation:
 Importance: Accurate cost estimation provides the basis for creating realistic project budgets.
 Impact: Enables organizations to allocate resources appropriately, preventing budget
overruns and ensuring financial stability throughout the project.
 Resource Management:
 Importance: Helps organizations allocate human resources, technology, and other assets
effectively.
 Impact: Ensures that the right skills and resources are available at each phase of the project,
optimizing productivity and minimizing bottlenecks.
 Risk Mitigation:
 Importance: Accurate cost estimation includes identifying and mitigating potential risks.

Ministry of Labor and Estimate cost for Web Version-II


Page 10 of 94 Skills and database projects
Author/Copyright November, 2023
 Impact: Allows for proactive risk management, reducing the likelihood of unforeseen
expenses and project disruptions.
 Project Planning and Scheduling:
 Importance: Provides a foundation for developing realistic project schedules.
 Impact: Facilitates better planning, helping teams adhere to timelines and deliver the
project on schedule.
 Stakeholder Communication:
 Importance: Accurate cost estimates aid in transparent communication with stakeholders.
 Impact: Builds trust by providing stakeholders with a clear understanding of the financial
aspects of the project, fostering collaboration and support.
 Decision-Making:
 Importance: Informs decision-making throughout the project lifecycle.
 Impact: Enables informed choices regarding project scope, features, and trade-offs,
ensuring that decisions align with budget constraints.

 Competitive Advantage:
 Importance: Accurate cost estimation allows organizations to competitively price their
services or products.
 Impact: Enhances competitiveness in the market by offering realistic and attractive
pricing without compromising profitability.
 Quality Assurance:
 Importance: A well-estimated budget supports the implementation of quality assurance
measures.
 Impact: Ensures that adequate resources are allocated for testing and quality control,
preventing issues that may lead to additional costs later in the project.
 Client and Stakeholder Satisfaction:
 Importance: Accurate cost estimates contribute to client and stakeholder satisfaction.
 Impact: Minimizes the risk of unexpected costs and scope changes, leading to a more
positive project experience for all involved parties.
 Project Success Metrics:

Ministry of Labor and Estimate cost for Web Version-II


Page 11 of 94 Skills and database projects
Author/Copyright November, 2023
 Importance: The accuracy of cost estimation is a key metric for evaluating project
success.
 Impact: Provides a benchmark against which the project's financial performance can be
measured, helping organizations learn and improve for future projects.
 Funding and Investment Decisions:
 Importance: Accurate cost estimates support funding and investment decisions.
 Impact: Influences the decision-making of stakeholders, investors, and financial
institutions, facilitating project financing and investment.
 Client Expectations Management:
 Importance: Accurate cost estimation helps manage client expectations.
 Impact: Allows organizations to set realistic expectations regarding project deliverables
and costs, minimizing the risk of dissatisfaction.
In summary, accurate cost estimation is fundamental to the success of website and database
projects. It ensures financial stability, effective resource allocation, and informed decision-
making, ultimately contributing to the achievement of project objectives and client
satisfaction.

Ministry of Labor and Estimate cost for Web Version-II


Page 12 of 94 Skills and database projects
Author/Copyright November, 2023
Self –check 1
Part I: Write true if the statement is correct and false if it wrong
1. Accurate cost estimation is primarily essential for project planning, budgeting, and ensuring
successful project outcomes.
2. Project scope definition involves specifying tangible outputs, features, and functionalities, as well
as identifying project exclusions, constraints, and assumptions.
3. Iterative nature in requirement analysis acknowledges that project requirements may evolve as the
project progresses, necessitating flexible documentation.
4. Stakeholder communication is one of the key impacts of accurate cost estimation, aiding in
building trust and fostering collaboration throughout the project.
5. The project scope statement is a formal document outlining the project's boundaries and
parameters, reviewed and agreed upon by relevant stakeholders to ensure a shared understanding
and commitment to project goals
.Part II: Choose the best answer
1. Which of the following is a key component of project scope definition?
a. Risk Mitigation c. Iterative Nature
b. Stakeholder Identification d.BudgetPlanning
2. What is the primary purpose of establishing clear project objectives?
a. Enhancing Stakeholder d. Facilitating Iterative Analysis
Communication
b. Aligning with Organizational Goals
c. Managing Resource Allocation
3. In the context of website and database projects, what does project scope definition help prevent?
a. Budget Overruns c. Iterative Nature
b. Stakeholder Communication d. Risk Mitigation
4. Why is the iterative nature of requirement analysis crucial in project development?
a. To prevent scope creep c. To align with organizational goals
b. To establish clear project objectives d. To facilitate budget planning
5. What role does accurate cost estimation play in project success metrics?
a. Facilitating Iterative Analysis c. Providing a Baseline for Measurement
b. Building Stakeholder Communication d. Enhancing Competitive Advantage

Ministry of Labor and Estimate cost for Web Version-II


Page 13 of 94 Skills and database projects
Author/Copyright November, 2023
Unit Two: Basics of Website and Database Projects

This unit is developed to provide you the necessary information regarding the following
content coverage and topics:
 Understanding Project Scope
 Types of Website and Database Projects
 Differentiating Between Website and Database Components
 Project Life Cycle Overview
This unit will also assist you to attain the learning outcomes stated in the cover page.
Specifically, upon completion of this learning guide, you will be able to:
 Understanding of the basic concepts and components of website and database projects.
 Distinguish between the elements specific to websites and databases, understanding
their roles and interactions in a project.
 Comprehend the various phases of a website and database project lifecycle
 Identify and categorize key cost components involved in website and database projects
 Understand how to efficiently allocate resources, including personnel, technology, and
infrastructure, to meet project requirements.

Ministry of Labor and Estimate cost for Web Version-II


Page 1 of 94 Skills and database projects
Author/Copyright November, 2023
2.1Understanding Project Scope
The project scope plays a crucial role in the cost estimation process for both website and
database projects. It defines the boundaries of the project, outlining what is included and
excluded, and provides the necessary details for accurately estimating the costs associated
with development, implementation, and maintenance. Here's how project scope
influences cost estimation in website and database projects:
2.1.1 Role of Project Scope in Website Cost Estimation:
 Determining Features and Functionalities:
 Role: The project scope defines the features and functionalities that the website
will have.
 Impact on Cost Estimation: The more complex and extensive the features, the
higher the development and testing cost. Each feature requires time and resources,
impacting the overall budget.
 Identifying Design Requirements:
 Role: The scope outlines design requirements, including the visual elements and
user interface.
 Impact on Cost Estimation: A highly customized and visually appealing design
may involve additional design and development efforts, affecting the overall cost.
 Technology Stack and Infrastructure:
 Role: The scope specifies the technology stack and infrastructure requirements.
 Impact on Cost Estimation: The choice of technologies and hosting options
influences costs. Some technologies or hosting services may have licensing fees
or higher operational costs.
 User Roles and Permissions:
 Role: The scope defines user roles and their permissions.
 Impact on Cost Estimation: Implementing role-based access control (RBAC)
and user authentication systems may require additional development efforts,
impacting costs.
 Mobile Responsiveness:
 Role: The scope determines whether the website needs to be mobile-responsive.

Ministry of Labor and Estimate cost for Web Version-II


Page 2 of 94 Skills and database projects
Author/Copyright November, 2023
 Impact on Cost Estimation: Developing a responsive design requires additional
consideration and testing, affecting development costs.
 Integration with Third-Party Services:
 Role: The scope identifies any third-party services or integrations.
 Impact on Cost Estimation: Integration with third-party services may involve
additional development work and potential licensing costs, influencing the
budget.
 Legal and Compliance Requirements:
 Role: The scope includes legal and compliance considerations.
 Impact on Cost Estimation: Ensuring legal compliance may involve legal
consultation and additional development efforts to implement privacy features,
affecting costs.
 Maintenance and Support:
 Role: The scope may include post-launch maintenance requirements.
 Impact on Cost Estimation: Planning for ongoing maintenance and support is
crucial and affects the long-term costs of the website.
2.1.2 Role of Project Scope in Database Cost Estimation:
 Database Design and Complexity:
 Role: The project scope outlines the database design and complexity.
 Impact on Cost Estimation: A more complex database structure may require
additional development and optimization efforts, influencing costs.
 Data Modeling and Normalization:
 Role: The scope includes data modeling and normalization requirements.
 Impact on Cost Estimation: Applying normalization principles may increase
development time but can enhance data integrity, impacting costs.
 Query Language (SQL) Requirements:
 Role: The scope specifies the use of SQL for database interactions.
 Impact on Cost Estimation: Writing and optimizing SQL queries may require
additional development efforts, influencing costs.
 Indexing and Performance Optimization:

Ministry of Labor and Estimate cost for Web Version-II


Page 3 of 94 Skills and database projects
Author/Copyright November, 2023
 Role: The scope may include requirements for indexing and performance
optimization.
 Impact on Cost Estimation: Implementing indexing and optimizing performance
may require additional development and testing efforts.
 Security Measures:
 Role: The scope outlines security measures for the database.
 Impact on Cost Estimation: Implementing robust security features, such as
encryption and access controls, may incur additional development costs.
 Integration with Applications:
 Role: The scope identifies integration requirements with other applications.
 Impact on Cost Estimation: Integrating the database with other systems may
require additional development efforts and influence costs.
 Scalability Considerations:
 Role: The scope outlines scalability requirements.
 Impact on Cost Estimation: Planning for scalability may involve additional
development and architectural considerations, impacting costs.
 Compliance and Regulations:
 Role: The scope addresses compliance with industry-specific regulations.
 Impact on Cost Estimation: Ensuring compliance may involve additional
development efforts and potential legal consultation, affecting costs.
In both website and database projects, the project scope serves as a blueprint for cost estimation. The
more detailed and comprehensive the scope, the more accurate the cost estimation can be,
leading to better project planning and resource allocation. Regular reviews and updates to the
project scope are crucial to adapting to changes and ensuring that the cost estimation remains
aligned with the evolving project requirements.

2.2 Types of Website and Database Projects


2.2.1 Static Websites vs. Dynamic Websites
A. Static Websites
Static websites consist of fixed content that doesn't change unless manually updated. They
are suitable for simple online presence and are often built using HTML and CSS. Cost

Ministry of Labor and Estimate cost for Web Version-II


Page 4 of 94 Skills and database projects
Author/Copyright November, 2023
estimation for static websites is generally lower, as they require less development effort
and ongoing maintenance.
B. Dynamic Websites
Dynamic websites, on the other hand, utilize server-side technologies like PHP, Python, or
Node.js to generate content dynamically. They often involve databases to store and
retrieve data, allowing for interactive and personalized user experiences. Dynamic
websites are more complex, requiring a higher level of development expertise and,
consequently, a higher cost.
2.2.2 E-commerce Platforms
 Overview
E-commerce projects involve the development of online stores where businesses can sell
products or services. These platforms include features like product listings, shopping
carts, and secure payment gateways. The complexity and cost of an e-commerce project
depend on factors such as the number of products, payment integrations, and security
requirements.
 Considerations
Cost estimation for e-commerce projects should account for functionalities like inventory
management, order processing, and user account management. Security measures, such
as SSL certificates and compliance with payment card industry standards, also contribute
to the overall cost.
2.2.3 Content Management Systems (CMS)
 Overview
CMS projects involve the development of systems that enable users to create, manage, and
publish digital content on the web. Popular CMS platforms include WordPress, Drupal,
and Joomla. The cost of CMS projects depends on customization requirements, the
complexity of content structures, and integration with third-party plugins.
 Customization and Integration
Customizing the design and functionality of a CMS, as well as integrating it with other
systems or databases, can significantly impact the project's cost. Content-heavy websites
with intricate publishing workflows may also require more advanced CMS solutions.
2.2.4 Custom Database Applications

Ministry of Labor and Estimate cost for Web Version-II


Page 5 of 94 Skills and database projects
Author/Copyright November, 2023
 Overview
Custom database applications involve the development of bespoke software solutions that
rely on databases to store, retrieve, and manipulate data. These projects are diverse and
can include customer relationship management (CRM) systems, inventory management
systems, and more. The cost estimation for custom database applications depends on the
complexity of data structures, user interfaces, and business logic.
 Database Considerations
The choice of the database system (e.g., MySQL, PostgreSQL, MongoDB) and the design of
the database schema influence the project's complexity and cost. Scalability requirements
and data security measures also play a significant role in determining the overall project
budget.
Understanding the specific characteristics of each type of project is crucial for accurate cost
estimation. The subsequent chapters will explore the factors that influence the cost of
these projects, providing readers with insights into the nuances of estimating expenses for
various website and database development endeavors.
2.3 Differentiating Between Website and Database Components
Websites and databases are integral components of modern information systems, and they
serve distinct but interconnected purposes. Let's differentiate between the components of
websites and databases. The differentiation between website and database components is
crucial for accurate cost estimation in a web development project. Each component has
its own set of considerations that impact the overall project budget. Here's a breakdown
of how differentiating between website and database components affects cost estimation:
2.3.1 Website Components and Cost Estimation:
 User Interface (UI) and Frontend Development:
 Cost Impact: Design complexity, interactive elements, and responsiveness
influence frontend development costs.
 Considerations: High-quality design and intricate frontend functionalities may
require more development time and resources.
 Backend Development:
 Cost Impact: The choice of backend technologies, complexity of business logic,
and integration with other systems affect costs.

Ministry of Labor and Estimate cost for Web Version-II


Page 6 of 94 Skills and database projects
Author/Copyright November, 2023
 Considerations: More sophisticated features and functionalities on the server
side may require additional development effort.
 Web Server and Hosting:
 Cost Impact: Hosting services, server specifications, and scalability requirements
influence costs.
 Considerations: High-traffic websites or those with specific performance needs
may require more robust and potentially expensive hosting solutions.
 Content Management System (CMS):
 Cost Impact: The choice of a CMS (if used) may have licensing fees or
customization costs.
 Considerations: Customizing or extending a CMS to meet specific requirements
can impact development costs.
 Mobile Responsiveness:
 Cost Impact: Ensuring mobile responsiveness adds development and testing
costs.
 Considerations: The complexity of adapting the website to various screen sizes
and devices affects the budget.
 Integration with Third-Party Services:
 Cost Impact: Integrations with external services may have associated costs or
require additional development effort.
 Considerations: Access to certain APIs or third-party services may have
associated fees.
 Security Measures:
 Cost Impact: Implementing robust security features incurs additional
development and testing costs.
 Considerations: Security measures, such as encryption and secure authentication,
are crucial but may require extra resources.
 Legal and Compliance:
 Cost Impact: Ensuring legal compliance may involve legal consultation and
additional development efforts.

Ministry of Labor and Estimate cost for Web Version-II


Page 7 of 94 Skills and database projects
Author/Copyright November, 2023
 Considerations: Compliance with data protection laws may influence the overall
project budget.

2.3.2 Database Components and Cost Estimation:


 Database Management System (DBMS):
 Cost Impact: Licensing fees, if applicable, and the choice of DBMS can impact
costs.
 Considerations: Some advanced features of certain DBMS may have associated
costs.
 Data Model and Database Design:
 Cost Impact: The complexity of the data model and the design process affect
costs.
 Considerations: A well-designed, normalized database may require more upfront
effort but can enhance efficiency in the long run.
 Query Language and Indexing:
 Cost Impact: Writing and optimizing queries may require additional
development effort.
 Considerations: Efficient queries and proper indexing contribute to better
performance but may involve extra development work.
 Security and Access Controls:
 Cost Impact: Implementing security measures involves development effort and
potential additional costs for specialized security features.
 Considerations: Access controls, encryption, and auditing may require additional
resources.
 Backup and Recovery:
 Cost Impact: Establishing backup and recovery mechanisms may have
associated costs.
 Considerations: Regular backup procedures and testing recovery processes may
involve additional efforts.
 Transactions and ACID Compliance:

Ministry of Labor and Estimate cost for Web Version-II


Page 8 of 94 Skills and database projects
Author/Copyright November, 2023
 Cost Impact: Ensuring transactional integrity may require additional
development effort.
 Considerations: ACID compliance contributes to data consistency but may
involve more development resources.
 Scalability Considerations:
 Cost Impact: Planning for scalability involves architectural considerations and
potential additional costs.
 Considerations: Choosing scalable technologies and designing for future growth
may influence the budget.
 Compliance and Regulations:
 Cost Impact: Ensuring compliance with industry regulations may involve legal
consultation and additional development effort.
 Considerations: Compliance with specific standards may add complexity and
cost to the project.
In summary, understanding the specific components of websites and databases and their associated
costs is vital for accurate cost estimation. Factors such as technology choices, development
complexity, scalability needs, and legal considerations significantly impact the overall budget for
a web development project. Regularly reviewing and updating the cost estimates throughout the
project lifecycle ensures that any changes or additions to the scope are appropriately reflected in
the budget.

2.4 Project Life Cycle Overview


The project life cycle provides a framework for managing and executing projects from
initiation to closure. Cost estimation is an integral part of each phase, helping
stakeholders plan and allocate resources effectively. Here's an overview of the project life
cycle from the perspective of website and database project cost estimation:
2.4.1 Initiation Phase:
 Overview:
 Define the project goals, scope, and objectives.
 Identify key stakeholders and establish project feasibility.
 Cost Estimation Considerations:
 High-level cost estimates based on initial project requirements.
Ministry of Labor and Estimate cost for Web Version-II
Page 9 of 94 Skills and database projects
Author/Copyright November, 2023
 Preliminary identification of major cost drivers for both website and database
components.
2.4.2 Planning Phase:
 Overview:
 Develop a detailed project plan, including tasks, timelines, and resource
requirements.
 Identify risks and develop a risk management plan.
 Define the project scope, deliverables, and acceptance criteria in detail.
 Cost Estimation Considerations:
 Refine cost estimates based on detailed project requirements.
 Break down costs for website and database components separately.
 Consider contingency planning for unforeseen expenses.
2.4.3 Execution (Development) Phase:
 Overview:
 Begin development based on the project plan.
 Regularly monitor and report progress.
 Implement features and functionalities outlined in the scope.
 Cost Estimation Considerations:
 Track actual costs against the planned budget.
 Address any deviations from the initial cost estimates.
 Assess resource usage and adjust estimates if needed.
2.4.4 Monitoring and Controlling Phase:
 Overview:
 Monitor project performance, ensuring that it aligns with the project plan.
 Control changes and address issues promptly.
 Ensure quality control through testing and reviews.
 Cost Estimation Considerations:
 Continuously update and refine cost estimates based on ongoing developments.
 Monitor and manage changes to the scope that may impact costs.
 Evaluate and adjust cost projections based on real-time data.
2.4.5 Closing Phase:

Ministry of Labor and Estimate cost for Web Version-II


Page 10 of 94 Skills and database projects
Author/Copyright November, 2023
 Overview:
 Finalize and deliver the project deliverables.
 Evaluate project success against objectives.
 Complete any remaining documentation and administrative tasks.
 Cost Estimation Considerations:
 Summarize actual costs and compare them against the final budget.
 Conduct a post-project review to identify lessons learned for future cost
estimations.
 Ensure accurate accounting for all project-related expenses.
2.5Additional Considerations for Website Projects:
 User Acceptance Testing (UAT):
 Incorporate UAT costs for testing the website's functionality from the user's
perspective.
 Allocate resources for fixing issues identified during UAT.
 Content Management and Updates:
 Account for ongoing costs related to content updates and management, especially
for projects using a CMS.
 Marketing and Launch:
 Consider costs associated with marketing activities and the launch of the website,
if applicable.
2.6Additional Considerations for Database Projects:
 Data Migration:
 Include costs for migrating existing data to the new database system.
 Plan for data validation and reconciliation during the migration process.
 Training and Documentation:
 Allocate resources for training end-users and creating documentation.
 Include costs for providing ongoing support and addressing user queries.
 Integration Testing:
 Budget for testing the integration between the database and other systems or
applications.
Continuous Improvement:

Ministry of Labor and Estimate cost for Web Version-II


Page 11 of 94 Skills and database projects
Author/Copyright November, 2023
 Post-Implementation Review:
 Conduct a thorough review of the project after implementation to identify areas
for improvement.
 Use insights from the review to enhance future cost estimation processes.
By integrating cost estimation considerations into each phase of the project life cycle,
organizations can achieve more accurate budgeting, better resource allocation, and
improved overall project management for both website and database projects. Regular
updates and adjustments to cost estimates based on real-time data contribute to more
effective decision-making throughout the project.

Self-check 2
Part I: Write true if the statement is correct and false if is wrong.
1. The complexity of features and functionalities in a website project has no impact on
development and testing costs.
2. Dynamic websites, utilizing server-side technologies and databases, generally have lower
development costs compared to static websites.

Ministry of Labor and Estimate cost for Web Version-II


Page 12 of 94 Skills and database projects
Author/Copyright November, 2023
3. In a database project, applying normalization principles to the data model can reduce
development time but may compromise data integrity.
4. The choice of a Database Management System (DBMS) can impact costs, with some
advanced features in certain DBMS incurring additional expenses.
5. Regularly updating and refining cost estimates throughout the project life cycle is essential
for effective decision-making and resource allocation.
Part II: Choose the correct answer
1. Which factor influences the cost of developing a dynamic website utilizing server-side
technologies?
A) Number of static pages C) Use of HTML and CSS
B) Choice of programming languages D) Visual appeal of the design
2. What does the scope in a database project define?
A) User roles and permissions C) Features and functionalities
B) Hosting options D) Database design and complexity
3. Which consideration is relevant to both website and database projects?
A) Mobile responsiveness C) Data modeling and normalization
B) Integration with third-party services D) Compliance with industry regulations
4. In a website project, what does the Execution (Development) phase involve?
A) Finalizing project deliverables D) Implementing features outlined in the
B) Monitoring project performance scope
C) Writing and optimizing SQL queries
5.What is a crucial consideration for cost estimation in both static and dynamic websites?
A) Visual appeal of the design C) Choice of Database Management
B) Complexity of features and System (DBMS)

Unit Three: Factors Influencing Cost Estimation

functionalities D) Integration with third-party services

Ministry of Labor and Estimate cost for Web Version-II


Page 13 of 94 Skills and database projects
Author/Copyright November, 2023
This unit is developed to provide you the necessary information regarding the following content
coverage and topics:
 Project Size and Complexity
 Functional Requirements
 Technology Stack
 Resource Requirements (Human, Technological)
 External Dependencies
 Project Risks and Contingencies
This unit will also assist you to attain the learning outcomes stated in the cover page.
Specifically, upon completion of this learning guide, you will be able to:
 Document and analyze functional requirements for both website and database projects.
 Assess and categorize projects based on size and complexity.
 Recognize the impact of project size and complexity on development time, resource
requirements, and overall costs.
 Understand examples of different project sizes and complexities for both website and
database projects.
 Understand how each functional requirement contributes to development effort and associated
costs.
 Recognize the influence of technology choices on development effort, scalability, and
maintenance costs.
 Understand the impact of project characteristics, functional requirements, and technology
choices on various cost elements.

3.1. Project Size and Complexity:


Project size and complexity are key factors that significantly influence the cost estimation for
both website and database projects. Understanding the size and complexity of a project
Ministry of Labor and Estimate cost for Web Version-II
Page 2 of 94 Skills and database projects
Author/Copyright November, 2023
helps in determining the amount of work, resources, and time required, thereby impacting
the overall cost. Let's explore these factors in detail for both types of projects:
3.1.1 Project Size and Complexity for a Website Project:
1. Small to Medium-Sized Website:
 Description:
 A small to medium-sized website typically includes a limited number of pages
and features.
 It might be a basic corporate website with information about the company,
services, and contact details.
 Influence on Cost:
 Development time is relatively shorter.
 The number of features and functionalities is limited, reducing complexity.
 Design and development efforts are less intensive.
Example:
Consider a small local business that needs a simple website to showcase its products and
provide basic contact information. The website may include a homepage, product pages,
a contact form, and a few additional informational pages.
2.Medium to Large-Sized E-commerce Website:
 Description:
 A medium to large-sized e-commerce website involves a significant number of product
pages, a shopping cart, and secure payment processing.
 Additional features may include user accounts, order tracking, and integration with a
product catalog or inventory management system.
 Influence on Cost:
 Development time increases due to the complexity of implementing e-commerce
features.
 Design and user experience considerations become more intricate.
 Integration with third-party services may be required.
Example:

Ministry of Labor and Estimate cost for Web Version-II


Page 3 of 94 Skills and database projects
Author/Copyright November, 2023
Imagine a mid-sized retail company expanding its business online. The e-commerce website
needs a product catalog, a user-friendly shopping cart, secure payment processing, and
integration with a shipping service for order fulfillment.
3. Large-Scale Portal or Social Platform:
 Description:
 Large-scale websites such as portals or social platforms involve extensive user
interactions, dynamic content, and user-generated content.
 Features may include user profiles, messaging systems, content sharing, and complex
search functionalities.
 Influence on Cost:
 Development time significantly increases due to the complexity of implementing
advanced features.
 Scalability becomes a crucial consideration.
 Comprehensive testing and optimization efforts are required.
Example:
Consider the development of a social networking platform where users can create profiles,
connect with others, share multimedia content, and engage in real-time messaging. The
project's complexity increases with the need for robust user authentication, data privacy
features, and seamless interaction.
3.1.2 Project Size and Complexity for a Database Project:
1. Small to Medium-Sized Database System:
 Description:
 A small to medium-sized database project involves managing a moderate amount of
data with straightforward relationships.
 It may include basic CRUD (Create, Read, Update, Delete) operations and simple
data retrieval.
 Influence on Cost:
 Database design and implementation are relatively straightforward.
 Query optimization may not require extensive efforts.
 Testing and validation are manageable.

Ministry of Labor and Estimate cost for Web Version-II


Page 4 of 94 Skills and database projects
Author/Copyright November, 2023
Example:
Consider a small business that needs a database to store and manage customer information,
purchase history, and inventory. The database design includes tables for customers,
orders, and products with straightforward relationships.
2. Medium to Large-Sized Database System:
 Description:
 A medium to large-sized database project involves handling a significant amount of
data with more complex relationships.
 It may include advanced features like data indexing, stored procedures, and triggers.
 Influence on Cost:
 Database design becomes more intricate, requiring careful consideration of
normalization and indexing.
 Query optimization efforts increase, impacting development time.
 Comprehensive testing and performance tuning are necessary.
Example:
Imagine a medium-sized e-commerce platform with a database that manages a large product
catalog, customer data, and order information. The database design involves multiple
interconnected tables, and the system requires advanced querying for reporting and
analytics.
3.Enterprise-Level Database System:
 Description:
 An enterprise-level database project involves managing extensive datasets with
complex relationships, multiple users, and high transaction volumes.
 It may include features like data warehousing, replication, and distributed
databases.
 Influence on Cost:
 Database design is highly sophisticated, considering scalability and redundancy.
 Advanced security measures, including encryption, are essential.
 Extensive testing, optimization, and ongoing maintenance efforts are required.

Ministry of Labor and Estimate cost for Web Version-II


Page 5 of 94 Skills and database projects
Author/Copyright November, 2023
Example:
Consider an enterprise-level database project for a multinational corporation with a need for
a comprehensive Customer Relationship Management (CRM) system. The database must
handle a vast amount of customer data, support multiple users globally, and ensure high
availability and performance.
Considerations for Cost Estimation:
1. Development Effort:
 The effort required for coding, testing, and debugging increases with project size
and complexity.
2. Resource Allocation:
 Larger and more complex projects may require a larger development team with
specialized skills, influencing labor costs.
3. Infrastructure and Technology:
 Advanced features and scalability requirements may necessitate specific
infrastructure and technologies, impacting costs.
4. Testing and Quality Assurance:
 Comprehensive testing efforts, including unit testing, integration testing, and user
acceptance testing, are essential for larger and more complex projects.
5. Project Management:
 The complexity of project management increases with project size, requiring more
sophisticated planning, monitoring, and coordination efforts.
Understanding the nuances of project size and complexity is crucial for accurate cost
estimation. Regularly revisiting and updating cost estimates throughout the project life
cycle ensures that the budget aligns with the evolving requirements and challenges of the
project.

3.2. Functional Requirements


Functional requirements are specifications that outline the specific features, capabilities, and
behaviors that a system, such as a website or database, must exhibit to meet the needs of
its users. These requirements serve as a foundation for project planning, design,
development, and testing. Clear and well-defined functional requirements are essential

Ministry of Labor and Estimate cost for Web Version-II


Page 6 of 94 Skills and database projects
Author/Copyright November, 2023
for accurate cost estimation. Let's explore functional requirements in detail with
examples for both website and database projects:
3.2.1 Functional Requirements for a Website Project:
1. User Authentication:
 Description: Users should be able to create accounts, log in, and manage their
profiles securely.
 Example: Users can register on the website using a valid email address and
password. Once registered, they can log in and update their profile information.
2. Content Management System (CMS):
 Description: If applicable, the website may require a CMS for easy content updates
and management.
 Example: Admin users should be able to log in to the CMS, create, edit, or delete
content pages, and manage multimedia assets.
3. Search Functionality:
 Description: Users should be able to search for specific information or products
within the website.
 Example: A search bar on the website allows users to enter keywords, and the
system returns relevant search results.
4. E-commerce Functionality:
 Description: For e-commerce websites, users should be able to browse products,
add items to a shopping cart, and complete secure transactions.
 Example: Users can view a product catalog, add items to the cart, proceed to
checkout, and make payments securely.
5. Responsive Design:
 Description: The website should be accessible and usable on various devices,
including desktops, tablets, and mobile phones.
 Example: The website layout adjusts dynamically based on the screen size,
providing an optimal viewing experience.
6. User Feedback and Reviews:
 Description: Users should be able to leave feedback, ratings, and reviews for
products or services.

Ministry of Labor and Estimate cost for Web Version-II


Page 7 of 94 Skills and database projects
Author/Copyright November, 2023
 Example: After making a purchase, users can rate the product and leave a review,
contributing to the overall user feedback.
7. Notification System:
 Description: Users may receive notifications for important events or updates.
 Example: Users receive email notifications for order confirmations, shipping
updates, and other relevant information.
8. Integration with Third-Party Services:
 Description: The website may need to integrate with external services such as
payment gateways, social media, or analytics tools.
 Example: Social media sharing buttons on product pages allow users to share their
favorite products on their social accounts.
3.2.2 Functional Requirements for a Database Project:
1. Data Storage and Retrieval:
 Description: The database should efficiently store and retrieve data as needed by the
application.
 Example: A database table named "Products" stores information such as product
ID, name, description, price, and inventory.
2. User Authentication and Authorization:
 Description: The database should support user authentication and authorization
mechanisms.
 Example: User credentials are stored securely in the database, and access to certain
tables or data is restricted based on user roles.
3. Data Validation and Integrity:
 Description: The database should enforce data integrity rules and validate input to
maintain accurate and consistent data.
 Example: The database ensures that only valid data is stored, and constraints
prevent the entry of incorrect or incomplete information.
4. Indexing for Performance:
 Description: Indexes should be created to optimize data retrieval performance.
 Example: An index is created on the "Date" column of a table to speed up queries
that involve date-based filtering.

Ministry of Labor and Estimate cost for Web Version-II


Page 8 of 94 Skills and database projects
Author/Copyright November, 2023
5. Transaction Management:
 Description: The database should support transactions to maintain the consistency
of the data.
 Example: When a user places an order, the database ensures that both the order
details and the inventory are updated atomically as part of a transaction.
6. Backup and Recovery:
 Description: Regular backups of the database should be performed to prevent data
loss and facilitate recovery.
 Example: Daily automated backups are created, and a recovery plan is in place to
restore the database to a specific point in time if needed.
7. Scalability:
 Description: The database architecture should be designed to handle increased data
volume and user load.
 Example: The database is designed with shading or partitioning strategies to
distribute data across multiple servers for scalability.
8. Logging and Auditing:
 Description: The database should log relevant events and activities for auditing
purposes.
 Example: An audit log records every change made to sensitive data, including the
user who made the change and the timestamp.
9. Integration with Application Logic:
 Description: The database interacts seamlessly with the application's backend logic.
 Example: Stored procedures or triggers are used to enforce complex business rules
within the database.
Considerations for Cost Estimation:
1. Development Effort:
 The complexity of implementing each functional requirement affects development
effort and, subsequently, costs.
2. Technology Stack:
 Certain features may require specific technologies or tools, impacting technology-
related costs.

Ministry of Labor and Estimate cost for Web Version-II


Page 9 of 94 Skills and database projects
Author/Copyright November, 2023
3. Testing and Quality Assurance:
 Each functional requirement necessitates testing efforts to ensure proper
functionality, adding to quality assurance costs.
4. Integration with External Services:
 Integration with third-party services may involve additional development effort and
potential licensing costs.
5. Scalability Considerations:
 The need for scalability influences the choice of database architecture and may
impact infrastructure costs.
6. Data Security and Compliance:
 Features related to user authentication, data encryption, and audit logging contribute
to data security and compliance, impacting development and maintenance costs.
7. Documentation and Training:
 Comprehensive documentation and training efforts are required to support the
implementation and maintenance of functional requirements.
8. Ongoing Maintenance and Support:
 The complexity of features affects ongoing maintenance costs, including bug fixes,
updates, and support activities.
By thoroughly documenting and understanding the functional requirements for a website or
database project, project stakeholders can make more accurate assessments of the
resources and efforts required. Regularly revisiting and updating cost estimates based on
any changes or additions to functional requirements ensures that the budget remains
aligned with project goals.

3.3. Technology Stack


The technology stack, often referred to as the tech stack, is a combination of software tools,
programming languages, frameworks, libraries, and other components that developers use
to build and operate a web application or a database system. The choice of a technology
stack significantly influences project development, scalability, and maintenance costs.
Let's explore the technology stack in detail for both website and database projects:
3.3.1 Technology Stack for a Website Project:
Ministry of Labor and Estimate cost for Web Version-II
Page 10 of 94 Skills and database projects
Author/Copyright November, 2023
1. Frontend (Client-Side):
 HTML, CSS, JavaScript:
 Description: HTML for markup, CSS for styling, and JavaScript for dynamic
client-side interactions.
 Example: Building the structure, layout, and interactivity of web pages.
 Frontend Frameworks:
 Example: React.js, Angular, Vue.js.
 Description: Frontend frameworks simplify development, enhance modularity,
and improve user interface interactions.
 Responsive Design:
 Example: Bootstrap, Foundation.
 Description: Frameworks that facilitate the creation of responsive and mobile-
friendly web pages.
2. Backend (Server-Side):
 Server-Side Scripting:
 Example: Node.js (JavaScript), Python (Django, Flask), Ruby (Ruby on Rails),
PHP.
 Description: Executes on the server, handling business logic, database
interactions, and serving requests.
 Backend Frameworks:
 Example: Express.js (Node.js), Django (Python), Ruby on Rails (Ruby), Laravel
(PHP).
 Description: Frameworks expedite backend development, providing structure and
common functionalities.
3. Database:
 Relational Database Management System (RDBMS):
 Example: MySQL, PostgreSQL, Microsoft SQL Server.
 Description: Organizes data into tables with predefined relationships, suitable for
structured data.
 NoSQL Database:
 Example: MongoDB, Cassandra, Firebase.

Ministry of Labor and Estimate cost for Web Version-II


Page 11 of 94 Skills and database projects
Author/Copyright November, 2023
 Description: Suitable for handling unstructured or semi-structured data and
providing flexibility in data storage.
4. Web Server:
 Web Server Software:
 Example: Apache, Nginx, Microsoft Internet Information Services (IIS).
 Description: Handles HTTP requests, forwards them to the application
server, and serves static files.
5.Middleware:
 Authentication and Authorization:
 Example: Passport.js, OAuth.
 Description: Middleware for user authentication and authorization.
 API Middleware:
 Example: Express middleware, Django REST framework.
 Description: Handles API-related functionalities, request parsing, and response
formatting.
6.Content Management System (CMS):
 CMS Platforms:
 Example: WordPress, Joomla, Drupal.
 Description: For websites requiring content management by non-technical users.
7.Version Control:
 Version Control System:
 Example: Git.
 Description: Manages source code versions, facilitates collaboration, and aids in
code deployment.
8.Frontend Build Tools:
 Build Tools:
 Example: Webpack, Parcel.
 Description: Automates tasks like bundling, minification, and transpilation of
frontend code.

9.Testing Frameworks:

Ministry of Labor and Estimate cost for Web Version-II


Page 12 of 94 Skills and database projects
Author/Copyright November, 2023
 Unit Testing:
 Example: Jest (JavaScript), Pytest (Python).
 Description: Ensures individual components function as intended.
 End-to-End Testing:
 Example: Cypress, Selenium.
 Description: Tests the entire application's workflow from end to end.
10.Deployment and Containerization:
 Containerization:
 Example: Docker.
 Description: Packages applications and their dependencies into containers for
consistent deployment.
 Orchestration:
 Example: Kubernetes.
 Description: Manages containerized applications, automates deployment, and
scales applications.
By carefully considering the technology stack for a website or database project, project
stakeholders can make informed decisions that align with project goals, scalability
requirements, and budget constraints. Regularly revisiting and updating cost estimates
based on any changes to the technology stack ensures that the budget remains accurate
and reflective of the evolving project needs.

3.4. Resource Requirements (Human, Technological)


Resource requirements, including human and technological resources, play a crucial role in
the success of website and database projects. Accurate estimation of these resources is
essential for effective project planning and budgeting. Let's explore in detail the human
and technological resource requirements for both types of projects along with examples:
3.4.1 Human Resource Requirements:
1.Project Management:
 Project Manager:
 Responsibilities: Overall project coordination, communication with stakeholders,
risk management.
Ministry of Labor and Estimate cost for Web Version-II
Page 13 of 94 Skills and database projects
Author/Copyright November, 2023
 Example: A certified project manager with experience in web development or
database projects.
 Scrum Master (Agile Projects):
 Responsibilities: Facilitates agile development processes, ensures team
adherence to agile principles.
 Example: A certified Scrum Master for managing agile development cycles.
2. Development Team:
 Developers:
 Responsibilities: Write code, implement features, and ensure the functionality of
the project.
 Example: Frontend developers (HTML, CSS, JavaScript), Backend developers
(Node.js, Python, Ruby).
 Database Administrators (DBAs):
 Responsibilities: Design and manage the database, ensure data integrity and
security.
 Example: A skilled DBA proficient in the chosen database management system
(e.g., MySQL, PostgreSQL).
 Quality Assurance (QA) Engineers:
 Responsibilities: Test and validate the functionality of the website or database.
 Example: QA engineers using automated and manual testing methods.
 DevOps Engineers:
 Responsibilities: Manage deployment, monitor system performance, and
implement automation.
 Example: DevOps engineers skilled in tools like Docker, Kubernetes, and CI/CD
pipelines.
3.Design and User Experience (UX/UI):
 UX/UI Designers:
 Responsibilities: Design user interfaces, ensure a positive user experience.
 Example: Designers proficient in tools like Adobe XD, Figma, or Sketch.
4.Content Management:
 Content Writers:

Ministry of Labor and Estimate cost for Web Version-II


Page 14 of 94 Skills and database projects
Author/Copyright November, 2023
 Responsibilities: Create and update website content, product descriptions, or
database documentation.
 Example: Content writers with domain knowledge for industry-specific projects.
5. Support and Maintenance:
 Technical Support:
 Responsibilities: Address user queries, troubleshoot issues, and provide technical
support.
 Example: Support specialists with knowledge of the website or database
functionality.
 Maintenance Team:
 Responsibilities: Implement updates, security patches, and ensure the system's
ongoing health.
 Example: Developers or DevOps engineers responsible for system maintenance.
6.Training:
 Trainers:
 Responsibilities: Train end-users, administrators, or support teams on using the
website or database.
 Example: Trainers with expertise in conducting training sessions.
3.4.2 Technological Resource Requirements:
1. Development Tools and Environments:
 Integrated Development Environment (IDE):
Example: Visual Studio Code, PyCharm, Eclipse.
 Description: Developers use IDEs to write, debug, and test code efficiently.
 Version Control System:
Example: Git.
 Description: Manages source code versions and facilitates collaborative development.
2.Programming Languages and Frameworks:
 Frontend Development:
Example: JavaScript, HTML, CSS.
 Description: The core languages for building the user interface, supplemented by
frameworks like React.js or Angular.

Ministry of Labor and Estimate cost for Web Version-II


Page 15 of 94 Skills and database projects
Author/Copyright November, 2023
 Backend Development:
Example: Php,Node.js (JavaScript), Django (Python), Ruby on Rails (Ruby).
 Description: The backend is developed using languages and frameworks that handle
server-side logic.
3. Database Management System (DBMS):
 Relational Database:
Example: MySQL, PostgreSQL.
 Description: Selected based on project requirements for structured data.
 NoSQL Database:
Example: MongoDB, Cassandra.
 Description: Chosen for flexibility with unstructured or semi-structured data.
4.Web Servers and Hosting:
 Web Server Software:
Example: Apache, Nginx.
 Description: Serves web pages and forwards requests to the application server.
 Cloud Hosting Services:
Example: AWS, Azure, Google Cloud.
 Description: Provides scalable infrastructure, storage, and hosting services.
5. Content Management System (CMS):
 CMS Platforms:
Example: WordPress, Drupal.
 Description: If applicable, a CMS simplifies content updates and management.
6. Testing and Quality Assurance:
 Testing Tools:
Example: Jest, Selenium.
 Description: Tools for unit testing, end-to-end testing, and performance testing.
7. Deployment and Containerization:
 Containerization:
Example: Docker.
 Description: Packages applications and dependencies into containers for consistent
deployment.

Ministry of Labor and Estimate cost for Web Version-II


Page 16 of 94 Skills and database projects
Author/Copyright November, 2023
 Orchestration:
Example: Kubernetes.
 Description: Manages containerized applications, automates deployment, and scales
applications.
8. Monitoring and Analytics:
 Monitoring Tools:
Example: Prometheus, Grafana.
 Description: Monitors system performance and resource usage.
 Analytics Tools:
Example: Google Analytics.
 Description: Tracks user interactions and gathers insights into website usage.
Considerations for Cost Estimation:
1. Licenses and Subscriptions:
 Costs associated with purchasing licenses for specific tools, frameworks, or services.
2. Training and Skill Development:
 Investment in training programs for team members to acquire new skills or
certifications.

3. Hardware and Infrastructure:


 Costs associated with server infrastructure, cloud services, and networking
components.
4. Software and Tooling:
 Expenses for acquiring and maintaining software licenses, development tools, and
third-party services.
5. Support and Maintenance Contracts:
 Costs associated with ongoing support contracts for tools, platforms, or services.
6. Consulting and Outsourcing:
 If applicable, costs for hiring external consultants or outsourcing specific tasks.
7. Continuous Improvement:
 Budget for implementing continuous improvement processes, including adopting new
technologies or tools.

Ministry of Labor and Estimate cost for Web Version-II


Page 17 of 94 Skills and database projects
Author/Copyright November, 2023
8. Contingency and Risk Management:
 Allocation of budget for addressing unforeseen challenges or risks that may impact
resource requirements.
By thoroughly understanding the human and technological resource requirements for a
website or database project, project stakeholders can create more accurate cost estimates.
Regularly revisiting and updating these estimates based on project progress, changes in
requirements, or unexpected challenges ensures that the budget remains realistic and
aligned with the evolving needs of the project.

3.5. External Dependencies


External dependencies in the context of a project refer to the external factors, resources, or
entities that the project relies on but are beyond the direct control of the project team.
These dependencies can significantly impact the project's timeline, cost, and overall
success. Identifying and managing external dependencies is crucial for accurate cost
estimation. Here are some common types of external dependencies and their implications
for cost estimation in website and database projects:
3.5.1 Types of External Dependencies:
1. Third-Party APIs and Services:
Example: Payment gateways, mapping services, authentication services.
 Cost Implications: Integration with third-party services may involve subscription fees,
transaction costs, or licensing fees.
2. External Libraries and Frameworks:
Example: Open-source libraries, frameworks, or plugins.
 Cost Implications: While many libraries are open source, dependencies on commercial
or licensed libraries can incur costs.
3. Regulatory Compliance:
Example: Compliance with data protection regulations (e.g., GDPR), industry standards.
 Cost Implications: Costs associated with legal consultations, audits, and implementing
compliance measures.
4. Infrastructure and Hosting:
Example: Reliance on cloud service providers (e.g., AWS, Azure).

Ministry of Labor and Estimate cost for Web Version-II


Page 18 of 94 Skills and database projects
Author/Copyright November, 2023
 Cost Implications: Costs for infrastructure usage, storage, data transfer, and potential
overage charges.
5. External Teams or Contractors:
Example: Outsourced development teams, consultants, or specialized experts.
 Cost Implications: Contractual fees, hourly rates, and potential additional costs for
changes or extensions.
6. Government Approvals or Permits:
Example: Approvals from regulatory bodies or government agencies.
 Cost Implications: Delays in project timelines may result in increased labor costs and
potential fines.
7. Hardware Dependencies:
Example: Dependence on specific hardware components or devices.
 Cost Implications: Costs associated with purchasing or integrating specific hardware.
8. Data Migration:
Example: Migrating data from legacy systems or external databases.
 Cost Implications: Costs associated with data extraction, transformation, and loading
(ETL) processes.
Cost Estimation Considerations:
1. Integration Costs:
 Integration with external dependencies may require additional development effort,
testing, and troubleshooting.
2. License and Subscription Fees:
 Some external dependencies, such as third-party APIs or libraries, may come with
licensing or subscription fees.
3. Development Timeframes:
 Delays in obtaining approvals, compliance certifications, or external services may lead
to increased development timelines, impacting labor costs.
4. Contingency Planning:
 Allocate budget for unforeseen issues related to external dependencies, such as delays or
unexpected costs.
5. Vendor Relationships:

Ministry of Labor and Estimate cost for Web Version-II


Page 19 of 94 Skills and database projects
Author/Copyright November, 2023
 Building strong relationships with external vendors can help negotiate favorable terms
and potentially reduce costs.
6. Legal and Compliance Costs:
 Compliance with regulations may require legal consultations, audits, and the
implementation of specific measures, contributing to overall project costs.
7. Risk Management:
 Identify and assess potential risks associated with external dependencies to proactively
address challenges and avoid cost overruns.
8. Alternative Solutions:
 Consider the availability of alternative solutions or contingency plans in case external
dependencies pose unexpected challenges.

Mitigation Strategies:
1. Thorough Research and Due Diligence:
 Conduct extensive research on external dependencies to understand potential costs,
limitations, and risks.
2. Clear Communication and Documentation:
 Maintain clear communication with external vendors, teams, or regulatory bodies.
Document agreements, expectations, and dependencies.
3. Regular Monitoring and Updates:
 Continuously monitor external dependencies throughout the project life cycle, updating
cost estimates as needed.
4. Flexibility in Planning:
 Build flexibility into project plans to accommodate potential delays or changes related to
external dependencies.
5. Collaborative Relationships:
 Foster collaborative relationships with external vendors and teams to facilitate smoother
communication and issue resolution.
6. Scenario Planning:
 Develop contingency plans and scenarios to account for different outcomes related to
external dependencies.

Ministry of Labor and Estimate cost for Web Version-II


Page 20 of 94 Skills and database projects
Author/Copyright November, 2023
By understanding the nature of external dependencies and considering their potential impact
on the project, project managers can create more accurate and realistic cost estimates.
Regularly revisiting and updating these estimates as the project progresses and external
factors evolve ensures that the budget remains aligned with the project's needs and
challenges.

3.6. Project Risks and Contingencies


Project risks are uncertainties or potential events that could impact the successful delivery of
a project, including its schedule, budget, and scope. Contingencies are planned responses
to manage or mitigate the impact of these risks. Identifying and addressing risks is crucial
for effective cost estimation in website and database projects. Here are some common
project risks and suggested contingencies:
3.6.1 Project Risks and Contingencies:
1. Technology Risks:
 Risk: Unforeseen challenges or limitations with chosen technologies, tools, or
frameworks.
 Contingency: Conduct thorough technology assessments before the project starts.
Include additional time and budget for learning curves or potential technology
changes.
2. Scope Creep:
 Risk: Uncontrolled expansion of project scope, leading to increased development
effort and costs.
 Contingency: Implement robust change control mechanisms. Clearly define and
document project scope. Regularly communicate with stakeholders to manage
expectations.
3. Requirements Volatility:
 Risk: Frequent changes in project requirements during development.
 Contingency: Conduct thorough requirements analysis before starting development.
Implement a change management process and allocate a contingency budget for
requirement changes.
4. Dependency on External Services:
 Risk: Delays or issues with third-party APIs, services, or external dependencies.
Ministry of Labor and Estimate cost for Web Version-II
Page 21 of 94 Skills and database projects
Author/Copyright November, 2023
 Contingency: Identify alternative services, build in additional time for integration,
and communicate closely with third-party providers. Maintain a contingency fund
for potential delays.
5. Resource Constraints:
 Risk: Shortages or unavailability of key team members or expertise.
 Contingency: Cross-train team members, have backup plans for key roles, and
maintain a list of external resources or contractors who can be brought in if needed.
6. Security Concerns:
 Risk: Potential security breaches or vulnerabilities in the website or database.
 Contingency: Implement robust security measures, conduct regular security audits,
and allocate a budget for security enhancements or emergency response.
7. Data Migration Challenges:
 Risk: Complexities or difficulties in migrating data from legacy systems to the new
database.
 Contingency: Conduct thorough data analysis and testing before migration. Plan for
a phased approach to data migration, allowing for rollback in case of issues.
8. Regulatory Changes:
 Risk: Changes in regulations affecting the project during development.
 Contingency: Stay informed about regulatory changes. Include buffers in the
schedule and budget to accommodate adjustments needed for compliance.
9. Quality Assurance Issues:
 Risk: Inadequate testing leading to the discovery of critical issues post-launch.
 Contingency: Implement a comprehensive testing strategy, including unit tests,
integration tests, and end-to-end testing. Allocate time and resources for thorough
QA processes.
10. Infrastructure and Hosting Challenges:
 Risk: Issues with cloud services, server outages, or unexpected infrastructure costs.
 Contingency: Diversify infrastructure providers if possible. Have a backup hosting
plan and budget for potential overage charges.
Cost Estimation Considerations:
1. Risk Impact Assessment:

Ministry of Labor and Estimate cost for Web Version-II


Page 22 of 94 Skills and database projects
Author/Copyright November, 2023
 Assess the potential impact of each identified risk on project cost and schedule.
Prioritize risks based on their severity.
2. Risk Quantification:
 Quantify the potential financial impact of risks. This involves estimating the
additional costs that might be incurred if a risk event materializes.
3. Contingency Budgeting:
 Allocate a contingency budget as a percentage of the total project cost to cover
unforeseen expenses related to identified risks.
4. Communication and Documentation:
 Clearly communicate identified risks and contingencies to stakeholders. Maintain
documentation that outlines the risk management plan and contingency measures.
5. Regular Risk Reviews:
 Conduct regular risk reviews throughout the project life cycle. Update risk
assessments and contingencies as the project progresses and new information
becomes available.
6. Learning from Past Projects:
 Draw on lessons learned from previous projects to identify potential risks and
effective contingency measures. Maintain a knowledge base for future reference.
7. Continuous Monitoring:
 Continuously monitor project risks, especially those that evolve over time. Be
proactive in addressing emerging risks and adjusting contingencies as needed.
8. Risk Mitigation Strategies:
 Develop mitigation strategies for high-priority risks to reduce the likelihood or
impact of these events.
By incorporating risk identification, assessment, and contingency planning into the cost
estimation process, project managers can create more realistic budgets that account for
uncertainties. Regularly revisiting and updating the risk management plan as the project
evolves ensures that the budget remains aligned with the project's needs and challenges.

Ministry of Labor and Estimate cost for Web Version-II


Page 23 of 94 Skills and database projects
Author/Copyright November, 2023
Self-check 3
Part I: Write true if the statement is correct and false if it is wrong.
1. Project Size and Complexity are Insignificant Factors in Cost Estimation.
2. A Content Management System (CMS) is Essential for All Website Projects.
3. Data Migration Tools are Exclusively Used in Database Projects.
4. The Choice of Frontend Frameworks Does Not Impact Website Development Costs.
5. Query Language SQL is Specific to NoSQL Databases.
Part II: Choose the correct answer
1. Which of the following is a key factor influencing cost estimation for both website and
database projects?
A) Weather conditions C) Marketing strategy
B) Project size and complexity D) Employee satisfaction
2. In a medium to large-sized e-commerce website project, what is a significant factor influencing
costs?
A) Limited features and functionalities C) Short development time
B) Integration with third-party services D) Basic user authenticatio
3. What is the purpose of a technology stack in web development?
A) Creating project timelines D) Conducting user testing
B) Managing financial resources
C) Choosing software tools and
components
4. Which functional requirement is crucial for an e-commerce website project?
A) User feedback and reviews C) Search functionality
B) Content Management System (CMS) D) Responsive design
5. What is the primary role of a Database Management System (DBMS) in a database project?
A) Managing project timelines C) Organizing and manipulating data
B) Handling business logic D) Creating user interfaces

Ministry of Labor and Estimate cost for Web Version-II


Page 24 of 94 Skills and database projects
Author/Copyright November, 2023
Unit Four Cost Estimation Methods

This unit is developed to provide you the necessary information regarding the following content
coverage and topics:
 Expert Judgment
 Analogous Estimation
 Parametric Estimation
 Three-Point Estimation
 Bottom-Up Estimation
This unit will also assist you to attain the learning outcomes stated in the cover page.
Specifically, upon completion of this learning guide, you will be able to:
 Gain knowledge about different cost estimation methods
 Identify the strengths, weaknesses, and best-use scenarios for each method.
 Comprehend the role of subject matter experts (SMEs) in providing insights for cost
estimation.
 Understand how analogous estimation relies on historical data from similar projects.
 Understand the identification of parameters, historical data analysis, and development of
mathematical models in parametric estimation.
 Develop critical thinking skills to assess the suitability of different cost estimation methods
based on project characteristics.

4.1. Expert Judgment


Expert judgment is a cost estimation method that relies on the knowledge, experience, and
insights of individuals or a group of experts to estimate various aspects of a project,
including costs, duration, and resource requirements. These experts, often individuals
with significant experience in the relevant domain or industry, use their judgment to

Ministry of Labor and Estimate cost for Web Version-II


Page 2 of 94 Skills and database projects
Author/Copyright November, 2023
provide informed assessments based on their expertise. Expert judgment is particularly
valuable in situations where historical data may be limited or inadequate.
Key Aspects of Expert Judgment in Cost Estimation:
1. Subject Matter Experts (SMEs):
 Description: SMEs are individuals who possess specialized knowledge and
experience relevant to the project at hand. They may come from various
disciplines, such as engineering, technology, finance, or project management.
 Role: SMEs contribute their expertise to assess project requirements, risks, and
potential costs.
2. Qualitative and Quantitative Inputs:
 Description: Expert judgment can involve both qualitative and quantitative
inputs. Qualitative inputs may include subjective assessments of project
complexity, risks, and uncertainties, while quantitative inputs involve numeric
estimates.
 Role: Experts provide insights that go beyond mere numbers, offering nuanced
perspectives on the potential challenges and opportunities associated with the
project.
3. Interviews and Workshops:
 Description: The expert judgment process often involves interviews, workshops,
or brainstorming sessions where experts collaborate to share their knowledge and
perspectives.
 Role: Interactions among experts can lead to a more comprehensive
understanding of the project, enabling a more accurate estimation.
4. Delphi Technique:
 Description: The Delphi Technique is a structured method for obtaining
consensus from a panel of experts. It involves multiple rounds of questionnaires
or surveys, with feedback provided anonymously between rounds to converge
towards a consensus.
 Role: Delphi Technique helps mitigate biases and fosters collective intelligence
among experts.
5. Assumptions and Constraints:

Ministry of Labor and Estimate cost for Web Version-II


Page 3 of 94 Skills and database projects
Author/Copyright November, 2023
 Description: Experts may need to make assumptions or work within certain
constraints when providing estimates. These assumptions and constraints should
be documented to ensure transparency and clarity.
 Role: Clearly defined assumptions and constraints help stakeholders understand
the context and limitations of the expert judgment.
6. Historical Knowledge:
 Description: Experts often draw on their experience with similar projects or
industry standards to inform their judgment. Historical knowledge allows experts
to consider patterns, trends, and lessons learned from past endeavors.
 Role: Historical knowledge contributes to the accuracy and reliability of the
expert judgment process.
7. Continuous Feedback:
 Description: The estimation process may involve ongoing feedback loops,
especially when dealing with evolving projects. Continuous feedback allows
experts to update their estimates based on new information.
 Role: Adaptability and responsiveness to changing project conditions are crucial
components of expert judgment.
Advantages of Expert Judgment in Cost Estimation:
1. Domain Expertise:
 Experts bring deep domain knowledge and insights that may not be readily
available from other sources.
2. Qualitative Insights:
 Experts can provide qualitative insights into the project's complexities, risks, and
potential challenges, complementing quantitative estimates.
3. Adaptability:
 Expert judgment can adapt to unique project circumstances and conditions,
making it applicable in a wide range of scenarios.
4. Quick Decision-Making:
 In situations where historical data is limited or unavailable, expert judgment
allows for relatively quick decision-making based on expert insights.
5. Problem Solving:

Ministry of Labor and Estimate cost for Web Version-II


Page 4 of 94 Skills and database projects
Author/Copyright November, 2023
 Experts can contribute to problem-solving by identifying potential issues and
proposing solutions based on their experience.
Challenges and Considerations:
1. Subjectivity:
 Expert judgment is inherently subjective and may be influenced by individual
biases or perspectives. It's essential to be aware of and manage these biases.
2. Limited Data:
 In the absence of sufficient historical data, the reliance on expert judgment may
be the primary source of estimation, making it critical to choose experts wisely.
3. Diversity of Experts:
 It's crucial to involve a diverse group of experts to ensure a comprehensive
understanding of the project and avoid potential biases.
4. Documentation:
 Clear documentation of the assumptions, constraints, and reasoning behind expert
estimates is essential for transparency and accountability.
5. Continuous Learning:
 Organizations should encourage a culture of continuous learning, allowing experts
to stay updated on industry trends and advancements.
Expert judgment is a valuable and widely used method for cost estimation, particularly in
projects where unique or unprecedented elements require the insights of individuals with
specialized knowledge. Effective application of expert judgment involves selecting the
right experts, fostering collaboration, and integrating qualitative and quantitative inputs
for a well-rounded estimation process.

4.2. Analogous Estimation


Analogous estimation, also known as top-down estimation, is a project cost estimation
method that relies on historical data from similar projects as a basis for estimating the
cost of the current project. This method is particularly useful when detailed information
about the current project is limited or unavailable. Analogous estimation involves
drawing parallels between the current project and past projects to make cost predictions.
Here's a more detailed explanation of the process:
Ministry of Labor and Estimate cost for Web Version-II
Page 5 of 94 Skills and database projects
Author/Copyright November, 2023
Key Aspects of Analogous Estimation:
1. Historical Data:
 Description: Analogous estimation uses historical information from previously
completed projects that share similarities with the current project.
 Role: Historical data serves as a reference point for understanding the resource
requirements, costs, and outcomes of comparable projects.
2. Similarity Assessment:
 Description: The estimator identifies projects that are similar in nature, scope,
size, complexity, and other relevant factors to the current project.
 Role: The more closely the selected historical projects align with the current
project, the more accurate the analogous estimation is likely to be.
3. Adjustments for Differences:
 Description: Once a historical project is identified, adjustments are made to
account for any differences between the historical project and the current project.
 Role: Adjustments consider factors such as scale, technological advancements,
project complexity, and any unique attributes that differentiate the two projects.
4. Expert Judgment:
 Description: Analogous estimation often involves the input of experts who use
their judgment to assess the relevance and applicability of historical data to the
current project.
 Role: Experts contribute insights to ensure that adjustments are made
appropriately and that the estimation aligns with the specific characteristics of the
current project.
5. Unit Cost or Parametric Models:
 Description: Analogous estimation may use unit cost or parametric models to
generalize cost estimates based on specific units of measurement (e.g., cost per
square foot, cost per function point).
 Role: These models provide a structured approach to adjusting historical data to
fit the current project's context.
6. Quick Assessment:

Ministry of Labor and Estimate cost for Web Version-II


Page 6 of 94 Skills and database projects
Author/Copyright November, 2023
 Description: Analogous estimation is generally a quicker and less detailed
estimation method compared to some other methods, making it suitable for early
project planning stages.
 Role: Quick assessments can aid in initial project feasibility studies or when there
is limited time for a detailed estimation process.
Advantages of Analogous Estimation:
1. Speed and Simplicity:
 Analogous estimation is quick and relatively simple compared to other estimation
methods, making it suitable for projects with time constraints.
2. Limited Information Requirements:
 It requires minimal detailed information about the current project, making it
useful when comprehensive data is not readily available.
3. Early Project Phases:
 Analogous estimation is often used in the early phases of a project when detailed
project information is scarce, helping stakeholders get a rough idea of potential
costs.
4. Expert Judgment Integration:
 Expert judgment is integral to the process, allowing for qualitative considerations
and adjustments based on the collective experience of the estimation team.
Challenges and Considerations:
1. Limited Accuracy:
 The accuracy of analogous estimation is contingent on the similarity between the
historical and current projects. If the projects differ significantly, the estimation
may be less accurate.
2. Dependency on Historical Data:
 The method relies heavily on the availability and relevance of historical data. If
suitable historical data is not available, the accuracy of the estimation may be
compromised.
3. Subjectivity:

Ministry of Labor and Estimate cost for Web Version-II


Page 7 of 94 Skills and database projects
Author/Copyright November, 2023
 Analogous estimation involves subjective judgments, and the adjustments made
by experts may introduce biases. It is crucial to manage and document these
subjective elements.
4. Scope Changes:
 If there are significant changes in the scope or requirements of the current project
compared to historical projects, the estimation may not accurately reflect the new
conditions.
5. Varying Project Complexity:
 Analogous estimation may struggle to account for variations in project
complexity, as it tends to provide a high-level overview rather than a detailed
breakdown.
6. Need for Expertise:
 The method relies on the expertise of the estimation team to identify relevant
historical projects and make accurate adjustments. Inexperienced or uninformed
estimators may compromise the accuracy of the estimation.
In summary, analogous estimation is a valuable method for providing quick and early project
cost estimates, especially when detailed information about the current project is limited.
However, its accuracy is contingent on the availability of relevant historical data and the
expertise of the estimation team in making appropriate adjustments for differences
between projects.

4.3. Parametric Estimation


Parametric estimation is a project cost estimation method that involves using statistical
relationships between historical data and other project variables to calculate project costs.
This method relies on the identification of key parameters or variables that influence
project costs and the development of mathematical models to estimate costs based on
these parameters. Parametric estimation is particularly effective when there is a sufficient
amount of historical data and a clear understanding of the relationships between project
characteristics and costs.
Key Aspects of Parametric Estimation:
1. Identification of Parameters:

Ministry of Labor and Estimate cost for Web Version-II


Page 8 of 94 Skills and database projects
Author/Copyright November, 2023
 Description: The estimator identifies key parameters or variables that
significantly influence project costs. These parameters can include factors such as
project size, complexity, duration, or specific technical characteristics.
 Role: Identifying the right parameters is crucial for the accuracy of the
estimation.
2. Historical Data Analysis:
 Description: Parametric estimation relies on historical data to establish
relationships between the identified parameters and project costs. The historical
data serves as a basis for developing the estimation model.
 Role: Analysis of historical data helps in understanding how changes in the
identified parameters impact project costs.
3. Mathematical Models:
 Description: Parametric estimation involves the development of mathematical
models that express the relationship between project parameters and costs. These
models can be simple linear equations or more complex statistical models.
 Role: Models are used to quantify the impact of changes in parameters on project
costs and provide a systematic approach to estimating costs.
4. Data Calibration:
 Description: The estimation model is calibrated or fine-tuned using historical
data. This process involves adjusting coefficients or parameters in the model to
align with observed trends and patterns in the data.
 Role: Calibration ensures that the estimation model accurately reflects the
relationships present in the historical data.
5. Unit Cost Estimation:
 Description: Parametric estimation often involves calculating unit costs based on
the identified parameters. For example, the cost per square foot for construction
projects or the cost per function point for software development projects.
 Role: Unit costs provide a standardized measure that can be applied to different
projects based on their specific parameters.
6. Adjustments for Project Specifics:

Ministry of Labor and Estimate cost for Web Version-II


Page 9 of 94 Skills and database projects
Author/Copyright November, 2023
 Description: While parametric estimation relies on general relationships, it
allows for adjustments to account for project-specific factors that may not be
captured by the parameters included in the model.
 Role: Adjustments enhance the accuracy of the estimation by accommodating
unique characteristics of the current project.
Advantages of Parametric Estimation:
1. Efficiency:
 Parametric estimation is often more efficient than some other methods, as it
leverages mathematical models to quickly calculate estimates based on known
parameters.
2. Consistency:
 The use of standardized unit costs and mathematical models promotes consistency
in cost estimation across projects.

3. Quantitative Approach:
 The method provides a quantitative and systematic approach to cost estimation,
which can enhance objectivity and reduce subjectivity in the estimation process.
4. Data-Driven Decision-Making:
 Parametric estimation relies on historical data and statistical analysis, facilitating
data-driven decision-making in cost estimation.
Challenges and Considerations:
1. Data Availability:
 The accuracy of parametric estimation depends on the availability and quality of
historical data. Limited or unreliable data can compromise the effectiveness of the
method.
2. Complexity of Relationships:
 Some projects may involve complex relationships between parameters and costs
that are challenging to capture accurately in a parametric model.
3. Assumption of Linearity:

Ministry of Labor and Estimate cost for Web Version-II


Page 10 of 94 Skills and database projects
Author/Copyright November, 2023
 Parametric models often assume linear relationships between parameters and
costs. In reality, relationships may be nonlinear, and the model's accuracy may
decrease in such cases.
4. Project Specifics:
 While adjustments can be made, parametric estimation may struggle to fully
account for project-specific factors that are not explicitly included in the model.
5. Maintenance of Models:
 Updating and maintaining parametric models over time requires ongoing efforts
to ensure they remain accurate and reflective of changing project characteristics.
6. Expertise Requirements:
 Developing and using parametric estimation models requires expertise in
statistical analysis and modeling. Organizations need skilled individuals to
effectively implement this method.
In summary, parametric estimation is a valuable method that leverages statistical
relationships between historical data and project parameters to estimate costs. It is
efficient, consistent, and provides a quantitative approach to cost estimation. However, its
effectiveness is contingent on the availability of reliable historical data and the ability to
develop accurate parametric models that capture the relationships between parameters
and costs.

4.4. Three-Point Estimation


Three-Point Estimation, also known as the PERT (Program Evaluation and Review
Technique) estimation, is a project management and cost estimation technique that uses
three estimates to represent the range of potential outcomes for an activity or task. The
three estimates are the optimistic (O), pessimistic (P), and most likely (M) values. The
Three-Point Estimation method is particularly useful for tasks where there is a level of
uncertainty or variability.
Key Aspects of Three-Point Estimation:
1. Optimistic Estimate (O):
 Description: The optimistic estimate represents the best-case scenario for the
completion time or cost of an activity. It assumes that everything progresses
smoothly with no unexpected issues.
Ministry of Labor and Estimate cost for Web Version-II
Page 11 of 94 Skills and database projects
Author/Copyright November, 2023
 Role: The optimistic estimate provides an optimistic view of how quickly or
inexpensively the activity could be completed.
2. Pessimistic Estimate (P):
 Description: The pessimistic estimate represents the worst-case scenario for the
completion time or cost of an activity. It considers potential obstacles, delays, and
challenges.
 Role: The pessimistic estimate helps account for risks and uncertainties that could
result in a longer duration or higher cost.
3. Most Likely Estimate (M):
 Description: The most likely estimate represents the best judgment of the person
making the estimate based on realistic assumptions and considerations.
 Role: The most likely estimate provides a balanced and grounded view of the
expected completion time or cost, considering both positive and negative factors.
4. PERT Formula:
 Description: The PERT formula is used to calculate the expected value (TE)
based on the optimistic (O), pessimistic (P), and most likely (M) estimates. The
formula is TE = (O + 4M + P) / 6.
 Role: The PERT formula provides a weighted average that gives more weight to
the most likely estimate, reflecting a probabilistic view of the activity's expected
duration or cost.
5. Probability Distribution:
 Description: Three-Point Estimation introduces a probability distribution that
allows for a more nuanced understanding of the likelihood of different outcomes.
 Role: The probability distribution helps project managers and stakeholders assess
the level of uncertainty associated with the activity.
6. Standard Deviation:
 Description: The standard deviation is a measure of the variability or spread of
the estimates. It is calculated using the formula σ = (P - O) / 6.
 Role: The standard deviation provides information about the level of uncertainty
or risk associated with the activity.
Advantages of Three-Point Estimation:

Ministry of Labor and Estimate cost for Web Version-II


Page 12 of 94 Skills and database projects
Author/Copyright November, 2023
1. Risk Consideration:
 Three-Point Estimation explicitly considers both optimistic and pessimistic
scenarios, making it a valuable tool for risk management.
2. Probabilistic View:
 The inclusion of a probability distribution and standard deviation provides a more
nuanced, probabilistic view of the expected outcome.
3. Balanced Estimation:
 By combining optimistic, pessimistic, and most likely estimates, Three-Point
Estimation provides a balanced and realistic assessment of the activity.
4. Sensitivity Analysis:
 The method allows for sensitivity analysis, enabling project managers to assess
how changes in the estimates impact the overall project.
Challenges and Considerations:
1. Subjectivity:
 The estimates provided by individuals can be subjective, and biases may influence
the selection of optimistic, pessimistic, and most likely values.
2. Assumption of Normal Distribution:
 The PERT formula assumes a normal distribution, which may not always reflect
the actual distribution of outcomes.
3. Complexity:
 While Three-Point Estimation provides a more sophisticated view of uncertainty,
it adds complexity to the estimation process.
4. Data Availability:
 The accuracy of Three-Point Estimation depends on the availability of reliable
data for the optimistic, pessimistic, and most likely estimates.
5. Limited Applicability:
 The method may be more applicable to certain types of projects or activities with
inherent variability. In cases where tasks are well-defined and predictable, simpler
estimation methods may suffice.
In summary, Three-Point Estimation is a valuable technique for project managers seeking to
account for uncertainty and risk in their project planning. It provides a more

Ministry of Labor and Estimate cost for Web Version-II


Page 13 of 94 Skills and database projects
Author/Copyright November, 2023
comprehensive view of potential outcomes and allows for a probabilistic assessment of
project timelines or costs. Despite its challenges, Three-Point Estimation can be a
valuable tool for projects with a degree of unpredictability.

4.5. Bottom-Up Estimation


Bottom-Up Estimation is a project cost estimation method that involves breaking down a
project into smaller, more manageable components and estimating the costs associated
with each individual component. These detailed estimates are then aggregated to
calculate the total project cost. This method is often considered more accurate than other
estimation techniques because it provides a granular view of the project's requirements
and allows for a thorough analysis of each element.
Key Aspects of Bottom-Up Estimation:
1. Work Breakdown Structure (WBS):
 Description: The project is decomposed into a hierarchical structure known as
the Work Breakdown Structure (WBS). The WBS represents the project's scope
and is organized into smaller, more manageable components or work packages.
 Role: The WBS serves as the foundation for bottom-up estimation, providing a
structured framework for breaking down the project into discrete tasks.
2. Detailed Estimation for Each Component:
 Description: For each work package or component identified in the WBS,
detailed estimates are prepared. These estimates take into account the resources,
time, and costs required to complete each specific task.
 Role: Detailed estimation ensures a comprehensive understanding of the
requirements and resources needed for each aspect of the project.
3. Resource Identification:
 Description: Bottom-Up Estimation involves identifying and quantifying the
resources required for each work package. This includes personnel, materials,
equipment, and any other resources necessary for completion.
 Role: Resource identification allows for a more accurate assessment of project
costs, as it considers the specific needs of each component.
4. Expert Input:

Ministry of Labor and Estimate cost for Web Version-II


Page 14 of 94 Skills and database projects
Author/Copyright November, 2023
 Description: Subject matter experts and team members contribute their expertise
to the estimation process for individual work packages. Their input is valuable in
ensuring that the estimates are realistic and reflect the project's nuances.
 Role: Expert input enhances the accuracy and reliability of the bottom-up
estimates.
5. Risk Analysis:
 Description: The detailed nature of bottom-up estimation allows for a more
thorough analysis of potential risks associated with each work package. Risks can
be identified and addressed at the component level.
 Role: Risk analysis contributes to a more robust risk management strategy by
addressing uncertainties at a granular level.
6. Aggregation of Estimates:
 Description: Once estimates are prepared for each work package, they are
aggregated to calculate the total project cost. This summation provides a
comprehensive view of the overall budget.
 Role: Aggregating estimates allows project managers and stakeholders to
understand the financial requirements for the entire project.
Advantages of Bottom-Up Estimation:
1. Accuracy:
 Bottom-Up Estimation is often more accurate than other methods because it
considers the unique requirements of each work package, leaving less room for
oversights.
2. Detailed Analysis:
 The method allows for a detailed analysis of project components, promoting a
better understanding of the project's intricacies and potential challenges.
3. Granular Control:
 Project managers have granular control over the budget, as they can identify and
address cost-related issues at the level of individual work packages.
4. Effective Resource Planning:
 Resource requirements are identified for each component, facilitating more
effective resource planning and allocation.

Ministry of Labor and Estimate cost for Web Version-II


Page 15 of 94 Skills and database projects
Author/Copyright November, 2023
5. Risk Identification:
 Risks are identified and analyzed at the component level, enabling a proactive
approach to risk management.
Challenges and Considerations:
1. Time-Consuming:
 Bottom-Up Estimation can be time-consuming, especially for large and complex
projects, as it requires detailed analysis for each work package.
2. Resource Intensive:
 The method may require a significant investment of resources, both in terms of
time and personnel, to conduct a thorough estimation for each component.
3. Limited Applicability for Early Stages:
 Bottom-Up Estimation may be less practical during the early stages of a project
when detailed project information is not yet available.
4. Dependencies Between Work Packages:
 Dependencies between work packages can complicate the estimation process.
Changes in one component may impact others, requiring careful coordination.
5. Subject to Expertise:
 The accuracy of bottom-up estimates is subject to the expertise and knowledge of
the individuals involved in the estimation process.
Bottom-Up Estimation is particularly valuable when precision and accuracy are crucial, and
when the project's scope is well-defined. While it may be more time-consuming, the
method provides a comprehensive view of project costs, helping project managers make
informed decisions and manage resources effectively.

Self-check4
Part I: Write true if the statement is correct and false if it is wrong.
1. Expert judgment in cost estimation relies on the knowledge, experience, and insights of individuals or
a group of experts.
2. Analogous estimation, also known as top-down estimation, is particularly useful when detailed
information about the current project is readily available.

Ministry of Labor and Estimate cost for Web Version-II


Page 16 of 94 Skills and database projects
Author/Copyright November, 2023
3. Parametric estimation involves the development of mathematical models that express the relationship
between project parameters and costs, and these models can be either linear or nonlinear.
4. In Three-Point Estimation, the PERT formula calculates the expected value based on the optimistic,
pessimistic, and most likely estimates, and it gives equal weight to each of these estimates.
5. Bottom-Up Estimation involves breaking down a project into smaller components, estimating the costs
for each component, and then aggregating these estimates to calculate the total project cost.
Part II: Choose the correct answer
1. Which key aspect is associated with Expert Judgment in cost estimation?
A. Historical Data Analysis B. Identification of Parameters
C. Work Breakdown Structure (WBS) D. Subject Matter Experts (SMEs)
2. What does Analogous Estimation primarily rely on for estimating the cost of the current
project?
A. Detailed project information C. Historical data from similar projects
B. Mathematical models D. Expert judgment
3. What role do mathematical models play in Parametric Estimation?
A. Assessing project risks C. Providing a weighted average
B. Calculating unit costs D. Identifying project parameters
4. In Three-Point Estimation, what formula is used to calculate the expected value?
A. TE = (O + P + M) / 3 C. TE = (O + 4M + P) / 6
B. TE = (O + 2M + P) / 4 D. TE = (O + P) / 2
5. What is a key advantage of Bottom-Up Estimation?
A. Speed and Simplicity D. Consideration of Optimistic and
B. Limited Information Requirements Pessimistic Scenarios
C. Granular Control and Detailed
Analysis

Ministry of Labor and Estimate cost for Web Version-II


Page 17 of 94 Skills and database projects
Author/Copyright November, 2023
Operation sheet 4.1 Cost estimation
Operation Title:Cost estimation
Purpose:Cost estimation using parametric approach
Equipment and Tools:MS Excel
Step 1: Define Project Scope
Clearly define the scope of your website and database project. This includes understanding
the functionalities, features, and requirements that need to be implemented.
Step 2: Identify Parameters
Identify the key parameters that will influence the project cost. For a website and database
project, parameters might include the number of web pages, database size, user roles, and
any other relevant factors.
Step 3: Gather Historical Data
Collect historical data from previous similar projects. This data should include information
on project size, effort, duration, and cost. If your organization doesn't have such data, you
might need to rely on industry benchmarks or publicly available data.
Step 4: Develop Parametric Models
Based on the identified parameters and historical data, develop parametric models. These
models express the statistical relationships between project parameters and costs. For
example, you might use a formula like:
Cost=a×(Parameter1)b×(Parameter2)c×…
Step 5: Assign Values to Parameters
For your specific project, assign values to the identified parameters. This may involve
working with the project team to estimate the number of web pages, database size, and
other relevant factors.
Step 6: Calculate Cost
Plug the assigned values into the parametric models to calculate the estimated cost.
Adjustments may be necessary based on project-specific factors that are not captured by
the parametric model.
EstimatedCost=a×(EstimatedParameter1)b×(EstimatedParameter2)c×…
Step 7: Validate and Refine

Ministry of Labor and Estimate cost for Web Version-II


Page 2 of 94 Skills and database projects
Author/Copyright November, 2023
Compare the calculated cost with industry benchmarks or other available sources to validate
its reasonableness. If there are significant differences, refine the parametric models or
reassess the assigned values for parameters.
Step 8: Document Assumptions and Risks
Clearly document the assumptions made during the estimation process and identify potential
risks that could impact the project cost. This helps in managing expectations and
preparing for uncertainties.
Step 9: Communicate and Review
Communicate the estimated cost to relevant stakeholders and conduct a review to ensure that
all aspects of the project have been considered. Make adjustments as needed based on
feedback.
Step 10: Monitor and Update
Throughout the project, monitor actual costs and compare them with the estimated costs. If
there are significant deviations, update the estimation models and refine the process for
future projects.
Remember that parametric estimation is a statistical approach, and the accuracy of the
estimate depends on the quality of the data and the appropriateness of the parametric
models. Regularly updating the models based on actual project data improves the
accuracy of future estimations.
Let's break down the parametric cost estimation formula with specific values for illustration:
Cost=a×(Parameter1)b×(Parameter2)c×…
Suppose you have a software development project, and you want to estimate the cost based
on two parameters: the number of features (Parameter1) and the complexity level
(Parameter2).
Let's assume the parametric model is:
Cost=100×(Number of Features)0.8×(Complexity Level)1.2
Now, let's say for your specific project:
 Number of Features (Parameter1Parameter1) = 50
 Complexity Level (Parameter2Parameter2) = 3
Substitute these values into the formula:
Cost=100×(50)0.8×(3)1.2Cost=100×(50)0.8×(3)1.2

Ministry of Labor and Estimate cost for Web Version-II


Page 3 of 94 Skills and database projects
Author/Copyright November, 2023
Now, calculate each part of the formula:
1. (50)0.8(50)0.8: Raise 50 to the power of 0.8.
2. (3)1.2(3)1.2: Raise 3 to the power of 1.2.
After performing these calculations, substitute the results back into the formula:
Cost=100×(result of (50)0.8)×(result of (3)1.2)Cost=100×(result of (50)0.8)×(result of (3)1.2
)
Finally, compute the overall cost:
Cost=100×(result of (50)0.8)×(result of (3)1.2)
Let's note that the actual numerical values might differ based on the specific model and
project context. The purpose of parametric estimation is to capture the relationships
between project parameters and cost based on historical data or industry standards.
Adjust the model coefficients (such as 100, 0.8, and 1.2 in this example) to best fit your
organization's historical data and experience

Ministry of Labor and Estimate cost for Web Version-II


Page 4 of 94 Skills and database projects
Author/Copyright November, 2023
Unit Five: Cost Components Breakdown

This unit is developed to provide you the necessary information regarding the following content
coverage and topics:
 Development Costs
 Infrastructure Costs
 Maintenance and Support Costs
 Contingency Costs
This unit will also assist you to attain the learning outcomes stated in the cover page.
Specifically, upon completion of this learning guide, you will be able to:
 Develop a comprehensive understanding of the concept of cost components breakdown in the
context of project management.
 Recognize the significance of detailed analysis and categorization in understanding financial
resource allocation.
 Understand the specific elements of development costs in the context of a website and
database project.
 Comprehend the nature of infrastructure costs in the context of a website and database
project.
 Understand the ongoing expenses associated with maintaining and supporting a website and
its underlying database.
 Recognize the importance of contingency costs in project cost estimation.

Ministry of Labor and Estimate cost for Web Version-II


Page 5 of 94 Skills and database projects
Author/Copyright November, 2023
5.1. Development Costs
Development costs in the context of cost estimation for a website and database project
pertain to the expenses associated with planning, designing, building, and implementing
both the website and its underlying database. These costs are crucial for estimating the
financial resources required for the successful execution of the project.
In the context of a website and database project, development costs specifically include
budgeting for:
 Personnel Costs:
Description: Personnel costs cover the salaries and benefits of individuals directly involved
in the development process, such as web developers, database administrators, project
managers, and UI/UX designers.
Examples: Web developer salaries, database administrator salaries, project manager salaries.
 Technology and Tools:
Description: Technology and tools costs encompass expenses related to acquiring or
licensing the necessary software, frameworks, and tools for web development and
database management.
Examples: Web development frameworks (e.g., React, Angular), Database management
system licenses (e.g., MySQL, MongoDB), Integrated Development Environments
(IDEs).
 Training and Skill Development:
Description: Training and skill development costs cover activities aimed at enhancing the
skills and knowledge of the development team, ensuring they stay updated on the latest
technologies and best practices.
Examples: Training programs for new technologies, Workshops on web development trends,
Certifications in database management.
 Consulting and Outsourcing:
Description: Consulting and outsourcing costs include payments made to external entities or
individuals providing specialized expertise, design services, or additional development
resources.
Examples: Hiring a UI/UX design consultant, outsourcing specific development tasks,
Engaging a security consultant.
Ministry of Labor and Estimate cost for Web Version-II
Page 6 of 94 Skills and database projects
Author/Copyright November, 2023
 Prototyping and Testing:
Description: Prototyping and testing costs cover expenses related to creating prototypes of
the website, conducting usability testing, and ensuring the quality and functionality of the
site.
Examples: Prototyping tools, User testing services, Quality assurance tools.
 Materials and Resources:
Description: Materials and resources costs involve the procurement of physical items or
resources necessary for the development process, such as server hardware, networking
equipment, and storage solutions.
Examples: Web server hardware, Storage solutions for the database, Networking equipment.
 Facilities and Infrastructure:
Description: Facilities and infrastructure costs include expenses related to office space,
utilities, and other physical infrastructure required for development activities.
Examples: Rent for office space, Electricity and internet costs, Office furniture and
equipment.
 Intellectual Property (IP) Costs:
Description: Intellectual property costs involve expenses associated with securing and
protecting the intellectual property rights of the website, such as trademarks or
copyrights.
Examples: Trademark registration fees, Copyright filing costs, Licensing fees for third-party
components.
 Marketing and Launch:
Description: Marketing and launch costs include expenditures related to promoting and
introducing the website to the target audience. This is essential for attracting users and
stakeholders.
Examples: Digital marketing campaigns, Launch events or promotions, Advertising
expenses.
 Documentation and Compliance:
Description: Documentation and compliance costs cover activities related to creating user
documentation, ensuring compliance with data protection regulations, and meeting
industry standards.
Ministry of Labor and Estimate cost for Web Version-II
Page 7 of 94 Skills and database projects
Author/Copyright November, 2023
Examples: Privacy policy and terms of use documentation, Compliance testing services,
Legal consultation on data protection.
 Database Costs:
escription: Database costs include specific expenses related to the database, such as licensing
fees for the database management system, storage costs, and any specialized tools for
database optimization.
In summary, development costs focus on the human and technological aspects of creating a
website and its associated database, excluding infrastructure expenses. These costs are
integral to effective project planning, resource allocation, and successful execution.

5.2. Infrastructure Costs


Infrastructure costs in the context of cost estimation for a website and database project refer
to the expenses associated with the physical and virtual components that support the
development, deployment, and ongoing operation of the project. These costs are crucial
for ensuring that the necessary resources and environments are in place to run both the
website and its associated database.
In the context of a website and database project, infrastructure costs include budgeting for:
1. Web Hosting: Allocating funds for hosting services that provide the infrastructure for the
website to be accessible on the internet, covering server space, bandwidth, domain
registration costs, and additional services provided by the hosting provider.
2. Database Hosting: Budgeting for infrastructure expenses related to hosting the database
separately from the website, covering database server costs, cloud database service fees,
and storage costs for database data.
3. Cloud Services: Allocating funds for using cloud platforms that provide infrastructure as
a service (IaaS), platform as a service (PaaS), or software as a service (SaaS) solutions,
including costs for cloud computing resources, cloud-based database services, and cloud
storage.
4. Networking Equipment: Budgeting for expenses related to the infrastructure needed for
communication between servers, databases, and other components, covering the purchase
or lease of networking hardware, configuration and maintenance costs, and internet
service provider fees.

Ministry of Labor and Estimate cost for Web Version-II


Page 8 of 94 Skills and database projects
Author/Copyright November, 2023
5. Server Hardware: Allocating funds for expenses related to the physical servers that host
the website and database, including the purchase, maintenance, and upgrade of server
equipment.
6. Data Center Costs: Budgeting for expenses related to the physical facilities that house
the servers and networking equipment, including rent, utilities, and security measures.
7. Backup and Recovery Infrastructure: Allocating funds for implementing and
maintaining robust backup and recovery solutions for both the website and the database,
covering backup server and storage costs, backup software licenses, and disaster recovery
planning.
8. Monitoring and Logging Tools: Budgeting for expenses related to software and services
that monitor the performance, security, and availability of the website and database,
including monitoring software licenses, cloud-based monitoring services, and security
information and event management (SIEM) tools.
9. Load Balancers: Allocating funds for hardware or software solutions that distribute
incoming web traffic across multiple servers to ensure optimal performance and
reliability, covering load balancer hardware costs, load balancing software licenses, and
configuration and maintenance costs.
10. Security Infrastructure: Budgeting for expenses related to implementing security
measures to protect the website and database from potential threats and attacks, including
firewalls, intrusion detection systems, SSL certificate costs, and security consulting
services.
11. Scalability Planning: Allocating funds for planning for future growth in terms of users,
data, or functionality, ensuring that the infrastructure can scale as needed. This includes
costs for scalable cloud services, infrastructure upgrades, and capacity planning and
optimization.
In summary, infrastructure costs involve anticipating and budgeting for the foundational
components that support the website and database throughout their lifecycle, from
development and deployment to ongoing operation and scalability.

Ministry of Labor and Estimate cost for Web Version-II


Page 9 of 94 Skills and database projects
Author/Copyright November, 2023
5.3. Maintenance and Support Costs
Maintenance and support costs in the context of a website and database project refer to the
ongoing expenses associated with keeping both the website and its underlying database
operational, secure, and up-to-date. These costs are crucial for ensuring that the project
continues to meet its objectives, remains secure, and adapts to changing requirements
over time.
From a cost estimation perspective, maintenance and support costs involve budgeting for
activities such as:
1. Software Updates and Patches: Allocating funds for regularly updating and patching
software components to address security vulnerabilities, bugs, and introduce new
features.
2. Security Measures: Budgeting for ongoing security measures to protect the website and
database from potential threats, including expenses for security software licenses, regular
audits, and incident response planning.
3. Database Maintenance: Setting aside funds for routine database maintenance tasks,
such as optimizing queries, cleaning up unnecessary data, and ensuring data integrity.
4. Backup and Recovery: Allocating resources for regular backups of both the website and
database, as well as the implementation of recovery strategies to ensure data integrity and
business continuity.
5. Server and Hosting Renewals: Planning for costs associated with renewing server
hosting services, domain registrations, and other infrastructure components to ensure
uninterrupted access to the website.
6. Technical Support: Budgeting for accessing technical support services, which may
include support from software vendors, hosting providers, or third-party service
providers.
7. User Support and Training: Allocating funds for providing ongoing support to end-
users, addressing user queries, and conducting training sessions for users as needed.
8. Monitoring and Performance Optimization: Setting aside resources for monitoring the
performance of the website and database, identifying bottlenecks, and optimizing system
performance.

Ministry of Labor and Estimate cost for Web Version-II


Page 10 of 94 Skills and database projects
Author/Copyright November, 2023
9. Regulatory Compliance: Budgeting for expenses related to maintaining compliance
with relevant regulations and standards, especially in industries with specific data
protection and security requirements.
10. Content Updates: Allocating funds for updating and managing content on the website,
including text, images, and multimedia elements.
11. Mobile Responsiveness Updates: Budgeting for expenses related to ensuring that the
website remains mobile-responsive, accommodating various devices and screen sizes.
12. Accessibility Updates: Setting aside resources for maintaining and improving
accessibility features to ensure that the website complies with accessibility standards to
accommodate users with disabilities.
In summary, maintenance and support costs play a vital role in the long-term success and
sustainability of a website and database project. Effective cost estimation involves
carefully considering these ongoing expenses to ensure that the project remains secure,
up-to-date, and aligned with evolving business needs.

5.4. Contingency Costs


Contingency costs in the context of a website and database project involve setting aside a reserve of
funds to address unforeseen circumstances, risks, or changes that may arise during the project
lifecycle. These funds act as a safety net to cover unexpected expenses and uncertainties,
ensuring that the project can adapt to challenges without compromising its success.
In the context of cost estimation for website and database projects, contingency costs include
budgeting for:
Risk Mitigation:Allocating funds to mitigate identified risks and uncertainties that may impact the
project, addressing issues related to technology, requirements, and external factors.
Scope Changes: Setting aside funds to accommodate changes to the project scope, whether initiated
by stakeholders or due to evolving requirements.
Technology Challenges: Budgeting for challenges related to technology, such as unexpected
compatibility issues, changes in technology trends, or the need to adopt new tools or
frameworks.
Vendor or Service Provider Issues: Allocating contingency funds to address issues that may arise
with external vendors or service providers, such as delays, unexpected costs, or changes in
service terms.
Ministry of Labor and Estimate cost for Web Version-II
Page 11 of 94 Skills and database projects
Author/Copyright November, 2023
Regulatory Changes: Setting aside funds to address the financial impact of changes in regulations
or compliance requirements that may necessitate adjustments to the website and database.
Market Dynamics: Budgeting for adjustments needed to address changes in market conditions or
user preferences, ensuring the website remains competitive.
Security Incidents: Allocating funds to respond to security incidents, such as data breaches or
cyberattacks, including costs for forensic analysis, security patches, and legal or public relations
expenses.
Force Majeure Events: Setting aside contingency funds to address unforeseen events beyond the
project team's control, such as natural disasters, political instability, or other force majeure
events.
In summary, contingency costs in cost estimation for website and database projects involve
anticipating and preparing for unexpected challenges, changes, or risks that may impact the
project's budget. This proactive approach ensures financial resilience and the ability to navigate
uncertainties throughout the project lifecycle.

Ministry of Labor and Estimate cost for Web Version-II


Page 12 of 94 Skills and database projects
Author/Copyright November, 2023
Self-Check 5
Part I: Write true if the statement is true and false if it is false.
1. Development costs in the context of a website and database project include expenses related to
the physical facilities that house servers and networking equipment.
2. Infrastructure costs for a website and database project encompass budgeting for activities such as
software updates, user support, and accessibility updates.
3. Maintenance and support costs in a website and database project involve planning for future
growth in terms of users, data, or functionality.
4. Contingency costs in cost estimation for website and database projects may include funds
allocated to address changes in market conditions or user preferences.
5. The breakdown of cost components primarily contributes to transparency and clarity in project
control but has minimal impact on financial planning and resource management.
Part II: Choose the correct answer and encircle it.
1. Which of the following is considered a development cost in the context of a website and database project?
A. Web hosting fees C. Database maintenance costs
B. Server hardware expenses D. Legal consultation fees
2. What do infrastructure costs for a website and database project include?
A. Training and skill development C. Marketing and launch expenditures
B. Backup and recovery infrastructure D. User support and training
3. What is a key aspect of maintenance and support costs in a website and database project?
A. Allocating funds for web hosting services D. Mitigating identified risks and uncertainties
B. Setting aside resources for monitoring
system performance
C. Planning for future growth in terms of users
4. Which of the following is a component of contingency costs in cost estimation for website and database
projects?
A. Database licensing fees C. Addressing issues related to technology challenges
B. Allocating funds for software updates D. Budgeting for networking equipment
5. What is the primary purpose of a cost components breakdown in project management?
A. Minimizing project transparency
B. Ignoring financial planning considerations
C. Categorizing costs for clarity and understanding
D. Excluding development costs from resource management

Ministry of Labor and Estimate cost for Web Version-II


Page 13 of 94 Skills and database projects
Author/Copyright November, 2023
Unit Six Cost Estimation Tools and Techniques
This unit is developed to provide you the necessary information regarding the following content
coverage and topics:
 Project Management Software
 Cost Estimation Tools
 Version Control Systems
 Collaboration and Communication Tools
This unit will also assist you to attain the learning outcomes stated in the cover page.
Specifically, upon completion of this learning guide, you will be able to:
 Develop a comprehensive understanding of collaboration and communication tools and their
role in enhancing team efficiency.
 Understand how collaboration and communication tools contribute to cost estimation in a
business context.
 Identify the specific advantages these tools offer in terms of improving operational efficiency
and reducing associated costs.
 Understand how these features contribute to time savings and improved accuracy, leading to
cost efficiency.
 Understand how improved team efficiency contributes to faster project completion and
potential cost savings.

Ministry of Labor and Estimate cost for Web Version-II


Page 2 of 94 Skills and database projects
Author/Copyright November, 2023
6.1. Project Management Software
Project Management Software is a tool designed to help plan, organize, and track the
progress of projects. From a cost estimation perspective, these tools offer several
advantages that contribute to effective budgeting and resource management:
1. Task and Resource Allocation: Project Management Software enables detailed task
planning and resource allocation. This ensures that team members are assigned tasks
based on their skills and availability, optimizing resource utilization and potentially
reducing labor costs.
2. Time Tracking and Productivity Analysis: Many project management tools include
features for tracking the time spent on tasks. This data allows for a better understanding
of resource efficiency and can help identify areas for improvement, potentially leading to
cost savings through increased productivity.
3. Budget Management: Project management software often includes budget tracking
features. This allows project managers to monitor expenses, compare them against the
allocated budget, and make informed decisions to prevent cost overruns.
4. Risk Management: These tools provide a platform for identifying and managing project
risks. By addressing potential issues early on, project managers can mitigate the impact
of risks on timelines and budgets, reducing the likelihood of unexpected costs.
5. Collaboration and Communication: Project management tools facilitate
communication and collaboration among team members. Efficient communication can
prevent misunderstandings, reduce errors, and ultimately contribute to cost savings by
avoiding rework and delays.
6. Real-Time Reporting: The ability to generate real-time reports on project progress,
milestones, and budget status is a key feature of project management software. This
transparency helps in proactive decision-making, preventing potential cost overruns and
ensuring projects stay on track.
7. Resource Optimization: By visualizing resource availability and workloads, project
managers can optimize the allocation of resources. This can prevent burnout, enhance
team efficiency, and contribute to cost savings by ensuring that resources are used
effectively.

Ministry of Labor and Estimate cost for Web Version-II


Page 3 of 94 Skills and database projects
Author/Copyright November, 2023
8. Task Dependencies and Critical Path Analysis: Project management tools often allow
the modeling of task dependencies and critical paths. Understanding these relationships
helps in identifying potential bottlenecks and optimizing project schedules, which can
lead to time and cost savings.
9. Workflow Automation: Automation features in project management software can
streamline routine tasks, reducing manual effort and minimizing the risk of errors. This
efficiency can result in cost savings by optimizing labor resources.
10. Client Collaboration: For client-facing projects, project management tools that facilitate
client collaboration can improve communication, reduce misunderstandings, and enhance
client satisfaction, potentially leading to repeat business and positive financial outcomes.
In summary, project management software contributes to cost estimation by providing tools
for efficient resource allocation, budget management, risk mitigation, and real-time
reporting. These features collectively enhance project control and contribute to successful
project outcomes within budgetary constraints.

6.2. Cost Estimation Tools


Cost Estimation Tools for website and database projects play a crucial role in predicting and
managing financial resources. Here are key aspects from a cost estimation perspective:
1. Scope Identification: Cost estimation tools help in defining and quantifying the scope of
the website and database project. This involves specifying features, functionalities, and
database requirements, laying the foundation for accurate cost predictions.
2. Resource Planning: These tools assist in identifying the human, technological, and
infrastructure resources needed for website and database development. This includes
estimating the effort required for designing, coding, testing, and maintaining the project
components.
3. Technology and Platform Considerations: Cost estimation tools account for the
technologies and platforms chosen for website and database development. Different
technologies may have varying licensing costs, and the scalability of database solutions can
impact infrastructure expenses.
4. Development Methodology: The chosen development methodology (e.g., Agile, Waterfall)
influences cost estimates. Tools consider factors like iterative development cycles, client

Ministry of Labor and Estimate cost for Web Version-II


Page 4 of 94 Skills and database projects
Author/Copyright November, 2023
feedback loops, and testing iterations when estimating costs for website and database
projects.
5. Database Design Complexity: The complexity of the database architecture, such as the
number of tables, relationships, and data volume, is a critical factor. Cost estimation tools
evaluate the intricacies of database design to determine resource requirements.
6. Integration Points: If the website and database need to integrate with other systems or
third-party services, cost estimation tools account for the development effort, API
integrations, and potential licensing costs associated with these integrations.
7. Security Requirements: Security considerations, such as implementing secure coding
practices, encryption, and compliance with data protection regulations, are factored into cost
estimates. Enhanced security measures may require additional development effort and
resources.
8. Testing and Quality Assurance: Cost estimation tools include provisions for testing
activities, ensuring that the website and database undergo thorough testing phases. This
involves estimating the effort for unit testing, integration testing, and quality assurance
processes.
9. Scalability and Performance: Tools consider the scalability requirements of the website
and database to accommodate potential growth in users or data. Scalability features, such as
load balancing or sharding for databases, impact cost estimates.
10. Documentation and Training: Costs related to documenting the codebase and providing
training for stakeholders are taken into account. Clear documentation and training can
reduce future maintenance costs and enhance the project's overall efficiency.
In summary, cost estimation tools for website and database projects address the intricacies of
web development, database design, technology choices, and other project-specific
factors. By systematically evaluating these elements, these tools contribute to accurate
budgeting, resource planning, and successful financial management throughout the
project lifecycle.

6.3. Version control system


A version control system (VCS) is a tool that helps manage changes to source code or any set
of files over time. From a cost estimation perspective, a VCS offers several benefits that
contribute to overall efficiency and savings in software development:
Ministry of Labor and Estimate cost for Web Version-II
Page 5 of 94 Skills and database projects
Author/Copyright November, 2023
Collaboration Efficiency: VCS enables multiple developers to work on the same project
simultaneously. This parallel development reduces project timelines and labor costs.
Error Reduction: VCS tracks changes made by each developer, allowing for the easy
identification and correction of errors. This can significantly reduce the time and
resources spent on debugging.
Rollback and Recovery: In case of errors or unwanted changes, VCS allows for easy
rollback to a previous stable version. This feature minimizes the impact of mistakes,
reducing the potential costs associated with fixing errors.
Branching and Merging: VCS supports branching, allowing developers to work on separate
features or bug fixes independently. When ready, these changes can be seamlessly
merged into the main codebase. This reduces the likelihood of conflicts and the
associated costs of resolving them.
Auditing and Accountability: VCS logs every change made to the codebase, providing a
detailed history of who made what changes and when. This accountability can help in
assessing the impact of changes and can be crucial in identifying the source of issues,
potentially saving costs related to investigating and resolving problems.
Continuous Integration (CI) and Continuous Deployment (CD): VCS integrates with
CI/CD pipelines, automating the testing and deployment processes. This automation
ensures a more reliable and streamlined development workflow, reducing manual effort
and associated costs.
Code Reviews: VCS facilitates code reviews by providing a clear view of changes made.
Code reviews help catch issues early in the development process, reducing the likelihood
of costly errors in later stages.
Documentation and Collaboration: VCS often includes features for documentation and
collaboration, fostering better communication among team members. Improved
communication can lead to faster issue resolution and more efficient use of resources.
In summary, a version control system contributes to cost savings by improving collaboration,
reducing errors, enabling efficient recovery from mistakes, supporting parallel
development, and streamlining processes in software development projects.
Collaboration and communication tools play a crucial role in enhancing team efficiency and
reducing costs in a business environment. From a cost estimation perspective, these tools
offer several advantages:

Ministry of Labor and Estimate cost for Web Version-II


Page 6 of 94 Skills and database projects
Author/Copyright November, 2023
Remote Collaboration: Collaboration tools enable teams to work together seamlessly,
regardless of geographical locations. This can result in cost savings by reducing the need
for travel expenses and maintaining physical office spaces.
Real-Time Communication: Instant messaging, video conferencing, and collaboration
platforms facilitate real-time communication. This immediacy can lead to quicker
decision-making, issue resolution, and project progress, ultimately saving time and
associated costs.
Document Sharing and Version Control: Tools that allow for easy sharing and
collaboration on documents reduce the risk of errors and streamline workflows. This can
result in time savings and improved accuracy, contributing to overall cost efficiency.
Project Management Integration: Collaboration tools often integrate with project
management systems, providing a centralized platform for task assignment, progress
tracking, and resource management. This integration can optimize project timelines and
resource allocation, leading to cost savings.
Knowledge Sharing and Training: Platforms that facilitate knowledge sharing and training
contribute to employee skill development and faster onboarding. This can reduce training
costs and enhance the overall competency of the workforce.
Workflow Automation: Many collaboration tools offer workflow automation features that
streamline routine tasks. Automating repetitive processes can save time and reduce the
likelihood of errors, ultimately lowering operational costs.
Centralized Communication History: Having a centralized record of communication and
collaboration activities can aid in decision-making, dispute resolution, and project audits.
This historical data can contribute to cost savings by providing insights into project
timelines and resource utilization.
Reduced Email Overhead: Collaboration tools often provide alternatives to traditional
email communication. By reducing reliance on email, which can be time-consuming and
lead to information overload, teams can operate more efficiently, potentially saving on
productivity costs.
Improved Team Productivity: Enhanced collaboration and communication contribute to
improved overall team productivity. When teams can work more efficiently and
effectively, projects are completed faster, leading to potential cost savings.

Ministry of Labor and Estimate cost for Web Version-II


Page 7 of 94 Skills and database projects
Author/Copyright November, 2023
In summary, collaboration and communication tools can lead to cost savings by streamlining
workflows, reducing the need for physical presence, improving communication
efficiency, and optimizing project management processes. These tools contribute to a
more agile and responsive work environment, potentially translating into financial
benefits for organizations.

Self-check 6
Part I: Write true if the statement is correct and false if it is wrong.
1. Project management software can assist in tracking labor costs associated with each task by
breaking down the project into activities.
2. Time tracking functionality in project management software is essential for monitoring
project timelines but does not contribute to accurate labor cost estimation.
3. Git is an example of a centralized version control system widely used for tracking changes in
source code during software development.
4. True/False: Collaboration and communication tools, such as Slack and Microsoft Teams, are
essential for effective teamwork and streamlining communication in website and database
projects.
5. Cost estimation platforms like CostOS and Candy offer specialized features for project
management, including task and activity management, making them versatile tools for overall
project coordination.
Part II:Choose the correct answer
1. Which functionality in project management software is crucial for estimating personnel
costs?
A) Time Tracking C) Cost Tracking and Budgeting
B) Resource Allocation D) Collaboration and Communication
2. Which version control system is known for its speed, flexibility, and branching
capabilities, making it highly popular in web development projects?
A) Subversion (SVN) B) Mercurial C) Git D) Bitbucket
3. What is the primary purpose of using collaboration tools like Slack and Microsoft Teams
in a project?
A) Version control D) Infrastructure setup
B) Code debugging
C) Effective teamwork and
communication
Ministry of Labor and Estimate cost for Web Version-II
Page 8 of 94 Skills and database projects
Author/Copyright November, 2023
4. Which tool is commonly used for estimating costs related to cloud services in website and
database projects?
A) GitLab B) AWS Pricing Calculator C) Jira D) Trello
5. In version control systems, what is the purpose of branching, allowing the isolation of
features or bug fixes?
A) Managing project budgets D) Isolating changes in development
B) Conflict resolution lines
C) Facilitating collaboration

Operation sheet 6.1 Cost estimation using Microsoft project


Operation Title: Cost estimation using Microsoft project
Purpose: To enable trainees to acquire skill to use Microsoft project
Equipment and Tools: Microsoft project
Step 1: Define Project Scope
1. Open your project management software and create a new project.
2. Clearly define the scope of your website and database project. This includes identifying
key features, functionalities, and deliverables.
Step 2: Break Down Work Structure
1. Create a Work Breakdown Structure (WBS) in your project management software. This
breaks down the project into smaller, manageable tasks.
2. Identify tasks related to website development, database design, testing, and other relevant
activities.
Step 3: Estimate Task Durations
1. Assign durations to each task in the WBS. This could be in days or hours, depending on
your project management software.
2. Use historical data or expert judgment to estimate how long each task will take.
Step 4: Identify Resources
1. List the resources (human and material) needed for each task. This might include
developers, database administrators, software licenses, etc.
2. Enter resource information into your project management software.
Step 5: Assign Costs to Resources
1. Attach costs to each resource in your project management tool. This could be hourly rates
for labor or fixed costs for materials and software licenses.
2. Ensure that these rates are accurate and up-to-date.
Step 6: Set Dependencies
Ministry of Labor and Estimate cost for Web Version-II
Page 1 of 94 Skills and database projects
Author/Copyright November, 2023
1. Define task dependencies. For example, website development might depend on the
completion of the database design.
2. Input these dependencies in your project management software.

Step 7: Run Cost Estimates


1. Use the built-in features of your project management software to run cost estimates.
Many tools have cost estimation features that calculate costs based on resource rates, task
durations, and dependencies.
2. Review the calculated costs and ensure they align with your expectations.
Step 8: Add Contingency
1. Factor in contingency costs for unforeseen issues or changes in requirements. This is
often a percentage of the total estimated cost.
2. Update your project plan in the software to reflect the contingency.
Step 9: Review and Adjust
1. Review the overall cost estimate and ensure it aligns with the project budget.
2. Make adjustments as needed, considering any constraints or feedback from stakeholders.
Step 10: Monitor and Update
1. Regularly update the project plan as the project progresses.
2. Monitor actual costs and compare them with the estimated costs.
3. Use the software to track any changes in scope, resources, or timelines, and adjust the
cost estimates accordingly.
Remember that the specific steps and features can vary between project management tools,
so refer to the documentation of the software you're using for detailed instructions.
Additionally, effective communication with the project team and stakeholders is crucial
throughout the estimation and project management process.
Here's a step-by-step guide using Microsoft Project to estimate costs for a website and
database project:
Step 1: Open Microsoft Project and Create a New Project
1. Launch Microsoft Project.
2. Create a new project by selecting "File" -> "New" -> "Blank Project."
Step 2: Define Project Scope and Tasks
1. Go to the "Task" tab and start creating tasks for your project. Include tasks related to
website development, database design, testing, etc.
2. Organize tasks hierarchically using the "Indent" and "Outdent" buttons to create a Work
Breakdown Structure (WBS).
Step 3: Estimate Task Durations
1. Click on the "View" tab and select the "Gantt Chart" view.
2. Double-click on each task and enter estimated durations in the "Duration" field.
Step 4: Identify Resources
1. Navigate to the "Resource" tab.
Ministry of Labor and Estimate cost for Web Version-II
Page 2 of 94 Skills and database projects
Author/Copyright November, 2023
2. Enter the resources needed for each task. For example, developers, database
administrators, software licenses, etc.
Step 5: Assign Costs to Resources
1. In the "Resource Sheet" view, enter the cost information for each resource. This could be
an hourly rate for labor or a fixed cost for materials and software licenses.
2. Ensure that the rates are accurate and up-to-date.
Step 6: Assign Resources to Tasks
1. Go back to the "Gantt Chart" view.
2. Assign resources to each task by entering the resource names in the "Resource Names"
column.
Step 7: Set Dependencies
1. Identify task dependencies by linking tasks. Select the "Predecessors" column and enter
the task IDs that need to be completed before the current task can start.
Step 8: Run Cost Estimates
1. Go to the "Project" tab.
2. Click on "Project Information" and set the start date for your project.
3. Click on "Project" again, then select "Project Information" -> "Advanced Properties" to
set the project's currency.
4. Go to the "Resource" tab and click "Resource Usage" to view resource costs.
5. Use the "Cost" column in the "Gantt Chart" view to see task costs.
Step 9: Add Contingency
1. Create a contingency task or buffer time in your project plan.
2. Assign resources and costs to the contingency task.
Step 10: Review and Adjust
1. Review the overall cost estimate and ensure it aligns with the project budget.
2. Make adjustments as needed based on feedback or constraints.
Step 11: Monitor and Update
1. Regularly update the project plan as the project progresses.
2. Monitor actual costs and compare them with the estimated costs.
3. Use Microsoft Project's tracking features to track changes in scope, resources, or
timelines, and adjust the cost estimates accordingly.
Remember, Microsoft Project has various features and views that can aid in project cost
estimation, so feel free to explore additional functionalities based on your project's needs.
Always communicate the estimates with stakeholders and regularly update the project
plan as the project evolves.

Ministry of Labor and Estimate cost for Web Version-II


Page 3 of 94 Skills and database projects
Author/Copyright November, 2023
Reference

Books:
1. "Software Estimation: Demystifying the Black Art" by Steve McConnell:
2. "The Art of Project Management" by Scott Berkun:
3. "Estimating Software Costs: Bringing Realism to Estimating" by Capers Jones:
Online Resources:
1. SEER by Galorath:
 SEER is a suite of software estimation tools. Their website also features insightful
articles and resources on cost estimation.
2. ProjectManagement.com:
 ProjectManagement.com offers a wealth of articles, webinars, and templates
related to project management and estimation.
3. IEEE Software Engineering Body of Knowledge (SWEBOK):
 SWEBOK provides a comprehensive overview of software engineering knowledge
areas, including software cost estimation.
4. Project Management Institute (PMI):
 PMI is a global leader in project management resources. Explore their
publications, webinars, and standards for project cost management.

Ministry of Labor and Estimate cost for Web Version-II


Page 4 of 94 Skills and database projects
Author/Copyright November, 2023
Ministry of Labor and Estimate cost for Web Version-II
Page 5 of 94 Skills and database projects
Author/Copyright November, 2023
Developer’s Profile

Qualific
N Organization/ Mobile
Name atio Field of Study E-mail
o Institution number
n
1 Frew Atkilt M-Tech Network & Bishoftu 0911787374 frew.frikii@gmail.com
Information Polytechnic
Security College
2 Gari Lencha MSc ICT Managment Gimbi Polytechnic 0917819599 Garilencha12@gmail.com
3 Kalkidan BSc Computer Science Entoto Polytechnic 0978336988 kalkidaniel08@gmail.com
Daniel
4 Solomon M-Tech Computer M/G 0918578631 solomonmelese6@gmail.com
Melese Engineering /M/Polytechnic
College
5 Tewodros MSc Information system Sheno Polytechnic 0912068479 girmatewodiros @gmail.com
Girma College
6 Yohannes BSc Computer Science Entoto Polytechnic 0923221273 yohannesgebeyehu73@gmail.co
Gebeyeh College m

Ministry of Labor and Estimate cost for Web Version-I


Page 6 of Skills and database
94 Author/Copyright projects November,
2023
u

Ministry of Labor and Estimate cost for Web Version-II


Page 7 of 94 Skills and database projects
Author/Copyright November, 2023

You might also like