EIA checklist
By yousra ahmed
Sec: 3
EIA report
Date: 24/3/2024
CHECKLIST FOR EIA REPORT
E.1 CHECKLIST FOR ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
REPORT
Adequacy Check
Item Remarks
Yes No
1.0 Executive Summary (Brief and Concise)
(a) In Bahasa Malaysia
(b) In English
2.0 Introduction
2.1 (a) Title of the project
(b) Project Proponent details
(c) EIA Consultant details
(d) Project location (boundary
coordinates)
(e) Relevant maps showing project
location and ESAs
2.2 Legal requirements
3.0 Terms of Reference
4.0 Statement of Need
(a) Principle reasons for proposed project
(include relevant supporting
documents)
(b) Aim of project
5.0 Project Options
(a) Alternatives considered?
(b) Project optimisation done?
6.0 Project Description
6.1 Project concept:
(a) Layout plan (Map)
(b) Landuse zoning and compatibility
(c) Size and land requirement
(d) Project component
(e) Method statement
(f) Labour requirement Contractor
(g) Raw material requirement Contractor
(h) Marine/Land transport Contractor
(i) Infrastructure/Utilities/Amenities
6.2 Project activities: Construction
6.3 Project activities: Operational
6.4 Project Implementation Schedule (Chart)
7.0 Description of Existing Environment
7.1 Baseline
1
CHECKLIST FOR EIA REPORT
(a) Physico-chemical
(i) Topography
(ii) Soil investigations Limited
(iii) Geological terrain mapping
(iv) Geotechnical report
(v) Seismic study
(vi) Landuse (5-km radius)
(vii) Hydrology/drainage
(viii) Climate
(ix) Water quality
(x) Ambient air quality
(xi) Ambient noise and vibration
levels
(b) Biological
(i) Terrestrial (Flora and fauna)
(ii) Aquatic/Marine (Flora and fauna)
(c) Socio-economy
(i) Demography
(ii) Historical, cultural and
archaeological aspects
7.2 Others:
(a) Traffic Impact Assessment
(b) Health Impact Assessment
(c) Social Impact Assessment
8.0 Evaluation of Impacts
8.1 Detailed examination of impacts during:
(a) Pre-construction Phase
(i) Site access
(ii) Site surveys, soil and
geotechnical studies
(iii) Environmental assessment
(iv) Land acquisition
(b) Construction Phase
(i) Access road and stream
crossings
(ii) Base camp and site facilities
establishment
(iii) Worker recruitment, mobilisation
of equipment and materials
(iv) Site clearing and biomass
removal
(v) Earthworks
(vi) Blasting
(vii) Drainage works
2
CHECKLIST FOR EIA REPORT
(viii) Structural works and facilities
establishment
(ix) Waste disposal
(x) Establishment of permanent
access
(xi) Final finishing and landscaping
(c) Operational Phase
(i) Occupation and operation of
project
(ii) Slope maintenance
(iii) Infrastructure, utility and
amenities maintenance
(d) Decommissioning Phase
(i) Site decommissioning
(ii) Rehabilitation works
9.0 Pollution Prevention and Mitigation Measure (P2M2)
9.1 Environmental Aspects
(a) Erosion and sedimentation
(b) Landslides and slope failure
(c) Drainage and flooding
(d) Water pollution
(e) Air quality and dust control
(f) Noise and vibration control
(g) Waste management
(h) Ecological management
(i) Public health and safety
(j) Land traffic
(k) Infrastructure and utility
10.0 Environmental Management Plan (EMP)
10.1 Guided Self-Regulation detailed out?
10.2 Pollution Control Systems provided?
10.3 LD-P2M2 included?
10.4 Proposed Monitoring Programme:
(a) Location of monitoring points
(b) Frequency of monitoring
(c) Parameters to be measured
(d) Procedures for reporting and
enforcement
10.5 Environmental Audit Programme
11.0 Study Findings/Conclusion
12.0 Reference
13.0 Appendices