0% found this document useful (0 votes)
80 views1 page

TCS Builtup

Uploaded by

venu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
80 views1 page

TCS Builtup

Uploaded by

venu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Ex.

Shyness

Ex. Shyness
Footpath & CARRIAGEWAY Ex. CARRIAGEWAY Footpath &
PAVER PAVED MEDIAN PAVED PAVER
Drain BLOCK BLOCK Drain
SHOULDER SHOULDER

ANTI-GLARE SCREEN
Building line Pedestrian Guard Rail (h=1.1m) Building line
Pedestrian Guard Rail (h=1.1m)
Chequered Tiles Chequered Tiles
Kerb Drain with Grating Kerb Drain with Grating
100mm Thk. Slab
300mm Length at 3m c/c
FRL 3.0% 3.0% FRL 300mm Length at 3m c/c 100mm Thk. Slab
(M25)
2.5% 2.5% (M25)

200 200

(M25)

M25 (Minimum)
100
(M25) (M25)

1000
(Minimum)
1000
M25
200

200
GL GL
100 thk PCC (M-15) 100 thk PCC (M-15)

wheephole matching wheephole matching


GSB bottom GSB bottom

BC
DBM

TCS-4: OVERLAY OF EXISTING 4-LANE ROAD IN BUILT-UP AREA

You might also like