Ex.
Shyness
Ex. Shyness
Footpath & CARRIAGEWAY Ex. CARRIAGEWAY Footpath &
PAVER PAVED MEDIAN PAVED PAVER
Drain BLOCK BLOCK Drain
SHOULDER SHOULDER
ANTI-GLARE SCREEN
Building line Pedestrian Guard Rail (h=1.1m) Building line
Pedestrian Guard Rail (h=1.1m)
Chequered Tiles Chequered Tiles
Kerb Drain with Grating Kerb Drain with Grating
100mm Thk. Slab
300mm Length at 3m c/c
FRL 3.0% 3.0% FRL 300mm Length at 3m c/c 100mm Thk. Slab
(M25)
2.5% 2.5% (M25)
200 200
(M25)
M25 (Minimum)
100
(M25) (M25)
1000
(Minimum)
1000
M25
200
200
GL GL
100 thk PCC (M-15) 100 thk PCC (M-15)
wheephole matching wheephole matching
GSB bottom GSB bottom
BC
DBM
TCS-4: OVERLAY OF EXISTING 4-LANE ROAD IN BUILT-UP AREA