ITEM DESCRIPTION UNIT
I. GENERAL REQUIREMENTS
A Mobilization
B Temfacil lot
1 Bankhouse lot
2 Temporary Enclosure lot
3 Utilities lot
C Safety lot
D Demobilization lot
II. SITE WORKS
A Site Clearing & Grubbing, Layout & Staking lot
B Excavation lot
III. CIVIL & STRUCTURAL WORKS
A GROUND FLOOW CONCRETING & MASONRY
1 GF Footing
1.1 3000 Psi Concrete cu.m
1.2 Gravel Bedding cu.m
1.3 Rebars G33 kl
1.4 Formworks & Scaffolds sqm
2 Tie Beam lm
2.1 3000 Psi concrete cu.m
2.2 Rebars kl
2.3 Formworks & Scaffolds sqm
3 Wall Footing (additional) lm
3.1 3000 Psi Concrete cu.m
3.2 Gravel Bedding cu.m
3.3 Rebars G33 Ig
4 GF Column
4.1 3000 Psi concrete cu.m
4.2 Rebars kl
4.3 Formworks & Scaffolds sqm
5 GF Slab (additional) sqm
5.1 3000 Psi Concrete cu.m
5.2 Gravel Bedding cu.m
5.3
Rebars G33 Ig
6 Stairs
6.1 3000 Psi concrete cu.m
6.2 Rebars kl
6.3 Formworks & Scaffolds sqm
7 GF 6’’ Base Wall sqm
7.1 6’’CHB plastered with 10mm DRB sqm
7.2 Backfill & Compaction cubm
8 GF 4’’ CHB Wall (additional)
8.1 6’’CHB plastered with 10mm DRB sqm
B SECOND FLOOR CONCRETING & MASONRY
1 Suspended Slab & Beam (additional) sqm
1.1 3000 Psi concrete cu.m
1.2 Rebars kl
1.3 0.7mmx5cm profilex95cm eff. Width steel deck lm
1.4 Formworks & Scaffolds sqm
2 2F Column
2.1 3000 Psi concrete cu.m
2.2 Rebars kl
2.3 Formworks & Scaffolds sqm
3 Roof Beam
3.1 3000 Psi concrete cu.m
3.2 Rebars kl
3.3 Formworks & Scaffolds sqm
4 2nd Storey 4’’ CHB Wall sqm
4.1 6’’CHB plastered with 10mm DRB sqm
C ROOF FRAME & ROOFING WORKS
1 1.5mmx2’’x6’’ C Purlins Ig
2 1.2mmx2’’x6’’ C Purlins Ig
3 2.5mmx2’’Steel Angle (Cut as cleat) Ig
4 RibType Roofing lm
5 GI Pre-painted Inside Gutter Ig
6 GI Pre-painted End Wall Flashing Ig
7 Consumables lot
IV ARCHITECTURAL WORKS
A Glass and Aluminum (additional) sqft
B Doors & Gates
800mm wide Wooden Panel Door w/ doorknob-
1 set
painted
2 700mm wide PVC Louver Door set
C Floor & Wall Finishes
1 400x400mm CR wall tiles pc
2 400x400mm CR floor tiles pc
3 600x600mm Floor Tiles pc
400x400mm Rustic Floor Tiles (stair steps, kitchen,
4 pc
balconies)
5 Granite Slab pc
6 60x60cm Black Tiles pc
7 2’’x10’ Aluminum Stair Nosing Ig
8 Portland Cement bg
9 Fine Sand cubm
10 ABC Grout bg
D Ceiling Works
1 PVC Ceiling-Ficem Board on light metal frames sqm
GI Spandrel Ceiling-Ficem Board on light metal
2 sqm
frames
E Railing
1 1 1.5mm thk-38 Square Tube lot
2 1.2mm thk-25 Square Tube lot
3 Consumables lot
F Concrete Canopies
1 Concrete Canopies sqm
G Cabinets
1 Kitchen Counter Cabinet lot
H Painting Works
1 Masonry Wall
1.1 Concrete Neutralizer gal
1.2 Primer gal
1.3 Reducer gal
1.4 Skim Coat bg
1.5 Marine Epoxy gal
1.6 Semi-Gloss Latex gal
1.7 Consumables lot
1.8 Metal
1.9 Red Oxide gal
2 Epoxy Primer gal
2.1 Body Filler gal
2.2 Automotive Paint gal
2.3 Paint Thinner gal
2.4 Epoxy Reducer gal
2.5 Lacquer Thinner gal
2.6 Consumables lot
V PLUMBING WORKS
A Fixtures
1 Water Closet Package set
2 Shower Set set
3 Kitchen Sink set
4 Goose Neck Faucet set
5 Hose Bib unit
6 SS Floor Drain unit
B Sewer & Drainage System lot
C Clean Water System lot
E Catch Basin
1 400x400 Catch Basin unit
VI ELECTRICAL WORKS
1 EMT lg
2 Wire Holder pc
3 Entrance Cap pc
4 #8 THHN Stranded Wire lm
5 #10 THHN Stranded Wire lm
6 #12 THHN Stranded Wire lm
7 #14 THHN Stranded Wire lm
8 Electrical Devices, Conduits, etc lot
9 6 branches Panel Board unit
10 Single -Gang Switch pc
11 2 -Gang Switch pc
12 Duplex Convenience Outlet pc
13 ACU Outlet pc
14 50A CB (Plug-in) pc
15 15A CB (Plug-in) pc
16 20A CB (Plug-in) pc
17 30A CB (Plug-in) pc
18 Recessed Light with housing set
VII OTHERS
A Water Proofing (CR & roof deck) lot
VIII POST-CONSTRUCTION
A Cleaning of Physical Job Site
B Reviewing the Project with Clients
C Finalizing Project Documents
D Returning of Equipment
E Punchlisting
F Transferring of Documents