GOVERNMENT POLYTECHNIC GONDIA
FULCHUR, GONDIA-441601
                                        FAX: 07182235136
                                  EMAIL: gp.gondia@gmail.com
                                  WEBSITE: www.gpgondia.ac.in
                             PROJECT DIARY
                                      ACADEMIC YEAR: 2023-24
Course: Capstone Project Execution
  Roll no.         Enrollment no.                              Name of student
     09              2112420240                            Pratima R. Dongarwar
     12              2112420251                              Ajinkya M. Kawale
     26              2112420265                            vaishnavi. P. Machhirke
     27              2112420268                              Diksha M. Jagane
     28              2112420269                             Ritik M. Dhodharmal
     32              2112420274                              Kamini R. Gautam
Government Polytechnic, Gondia
Vision
To create technically competent and socially responsible technicians for Industries and society
Mission
To impart knowledge to cater the need of industries and society.
To develop technical and environment friendly competencies to solve real life problem.
To inculcate the spirit of team work, ethical values and leadership qualities.
To escalate skills of faculties and staff through training.
Computer Department
Vision
To strive for the development of technicians and empower them to face ever changing challenges in the field
of Computer Engineering.
Mission
    ·     M1: To impart knowledge through teaching learning process to cater the needs of industries and higher education for
          life-long learning.
    ·     M2: To imbibe ethical values and professional competencies.
    ·     M3: To provide environment friendly solutions to solve real life problems.
    ·     M4: To inculcate leadership qualities to solve problems of industry and Society.
                   Project Confirmation and Model Presentation
Date of presentation: 10 / 04 / 2024
Name of group members:
 1. Pratima R. Dongarwar    (2112420240)
 2.Ajinkya M. Kawale       (2112420251)
 3.Vaishnavi P. Machhirke (2112420265)
 4.Diksha M. Jagane        (2112420268)
 5.Ritik M. Dhodharmal    (2112420269)
 6.Kamini R. Gautam       (2112420274)
                                                                  Name and sign of
           Name of project                  Criteria of project
                                                                  committee members
           Smart classroom              IoT based smart light
                                        system
Name of project selected: IoT Based Smart Light System
Name of Guide: B. M. Meshram Madam
Sign of Guide:
                         Time frame for project
Sr.no   Weeks                    Project content completion target
  1       1     Communicating with group member
  2       2     Designing circuit diagram
  3       3     Selection of proper material
  4       4     Selection of marketplace
  5       5     Buying or ordering proper resources
  6       6     Implementation of circuit diagram
  7       7     Ordering required extra resources
  8       8     Working on voice recognition module
  9       9     Completion of circuit / hardware
 10      10     Mid-term Presentation
 11      11     Writing code for project
 12      12     Writing code for sender circuit
 13      13     Implementation on circuit
 14      14     Final confirmation of project
 15      15     Writing thesis of project
 16      16     Final submission of term work
                                             Progress of the project
      Week 1: Communicating with group member
From: -      02/02/2024                    To: - 08/02/2024
                                                                                            Date of    Dated sign
Sr.no             Project activity                          Description
                                                                                          completion   of Guide
  1      Setting meeting platform            We discussed on circular of msbte on        02/02/2023
                                             CPE
                                                                                         03/02/2024
  2      Discussion                          We discussed on state the objective or
                                             goal of the project.
  3      Dividing work                       We divided work according to                04/02/2024
                                             satisfaction of members
  4      Starching for material              List the materials used, such as         05/02/2024
                                             Microcontroller, smart bulbs, Bluetooth.
  5      Research mobile app development     We started research on mobile               06/02/2024
         framework and technologies
                                             application. mobile apps can be developed
                                             to control and monitor the smart light
                                             system from a smartphone.
  6      Study of previous applications      We started study on previous control        07/02/2024
                                             the brightness, speed and scheduling
                                             of light using a smartphone app.
  7      Confirmation of process to          We selected process to follow for           08/02/2024
         complete goal & Diary writing       completion of goal and write weekly
                                             dairy
      Remarks (if any):
      Signature of the Guide:
                                             Progress of the project
Week 2: Designing circuit diagram
From: - 09/02/2024        To:- 15/02/2024
                                                                                        Date of    Dated sign
Sr.no                Project activity                       Description
                                                                                      completion   of Guide
  1      Selection of sender circuit        We shortlist master circuit diagram      09/02/2024
         diagram                            from websites
  2      Additional changes on sender       We implemented our idea with Bluetooth 10/02/2024
         circuit                            module
  3      Designing sender circuit diagram   we designed master circuit diagram       11/02/2024
                                            with components
  4      Selection of receiver circuit      we shortlisted slave circuit diagram     12/02/2024
         diagram                            from websites
  5      Additional changes on receiver     We implemented our idea with servo       13/02/2024
         circuit                            motors
  6      Designing receiver circuit         we designed slave circuit diagram with   14/02/2024
         diagram                            components
  7      Final confirmation                 Finally, our guide confirmed our         15/02/2024
                                            circuits.
      Remarks (if any):
      Signature of the Guide:
                                              Progress of the project
Week 3: Selection of proper material
From: - 16/02/2024         To: -22/02/2024
                                                                                             Date of    Dated sign
Sr.no                Project activity                         Description
                                                                                           completion   of Guide
  1      Microcontroller                     Using a 12-volt microcontroller may         16/02/2024
                                             require additional components.
  2      Relay AND Single channel relay      We selected 12v single channel relay          17/02/2024
                                             allows to control a single device or circuit.
  3      Optocoupler                         We selected 5v                              18/02/2024
  4      Arduino board                       Arduino nano for master circuit             19/02/2024
  5      Bluetooth module                    HC05 Bluetooth module                       20/02/2024
  6      Breadboard                          Arduino uno for slave circuit               21/02/2024
  7      Final selection                     We all group member confirmed this          22/02/2024
                                             component
      Remarks (if any):
      Signature of the Guide:
                                     Progress of the project
Week 4: Selection of marketplace
from: - 23/02/2024         To: -
01/03/2024
                                                                             Date of    Dated sign
Sr.no             Project activity               Description
                                                                           completion   of Guide
  1      Transformer                 Kolkata 3dprinted.in                  23/02/2024
  2      Voltage regulator           Electronicscomp.com                   24/02/2024
  3      Crystal oscillator          Electronicscomp.com                   25/02/2024
  4      Jumper wire, Load wire      Electronicscomp.com                   26/02/2024
  5      Capacitor, Diode            Electronicscomp.com                   27/02/2024
  6      AC Bulb holderbat Bulb      Amazon.com                            28/02/2024
  7      Final selection             We finally selected marketplace for   01/03/2024
                                     our hardware components
      Remarks (if any):
      Signature of the Guide:
                                             Progress of the project
Week 5: Buying or ordering proper resources
From: - 02/03/2024        To: - 08/03/2024
                                                                                       Date of    Dated sign
Sr.no             Project activity                         Description
                                                                                     completion   of Guide
  1      Discussion meeting                  We discussed with group members         02/03/2024
  2      Ordered materials from              We added and checkout some              03/03/2024
         amazon                              components from amazon
  3      Safety and reliability of           We talked with hr. of 3dindia.in        04/03/2024
         3dindia.in                          abate service reliability
  4      Ordered materials from online Confirmed order                               05/03/2024
  5      Ordered components from             We added and checkout some              06/03/2024
         electronicscomp.com                 components from this site
  6      Discussion with group               Discussed with team members on          07/03/2024
         members                             cost of materials and cost estimation
  7      Final checkouts                     We confirmed all orders                 08/03/2024
      Remarks (if any):
      Signature of the Guide:
                                          Progress of the project
Week 6: Implementation of circuit diagram
From:- 09/03/2024           To:- 15/03/2024
                                                                                        Date of    Dated sign
Sr.no              Project activity                         Description
                                                                                      completion   of Guide
  1      Meeting                               We all discussed face to face          09/03/2024
                                               regarding implementation of circuit
                                               diagram to add on thesis
         Selected software                    We discussed and shortlisted some
  2                                           software for designing                  10/03/2024
         Confirm software                      We confirmed software for designing
  3                                            circuit
                                                                                      11/03/2024
  4      Designing sender circuit              we designed master circuit diagram     12/03/2024
         diagram                               with components
  5      Additional changes on sender          we shortlisted slave circuit diagram   13/03/2024
         circuit diagram                       from websites
  6      Additional changes on                 We implemented our idea with           14/03/2024
         receiver circuit                      servo motors
  7      Final confirmation                    Finally, our guide confirmed our       15/03/2024
                                               circuits.
      Remarks (if any):
      Signature of the Guide:
                                            Progress of the project
Week 7: Ordering required extra
Resources from: - 16/03/2024            To: -
22/03/2024
                                                                                               Date of    Dated sign of
Sr.no             Project activity                            Description
                                                                                             completion      Guide
  1       Received our orders               We received orders but problem was that we       16/03/2024
                                            did not order assembly tools so we started
                                            searching them.
  2       First of all, we researched       From many websites, videos i decided some        17/03/2024
          required resources                materials
  3       Then ordered from amazon          Fishing wires, bulb, optocoupler, materials      18/03/2024
  4       I go to market                    I brought some screws, wires, jumper wires.      19/03/2024
  5       Shouldering ion                   Our group member has ion so he got his ion       20/03/2024
  6       Discussion confirmation           Finally, we discussed for this extra materials   21/03/2024
                                            cost
  7       Final collection                  We collected all materials and store them in     22/03/2024
                                            my (leaders) home.
      Remarks (if any):
        Signature of the Guide:
                                           Progress of the project
      Week 8: Working on voice recognition
Module From:- 23/03/2024             To:- 29/03/2024
                                                                                     Date of    Dated sign
Sr.no             Project activity                        Description
                                                                                   completion   of Guide
  1      Discussion                          We all discussed on master circuit    23/03/2024
  2      Collection of proper resources      We shortlisted and collected proper   24/03/2024
                                             resources for master circuit
  3      Bluetooth module                    We configured Bluetooth module of     25/03/2024
         configuration                       master circuit and then written
                                             down its address
  4      Implementation of circuit           Using nano, v3 module and HC05        26/03/2024
                                             we started work.
  5      use of soloing ion                  We used scolding ion for connection   27/03/2024
  6      Completion of sender circuit        We successfully implemented           28/03/2024
                                             master circuit then seated voice in
                                             it
  7      Final testing                       Tested voice commands in serial       29/03/2024
                                             monitor
      Remarks (if any):
      Signature of the Guide:
                                             Progress of the project
      Week 9: Completion of circuit /
Hardware From: -30/03/2024           To: -
05/04/2024
                                                                                     Date of     Dated sign
Sr.no             Project activity                         Description
                                                                                    completion   of Guide
  1      Received hand from online           Unpack the order                      30/03/2024
  2      Study                               We started study on small parts       31/03/2024
                                             which was before onset image
  3      Now started assembling smart        We started assembling with fishing    01/04/2024
         light system
                                             wires and play material
  4      Assembling                          Assembling remote monitoring using    02/04/2024
                                             smart light system
  5      Assembling parts                    We assembled LED light generate by    03/04/2024
                                             control the light remotely.
  6      Mobile application assembly         We assembled apps allow users to       04/04/2024
                                             adjust speed, on/off and scheduling of
                                             the light remotely.
  7      Final confirmation                  We checked each smart classroom       05/04/2024
                                             and joins
      Remarks (if any):
      Signature of the Guide:
                                             Progress of the project
Week 10: Mid-term Presentation
From: - 06/04/2024        To: - 12/04/2024
                                                                                      Date of    Dated sign
Sr.no             Project activity                          Description
                                                                                    completion   of Guide
  1      Discussion                          We all group member discussed          06/04/2024
                                             because faculty give us date for mid
                                             presentation which was on
                                             10/04/2023
  2      Sender circuit confirmation         We checked with many inputs            07/04/2024
                                             sender circuit
  3      Hand confirmation                   We confirmed our hand by testing       08/04/2024
                                             it many time
  4      Preparation                         We all prepared for presentation       09/04/2024
  5      Final midterm presentation          The presentation was all good          10/04/2024
  6      Study                               We started study on our receiver       11/04/2024
                                             circuit
  7      Diary writing                       We updated our daily diary             12/04/2024
      Remarks (if any):
      Signature of the Guide:
                                           Progress of the project
Week 11: - Writing code for project
From: - 13/04/2024                To: - 19/04/2024
                                                                                Date of    Dated sign
Sr.no          Project activity                       Description
                                                                              completion   of Guide
  1      Discussion                   We all group member discussed for       13/04/2024
                                      laptop on which the code will written
                                      and leader started it from his laptop
  2      Software                     Leader downloaded all sdk for running   14/04/2024
                                      and editing code
  3      Libraries                    Leader downloaded all lbraries          15/04/2024
  4      Configuration                Now they configured all Bluetooth       16/04/2024
                                      modules
  5      Writing                      Final writing of code is started        17/04/2024
  6      Writing                      Final writing of code is continued      18/04/2024
  7      editing                      Editing of code is done                 19/04/2024
      Remarks (if any):
      Signature of the Guide:
                                       Progress of the project
Week 12: Writing code for sender circuit
From: - 20/04/2023 To: - 26/04/2023
                                                                              Date of    Dated sign
Sr.no              Project activity                 Description
                                                                            completion   of Guide
  1      Discussion                    We all group member discussed        20/04/2024
                                       for laptop on which the code will
                                       written and leader started it from
                                       his laptop
  2      Software                      Leader downloaded all sdk for        21/04/2024
                                       running and editing code
  3      Libraries                     Leader downloaded all lbraries       22/04/2024
  4      Configuration                 Now they configured all Bluetooth    23/04/2024
                                       modules
  5      Writing                       Final writing of code is started     24/04/2024
  6      Writing                       Final writing of code is continued   25/04/2024
  7      editing                       Editing of code is done              26/04/2024
      Remarks (if any):
      Signature of the Guide:
                                              Progress of the project
      Week 13: Implementation on
Circuit From: - 27/04/2023            To: -
03/05/2023
                                                                                  Date of     Dated sign
Sr.no              Project activity                        Description
                                                                                 completion   of Guide
  1      Meeting                              We group members discussed on     27/04/2024
                                              implementation
  2      connecting circuit                   We implemented code connecting    28/04/2024
                                              all real module in atmega328p
  3      Receiver circuit                     We implemented code to atmega328p 29/04/2024
                                              By using buffer technics
  4      Testing                              We tested all circuit             30/04/2024
  5      Testing                              We tested all really module       01/05/2024
  6      Fixing bugs                          Some bugs found we resolve them   02/05/2024
  7      Final implementation                 After testing and debugging we    03/05/2024
                                              finally implemented codes on
                                              circuit
      Remarks (if any):
      Signature of the Guide:
                                      Progress of the project
      Week 14: Final confirmation & presentation of
Project From: - 04/05/2023 To: - 10/05/2023
                                                                                 Date of    Dated sign
Sr.no             Project activity                     Description
                                                                               completion   of Guide
  1      Completion                     We completed with our project          04/05/2024
  2      preparation                    We started preparation of              05/05/2024
                                        presentation
  3      Decoration                     We decorated our project               06/05/2024
  4      store                          We maced proper box for storing        07/05/2024
                                        project Smart Light
  5      Circuit assembly               We assembled circuits in small         08/05/2024
                                        plastic payout with the help of glue
                                        gun
  6      Wires binding                  We bound all wires properly            09/05/2024
  7      Final presentation             This was our final presentation and    10/05/2024
                                        we successfully executed and
                                        presented our project.
      Remarks (if any):
      Signature of the Guide:
                                           Progress of the project
      Week 15: Writing thesis of project
from: - 11/05/2023        To: -
17/05/2023
                                                                                   Date of    Dated sign
Sr.no              Project activity                     Description
                                                                                 completion   of Guide
  1      Introduction and starting         We write introduction and             11/05/2024
         pages                             certificate, acknowledgement,
                                           index, abstract
  2      Methodology                       We started writing                    12/05/2024
                                           scope, methodology and objectives.
  3      Code & results                    We write codes and added results      13/05/2024
                                           in thesis
  4      Testing and implementation        We write testing process added        14/05/2024
         details                           uml diagrams etc.
  5      Images, literature survey and     Today i created literatures, images   15/05/2024
         user manual                       and user manual in thesis
  6      Checking by guide                 Our guide told us some changes        16/05/2024
  7      Final confirmation                After making changes our guide        17/05/2024
                                           approved our thesis.
      Remarks (if any):
      Signature of the Guide:
                                      Progress of the project
Week 16: Final Submission of term work
From: - 18/05/2023 To: - 24/05/2023
                                                                              Date of    Dated sign
Sr.no             Project activity                   Description
                                                                            completion   of Guide
  1      Thesis printing              We give thesis for printing to cafe   18/05/2024
  2      Diary printing               We gave diary for printing            19/05/2024
  3      CD-ROM                       We buy cd and uploaded all            20/05/2024
                                      documents, pdf, videos related to
                                      cpp and cpe
  4      Google drive                 We uploaded similar media on          21/05/2024
                                      google drive
  5      Received diary and           We give our thesis and diary to       22/05/2024
         report/thesis                guide for signatures
  6      Signatures                   We gave diary and report to hod       23/05/2024
                                      and principal for signatures.
  7      Final submission             We finally submitted term work to     24/05/2024
                                      department and guide respectively.
      Remarks (if any):
      Signature of the Guide: