0% found this document useful (0 votes)
314 views11 pages

Form CIDB IBS Score M1 2018

Uploaded by

hkhcsb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
314 views11 pages

Form CIDB IBS Score M1 2018

Uploaded by

hkhcsb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 11
Form CIDB IBS Score M1(2018) CALCULATION FOR IBS SCORE For office use No: Project Registration Project Category: Project Name: Contract Valve: Contractor Name: Developer / Owner Name: Architecture Consultant CivillStructure Engineer Consultant Name: List of Submitted Drawings 1) 6) 2) 7 3) 8) 4) 9) 5) 10) We hereby declare that the information given and. the IBS Score submitted herewith is true and complete. ‘The total IBS Score for the proposed building / project is Date: Name & Signature of Qualified Person Designation: Reg No. (ArchiPE): CALCULATIONS OF OVERALL IBS SCORE PROJECT DETAILS Project Name : TypelBlock No : Total no of Units/blocks: Contract Value! Category of Building Residential (landed) Industrial ‘Commercial Residential (high rise) Institutional Others For mixed development, please indicate the area of the category: Residential (landed) Industrial Residential (high rise) Institutional m ‘Commercial im’ Others CALCULATION OF IBS SCORE 4.4 FLOOR = PRECAST CONCRETE SLAB a) Precast columns and beams 10 b)_ Precast columns and in-situ beams using reusable a formwork ©) Precast columns and in-situ beams using timber op formwork d) Precast beams and in-situ columns using reusable oG formwork @) Precast beams and in-situ column using timber or formwork ) In-situ column and beams using reusable system, oe formwork g) In-situ column and beams using timber formwork 05 hh) Metal columns and beams 10 i) Timber column and beam 10 |) Load bearing blocks 08 )_ Metal framing with permanent formwork 07 4.2 FLOOR = IN-SITU CONCRETE ON PERMANENT FORMWORK a) Precast columns and beams 08 b) Precast columns and in-situ beams using reusable or formwork ©) Precast columns and in-situ beams using timber oe formwork 4). Precast beams and in-situ columns using reusable oF formwork ) Precast beams and in-situ column using timber oa formwork ) In-situ column and beams using reusable system formwork oS @)_Insitu column and beams using timber formwork o4 1h) Metal columns and beams 08 i) Timber colurmn and beam 08 |) Load bearing blocks 07 k)_ Metal framing with permanent formwork 06 4.3 FLOOR = IN-SITU CONCRETE USING REUSABLE FORMWORK a) Precast columns and beams 06 b) Precast columns and in-situ beams using reusable G formwork ©) Precast columns and in-situ beams using timber on formwork d) Precast beams and in-situ columns using reusable formwork oS @) Precast beams and in-situ column using timber aa formwork 4) In-situ column and beams using reusable system oa formwork 9) In-situ column and beams using timber formwork 02 h) Metal columns and beams 06 i) Timber column and beam 06 |) Load bearing blocks 05 ) Metal framing with permanent formwork 04 4.4 FLOOR = IN-SITU CONCRETE USING TIMBER FORMWORK a) Precast columns and beams 05 b)_ Precast columns and in-situ beams using reusable on formwork ©) Precast columns and in-situ beams using timber oo formwork 4) Precast beams and in-situ columns using reusable 04 formwork °) Precast beams and in-situ column using timber formwork oo 4) In-situ column and beams using reusable system oa formwork @) In-situ column and beams using timber formwork 0.0 hh). Metal columns and bears 08 i) Timber column and beam 08 |) Load bearing blocks oa k) Metal framing with permanent formwork 03 4.5 FLOOR = STEEL FLORING SYSTEM a) Precast columns and beams 10 b)_ Precast columns and in-situ beams using reusable ae formwork ©) Precast columns and in-situ beams using timber op formwork d) Precast beams and in-situ columns using reusable 08 formwork @). Precast beams and in-situ column using timber or formwork 4) In-situ column and beams using reusable system a formwork 9) In-situ column and beams using timber formwork 05 hh) Metal columns and beams 10 i) Timber column and bear 10 4) Load bearing blocks 08 k)_ Metal framing with permanent formwork o7 1.6 FLOOR = TIMBER FRAME FLORING SYSTEM a) Precast columns and beams 10 b)_ Precast columns and in-situ beams using reusable oe formwork ©) Precast columns and in-situ beams using timber or formwork d) Precast beams and in-situ columns using reusable 08 formwork €) Precast beams and in-situ column using timber ca formwork 4) In-situ column and beams using reusable system ae formwork 9) In-situ column and beams using timber formwork 05 hh) Metal columns and beams 10 i) Timber column and beam 10 4) Load bearing blocks 08 k)__ Metal framing with permanent formwork o7 4.7 FLOOR = NO SLAB a) Precast columns and beams 10 b) Precast columns and in-situ beams using reusable oe formwork ©) Precast columns and in-situ beams using timber op formwork 4d) Precast beams and in-situ columns using reusable 08 formwork ©) Precast beams and in-situ column using timber 07 formwork 4) In-situ column and beams using reusable system oe formwork 9) In-situ column and beams using timber formwork 05 hh) Metal columns and beams 10 i) Timber column and bear 10 i) Load bearing blocks 08 k)__ Metal framing with permanent formwork o7 2.0 ROOF SYSTEM a) Prefab timber roof trusses 10 b)_ Prefab metal roof trusses 10 ©) Conventional timber roof trusses 00 TOTALAREA Dm ‘Sub-total for structural system (maximum 50 points) (A) PART 2: WALL SYSTEM a) Precast concrete panels 10 b). Wall clad 10 ©) Prefabricated timber panels 10 4d) Full height glass panels 10 @) Drywall systems 10 4) In-situ concrete with reusable system formwork o4 9) In-situ concrete with permanent formwork o7 hh). Blockwork systems 0s ) Common brickwalls, 00 j) In-situ concrete with timber formwork 0.0 TOTAL AREA || bay ‘Sub-total for wall system (maximum 20 points) ( B ) PART 3: OTHER SIMPLIFIED CONSTRUCTION SOLUTIONS. 10 Utilisation of standardized components based| on MS1064 a) Beams Nos 2 4 b) Columns Nos 2 4 ©) Walls, m 2 4 4) Slabs mm 2 4 ©) Doors Nos 2 4 4) Windows Nos 2 4 trommrmenme a) For building more than 2 storeys ii. Vertical repetition of structural floor layout Nos 1 2 iii, Horizontal repetition of structural floor layout Nos 1 2 a) Usage of prefab bathroom units (PBU) Nos 1 2 b)_ Usage of prefab staircase Nos 1 2 c) Usage of BIM models for IBS Score eee J submission Level 2 6 4) Usage of Modular gridlines in drawings Nos 4 (for > 50% usage) ‘Sub-total for other simplified construction solutions (maximum 30 points) (C ) TOTAL (maximum 100 points) (A+B +C) TOTAL TOTAL IBS SCORE FOR THIS PROJECT =

You might also like