Form CIDB IBS Score M1(2018)
CALCULATION FOR IBS SCORE
For office use
No:
Project Registration
Project
Category:
Project Name:
Contract Valve:
Contractor Name:
Developer / Owner Name:
Architecture Consultant
CivillStructure Engineer Consultant Name:
List of Submitted Drawings
1) 6)
2) 7
3) 8)
4) 9)
5) 10)
We hereby declare that the information given and. the IBS Score submitted herewith is true and complete.
‘The total IBS Score for the proposed building / project is
Date:
Name & Signature of Qualified Person
Designation:
Reg No. (ArchiPE):CALCULATIONS OF OVERALL IBS SCORE
PROJECT DETAILS
Project Name :
TypelBlock No : Total no of Units/blocks:
Contract
Value!
Category of Building
Residential (landed) Industrial ‘Commercial
Residential (high rise) Institutional Others
For mixed development, please indicate the area of the category:
Residential (landed) Industrial
Residential (high rise) Institutional m
‘Commercial im’ Others
CALCULATION OF IBS SCORE
4.4 FLOOR = PRECAST CONCRETE SLAB
a) Precast columns and beams 10
b)_ Precast columns and in-situ beams using reusable a
formwork
©) Precast columns and in-situ beams using timber op
formwork
d) Precast beams and in-situ columns using reusable oG
formwork
@) Precast beams and in-situ column using timber or
formwork) In-situ column and beams using reusable system, oe
formwork
g) In-situ column and beams using timber formwork 05
hh) Metal columns and beams 10
i) Timber column and beam 10
|) Load bearing blocks 08
)_ Metal framing with permanent formwork 07
4.2 FLOOR = IN-SITU CONCRETE ON PERMANENT
FORMWORK
a) Precast columns and beams 08
b) Precast columns and in-situ beams using reusable or
formwork
©) Precast columns and in-situ beams using timber oe
formwork
4). Precast beams and in-situ columns using reusable oF
formwork
) Precast beams and in-situ column using timber oa
formwork
) In-situ column and beams using reusable system
formwork oS
@)_Insitu column and beams using timber formwork o4
1h) Metal columns and beams 08
i) Timber colurmn and beam 08
|) Load bearing blocks 07
k)_ Metal framing with permanent formwork 064.3 FLOOR = IN-SITU CONCRETE USING REUSABLE
FORMWORK
a) Precast columns and beams 06
b) Precast columns and in-situ beams using reusable G
formwork
©) Precast columns and in-situ beams using timber on
formwork
d) Precast beams and in-situ columns using reusable
formwork oS
@) Precast beams and in-situ column using timber aa
formwork
4) In-situ column and beams using reusable system oa
formwork
9) In-situ column and beams using timber formwork 02
h) Metal columns and beams 06
i) Timber column and beam 06
|) Load bearing blocks 05
) Metal framing with permanent formwork 04
4.4 FLOOR = IN-SITU CONCRETE USING TIMBER
FORMWORK
a) Precast columns and beams 05
b)_ Precast columns and in-situ beams using reusable on
formwork
©) Precast columns and in-situ beams using timber oo
formwork
4) Precast beams and in-situ columns using reusable 04
formwork°)
Precast beams and in-situ column using timber
formwork oo
4) In-situ column and beams using reusable system oa
formwork
@) In-situ column and beams using timber formwork 0.0
hh). Metal columns and bears 08
i) Timber column and beam 08
|) Load bearing blocks oa
k) Metal framing with permanent formwork 03
4.5 FLOOR = STEEL FLORING SYSTEM
a) Precast columns and beams 10
b)_ Precast columns and in-situ beams using reusable ae
formwork
©) Precast columns and in-situ beams using timber op
formwork
d) Precast beams and in-situ columns using reusable 08
formwork
@). Precast beams and in-situ column using timber or
formwork
4) In-situ column and beams using reusable system a
formwork
9) In-situ column and beams using timber formwork 05
hh) Metal columns and beams 10
i) Timber column and bear 10
4) Load bearing blocks 08
k)_ Metal framing with permanent formwork o71.6 FLOOR = TIMBER FRAME FLORING SYSTEM
a) Precast columns and beams 10
b)_ Precast columns and in-situ beams using reusable oe
formwork
©) Precast columns and in-situ beams using timber or
formwork
d) Precast beams and in-situ columns using reusable 08
formwork
€) Precast beams and in-situ column using timber ca
formwork
4) In-situ column and beams using reusable system ae
formwork
9) In-situ column and beams using timber formwork 05
hh) Metal columns and beams 10
i) Timber column and beam 10
4) Load bearing blocks 08
k)__ Metal framing with permanent formwork o7
4.7 FLOOR = NO SLAB
a) Precast columns and beams 10
b) Precast columns and in-situ beams using reusable oe
formwork
©) Precast columns and in-situ beams using timber op
formwork
4d) Precast beams and in-situ columns using reusable 08
formwork
©) Precast beams and in-situ column using timber 07
formwork4) In-situ column and beams using reusable system oe
formwork
9) In-situ column and beams using timber formwork 05
hh) Metal columns and beams 10
i) Timber column and bear 10
i) Load bearing blocks 08
k)__ Metal framing with permanent formwork o7
2.0 ROOF SYSTEM
a) Prefab timber roof trusses 10
b)_ Prefab metal roof trusses 10
©) Conventional timber roof trusses 00
TOTALAREA Dm
‘Sub-total for structural system (maximum 50 points) (A)PART 2: WALL SYSTEM
a) Precast concrete panels 10
b). Wall clad 10
©) Prefabricated timber panels 10
4d) Full height glass panels 10
@) Drywall systems 10
4) In-situ concrete with reusable system formwork o4
9) In-situ concrete with permanent formwork o7
hh). Blockwork systems 0s
) Common brickwalls, 00
j) In-situ concrete with timber formwork 0.0
TOTAL AREA
|| bay
‘Sub-total for wall system (maximum 20 points) ( B )PART 3: OTHER SIMPLIFIED CONSTRUCTION
SOLUTIONS.
10 Utilisation of standardized components based|
on MS1064
a) Beams Nos 2 4
b) Columns Nos 2 4
©) Walls, m 2 4
4) Slabs mm 2 4
©) Doors Nos 2 4
4) Windows Nos 2 4
trommrmenme
a) For building more than 2 storeys
ii. Vertical repetition of structural floor layout Nos 1 2
iii, Horizontal repetition of structural floor layout Nos 1 2
a) Usage of prefab bathroom units (PBU) Nos 1 2
b)_ Usage of prefab staircase Nos 1 2c) Usage of BIM models for IBS Score eee J
submission Level 2 6
4) Usage of Modular gridlines in drawings Nos 4 (for > 50% usage)
‘Sub-total for other simplified construction solutions (maximum 30 points) (C )
TOTAL (maximum 100 points) (A+B +C)TOTAL
TOTAL IBS SCORE FOR THIS PROJECT =