DK 10 600 (Deck)

This document provides a maintenance plan and record for various deck department equipment on a ship. It includes pipelines, life saving appliances, firefighting equipment, cranes, davits, and other miscellaneous machinery. The plan outlines inspection and maintenance tasks to be completed on monthly, quarterly, and annual intervals.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views42 pages

DK 10 600 (Deck)

This document provides a maintenance plan and record for various deck department equipment on a ship. It includes pipelines, life saving appliances, firefighting equipment, cranes, davits, and other miscellaneous machinery. The plan outlines inspection and maintenance tasks to be completed on monthly, quarterly, and annual intervals.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 42

Index DK-10-600 (Deck Department)

29 Illumination Device
1 LSA, FFA, Pipeline for Hyd, CO2 and Comp air lines 30-32 Miscellaneous Appliances
2 Pipeline for Ballast and fire lines 33-1) Flooding Alarm system
3 Pipeline for FW and FO lines 33-2)-35-1) Navigational equip
4 Pipeline for Electric and Sanitary lines 35-2) Measuring Equipments
5-1) Pipelines for Steam lines 36 Construction -Ballast, FW tanks and Chain locker
5-2) Mooring Machineries 37-38 Construction -Ballast, FW tanks and Chain locker
6-1) Cargo Grabs (for vessel, which designed TST and DBT)
6-2)-7 Cargo gears 39 Construction and Mooring Equipment
8 Micellaneous Machineries, Cranes and Davits
9-1) Cargo fittings Record for ship, 20_____
9-2)-10-1) Hatches 1 2 3 4 5 6 7 8 9 10 11 12
10-2)-12 Closing Appliances -Hatch covers
13-14 Closing Appliances -Hatch coamings
15 Cargo hold
16 Out side Plates, Anchor and Decks
17 Superstructure -Masts and Stores
18 Superstructure -Houses
19 Superstructure -Doors
20-1) Mooring fittings -Bitts, Chocks or Mooring Holes, Cleats Sample:
20-2) Scupper This gray color means a plan of maintenance.
21-1) Mooring fittings -Fairleaders, Stand rollers and Bollard Note After finish maintain, put on the date in the gray column
21-2) Cat ways
22 Air vent head a.To be reported carrying out work by monthly working report, DK-10-2000.
23-25 Ventilating (Natu and Mech vent around superstructue) b.To be reported any abnormal conditions by Obsevation/Nonconformity report,
26-27 Ventilating (For cargo hold vent hatch and Mech vent) DK-13-100
28 Embarkation and Walking Devices
DK-10-600

SA
Miscellaneous Miscellaneous Machineries, Cranes and Davits SAMPLE
Record for ship, 20_____ 20_____ *a "Y" means further maintenance is
Work requiring
Working matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month Miscellaneous Cranes and Davits
Provision Crane Inspection/Operation 15 20 27 15 7 Y Needs to conduct maintenance work after
Inspection Point FO Davit(P/S) Inspection/Operation N/A complete maintenance work of CO2 pipelime
①Jib ②SWL Mark Misc. Davit _Sludge davit (P/S)_ Inspection/Operation 15 20 27 15 7 Y

MP
③Shackle ④Blocks Misc. Davit ________________ Inspection/Operation
Necessary work planning month Description in case of not adapted
⑤Sheaves ⑥Hooks (After set up, planningmonth is not changed)
⑦Oil Leaking ⑧Ladder
⑨Operation Test ⑩Limit Switch
⑪Oil Leaking ⑫Wire

*a
Working matter/Company Plan Item Work 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark Please
*b record vessel maintenance plan
Interval: 3 month Miscellaneous Cranes and Davits or other remarks, like sample

L
Provision Crane Greasing 16 28 N
Inspection Point FO Davit(P/S) Greasing N/A
①Hoisting wire Misc. Davit _Sludge davit (P/S)_ Greasing 16 28 N

E
②Ruffing wire Misc. Davit ________________ Greasing
③Each grease points Greasing is conducted on planning month Greasing is conducted before planning month
④ Open gear

*a
Working matter/Company Plan Item Work 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 12 month Miscellaneous Cranes and Davits
Provision Crane Overhaul/Inspection 15 N Maintenance conducted at the overhaul time
Inspection Point FO Davit(P/S) Overhaul/Inspection 15 N Maintenance conducted at the overhaul time
①Sheaves for hook block Misc. Davit ________________ Overhaul/Inspection
Misc. Davit ________________ Overhaul and Inspection is conducted but exceeded
Overhaul/Inspection
1 month from planning month

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Life Saving Appliances P-1

Refer to "SOLAS checklist of LSA" and "Life boat & Davit maker's checklist"

Fire Firgting Equipment and Appliances


Refer to "Maintenance plan for Fire fighting equipments and Appliances"

Pipelines Hydr., CO2 and Comp air Lines


Record for ship, 20_____ 20_____ *a
Working
Working matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month Hydr. Line (On Deck)
1.Forecastle Inspection X X X X X X X X X X X X
Inspection Point 2.Upper Deck Inspection
①Pipe body 3.Poop Deck Inspection
②Expansion Joint 4.Around hatch cover Inspection
③Flange and Bolt 5.__________________Deck Inspection
④Packing 6.__________________Deck Inspection
⑤U Bolt
⑥Pipe Support CO2 Line (On Deck)
⑦Pipe rest 1.CO2 bottle room Inspection
⑧Valve 2.Upper Deck Inspection
⑨Air Plug 3.Around hatch cover Inspection
⑩Paint 4.__________________Deck Inspection
⑪Rubber hose 5.__________________Deck Inspection

Comp air line (On Deck)


1.Forecastle Inspection
2.Upper Deck Inspection
3.Poop Deck Inspection
4.__________________Deck Inspection
5.__________________Deck Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Pipelines Ballast and Fire lines P-2

Record for ship, 20_____ 20_____ *a


work
Working matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month Ballast line (On Deck )
1.Forecastle Inspection
Inspection Point 2.Upper Deck Inspection
①Pipe body 3.Poop Deck Inspection
②Expansion Joint 4.__________________Deck Inspection
③Flange and Bolt 5.__________________Deck Inspection
④Packing
⑤U Bolt Fire line (On Deck )
⑥Pipe Support 1.Forecastle Inspection
⑦Pipe rest 2.Upper Deck Inspection
⑧Valve 3.Poop Deck Inspection
⑨Air Plug 4.Compass Deck Inspection
⑩Paint 5.Navigational Bridge Deck Inspection
6.D Deck Inspection
7.C Deck Inspection
8. B Deck Inspection
9. A Deck Inspection
10.__________________Deck Inspection

Interior
1.Navigational Bridge Inspection
2.D Deck Inspection
3.C Deck Inspection
4.B Deck Inspection
5.A Deck Inspection
6.BSN Store Inspection
7.Under deck passage Inspection
8.__________________Deck Inspection
9.__________________Deck Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Pipelines FW and FO Lines P-3

Record for ship, 20_____ 20_____ *a


Working
Working matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month FW line (On Deck)
1.Forecastle Inspection
Inspection Point 2.Upper Deck Inspection
①Pipe body 3.Poop Deck Inspection
②Expansion Joint 4.Compass Deck Inspection
③Flange and Bolt 5.Navigational Bridge Deck Inspection
④Packing 6.D Deck Inspection
⑤U Bolt 7.C Deck Inspection
⑥Pipe Support 8. B Deck Inspection
⑦Pipe rest 9. A Deck Inspection
⑧Valve 10.__________________Deck Inspection
⑨Air Plug Interior
⑩Paint 1.Navigational Bridge Inspection
⑪Pressure gauge 2.D Deck Inspection
⑫Thrmometer 3.C Deck Inspection
4.B Deck Inspection
5.A Deck Inspection
6.BSN Store Inspection
7.Under deck passage Inspection
8.__________________Deck Inspection
*To be done pressure test FO line (On Deck)
for bunker lines every year. 1.Upper Deck Inspection
and stenciled tested date. 2.Poop Deck Inspection
3.Bunkering Manifold Inspection
4.__________________Deck Inspection
Interior
1.Under deck passage Inspection
2.__________________Deck Inspection
3.__________________Deck Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Pipelines Electric and Sanitary Lines P-4

Record for ship, 20_____ 20_____ *a


Work
Working matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month Elect. Line (On Deck)
General Inspection 1.Forecastle Inspection
Inspection Point 2.Upper Deck Inspection
①Pipe body 3.Poop Deck Inspection
②Expansion Joint 4.Compass Deck Inspection
③Flange and Bolt 5.Navigational Bridge Deck Inspection
④Packing 8.D Deck Inspection
⑤U Bolt 9.C Deck Inspection
⑥Pipe Support 10. B Deck Inspection
⑦Pipe rest 11. A Deck Inspection
⑧Valve 12.__________________Deck Inspection
⑨Connection box 13.__________________Deck Inspection
⑩Paint Interior
1.Navigational Bridge Inspection
4.D Deck Inspection
5.C Deck Inspection
6.B Deck Inspection
7.A Deck Inspection
8.BSN Store Inspection
9.Under deck passage Inspection
10.__________________Deck Inspection
Sanitary line,Interior
1.Navigational Bridge Inspection
4.D Deck Inspection
5.C Deck Inspection
6.B Deck Inspection
7.A Deck Inspection
8.__________________Deck Inspection
9.__________________Deck Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Pipelines Steam Lines P-5

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month Steam line (On Deck)
1.Forecastle Inspection
Inspection Point 2.Upper Deck Inspection
①Expansion Joint 3.Poop Deck Inspection
②Flange and Bolt 4.__________________Deck Inspection
③Packing Interior
④U Bolt 1.Navigational Bridge Inspection
⑤Pipe Support 2.D Deck Inspection
⑥Pipe rest 3.C Deck Inspection
⑦Valve 4.B Deck Inspection
⑧Pressure Gauge 5.A Deck Inspection
6.__________________Deck Inspection

Mooring Machineries
Record for ship, 20_____ 20_____ *a
Work
Working matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month Windlass
General Inspection Windlass (P) Inspection
Windlass (S) Inspection
①Frame ②Fitting Bolt
③Brake Lining ④Brake Band Mooring Winches
⑤Crutch and Lever ⑥Stopper Pin Forecastle (P) Inspection
⑦Gear (Greasing) ⑧Warping End Forecastle (Center) Inspection
⑨Gypcy Wheel ⑩Oil Leaking Forecastle (S) Inspection
⑪Spill Container and plug
⑫Brake Handle,spindle,Fitting Bolt Poop Deck (P) Inspection
⑬Tiger, Heave and Sluck Mark Poop Deck (Center) Inspection
⑭Operation test Poop Deck (S) Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Cargo Grabs P-6

Record for ship, 20_____ 20_____ *a


Work
Working matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month Cargo Grabs
No.1 Grab Inspection/Greasing
Inspection Point No.2 Grab Inspection/Greasing
①Frame ②Indicate the Weight No.3 Grab Inspection/Greasing
③Cable ④Reel No.4 Grab Inspection/Greasing
⑤Lashing Materials ⑥Hinges
⑦Greasing

Cargo Gears Cargo Machineries

※ To be conduct inspection and maintnance accordance with instruction book


Record for ship, 20_____ 20_____ *a
Work
Working matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month Deck Cranes
No.1 Crane Inspection
Inspection Point No.2 Crane Inspection
①Post/Structure ②Jib yard No.3 Crane Inspection
③Oil level/leaking ④Sheave No.4 Crane Inspection
⑤Luffing wires ⑥Cargo wires
⑦Cargo block ⑧Gear unit
⑨Angle indicator ⑩SWL Mark
⑪Control lever ⑫Window/Wiper
*a
Working Matter/Company Plan Item Work 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 3 month No.1 Crane Claning
No.2 Crane Claning
Inspection Point No.3 Crane Claning
①Cleaning oil filter with engine dept No.4 Crane Claning

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Cargo Gears Cargo Machineries P-7

※ To be conduct inspection and maintnance accordance with instruction book


Record for ship, 20_____ 20_____ *a
Work
Working matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 3 month Deck Cranes
No.1 Crane Hammering
Inspection Point No.2 Crane Hammering
①Mounting bolts for slewing bearing No.3 Crane Hammering
②Foundation bolts No.4 Crane Hammering
③Other bolts

*a
Working Matter/Company Plan Item Work 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 2 month Deck Cranes
No.1 Crane Greasing/Measurement
Inspection Point No.2 Crane Greasing/Measurement
①Luffing wires No.3 Crane Greasing/Measurement
③Cargo wires No.4 Crane Greasing/Measurement
⑤Slewing pinion & gear
⑦Crane post each Grease point

*a
Working Matter/Company Plan Item Work 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month Deck Cranes
No.1 Crane Check operation/adjustment

Inspection Point No.2 Crane Check operation/adjustment

①Limit switch No.3 Crane Check operation/adjustment

②Brake No.4 Crane Check operation/adjustment

③Brake lining
※ "No load" during inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Miscellaneous Miscellaneous Machineries, Cranes and Davits P-8

Record for ship, 20_____ 20_____ *a


Work
Working matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month Miscellaneous Cranes and Davits
Provision Crane Inspection/Operation
Inspection Point FO Davit(P/S) Inspection/Operation
①Jib ②SWL Mark Misc. Davit ________________ Inspection/Operation
③Shackle ④Blocks Misc. Davit ________________ Inspection/Operation
⑤Sheaves ⑥Hooks
⑦Oil Leaking ⑧Ladder
⑨Operation Test ⑩Limit Switch
⑪Oil Leaking ⑫Wire

*a
Working matter/Company Plan Item Work 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 2 month Miscellaneous Cranes and Davits
Provision Crane Greasing
Inspection Point FO Davit(P/S) Greasing
①Hoisting wire Misc. Davit ________________ Greasing
②Ruffing wire Misc. Davit ________________ Greasing
③Each grease points
④ Open gear

*a
Working matter/Company Plan Item Work 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 12 month Miscellaneous Cranes and Davits
Provision Crane Overhaul/Inspection
Inspection Point FO Davit(P/S) Overhaul/Inspection
①Sheaves for hook block Misc. Davit ________________ Overhaul/Inspection
Misc. Davit ________________ Overhaul/Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Cargo Fittings P-9

Record for ship, 20_____ 20_____ *a


Work
Working matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month Deck eye plates
1. Fore (Upper Deck) Inspection
Inspection Point 2. Mid (Upper Deck) Inspection
①Outline 3. Aft (Upper Deck) Inspection
②Tiger Mark Bitts
1. Fore (Upper Deck) Inspection
2. Mid (Upper Deck) Inspection
3. Aft (Upper Deck) Inspection
Cleats
1. Fore (Upper Deck) Inspection
2. Mid (Upper Deck) Inspection
3. Aft (Upper Deck) Inspection

Hatches Access Hatches


Record for ship, 20_____ 20_____ *a
Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Innterval : 1 month No.1 Hacth(Fore & Aft) Inspection
No.2 Hatch(Fore & Aft) Inspection
Inspection Point No.3 Hatch(Fore & Aft) Inspection
①Packing No.4 Hatch(Fore & Aft) Inspection
②Tightening Bolt No.5 Hatch(Fore & Aft) Inspection
③Hinges No.6 Hatch(Fore & Aft) Inspection
④Outline No.7 Hatch(Fore & Aft) Inspection
⑤Stopper Pins No.8 Hatch(Fore & Aft) Inspection
⑥Marking

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Hatches Rope Hatches, Skylight, Escape Hatches and others P-10

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Innterval : 1 month Rope Hatch (Forecastle) Inspection
Rope Hatch (Poop Deck ) Inspection
Inspection Point Skylight Inspection
①Packing ②Tightening Bolt Escape Hatch Inspection
③Hinges ④Outline ________________Hatch Inspection
⑤Stopper Pins ________________Hatch Inspection

Closing Appliances Hatch covers *If vessel has "Hatch Cover Maintenance Checklist" Separately, skip this item.

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Innterval : Every opening time No.1 Hacth cover Inspection
Gasket No.2 Hatch cover Inspection
No.3 Hatch cover Inspection
Inspection Point No.4 Hatch cover Inspection
①Wear and tear No.5 Hatch cover Inspection
②Mechaniclal damage No.6 Hatch cover Inspection
③Check elasticity No.7 Hatch cover Inspection
④General Inspection No.8 Hatch cover Inspection
*a
Working Matter/Company Plan Item Work 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Innterval : 3 month No.1 Hacth cover Inspection/Greasing
Stopper for Stowed and Vertical position No.2 Hacth cover Inspection/Greasing
(Folding type) No.3 Hacth cover Inspection/Greasing
No.4 Hacth cover Inspection/Greasing
Inspection Point No.5 Hacth cover Inspection/Greasing
①Check functioning No.6 Hacth cover Inspection/Greasing
②Check stowed position No.7 Hacth cover Inspection/Greasing
③Greasing No.8 Hacth cover Inspection/Greasing

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Closing Appliances Hatch covers *If vessel has "Hatch Cover Maintenance Checklist" Separately, skip this item. P-11

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Innterval : 6month No.1 Hacth cover Inspection
Hinges No.2 Hatch cover Inspection
No.3 Hatch cover Inspection
Inspection Point No.4 Hatch cover Inspection
①General inspection of hinges No.5 Hatch cover Inspection
②Check eye plate wear No.6 Hatch cover Inspection
No.7 Hatch cover Inspection
No.8 Hatch cover Inspection

*a
Working Matter/Company Plan Item Work 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Innterval : 2 month No.1 Hacth cover Greasing
Hinges No.2 Hacth cover Greasing
No.3 Hacth cover Greasing
Inspection Point No.4 Hacth cover Greasing
①Greasing to each point No.5 Hacth cover Greasing
No.6 Hacth cover Greasing
No.7 Hacth cover Greasing
No.8 Hacth cover Greasing
*a
Working Matter/Company Plan Item Work 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Innterval : 6 month No.1 Hacth cover Inspection
Steel constriction No.2 Hacth cover Inspection
No.3 Hacth cover Inspection
Inspection Point No.4 Hacth cover Inspection
①General Inspection No.5 Hacth cover Inspection
Flame and Plate No.6 Hacth cover Inspection
②Marking condition No.7 Hacth cover Inspection
No.8 Hacth cover Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Closing Appliances Hatch covers *If vessel has "Hatch Cover Maintenance Checklist" Separately, skip this item. P-12

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Innterval : 12month To be overhaul and inspect hatch cover wheel per 12 month. All wheel has been overhaul and inspect within 5 years.
Wheel No.1 Hacth cover Overhaul/Inspection
No.2 Hatch cover Overhaul/Inspection
Inspection Point No.3 Hatch cover Overhaul/Inspection
①General inspection No.4 Hatch cover Overhaul/Inspection
②Inspect condition of Axis No.5 Hatch cover Overhaul/Inspection
and Bearing No.6 Hatch cover Overhaul/Inspection
No.7 Hatch cover Overhaul/Inspection
No.8 Hatch cover Overhaul/Inspection
*a
Working Matter/Company Plan Item Work 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Innterval : 2 month No.1 Hacth cover Greasing
Wheel No.2 Hacth cover Greasing
No.3 Hacth cover Greasing
Inspection Point No.4 Hacth cover Greasing
①Greasing to each point No.5 Hacth cover Greasing
No.6 Hacth cover Greasing
No.7 Hacth cover Greasing
No.8 Hacth cover Greasing
*a
Working Matter/Company Plan Item Work 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Innterval : 1 month No.1 Hacth cover Inspection
Hydraulic Hose and Hyd Piping No.2 Hacth cover Inspection
No.3 Hacth cover Inspection
Inspection Point No.4 Hacth cover Inspection
①General Inspection No.5 Hacth cover Inspection
No.6 Hacth cover Inspection
No.7 Hacth cover Inspection
No.8 Hacth cover Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Closing Appliances Hatch coamings *If vessel has "Hatch Cover Maintenance Checklist" Separately, skip this item. P-13

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Innterval : 6 month No.1 Hacth coamings Inspection
Steel constriction No.2 Hacth coamings Inspection
No.3 Hacth coamings Inspection
Inspection Point No.4 Hacth coamings Inspection
①General Inspection No.5 Hacth coamings Inspection
Flame and Plate No.6 Hacth coamings Inspection
No.7 Hacth coamings Inspection
No.8 Hacth coamings Inspection
*a
Working Matter/Company Plan Item Work 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Innterval : 2 month No.1 Hacth coamings Inspection
Drain valve No.2 Hacth coamings Inspection
No.3 Hacth coamings Inspection
Inspection Point No.4 Hacth coamings Inspection
①General inspection No.5 Hacth coamings Inspection
Pipe and Valve is not clogged No.6 Hacth coamings Inspection
②Foat ball moving No.7 Hacth coamings Inspection
③Remove clogging item No.8 Hacth coamings Inspection
④Shut-off caps
*a
Working Matter/Company Plan Item Work 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Innterval : 2 month No.1 Hacth coamings Inspection
Gas Sampling Point No.2 Hacth coamings Inspection
No.3 Hacth coamings Inspection
Inspection Point No.4 Hacth coamings Inspection
①General inspection No.5 Hacth coamings Inspection
Valve and attachment No.6 Hacth coamings Inspection
②Open and Close function No.7 Hacth coamings Inspection
③Marking No.8 Hacth coamings Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Closing Appliances Hatch coamings *If vessel has "Hatch Cover Maintenance Checklist" Separately, skip this item. P-14

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Innterval : 3month No.1 Hacth coaming Inspection/Greasing
Quick acting cleat No.2 Hatch coaming Inspection/Greasing
No.3 Hatch coaming Inspection/Greasing
Inspection Point No.4 Hatch coaming Inspection/Greasing
①Check the functioning No.5 Hatch coaming Inspection/Greasing
②Check rubber buffer No.6 Hatch coaming Inspection/Greasing
③Greasing No.7 Hatch coaming Inspection/Greasing
No.8 Hatch coaming Inspection/Greasing
*a
Working Matter/Company Plan Item Work 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Innterval : Every opening time No.1 Hacth coaming Inspection
Hatch coaming and Gatter way No.2 Hacth coaming Inspection
No.3 Hacth coaming Inspection
Inspection Point No.4 Hacth coaming Inspection
①General inspection No.5 Hacth coaming Inspection
②Cleaning obstruction No.6 Hacth coaming Inspection
③Marking condition No.7 Hacth coaming Inspection
No.8 Hacth coaming Inspection
*a
Working Matter/Company Plan Item Work 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Innterval : 6 month No.1 Hacth coaming Inspection
Guide rail, Wheel trach, Bearing pad No.2 Hacth coaming Inspection
No.3 Hacth coaming Inspection
Inspection Point No.4 Hacth coaming Inspection
①General Inspection No.5 Hacth coaming Inspection
②Wear and tear No.6 Hacth coaming Inspection
No.7 Hacth coaming Inspection
No.8 Hacth coaming Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Cargo Hold Holds P-15

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Innterval : 1 month No.1 Cargo Hold
Inspection
Ballast hold (Y/N)
Inspection Point No.2 Cargo Hold
Inspection
①Frame ②Girder Ballast hold (Y/N)
③Stringer ④Ladder No.3 Cargo Hold
Inspection
⑤Pipe Ballast hold (Y/N)
a.Ballast Line (Inc.U band & rest) No.4 Cargo Hold
Inspection
b.FO Line ( -do- ) Ballast hold (Y/N)
c.Sounding Pipe ( -do- ) No.5 Cargo Hold
Inspection
d.Scupper Pipe ( -do- ) Ballast hold (Y/N)
e.Temparature Pipe( -do- ) No.6 Cargo Hold
Inspection
a. Other pipe : Ballast hold (Y/N)
b. Other pipe : No.7 Cargo Hold
Inspection
c. Other pipe : Ballast hold (Y/N)
⑥Eye ring ⑦Tank Top Plate No.8 Cargo Hold
Inspection
⑧Hopper Plates Ballast hold (Y/N)
⑨Bulkhead plate
⑩Monhole
a.Packing b.Tightening Bolts
c.Hinges d.Plate
⑪Hold Light a.Bulb
b.Cable and connection
c.Front glass
d.Frame
e.Fitting bolts and nut
⑫Fitting for ballast hold

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
*Regarding hold maintenance, please follow maintenance and reporting procedure with DK-10-2000B
DK-10-600

Out side Plates P-16

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Innterval : 1 month Boot top Plate(P) Inspection
Inspection Point Boot top Plate(S) Inspection
①Plates Top side Plates(P) Inspection
②Draft Mark Top side Plates(S) Inspection
③Freeboard Mark
④Upper Deck Line Mark

Anchor
Record for ship, 20_____ 20_____ *a
Work
Working matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 3 months Anchor Inspection
Inspection Point Anchor Seat Inspection
①Paint Kedge Anchor Inspection
②Diameter Anchor Chain Inspection
Anchor Recess Inspection

Decks
Record for ship, 20_____ 20_____ *a
Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Innterval : 1 month Fore castle Deck Inspection
Inspection Point Upper Deck(P) Inspection
①Frame Upper Deck(S) Inspection
②Plates Poop Deck Inspection
③Deck girder Wing Deck Inspection
④Deck stringer Compass Deck Inspection
Cabin Decks Inspection
Under deck passage Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
AF3: Question
Is item needs to conduct maintenance work?
If select "Y"
Please record planning duration in Remark column
If select "N"
Not required other action
AF13: Question
Is item needs to conduct maintenance work?
If select "Y"
Please record planning duration in Remark column
If select "N"
Not required other action
AF22: Question
Is item needs to conduct maintenance work?
If select "Y"
Please record planning duration in Remark column
If select "N"
Not required other action
AG4: If *a column is selecting "Y", please record maintenance planning duration.
(Example: Within this voyage, when weather permit)
If *a column is selecting "N", please record special remarks (If applicable)
AG14: If *a column is selecting "Y", please record maintenance planning duration.
(Example: Within this voyage, when weather permit)
If *a column is selecting "N", please record special remarks (If applicable)
AG23: If *a column is selecting "Y", please record maintenance planning duration.
(Example: Within this voyage, when weather permit)
If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Superstructure Masts
P-17

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 3 months Fore Mast Inspection
Radar Mast Inspection
Inspection Point Other mast Inspection
①Ladder ②Stay wire 1. Inspection
③Turnbucle ④Bracket 2. Inspection
⑤Platform ⑥Handrail 3. Inspection
⑦Eye ring ⑧Shackle
⑨Insulator

Superstructure Stores
Record for ship, 20_____ 20_____ *a
Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 3 months Stores in the accommodation Inspection
Bsn Store Inspection
①Emergency Towing Booklet Paint Locker Inspection
must be stowed in BSN store Battery room Inspection
②Neat and tidy all the time SOPEP room Inspection
③Control Inventry Fire control room entrance Inspection
④Eye Protection, Rubber glove All Stores of Crane house Inspection
and Rubber epron must be stowed Other store Inspection
in the battery room 1. Inspection
2. Inspection
3. Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Superstructure House P-18

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 3 months Inside
Passage & Stair (D Deck) Inspection
Inspection Point Passage & Stair (C Deck) Inspection
①Plates Passage & Stair (B Deck) Inspection
②Frame Passage & Stair (A Deck) Inspection
③Bracket Passage & Stair (Upp. Deck) Inspection
④Cleaning Passage Inspection
⑤Sanitation Passage Inspection
⑥Tidying

Additional Inspection Point for Outside


Stairway Stairway (Navigation Bidge) Inspection
①Step Stairway (D Deck) Inspection
②Slip Protection Stairway (C Deck) Inspection
Stairway (B Deck) Inspection
Stairway (A Deck) Inspection
Additional inspection Point for Stairway (Upper Deck) Inspection
Exterior stairway Stairway Inspection
①Tiger Mark Stairway Inspection

Additional Inspection Point for Other


①Handrail Assembly station Inspection
②Chain and Chackle
③Marking

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Superstructure Doors (Weather tight, Fire Protection doors and others) P-19

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Innterval : 1 month Navigation Bridge entrance Inspection
All Accommodation entrance Inspection/Greasing
Inspection Point Upper Deck entrance Inspection/Greasing
①Packing Bsn Store entrance Inspection/Greasing
②Tightening Bolt Paint Locker entrance Inspection/Greasing
③Hinges Each Deck store entrance Inspection/Greasing
④Outline Battery room entrance Inspection/Greasing
⑤Plates Emrg. Generator room entrance Inspection/Greasing
⑥Door Lock Hospital entrance Inspection/Greasing
⑦Pirates Lock Steering room entrance Inspection/Greasing
⑧Knobs SOPEP room entrance Inspection/Greasing
⑨Pad lock or seal paper Provision space entrance Inspection/Greasing
⑩Self Closing Device Engine room entrance Inspection/Greasing
⑪Greasing Engine room entrance (Funel door) Inspection/Greasing
CO2 bottle room entrance Inspection/Greasing
*All fire doors must be closed Tally office entrance Inspection/Greasing
automatically. Air conditioning room entrance Inspection/Greasing
Fire control room entrance Inspection/Greasing
Under deck passage entrance Inspection/Greasing

#1 Crane entrance & Hous (P/S) Inspection/Greasing


#2 Crane entrance & Hous (P/S) Inspection/Greasing
#3 Crane entrance & Hous (P/S) Inspection/Greasing
#4 Crane entrance & Hous (P/S) Inspection/Greasing

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Mooring fittings Bitts, Chocks or Mooring Holes,Cleats P-20

Record for ship, 20_____ 20_____ *a


Work
Working matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month Bitts
1. Fore (Upper Deck) Inspection
Inspection Point 2. Mid (Upper Deck) Inspection
①Outline 3. Aft (Upper Deck) Inspection
②Working Chocks/mooring holes
③Tiger Mark 1. Fore (Upper Deck) Inspection
④SWL Mark 2. Mid (Upper Deck) Inspection
⑤Greasing 3. Aft (Upper Deck) Inspection
Cleats
1. Fore (Upper Deck) Inspection
2. Mid (Upper Deck) Inspection
3. Aft (Upper Deck) Inspection
Universal Mooring Holes
1. Fore (Upper Deck) Inspection
2. Mid (Upper Deck) Inspection
3. Aft (Upper Deck) Inspection

Scupper
Record for ship, 20_____ 20_____ *a
Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month Scupper (On Deck)
1.Forecastle Inspection
Inspection Point 2.Upper Deck (Fore) Inspection
①Free from debris 3.Upper Deck (Mid) Inspection
②Scupper plug 4.Upper Deck (Aft) Inspection
5.Poop Deck Inspection
6.__________________Deck Inspection
7.__________________Deck Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Mooring fittings Fairleaders, Stand rollers and Bollard P-21

Record for ship, 20_____ 20_____ *a


Work
Working matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month Fairleaders
Inspection Point 1. Fore (Upper Deck) Inspection
①Outline 2. Mid (Upper Deck) Inspection
②Working 3. Aft (Upper Deck) Inspection
③Tiger Mark
④SWL Mark Stand Rollers
⑤Greasing 1. Fore (Upper Deck) Inspection
2. Mid (Upper Deck) Inspection
3. Aft (Upper Deck) Inspection

Bollards
1. Fore (Upper Deck) Inspection
2. Mid (Upper Deck) Inspection
3. Aft (Upper Deck) Inspection

Cat ways
Record for ship, 20_____ 20_____ *a
Working
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month 1.Forecastle
2.Upper Dk Inspection
Inspection Point 3.Poop Dk Inspection
①Frame 4.Compass Deck Inspection
②Step 5.______________Deck Inspection
③Plates 6.______________Deck Inspection
④Handrail 7.______________Deck Inspection
⑤Slip Preotection Inspection
⑥Tiger Mark

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Air Vent Head P-22

Record for ship, 20_____ 20_____ *a


Working
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month Air Vent Head
1.FOT Inspection
Inspection Point 2.DOT Inspection
①Air Vent Head body 3.Bilge T. Inspection
②Connected pipe 4.WBT-1 (Forward) Inspection
③Painting 5.WBT-2 (Mid) Inspection
④Water tight closing appliance 6.WBT-3 (Aft and Poop Deck) Inspection
(Ball type) 7.Gray water T. Inspection
8.FW and DW T. Inspection
9.Other tank ______________ Inspection
10.Other tank ______________ Inspection
11.Other tank ______________ Inspection

*a
Working Matter/Company Plan Item Work 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 6 month Air Vent Head
1.FOT Overhaul/Inspection
Inspection point 2.DOT Overhaul/Inspection
①Internal condition 3.Bilge T. Overhaul/Inspection
②Gasket 4.WBT-1 (Forward) Overhaul/Inspection
③Water tight closing appliance 5.WBT-2 (Mid) Overhaul/Inspection
(Ball type including attachmen6.WBT-3 (Aft and Poop Deck) Overhaul/Inspection
④Tightning 7.Gray water T. Overhaul/Inspection
8.FW and DW T. Overhaul/Inspection
9.Other tank ______________ Overhaul/Inspection
10.Other tank ______________ Overhaul/Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Ventilating Ventilator-1 (Around Superstructure) P-23

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month 1.Bsn Store Ventilator Inspection
General Inspection 2. Bow thruster room Vent Inspection
Inspection Point 3.Mechanical vent for accomodati Inspection
①Ventlator outlines 4.Compass deck Vent Inspection
②Handle 5.Navigation Bridge Vent Inspection
③O-S Mark 6.D Deck Vent Inspection
④Space letter 7.C Deck Vent Inspection
⑤Screen 8.B Deck Vent Inspection
⑥Trank 9.A Deck Vent Inspection
⑦Valve for trank 10.Mechanical Vent for provision Inspection
⑧Fitting bolt 11.Galley Vent (Supply & Exh) Inspection
⑨Spindle 12.Eng room Mechanical vent Inspection
⑩Packing 13.Steering room Vent Inspection
⑪Greasing 14.CO2 bottle room Vent Inspection
15.Emergency generator Vent Inspection
Add for Mechanical Vent 16.Paint Locker Vent Inspection
⑫General Inspection 17.Under deck passage Vent Inspection
⑬Foundation bolts (Supply & Exh) Inspection
⑭Bolts for assembly 18._____________________ Inspection
19._____________________ Inspection
20._____________________ Inspection
21._____________________

22.No.1 Crane (Incl. House)Vent Inspection


23.No.2 Crane (Incl. House)Vent Inspection
24.No.3 Crane (Incl. House)Vent Inspection
25.No.4 Crane (Incl. House)Vent Inspection
26._____________________ Inspection
27._____________________ Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Ventilating Ventilator-1 (Mechanical vent around Superstructure) P-24

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month 1.Bsn Store Ventilator Greasing
2. Bow thruster room Vent Greasing
Inspection Point 3.Mechanical vent for accomodati Greasing
①Elect motor greasing point 4.Mechanical Vent for provision s Greasing
(If appricable) 5.Galley Vent (Supply & Exh) Greasing
6.Eng room Mechanical vent Greasing
7.Steering room Vent Greasing
8.CO2 bottle room Vent Greasing
9.Emergency generator Vent Greasing
10.Under deck passage Vent Greasing
11._____________________ Greasing
12._____________________ Greasing
13._____________________ Greasing
14._____________________ Greasing
15._____________________ Greasing

16.No.1 Crane (Incl. House)Vent Greasing


17.No.2 Crane (Incl. House)Vent Greasing
18.No.3 Crane (Incl. House)Vent Greasing
19.No.4 Crane (Incl. House)Vent Greasing

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Ventilating Ventilator-1 (Mechanical vent around Superstructure) P-25

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 12 month 1.Bsn Store Ventilator Overhaul/Inspection
2. Bow thruster room Vent Overhaul/Inspection
Inspection Point 3.Mechanical vent for accomodati Overhaul/Inspection
①Impeller condition inspection 4.Mechanical Vent for provision s Overhaul/Inspection
5.Galley Vent (Supply & Exh) Overhaul/Inspection
6.Eng room Mechanical vent Overhaul/Inspection
7.Steering room Vent Overhaul/Inspection
8.CO2 bottle room Vent Overhaul/Inspection
9.Emergency generator Vent Overhaul/Inspection
10.Under deck passage Vent Overhaul/Inspection
11._____________________ Overhaul/Inspection
12._____________________ Overhaul/Inspection
13._____________________ Overhaul/Inspection
14._____________________ Overhaul/Inspection
15._____________________ Overhaul/Inspection

16.No.1 Crane (Incl. House)Vent Overhaul/Inspection


17.No.2 Crane (Incl. House)Vent Overhaul/Inspection
18.No.3 Crane (Incl. House)Vent Overhaul/Inspection
19.No.4 Crane (Incl. House)Vent Overhaul/Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Ventilating Ventilator-2 (For cargo holds vent hatch) P-26

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month 1.No.1 Cargo Hold(Fore) Inspection
2.No.1 Cargo Hold(Aft) Inspection
Inspection Point 3.No.2 Cargo Hold(Fore) Inspection
①Ventlator outlines 4.No.2 Cargo Hold(Aft) Inspection
②Screen 5.No.3 Cargo Hold(Fore) Inspection
③Louver & Frame 6.No.3 Cargo Hold(Aft) Inspection
④Gasket 7.No.4 Cargo Hold(Fore) Inspection
⑤Hinge 8.No.4 Cargo Hold(Aft) Inspection
⑥Nut & Fiting 9.No.5 Cargo Hold(Fore) Inspection
⑦Marking 10.No.5 Cargo Hold(Aft) Inspection
11.No.6 Cargo Hold(Fore) Inspection
12.No.6 Cargo Hold(Aft) Inspection
13.No.7 Cargo Hold(Fore) Inspection
14.No.7 Cargo Hold(Aft) Inspection
15.No.8 Cargo Hold(Fore) Inspection
16.No.8 Cargo Hold(Aft) Inspection
17._____________________ Inspection
18._____________________ Inspection

Ventilating Ventilator-2 (For cargo holds mechanical vent)


Record for ship, 20_____ 20_____ *a
Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month 1.No.1 Cargo Hold Inspection
2.No.2 Cargo Hold Inspection
Inspection Point 3.No.3 Cargo Hold Inspection
①General Inspection 4.No.4 Cargo Hold Inspection
②Foundation bolts 5.No.5 Cargo Hold Inspection
③Bolts for assembly

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Ventilating Ventilator-2 (For cargo holds mechanical vent) P-27

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month
6.No.8 Cargo Hold (EAR, NAR) Inspection
Inspection Point 7. De-humidifier room Inspection
①General Inspection 8. Aft maintenance room Inspection
②Foundation bolts 9._____________________ Inspection
③Bolts for assembly 10._____________________ Inspection
*a
Working matter/Company Plan Item Work 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month 1.No.1 Cargo Hold Greasing
2.No.2 Cargo Hold Greasing
Inspection Point 3.No.3 Cargo Hold Greasing
①Elect motor greasing point 4.No.4 Cargo Hold Greasing
(If appricable) 5.No.5 Cargo Hold Greasing

6.No.8 Cargo Hold (EAR, NAR) Greasing


7. De-humidifier room Greasing
8. Aft maintenance room Greasing
9._____________________ Greasing
*a
Working matter/Company Plan Item Work 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 12 month 1.No.1 Cargo Hold Overhaul/Inspection
2.No.2 Cargo Hold Overhaul/Inspection
Inspection Point 3.No.3 Cargo Hold Overhaul/Inspection
①Impeller condition inspection 4.No.4 Cargo Hold Overhaul/Inspection
5.No.5 Cargo Hold Overhaul/Inspection

6.No.8 Cargo Hold (EAR, NAR) Overhaul/Inspection


7. De-humidifier room Overhaul/Inspection
8. Aft maintenance room Overhaul/Inspection
9._____________________ Overhaul/Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Embakation and Walking Devices P-28

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month Embk Ladder (Boat Deck)(P) Inspection
Embk Ladder (Boat Deck)(S) Inspection
Inspection Point Embarkation Ladder (Fore) Inspection
①Frame ②Step Boading area (Boat Deck)(P) Inspection
③Platform plate ④Handholds Boading area (Boat Deck)(S) Inspection
⑤Wire ⑥Shackle Boading area (Fore)(P/S) Inspection
⑦Sheaves ⑧Markings
⑨Platform Center pin Accomodation Ladder(P) Inspection
⑩Distance Piece Accomodation Ladder(S) Inspection
⑪Man rope/Side rope
⑫Stanchion post Pilot Assistant Ladder(P) Inspection
⑬Safety net (For Acc ladder) Pilot Assistant Ladder(S) Inspection
For Pilot & Embarkation ladder
⑭Shackle for ladder Pilot Ladder(P) Inspection
⑮Spreader ⑯Steps Pilot Ladder(S) Inspection
⑰Side ropes ⑱Man ropes
*a
Working Matter/Company Plan Item Work 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 2 month Accomodation Ladder(P) Greasing
Accomodation Ladder(S) Greasing
Inspection Point
① Each greasing point Pilot Assistant Ladder(P) Greasing
② Wire rope Pilot Assistant Ladder(S) Greasing
*a
Working Matter/Company Plan Item Work 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 year Accomodation Ladder(P) Replacement
Accomodation Ladder(S) Replacement
Inspection Point
① Hydraulic oil of gear unit

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Lights Illumination Device(Excepted Cargo Hold Light) P-29

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month 1.Forecastle Inspection
2.Upper Deck Inspection
Inspection Point 3.Poop Deck Inspection
①Bulb 4.Compass Deck Inspection
②Connected pipes 5.Navigation Bridge Deck Inspection
③Fitting Bolt and Nut 6.D Deck Inspection
④Packing 7.C Deck Inspection
⑤Cover glass 8.B Deck Inspection
⑥Protector 9.A Deck Inspection
⑦Emg.Light mark 10.__________________Deck Inspection
⑧Registant 11.No.1 Crane (Inc House) Inspection
⑨Flooding water 12.No.2 Crane (Inc House) Inspection
13.No.3 Crane (Inc House) Inspection
14.No.4 Crane (Inc House) Inspection
15.Fore Mast Inspection
16.Radar Mast Inspection
17.__________________Mast Inspection
18.Bsn Store, Interior Inspection
19.Engine Control Rm Inspection
20.Engine Rm Inspection
21.Steering Rm Inspection
22.Refrigerator Rm Inspection
23.Escape Trunk Inspection
24.CO2 bottle room Inspection
25.Under deck passage Inspection
26.Bow thruster room Inspection
27.Funnel Inspection
28.Emergency generator room Inspection
29.__________________ Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600
Miscellaneous
Appliances Bulwarks, Spill Containers, Handrails P-30

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month Bulwarks
Inspection Point 1.Fore Castle Inspection
①Frame ②Plate
③Bracket

Interval: 1 month Spill Containers


1.For FO tank Inspection
Inspection Point 2.For DO tank Inspection
①Plates ②Plug 3.For W.O. tank Inspection
③Obstackles④Capacity 4.For Windlass and mooring winc Inspection
(forward)
5.For mooring winch (Aft) Inspection
6. For Upp deck Hyd machinery Inspection
7. _________________ Inspection
8. _________________ Inspection
Interval: 1 month Handrails
1.Fore Castle Inspection
Inspection Point 2.Upper Dk(P) Inspection
①Frames 3.Upper Dk(S) Inspection
4.Poop Dk Inspection
5.Compass Deck Inspection
6.Navigation Bridge Deck Inspection
9.D Deck Inspection
10.C Deck Inspection
11.B Deck Inspection
12.A Deck Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600
Miscellaneous
Appliances Gear Boxes P-31

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 4 Y/N Remark *b
Interval: 1 month Gear Boxes
1.Windlass & Mooring winch Inspection
Inspection Point 2. Mooring winch (Poop deck) Inspection
①Plates 3. Pilot assistant ladder control Inspection
②Hinge 4. Pneumatic motor for davit Inspection
③Open/Close handle
④Rubber hose
⑤Valve & Plug for emergency3.No1 Hatch Cover Inspection
⑥Operation 4.No2 Hatch Cover Inspection
5.No3 Hatch Cover Inspection
6.No4 Hatch Cover Inspection
7.No5 Hatch Cover Inspection
8.No6 Hatch Cover Inspection
9.No7 Hatch Cover Inspection
10.No8 Hatch Cover Inspection
11.Hyd pump for emergency opera Inspection

12.No.1 Crane House Inspection


13.No.2 Crane House Inspection
14.No.3 Crane House Inspection
15.No.4 Crane House Inspection
16._____________________ Inspection
17._____________________ Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600
Miscellaneous
Appliances Switch Boxes P-32

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month Switch Boxes
1.Fore Castle Inspection
Inspection Point 2.Upper Dk(P) Inspection
①Plates 3.Upper Dk(S) Inspection
②Hinge 4.Poop Dk Inspection
③Packing 5.Compass Deck Inspection
④Receptackle 6.Navigation Bridge Deck Inspection
⑤Receptackle Cover 9.D Deck Inspection
⑥Open/Close Lever 10.C Deck Inspection
11.B Deck Inspection
12.A Deck Inspection
13.No.1 Crane House Inspection
14.No.2 Crane House Inspection
15.No.3 Crane House Inspection
16.No.4 Crane House Inspection
17._____________________ Inspection
18._____________________ Inspection
19._____________________ Inspection
20._____________________ Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Flooding Alarm System Water Ingress Alarm System P-33

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Name of Equipment 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month Water ingress alarm system Inspection

Interval: 6 month FPT Operation test


BSN store Operation test
Check point Bow thruster room (Fwd & Aft) Operation test
① Pre-alarm No1 Cargo Hold Operation test
② Main alarm No2 Cargo Hold Operation test
③ Bilge well (If applicable) No3 Cargo Hold Operation test
No4 Cargo Hold Operation test
No5 Cargo Hold Operation test
No6 Cargo Hold Operation test
No7 Cargo Hold Operation test
No8 Cargo Hold Operation test
Under deck pass (P & S) Operation test
Pipe duct Operation test
Other: _________________ Operation test

Navigational Equipment-1 Magnetic Compass, Gyro Compass,

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Name of Equipment 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month Gyro and Repeater Compass Inspection
Accordance with manual 1.Master Compass Inspection
*To be measured deviation 2.Repeater, Helm stand Inspection
every year 3.Navigation Bridge Inspection
*To be overhauled Gyro 4.Navigation Bridge,Wing(P)(S) Inspection
compass every dry dock 5.Steering Rm Inspection
Magnetic Compass Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600
Navigational Equipment-2 Auto Pilot, Doppler sonar,Echo Sounder,Barometer EM Log, Radar with ARPA,
P-34
GPS, Course Recorder, Wind Meter, Rudder Angle Ind., RPM IND., Heading Cont. System, AIS, VDR, ECDIS
Record for ship, 20_____ 20_____ *a
Work
Working Matter/Company Plan Name of Equipment 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month Auto Pilot Inspection
Doppler Sonar Inspection
Accordance with manual Echo Sounder Inspection
Aneroid Barometer Inspection
Distance and Speed Meter Inspection
1.Transmitter (EM Log) Inspection
2.Reciever,Navigation Bridge Inspection
No.1 Radar & ARPA Inspection
No.2 Radar & ARPA Inspection
No.1 GPS Inspection
No.2 GPS Inspection
Wind meter Inspection
Rudder Angle Indicator Inspection
RPM Indicator Inspection
Heading Control System Inspection
Clinometer Inspection
Voyage Data Recorder (VDR) Inspection
AutoIdentification System (AIS) Inspection
BNWAS Inspection

<<ECDIS is categorized as Essential Equipment. Refer DK-10-800>>


Interval: 1 month ECIDS
Cleaning (Display, Case, Vent Hole) 1. Cleaning Cleaning
SELF TEST 2. SELF TEST Operation
(Not required for JRC and Chart world)
Interval: 3 month 1. Cabling check Inspection
Cabling (firmly connected, damage) 2. Adjust dispaly color Adjustment
Adjusting display color

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Navigational Equipment-3 Signal Lights, Daylight signal light P-35

Record for ship, 20_____ 20_____ *a


Work
Working Matter/Company Plan Name of Equipment 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month Daylight Signal
1.Navigation bridge Inspection
Inspection Point
①Bulb ②Fitting bolt Signal Light
③Packing ④Cover glass 1.Radar mast Inspection
⑤Protector ⑥Registance 2.Fore Inspection
⑦Operation ⑧Spare bulb 3.Aft Inspection

Measuring Equipments Oxgen meter, Gas Detector, Boiler Prssure Gauge


Record for ship, 20_____ 20_____ *a
Work
Working Matter/Company Plan Name of Equipment 4 5 6 7 8 9 10 11 12 1 2 3 Y/N Remark *b
Interval: 1 month Gas Detector Operation
①Operation Test by Fresh air Boiler Pressure Gauge (Main) Inspection
②Operation condition inspection
③Span Adjusting
④Battery ⑤Visual

Interval: 6 month Gas Detector Caribration


①Calibration by C/O If caribration by ship's staff is unnecessary, to be skip this item

Interval: 6 month Boiler Pressure Gauge (Main) Comparsion


①Compare with standard gauge

Interval: 1 year Gas Detector Caribration by shore


①Calibration by shore service Boiler Pressure Gauge (Main) Replace
②Replace with newly calibrated gauge

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Construction Ballast Tanks, FW Tanks and Chain locker P-36

Record for ship, 20_____ 20_____ Date of last *a


Work
Working matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 inspection Y/N Remark *b
Interval: At least Dry Dock F.P.Tank Inspection
A.P.Tank Inspection
Inspetion Point Water Ballast Tank(P) No.1 Inspection
①Frame Water Ballast Tank(S) No.1 Inspection
②Girder Water Ballast Tank(P) No.2 Inspection
③Stringer Water Ballast Tank(S) No.2 Inspection
④Ladder Water Ballast Tank(P) No.3 Inspection
⑤Pipe Water Ballast Tank(S) No.3 Inspection
a.Ballast Line Water Ballast Tank(P) No.4 Inspection
(Including U band & rest) Water Ballast Tank(S) No.4 Inspection
b.FO Line ( -do- ) Water Ballast Tank(P) No.5 Inspection
c.Sounding Pipe( -do- ) Water Ballast Tank(S) No.5 Inspection
d.Scupper Pipe( -do- ) Water Ballast Tank(P) No.6 Inspection
⑥Manhole Water Ballast Tank(S) No.6 Inspection
a.Packing Water Ballast Tank(P) No.7 Inspection
b.Tightening Bolts Water Ballast Tank(S) No.7 Inspection
c.Hinges Water Ballast Tank(P) No.8 Inspection
d.Plates Water Ballast Tank(S) No.8 Inspection
Slop Tank(P) Inspection
Slop Tank(S) Inspection
Pipe Duct Space Inspection
Other Ballast tank
Space: ______________ Inspection
Space: ______________ Inspection
Interval: At least Dry Dock Cleaning of potable water tanks depend on the water condition but not exceed dry dock - "MLC manual"
Fresh Water Tank Inspection/Cleaning
Drinking Water Tank Inspection/Cleaning
Interval: Dry Dock Chain Locker(P) Inspection
General Inspection Chain Locker(S) Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Construction Ballast Tanks (Devided with TST and DBT) P-37

Record for ship, 20_____ 20_____ Date of last *a


Work
Working matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 inspection Y/N Remark *b
Interval: At least Dry Dock F.P.Tank Inspection
A.P.Tank Inspection
Inspetion Point Topside Tank(P) No.1 Inspection
①Frame Topside Tank(S) No.1 Inspection
②Girder Topside Tank(P) No.2 Inspection
③Stringer Topside Tank(S) No.2 Inspection
④Ladder Topside Tank(P) No.3 Inspection
⑤Pipe Topside Tank(S) No.3 Inspection
a.Ballast Line Topside Tank(P) No.4 Inspection
(Including U band & rest) Topside Tank(S) No.4 Inspection
b.FO Line ( -do- ) Topside Tank(P) No.5 Inspection
c.Sounding Pipe( -do- ) Topside Tank(S) No.6 Inspection
d.Scupper Pipe( -do- ) Topside Tank(P) No.6 Inspection
⑥Manhole Topside Tank(S) No.7 Inspection
a.Packing Topside Tank(P) No.7 Inspection
b.Tightening Bolts Topside Tank(P) No.8 Inspection
c.Hinges Topside Tank(S) No.8 Inspection
d.Plates ______________________ Inspection
______________________ Inspection
D.Bottom Tank(C/P)No.1 Inspection
D.Bottom Tank(S) No.1 Inspection
D.Bottom Tank(P) No.2 Inspection
D.Bottom Tank(S) No.2 Inspection
D.Bottom Tank(P) No.3 Inspection
D.Bottom Tank(S) No.3 Inspection
D.Bottom Tank(P) No.4 Inspection
D.Bottom Tank(S) No.4 Inspection
D.Bottom Tank(P) No.5 Inspection
D.Bottom Tank(S) No.5 Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Construction Ballast Tanks (Devided with TST and DBT), FW Tanks and Chain locker P-38

Record for ship, 20_____ 20_____ Date of last *a


Work
Working matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 inspection Y/N Remark *b
Interval: At least Dry Dock D.Bottom Tank(P) No.6 Inspection
D.Bottom Tank(S) No.6 Inspection
Inspetion Point D.Bottom Tank(P) No.7 Inspection
①Frame D.Bottom Tank(S) No.7 Inspection
②Girder D.Bottom Tank(P) No.8 Inspection
③Stringer D.Bottom Tank(S) No.8 Inspection
④Ladder Slop Tank(P) Inspection
⑤Pipe Slop Tank(S) Inspection
a.Ballast Line Pipe Duct Space Inspection
(Including U band & rest)
b.FO Line ( -do- )
c.Sounding Pipe( -do- )
d.Scupper Pipe( -do- )
⑥Manhole
a.Packing
b.Tightening Bolts
c.Hinges
d.Plates

Other Ballast tank


Space: ______________ Inspection
Space: ______________ Inspection
Space: ______________ Inspection
Space: ______________ Inspection
Interval: At least Dry Dock Cleaning of potable water tanks depend on the water condition but not exceed dry dock - "MLC manual"
Fresh Water Tank Inspection/Cleaning
Drinking Water Tank Inspection/Cleaning
Interval: Dry Dock Chain Locker(P) Inspection
General Inspection Chain Locker(S) Inspection

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)
DK-10-600

Construction Cofferdams and Other spaces P-39

Record for ship, 20_____ 20_____ Date of last *a


Working
Working matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 inspection Y/N Remark *b
Interval: Dry dock Name of Cofferdam
1.
Inspection Point 2.
①Frame ②Girder 3.
③Stringer ④Ladder 4.
⑤Pipe 5.
a. Ballast Line 6.
(Including.U band & rest) 7.
b.FO Line ( -do- ) 8.
c.Sounding Pipe ( -do- ) Other Spaces
d.Scupper Pipe ( -do- ) 1.
e.Temparature Pipe( -do- ) 2.
⑥Manhole 3.
a.Packing 4.
b.Tightening Bolts 5.
c.Hinges d.Plates 6.

Mooring Equipment Anchors


Record for ship, 20_____ 20_____ Date of last *a
Work
Working matter/Company Plan Item 4 5 6 7 8 9 10 11 12 1 2 3 inspection Y/N Remark *b
Interval: Dry dock Anchor chain(P) Inspection/Measurement

Anchor Chain(S) Inspection/Measurement

including marking Anchor(P) Inspection/Measurement

*Measuring required Anchor(S) Inspection/Measurement

from 2nd S.Survey

*Remarks *a. Is it needs to conduct maintenance work? Please select "Y (This item needs to maintain)"/ "N(As of now no needs to maintain this item)"
*b If *a column is selecting "Y", please record maintenance planning duration /If *a column is selecting "N", please record special remarks (If applicable)