Hira For Refractory
Hira For Refractory
MECHANICAL WORKS
S. ACTIVITY HAZARD CONSEQUENCE PROBABILITY SEVIRITY RISK LEVEL RISK RATING CONTROL MEASURES
No. FACTOR FACTOR
ACTIVITY – 1 SHIFTING OF REFECTORY METERIAL WITH THE HELP OF HYDRA&TRACTOR
Loading & 1. Toppling of tractor/hydra . 1. Person may sustain severe 1. Soil condition is good & well level.
unloading of 2. Failure of tractor /hydra injuries. 2. Not allowed another person to sit in hydra/tractor
1 3 3 MODERATE 2
material 3. Injury due to unsafe handling 2. Persons working at while operating time.
4. Chemical reaction. suspended load. 3. Hydra has a valued test certificate.
5. Struck between material. 3. Property damage. The operator had availed driving license.
6.Falling of loose material 4. Allergy 4. Proper PPEs are wearing all work force in evolving this
5.Cut injury. activity
6.Injury 5. Loose material should be carefully loaded& Unloaded
manually.
6. Wheel stopper to be ensured of the tractor while the
loading, unloading time.
7. During packed material loading person entry on trolley
is restricted.
S. ACTIVITY HAZARD CONSEQUEN PROBABILIT SEVIRITY RISK RISK RATING CONTROL MEASURES
No. CE Y FACTOR FACTOR LEVEL
ACTIVITY – 2 LIFTING ARRAINGEMENT BY WRINCH MACHINE&CRANE
1 Lifting of 1. Failure of winch/crane. 1. Serious injury, High 1.Area should be properly barricaded
refractory 2. Electrocution. 2. Disorder of 3 4 3 2. Know the accurate weight of the material should
material by 3. Cut injury. winch rope from lift.
winch/crane 4. Scratch injury. sheaves 3. Choose the appropriate sling.
5. Failure of slings. 4. Mark the SWL of the sling.
6.Falling of material. 5. Ensure the third party inspection certificates are
available for all lifting tools & tackles and its validity.
6. Check the all the tools before in use.
7.Ensure proper clamping of bucket
8. Ensure that conveying wire Is free from any
damage and no obstructions in path way.
9. Proper packing to be provided in guide pulleys
sling.
2 High
Shifting of 1.Serious injury 3
1. Failure of winch/crane. 4 5
refractory 2. Fatal. 1. Keep material in basket properly. Bricks to be kept /
2. Electrocution. 3. Property damage
material from stack safely and ensure that will not drop down during
3. Cut injury. 4. Fire
ground floor to movement.
4. Scratch injury.
working area. 2. Carton of bricks to be shifted with the help of crane
5. Failure of slings.
6. Falling of material. or winch, using slings as per the weight of cartons.
3. Carton of bricks will stock properly in floor not block
access.
4. After tacking of bricks remove all scarps and
cartons all flammable materials.
5. Lift only one carton bricks, as per the capacity of
winch certified.
6. Ensure height of stack is not more than 5.5 feet and
will not damage the floor.
7. The whole gang engaging the activity will wear
right ppes.
8. Ensure that the door of basket is closed properly
while lifting time.
1 Shifting of mixer 1. Toppling of hydra/trailor, 1. Material/property 2 3 HIGH 3 1. Ensure that the area should be well leveled.
machine in to tractor. damage. 2. Only valid person should operate the vehicle.
work place with 2. Serious injury. 3. Proper tie rope are to be provided in material while
the help of trailor transporting time.
,hydra crane /
tractor
1 Arc welding 1. Radiation harmful to naked 1. Welder's cataract. 2 5 HIGH 4 1.Use welding shield / goggles.
eyes. 2. Burn injury. 2. Fireproof apron / gloves / screen.
2. Splinters / slag. 3. Lung ailments 3. Ventilation (local or exhaust if possible)
3.Toxic flames. 4. Dermatitis. 4. Full-sleeved coverall and gloves.
4. Dislocation / fall of job piece 5. Hit injury / crush injury. 5. Proper clamping system / material handling
due to faulty clamping. 6. Electric shock. techniques.
5. Loose connections / Loss of 7. Fire / explosion. 6. Use shock proof boots and hand gloves.
insulation. 8. Asphyxiation. 7. Provide earthing to the plant.
6. Flammable gases. 8. Periodical gas testing.
7. Poor ventilation 9. Keep fire extinguisher (DCP/CO2) standby.
10. Adequate ventilation.
11. Training & instructions.
12. Provide exhaust fan while confined space weldind.
02 Apply of 1. Eye injury. 1. Injury to eye. 2 3 MEDIUM 3 1.All involved worker man must wear PPE’S
Bituminous 2.Fire 2. Burn injury 2.If painting work in progress no hot work at that
paint. 3. Suffocation 3. Unconscious area.
4. Allergy. 3.Keep fire extinguisher near to the work area.
4.During height work safety harness must wear.
5.Proper platform to be provided for work.
4
1 Brick lining work in 1. Serious injury. 1. Property damage. 3 2 HIGH 3 1. All workmen engaging this work should wear appropriate
cyclones. 2. Fall of materials. 2. Suffocation. PPEs like Helmet with chin strap, safety shoes, safety jacket,
3. Fall of man from height 3. Getting eye injury due to direct contact Nose mask, rubber hand gloves, safety goggles.
4. Skin injury. with material. 2. Proper width of work platforms maintain.
5. Eye injury. 3. Proper stacking of material in working area.
4. Ensure that the brick is properly sit on the line then only the
another brick should erect.
5. In shifting of bricks in to job area care on loose bricks.
2.
Cutting of brick for
1.Electrocussion 1. Electrical shock.
required size for job. 1. Check the tools which are to be used before used.
2. Cut injury. 2. Cut injury due to sharp edges.
3. Fall of material 3. Property damages 2. Remove all scrap peace of bricks in working area.
3. Wear all suitable PPEs.
4. Information to be pass or stop the below work area.
5. Ensure proper super vision to be there.