0% found this document useful (0 votes)
42 views5 pages

8MDL

The document outlines key performance indicators for a department. It includes metrics such as employee turnover rate, timely submission of reports, and average scores of subordinates. The KPIs are grouped into categories and each is assigned a percentage of the total score. A rating system is provided to assess overall performance.

Uploaded by

michael.bunyi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views5 pages

8MDL

The document outlines key performance indicators for a department. It includes metrics such as employee turnover rate, timely submission of reports, and average scores of subordinates. The KPIs are grouped into categories and each is assigned a percentage of the total score. A rating system is provided to assess overall performance.

Uploaded by

michael.bunyi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

DEPARTMENT KEY PERFORMANCE INDICATOR

8MDL DEPARTMENT

MONTH

KPI TOTAL % PROCESS MEASUREMENT DESCRIPTION REPORTS SCORE EQUIVALENT ASSESMENT RECOMMENDATION IMPACT

Number of ecf resolved on time This KPI measures the department's 1


1 30% RESPONSE TO ECF quick and effective response to HR report 6.00%
over the total number of ecf different concerns of the employees 5

The average score of all the


AVERAGE SCORE OF AVERAGE KPI OF THE EMPLOYEES IN subordinates in the same department INDIVIDUAL KPI/HEAD OR
2 30%
SUBBORDINATES THE DEPARTMENT will be computed excluding the SUPERVISOR
85% 25.50%
performance evaluation.

SCORE BASED FROM THE KPI of the Head excluding the


3 20% SCORE OF HEAD
COMPUTATION performance evaluation
INDIVIDUAL KPI 75% 15.00%

USE THE CRITERIA AND SCORE


BASED ON THE EVALUATION. IF IT IS
NOT POSSIBLE TO EVALUATE DUE
KAIZEN will be counted if it is 1
TO LACK OF TIME, A SCORING
4 20% ITIK (KAIZEN) (N+1) implemented, otherwise, it has no
SCHEME AS STATED IN THE
BASED ON THE SUBMITTED REPORT 6.67%
credit 3
MEASUREMENT WILL BE USED.
NUMBER OF SUBMITTED KAIZEN
OVER 3 PER QUARTERMAY BE USED

TOTAL KPI
SCORE
100% TOTAL 53.17%

NOTE:
A. The score which will be added to the department's KPI excludes behavioral evaluation. Behavioral evaluation is 30% and KPI is 70%
B. If there's no ECF submitted within a quarter, the average score for subordinates and the head's score will be equal to 40 each.

RATING ADJECTIVAL EQUIVALENT


100 OUTSTANDING (Consistent Outstanding Performance)
80 - 99 VERY SATISFACTORY (Exceed normal expectations and requirements of the job)
60 - 79 SATISFACTORY (Meets standard performance and requirements of the job)
40 - 59 FAIR (Performance fails below the normal requirements of the job)
39 - BELOW POOR (Performance unacceptable for the position; inadequate/unsatisfactory performance)
KEY PERFORMANCE INDICATOR
8MDL DEPARTMENT

MONTH

KPI TOTAL % PROCESS MEASUREMENT DESCRIPTION REPORTS Month 1 Month 2 Month 3 TOTAL RQD % TOTAL% ASSESMENT RECOMMENDATION IMPACT

# OF RESIGNED EMPLOYEE WITHIN


THE DEPARTMENT The percentage of resigned employees will be 7
EMPLOYEES TURN OVER 2 3 2
1 20%
RATE
deducted from 100%. This KPI measures the Based on HRSS Report
130 132 19
97.51% 19.50%
TOTAL # OF EMPLOYEE WITHIN THE ability of the leader to retain a subbordinate 281
DEPARTMENT

AUDITOR'S REPORT/MANAGEMENT
REPORT 1. Training evaluation when
TIMELY AND COMPLETE SUBMISSION # OF LATE AND INCOMPLETE necessary
REPORTS This KPI measures the productivity of the heads 7
OF REPORT (e.g.Report being asked 2. Video Reactions 2 3 2
2 20%
by top management or any
in terms of submitting the reports necessary to
(Identify the reports to be submitted 15 11 15
82.93% 16.59%
TOTAL # OF AUDITED run and maintain the business 41
department) REPORTS/NUMBER OF REPORTS TO and the dates when they are supposed
BE SUBMITTED to be submitted by the manager and
cluster heads)

# of resolved
issues/complaints/concerns This KPI will measure how fast is the head in 18 15 19 52
3 20% Resolved issues/complaints/concerns Total number of resolving an issues
system based 30 20 25 75
69.33% 13.87%
issues/complaints/concerns

The KPI score will be used excludes


4 20% KPI OF SUBORDINATES AVERAGE KPI SCORE OF THE STAFF
performance evaluation.
Based on the KPI Report 85% 85% 75% 82% 81.67% 16.33%

Notice to Explain = 10 Scores will be deducted from 100%. The


5 10% BEHAVIOUR Warning = 20 deduction will depend on the severity of the Based on HRSS Report 20 20 20 0.80 80% 8.00%
Suspension = 40 disciplinary action.

TOTAL NUMBER OF
TARDY/ABSENCES PER MONTH The percentage of tardiness/absences will be 4 3 4 11
6 10% ATTENDANCE
deducted from 100%
Based on HRSS/HEADS Report
26 26 26
85.90% 8.59%
TOTAL NUMBER OF WORKING DAYS 78
PER MONTH

1 NOT MANDATORY TRAINING EMPLOYEES MUST PRESENT CERTIFICATE


TRAINING CONDUCTED BY ANY ATTENDED WITHIN 3 MONTHS IS OR PROOF OF ATTENDANCE. TRAINING
Additional 3%
ENTITY BUT NOT MANDATORY EQUIVALENT TO 3 ADDITIONAL OFFICER WILL EVALUATE THE VALIDITY OF
Based on HRSS Report 3.00%
POINTS IN THE KPI THE TRAINING AND ITS PROOF

IF THE EMPLOYEE SUBMITTED A


A DOCUMENT/FORM MUST BE PRESENTED
Additional 5% KAIZEN KAIZEN, HE/SHE WILL
BEFORE IT CAN BE CREDITED.
Based on the evaluation 5.00%
AUTOMATICALLY GET 5 %.
KEY PERFORMANCE INDICATOR
8MDL DEPARTMENT

MONTH

KPI TOTAL % PROCESS MEASUREMENT DESCRIPTION REPORTS Month 1 Month 2 Month 3 TOTAL RQD % TOTAL% ASSESMENT RECOMMENDATION IMPACT

This performance metric measures the


1 20% Engineering-on-Time Delivery # of Projects Delivered on-Time rate at which the employee meets its Department report/Audit/Eric 6 1 2 4 7 58% 11.67%
Total # of Projects Delivered deliverables on time 3 4 5 12

# of repairs/projects executed with


back job This KPI measures the quality of the 1 2 1 4
2 20% Quality of repair/project Department report/Audit/Eric 6 83% 16.52%
total # of repairs made job assigned to the employee 15 5 3 23

Scores will be deducted from 100%.


Time Adherence to Job Order 1 late submission of JO Finalization =
4 20% This KPI measures the employee's Department report/Audit/Eric 6 10 10 30 0.83 83% 16.67%
Finalization 10
adherence to the schedule

The employee will be audited on the


# OF LATE AND INCOMPLETE spot based on the date of submission OWN REPORT/AUDITOR'S REPORT
REPORTS 1x a week or 4x a month and will check 1. Personnel 1 1 2 4
TIMELY AND COMPLETE SUBMISSION
5 20% na completeness and timeliness of the Monitoring Report 60% 12.00%
OF REPORT TOTAL # OF AUDITED 3 5 2 10
reports. This KPI measures how
REPORTS/NUMBER OF REPORTS TO consistent the manager is in (Reports will be identified)
BE SUBMITTED submitting his report

Notice to Explain = 10 Scores will be deducted from 100%.


6 10% BEHAVIOUR Warning = 20 The deduction will depend on the Based on HRSS Report 20 20 10 0.83 83% 8.33%
Suspension = 40 severity of the disciplinary action.

TOTAL NUMBER OF
1 2 3
TARDY/ABSENCES PER MONTH
The percentage of tardiness/absences 6
7 10% ATTENDANCE Based on HRSS/HEADS Report 92% 9.23%
will be deducted from 100% 78
TOTAL NUMBER OF WORKING DAYS
26 26 26
PER MONTH

EMPLOYEES MUST PRESENT


1 NOT MANDATORY TRAINING
CERTIFICATE OR PROOF OF
TRAINING CONDUCTED BY ANY ATTENDED WITHIN 3 MONTHS IS
Additional 3% ATTENDANCE. TRAINING OFFICER Based on HRSS Report 3.00%
ENTITY BUT NOT MANDATORY EQUIVALENT TO 3 ADDITIONAL
WILL EVALUATE THE VALIDITY OF
POINTS IN THE KPI
THE TRAINING AND ITS PROOF

IF THE EMPLOYEE SUBMITTED A A DOCUMENT/FORM MUST BE


Additional 5% KAIZEN KAIZEN, HE/SHE WILL PRESENTED BEFORE IT CAN BE Based on the evaluation 5.00%
AUTOMATICALLY GET 5 %. CREDITED.
KEY PERFORMANCE INDICATOR
8MDL DEPARTMENT

MONTH

KPI TOTAL % PROCESS MEASUREMENT DESCRIPTION REPORTS Month 1 Month 2 Month 3 TOTAL RQD % TOTAL% ASSESMENT RECOMMENDATION IMPACT

# of repairs executed based on The KPI measures the adherence of


1 40% Work Order Cycle Time expected schedule the employee to their schedule of Eric 6 or Audit 2 3 6 11 65% 25.88%
total # of repairs made completion 5 4 8 17

# of repairs/projects executed with


back job This KPI measures the quality of the 1 6 3 10
2 40% Quality of repair/project Eric 6 or Audit 63% 25.19%
total # of repairs made job assigned to the employee 8 10 9 27

Notice to Explain = 10 Scores will be deducted from 100%.


3 10% BEHAVIOUR Warning = 20 The deduction will depend on the Based on HRSS Report 20 20 10 0.83 83% 8.33%
Suspension = 40 severity of the disciplinary action.

TOTAL NUMBER OF
TARDY/ABSENCES PER MONTH
The percentage of tardiness/absences 2 3 1 6
4 10% ATTENDANCE Based on HRSS/HEADS Report 92% 18.46%
will be deducted from 100% 26 26 26 78
TOTAL NUMBER OF WORKING DAYS
PER MONTH

EMPLOYEES MUST PRESENT


1 NOT MANDATORY TRAINING
CERTIFICATE OR PROOF OF
TRAINING CONDUCTED BY ANY ATTENDED WITHIN 3 MONTHS IS
Additional 3% ATTENDANCE. TRAINING OFFICER Based on HRSS Report 3.00%
ENTITY BUT NOT MANDATORY EQUIVALENT TO 3 ADDITIONAL
WILL EVALUATE THE VALIDITY OF
POINTS IN THE KPI
THE TRAINING AND ITS PROOF

IF THE EMPLOYEE SUBMITTED A A DOCUMENT/FORM MUST BE


Additional 5% KAIZEN KAIZEN, HE/SHE WILL PRESENTED BEFORE IT CAN BE Based on the evaluation 5.00%
AUTOMATICALLY GET 5 %. CREDITED.
KEY PERFORMANCE INDICATOR
8MDL DEPARTMENT

MONTH

KPI TOTAL % PROCESS MEASUREMENT DESCRIPTION REPORTS Month 1 Month 2 Month 3 TOTAL RQD % TOTAL% ASSESMENT RECOMMENDATION IMPACT

# of projects executed based on The KPI measures the adherence of


1 20% Work Order Cycle Time expected schedule the employee to their schedule of Eric 6 or Audit 2 3 6 11 65% 12.94%
total # of projects made completion 5 4 8 17

# of repairs/projects executed with


back job This KPI measures the quality of the Audit and feedback from the user of 1 6 3 10
2 20% Quality of project
total # of repairs made job assigned to the employee top management 8 10 9 27
63% 12.59%

The KPI measures the timely


1 late requestion is equivalent to 10%
3 10% Parts requisition/Monitoring
deduction
requisition of parts in order to Eric 6 or Audit 10 10 30 0.83 83% 8.33%
accomplish the job on time.

The maintenance will be audited on the


# OF LATE AND INCOMPLETE spot based on the date of submission
REPORTS 1x a week or 4x a month and will check 5
TIMELY AND COMPLETE SUBMISSION OWN REPORT/AUDITOR'S REPORT 2 1 2
4 15%
OF REPORT
na completeness and timeliness of the
(Reports will be indentified) 19 19 19
91% 13.68%
TOTAL # OF AUDITED reports. This includes the ff. 57
REPORTS/NUMBER OF REPORTS TO 1.
BE SUBMITTED

Ask for the updated reports for


# OF INACCURATE REPORTS The percentage of the wrong/ defective 5
Submission and who is needing the 2 1 2
5 15% ACCURACY OF THE REPORT items acquired will be deducted from
report. This will be audited by 19 19 19
91% 13.68%
TOTAL # REPORTS AUDITED 100% 57
checking 4 reports every month

Notice to Explain = 10 Scores will be deducted from 100%.


6 10% BEHAVIOUR Warning = 20 The deduction will depend on the Based on HRSS Report 85% 85% 75% 82% 82% 16.33%
Suspension = 40 severity of the disciplinary action.

TOTAL NUMBER OF
TARDY/ABSENCES PER MONTH
The percentage of tardiness/absences 2 3 1 6
7 10% ATTENDANCE Based on HRSS/HEADS Report 92% 18.46%
will be deducted from 100% 26 26 26 78
TOTAL NUMBER OF WORKING DAYS
PER MONTH

EMPLOYEES MUST PRESENT


1 NOT MANDATORY TRAINING
CERTIFICATE OR PROOF OF
TRAINING CONDUCTED BY ANY ATTENDED WITHIN 3 MONTHS IS
Additional 3% ATTENDANCE. TRAINING OFFICER Based on HRSS Report 3.00%
ENTITY BUT NOT MANDATORY EQUIVALENT TO 3 ADDITIONAL
WILL EVALUATE THE VALIDITY OF
POINTS IN THE KPI
THE TRAINING AND ITS PROOF

IF THE EMPLOYEE SUBMITTED A A DOCUMENT/FORM MUST BE


Additional 5% KAIZEN KAIZEN, HE/SHE WILL PRESENTED BEFORE IT CAN BE Based on the evaluation 5.00%
AUTOMATICALLY GET 5 %. CREDITED.

You might also like