Briefly explain a GT (Full speed no load condition). Stop igniters, flame detectors .
igniters, flame detectors .By nipping          Simple cycle operation: When GT
A marine gas turbine is a type of            command is given from panel. Fuel           up trouble at very beginning have              alone is operated, it is known as
engine used to propel marine vessels,        supply is reduced automatically and         significant       effect     on     reliable   simple cycle operation.
such as ships and submarines. It             then GT start coasting down .As the         continuous          service      of      the   Simple cycle efficiencies are very
operates on the principle of converting      speed come down to around 60% or            engine.2.Baroscopic             inspection.    low, normally of the order of 30% to
the energy of combusted fuel into            below the fuel is shut of completely.       Inspection of turbine internals using a        33%. Combined cycle concept: A
mechanical power.                            GT coasts to rest. At zero speed, the       baroscope.           Access holes for          combined cycle Down stream of GT is
Compressor: Air is compressed by a           ratcheting starts automatically now.        borescope provided in GT for inserting         placed an HRSG to operate a steam
series of rotating blades within the         (This means turning gear is on)             optical borescope probe on a non-              turbine plant to produce power .
compressor section. The compressor           Ratcheting is stopped after GT is           operating gas turbine for visual               Overall efficiency of this plant is of
increases the pressure and density of        cooled       down         (Wheel-space      observation of stationary and rotating         the order 42% to 47%. Co-generation
the air before entering the combustion       temperature <80 degree C).                  parts with out removing casing upper           plant: In a cogeneration plant HRSG
chamber.                                     The auxiliary lube oil pump starts          part.                                          steam is utilised not for steam turbine
Combustion Chamber: The                      automatically during shut down cycle        Running inspection consists of the             operation ; but utilised for process
compressed air enters the combustion         and runs until cool down is completed       observations made during the engine in         requirements like desalination plant or
chamber, where it is mixed with fuel,                                                    service. Operating data recorded and           chemical process plants .plant
typically liquid or gaseous. The fuel-       Lubrication system                          evaluated periodically. A few                  efficiency of the order 75% to 85%.
air mixture is ignited, creating a high-     Major lubricating system parts- A           parameters typical running inspection          Energy Efficient Facilities:
temperature and high-pressure gas.           majority of the parts listed are            to focus on are as given below: Exhaust        Regenerator, Intercooler, Reheater.
Turbine: The hot, high-pressure gas          normally found in the lubrication           temperature, wheel space temperature,          Regenerator: In order to achieve fuel
flows through a series of turbine            system of most gas turbine engines          exhaust plenum- duct leaks. vibration          economy, hot gases from turbine
blades. The expanding gas causes the         Lubricating oil reservoir MOP-Main          ,fuel flow ,fuel nozzle pressure, fuel oil     exhaust is used to pass through a heat
turbine blades to rotate rapidly. The        oil pump (driven from accessory             leaks Bearing Lubricating oil pressure         exchanger to raise the compressed air
turbine extracts energy from the gas,        gear).AOP-Auxiliary oil pump(driven         , lubricating oil leaks. IGV position,         temperature thus recovering heat from
converting it into mechanical power.         by motor).EOP-Emergency oil pump            air inlet filter differential pressure.        exhaust thus bringing down the fuel
Shaft: The rotating turbine is               ((driven by DC motor). Scavenger            Shut down inspection are performed             consumption. This increases the
connected to a shaft, which transmits        pump(s)also often provided in return        at pre planned specific intervals by           efficiency by 20-30%. Intercooler:
the mechanical power to the                  line.                                       shutting down the gas turbine. CI -            Intercooler is used to improve the
propulsion system. In marine                 In a typical gas turbine lubrication        COMBUSTION INSPECTION, HGP-                    efficiency of the gas turbine which
applications, the shaft is usually           system, a pressurized system or pump        HOT GAS PATH INSPECTION, MI-                   increases the net work output by
connected to a propeller or water jet        circulates the lubricant oil among the      MAJOR INSPECTION                               providing inter coolers between
system, generating thrust to propel the      different components that are required      Combustion           inspection:      (After   stages. As air temperature reduces air
vessel.                                      to be lubricated and cooled, while a        completion of 8000 fired hours[after           density increases by which enable the
The sketch shows the general layout          scavenging system returns the oil back      every 1 year period)) include Fuel             compressor to produce the desired
of the marine gas turbine, including         to the storage tank.The lubricating         nozzles, combustion liners and                 discharge pressure by doing less work.
the compressor, combustion chamber,          requirements for the gas turbine are        transition pieces are removed for              Reheater: High-pressure gases from
turbine, and shaft.                          furnished by a common forced-feed           inspection and repairs/replacement.            the primary combustion chamber
Advantages of GT as Marine                   lubrication system. Lubricating fluid is    HGP (After 24000 fired hours [after            enters the high-pressure stage of the
Engine                                       circulated to a] the turbine bearings,      every 3 years]) Whole the casing is            gas turbine where energy is extracted
High power to weight ratio/less              generator bearings] the reduction gear      horizontally split and the top half can        and the temperature and the pressure
weight. It is compact and hence              system (load gearbox), accessory gear       be lifted up removing all bolts for            drops. The cooler gases exiting this
occupies less space. Ability for quick       system       (accessory       gearbox).     access to internal parts. Inspect rotor        high pressure stage then enters a
start and reliable operation. High-          Branches: a] a branch taken as control      blades &stator blades opening turbine          secondary combustion chamber called
speed engine. GT package is easy to          oil b] a branch taken as coupling oil to    casing top cover ALONE during HGP              the reheat combustor where additional
shift and to install. Less pollution as      lubricate couplings] a branch taken as      inspection.                                    fuel is burnt to raise the temperature
only clean fuel fired. Less cooling          suction for hydraulic oil pump d]           MAJOR INSPECTION (After 48000                  of the gases again. These gases then
water requirement                            Bearing oil lines to bearings are           fired hours[after every 6 years])              enters the second stage of turbine
Disadvantages of GT as Marine                provided with orifices and oil pressure      Apart from combustion and hot gas             where, due to the increased
Engine                                       around 12 to 15 kgcm2 maintained,           path inspection, the whole casing              temperature more energy can be
Capital cost high. Operating cost high.                                                  upper part is removed including both           extracted.
Maintenance       cost high.        Strict   Liquid Fuel Oil System                      compressor & turbine for inspection,           Features of Aero Derivative
maintenance schedules. High speed            Fuel trip valve is open and fuel is         rotor removal, repair or replacement of        Combustion Chamber:
engine. [Double reduction load gear          available at main fuel pump suction.        internal parts.                                Primary air [combustion air]: Air is
box provided to drive propeller]. Open       Pump supply fuel at high discharge                                                         introduced around the let of fuel.
cycle efficiency is only around 35%.         pressure through HP filter to Flow          Two-spool split shaft Marine GT                Burns approximately at stoichiometric
Complex in design and manufacturing.         divider- [refer line diagram]Fuel pump      Consist of low pressure compressor             ratio during rapid combustion
Not economical for marine use.               bypass valve regulates the amount of        driven by the low pressure turbine ,           generating very high temperature.
Start-up procedure of GT                     fuel input to the turbine combustion        high pressure compressor driven by             Secondary air :[INTERMEDIATE
GT is put on ratcheting (on turning          chamber by varying amount of                the high pressure turbine, combustor,          AIR] [ for completing combustion]:
gear). Starting device is energized and      bypassed fuel. If bypass valve closes,      and free power turbine. This                   Secondary air introduced through
connected to turbine to bring it up to       more fuel goes to the combustors &          configuration of GT operates at a              holes in this zone to supplement the
firing speed or cranking speed, which        vice versa. Flow divider: Flow divider      higher efficiency as:. Low-pressure            combustion process and ensure
is 20% of normal speed. Fuel is              supply oil to all combustion chambers       compressor run at lower rpm                    complete combustion. Dilution Air
injected and ignited at 20% normal           at equal pressure and equal quantity.       compressor consume less power to               [to bring down temperature ]:
speed. After a short warm up period,         high pressure fuel oil pushes the gears     produce desired compression ratio.             Additional air is fed for diluting and
additional fuel is supplied and the unit     inside the flow divider. since all gears    This design allows higher                      cooling the exit gases from
is accelerated to self-sustaining speed.     are mounted on same shaft, all gears        compression ratio to operate                   combustor.
50% speed. At this speed the starting        rotate at same RPM and the flow is          efficiently over the entire speed range.       Low weight and small frontal area.
device          automatically         get    divided equally among all gears .           Both LP & HP compressors operate at            Less pressure loss. Ability to
disengaged.[jaw clutch disengages].                                                      their own optimum speed.                       withstand high temperature and
Under the control of GT control              INSPECTION IN GT                                                                           corrosive conditions for long life.
system, the speed accelerate and             Stand By Inspection, Running                Facilities to enhance performance of           Serviceability/ easy access for
reaches full speed. Now the machine is       Inspection, Shut Down Inspection.           GT                                             maintenance. Ability to provide
ready to take up load.GT load can be         Stand by Inspection: Pertaining to          Two ways to enhance performance:               Uniform temperature distribution in
varied from control panel as per             visual inspection and maintenance           By heat recovery and Incorporating             turbine inlet. Stable operation across a
demand.                                      during      unit    shut    down.      It   energy efficiency facilities.                  wide operating range. Complete
Shut Down Sequence of GT                     includes:1.Cleaning up, attending to        Heat Recovery: Simple Cycle                    combustion of fuel in the space of
GT drive load is brought to zero and         leaks, filter changing, checking of lube    Operation, Combined cycle operation,           combustion chamber. Low emission.
disengaged.GT now running at FSNL            oil and fuel oil piping ,checking           Co-generation plant.
Briefly Explain GT   Two-spool split shaft Marine GT
Aero Derivative GT
                     Performance Enhancement of A GT
Fuel Oil System
Lubrication System