JSA Form

The document describes a job safety analysis form for earthworks involving the use of a dozer and compactor. It lists the task steps, identifies potential hazards such as being crushed or buried, and proposes control measures like using proper PPE and trained operators. The analysis rates risks and assigns responsibilities to reduce risks to an acceptable level.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
17 views4 pages

JSA Form

The document describes a job safety analysis form for earthworks involving the use of a dozer and compactor. It lists the task steps, identifies potential hazards such as being crushed or buried, and proposes control measures like using proper PPE and trained operators. The analysis rates risks and assigns responsibilities to reduce risks to an acceptable level.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

JOB SAFETY ANALISYS FORM

PROJECT : Pembangunan Jalan tol JTTS – BA -S DATE : 16 April 2024 JSA NO.: 001

TASK / Job : Penimbunan tanah dengan menggunakan Dozer + Compactor JSA Team

LOCATION Banda Aceh NAME POSITION SIGNATURE

NO. OF PERSONS INCLUDED IN TASK 6 org Ari Suhendra Team JSA Leader

TASK DESCRIPTION / Job step:


Agung Supervisor
1. Survey utk menentukan volume timbunan
2. Galian tanah utk timbunan
Afsal Foreman
3. Menggeser tanah timbunan dengan dozer
4. Pemadatan Mega Engineer - QC
5. QC test
6. Pekerjaan selesai – Parkir alat

Nur kholis HSE / Team K3

REFERENCE: JSA Team Leader confirm that the risk for task describe have been reviewed and the controls measures which are
recommended reduce the risk to tolerable level and I consider it is safe so the task can be proceed
1. Dena lokasi
2. SOP NAME SIGNATURE
3. Method Statement DESIGNATION
4. Mengisi form
5. Certificates Date:
6. MCU certificate
7. PTW / Izin kerja I am satisfied that the controls measures identified when put into place will reduce the risk to tolerable level. The
task/action change is permitted to proceed. CONFIRMED & APPROVED BY PROJECT MANAGER

NAME SIGNATURE
DESIGNATION

Date:
JSA WORK SHEET
TASK DESCRIPTION
Hazard Identification Risk Evaluation Risk Control
Hazard Effect: Initial Actions
Hazard Description TYPE Control measures: Residual Responsible
No. Task Activity : SD Manusia, Aset, Risk/ Resiko Closed
Potensi Bahaya Cidera, Loss, pencemaran E, S, RE, DC, APD Risk Person
Lingk Awal (Y/N)
S P R S P R

1 Survey utk
menentukan
volume
timbunan

2 Galian tanah utk


timbunan

3 Menggeser Terlindas/tertabrak alat Manusia Cidera - Gunakan APD yg dilengkapi No


tanah timbunan dozer reflector
- Dozer dilengkapi lampu Yes
dengan dozer
E 2 H4 penerangan C 1 L6 Supv
Yes
- Terdapat petugas pengawas
lalulintas
-Operator legal
Dozer terbalik Alat Loss - Operator Supv Yes
berpengalaman
E 3 H5 - Surat izin operasi D 1 M2 No
- Pemeliharaan rutin
Yes
jalan yg akan di lalui
Tertimbun tanah timbunan Manusia Cidera - Memasang rambu2 Supv Yes
peringatan No

H5 - Gunakan APD yg L5
E 3 B 1
dilengkapi reflector
No
- Terdapat petugas
pengawas lalulintas
4 Pemadatan

5 QC test

2
JSA WORK SHEET
TASK DESCRIPTION
Hazard Identification Risk Evaluation Risk Control
Hazard Effect: Initial Actions
Hazard Description TYPE Control measures: Residual Responsible
No. Task Activity : SD Manusia, Aset, Risk/ Resiko Closed
Potensi Bahaya Cidera, Loss, pencemaran E, S, RE, DC, APD Risk Person
Lingk Awal (Y/N)
S P R S P R

6 Pekerjaan
selesai – Parkir
alat

10

11

3
S = SEVERITY = TINGKAT KEPARAHAN
P = PROBABILITY = TINGKAT KEMUNGKINAN
R = RISK = RESIKO