0% found this document useful (0 votes)
146 views9 pages

Sheet Piling JSA

Sheet Piling JSA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
146 views9 pages

Sheet Piling JSA

Sheet Piling JSA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 9
9g TOYO ENGINEERING INDIA PVT. LTD. £6 “onman. prc, Det” sagan Osea Torta TOYO Gin-izosoomniseirrcoasess Ret, : 19PP/TOVO-S/EPCC3-S/1-0288 Date : march 02,2033 [RECEIVED M/s 10N EXCHANGE (INDIA) LIMITED Paradip, Odisha = 754 141 Tea al {sass via nceg peer etegs OO Sef ate Subject: 5A for Sheet Piling activity. Ref. No, _: EPPC -03/27199232 Dated 03.09.2021. TON Exchange Transmittal No: 6417-IPPP-T-IEILMO-TH-SITE-0103 Date Feb. 28, 2023. Dear Sir, This has reference to submited ISA for Sheet Piling activity. PMC has reviewed the document and approved. This is for your Information and record Thanking you ering Indla Pvt. Led yk ae wl wees Endl As stated above Wate wtooang. contd Head ce | Toy owe tl Stadt Sst Map Kan Marg (Mont —<0007. ION EXCHANGE 4 se 2 r 2 ETP PRUJECT, EPCC-03 PACKAGE, 1.2 MMIPA PX-PTA IONEXCHANGE ovo |_ PROJECT IOCL REFINERY PARADIP | é Tefahang the Pat eee eee JSA for Sheet Piling Activity | TE Doe: Wo. AOTRO22TOO0-5A 0975 ‘Cesc Na PPP LAV 836 3A 256-0075 [erCCosrariras Baie: [ aazazs = ETP [lie PCPA OGL PARADE TESA AM ond Equipment Took facies invoWed | Crone/Forora, Vibrton Hionmer wilt Excavator, Fywa, 1 Welding, Gas Cuting se, Dewotedng Pump Lifing too & tockiesHond foot ale : Jeb Descpin 5A for Sheet Ping Activly | [a0 Clot Catait Name of he Se Engine = Chonan NYSE We AGG GREE 1 PFE / solely device requiced Safety helmet, Safety shoe, hand gloves, Face Shield, Safety goggles, IFR, FBH, baricading tape ore = ve ra 2 Nocinojees | roctopetaton | loci ted sty 3 [cecuneaen | neone = wae 3 | nore [senawe | none [signe [name [ona | nome | Sone | Nome | Sonate [None [Sonate [nove | ona 5 Remon eee |Table [Rll C7 aan! Bn ; Mua] @, SE ee Tocthmexsarey noo 8 | rome | snatre | nome [nate | name | gnome] nome [sgnanre | name Sonate PRS ‘Avon sn etonde a hoa San Yous Coreruragn } gQ ETP PROJECT. EPCC-03 PACKAGE, 1.2 MMTPAPX-PTA | @ ION EXCHANGE 00 PROJECT IOCL REFINERY PARADIP Péushing the Plan 6 JSA for Sheet Piling Activity _ TE Doe, Noa OTREEETOOND SA GO7s T ‘Cent Doe. No PPF-SAT-0620-3A-256-0075 J08 sTePs HAZARDS | PRECAUTIONS TO BE TAKEN RESPONSIBILTY | Moblizaon of [+ Trexpainced workmen | Deploy experienced workers on the Jb, ST azeeing Compelzney dhe) | fe Engineer Manpower and / by concern engineer to be ensied & site HSE Machine Operator + Machine uninspeced- | 2nsure heath checkup befor tring the jo, Form-31A tobe submited Unauthorized lor to startup the job and copy to be maintained Unloading of Material NNo Induction training / | 3-All shall have IOCL safety induction Medical, “4Manpower shall be transported in bus only. ‘5-Designated supervisor must be deployed forthe job, PTW authorization ‘must be ensure from IOCL/PMC. ll the workers must be communicated about the sit fact emergency system and IS prior to tart ofthe job, 7-Ensue dally TBT before stating the job. Dos and don'ts shouldbe clearly explained to the working crew. ‘8-Ensure Emergency plan discussed with the execution team. ‘Ensure all the relevant permits and clearances are taken before start ofthe Job e.g. Cold work/ Hot work / Height work. 10-Ensure vertigo test forthe workers If going to work a height 190 2017 ETP PROJECT, EPCC-03 PACKAGE, 1.2 MMTPA PX-PTA PROJECT IOCL REFINERY PARADIP JSA for Sheet Piling Activity @ IONEXCHANGE Pahing the Pan TE Doe Noha O72aRTORRE TA 0875 “Glens Doe: No. PFF-Ga17-820-5A 234-0075 TT-Ensure Safe material handling ewarenes: 12 Ena approved compte eon fl pe reer ech an its Dipl enone man 1. Sty Sond sige sal be play 14 Ene Pe npecon of machin 6 Geb alle mbjeced oT nd ———— Tapa Wats — saree TFS Sa BT a TST Ta FS TOSI BEG Bm traty uc esi ise 2 Proper xs mt be provid for wok oto nda sede ee Contact with Sharp | from sipvtrip hazards Seber | Up Manto PE Sey Shes Cu bot wt seo. Safty eS inverts Hiei + Poor Sapeision | asp rand 0a harp eds / aces oe ee nace am | Nanas Wane lar wher dian oer a ‘aa ae 7. Hold the material firmly while handling. & ton mca onding std a poste 9 Scie he atl wie sing ie Poe Teco Sa pen eure Pango Eto | Tope de omen]. Te ae a bad Se ngner Topple due to uneven ‘ground condition, Severe injury to person Fatal, + Property damage, + Uncontrolled vehicle Moverent 1 Topple of Cane or Farana + Missing or not werking su + Damaged ‘Sunauthoczed iting tools & Tackles ee ‘1 The surface must be leveled and compacted. Check the level of outrigger during placement. Safe distance from open excavation and manholes tobe ensured Outriggers must be fly extended. Strictly 15 shall not be used for siting of sheets Drivers / Operators shall not be allowed mobile phone during the ‘operation of equipment, Flagman should be present during vehicle movement Equipment operators and drivers shall follow site speed limi and traffic signs. '&. Reverse hor in working condition. 9. Unauthorized entry shouldbe restricting by hard bareading & dsp job Signage. 10, Operator shall ensue that no blind spot in operator or diver cabin, 11. Dally checklist shouldbe followed by operators. A. Segregation of man machine pathway. 13, Operator competency shal be ensured before starting the equipment. 14.Operator medical fines, eye test & hearing test report with other documents shal be submitted before engagement. ‘Only certified & competent operator to be engaged to operate the vehicle, Speedlimit tobe followed (20 ln 17 re inspection to be carried out before engaging the vehicle. 18. Onl inspected 6. certified equipment to be engaged for ste activites, 2 a 4 5 t Site Engineer 6 Site HSE Page 4067 anil @ 2 ETP PROJECT, EPCC-03 PACKAGE, 1.2 MMTPA PX-PTA PROJECT IOCL REFINERY PARADIP JSA for Sheet Piling Activity @ ION EXCHANGE Pking the ad TEL D6 No Aa O7302230030-5K 0075 ] ‘Chen's Doe: Wo-FPFGa17 820-5A-230-0078 19. To be ensuring the presence ofS the tame in working condition 20. All safety devices tobe checked before engaged 21, Ensure thet all iting tools & takes certified from Third party and having valid TAI certifieate, 22. Alling tos to be physica inspected before starting the Particular Jb. 23. Damaged iting tool shal not be used tse 24, Colour coding, Serial number & capacity to be marked onal ling tools 25 per TP certificate 25 Ensure the length of the flatbed triers adequate 26. Ensure that materia is properly secured on the trl. 27. Ensure proper compaction & level of ground condtation. infaltion/Removal” [+ Siuatti byte Vibro ||. Barcadng wi signage to be ensured ett oomstraed ay Site Engineer eae oe pei + Hastie [2 nes ela warned ntoom am ef evr re oe se ee te 2. Finn Revs har vo ann ctor. a civees einen | ee aeeee Marian vtrotanne fcmto oprtr conpeey athe sarap ; REESE | Sears coerce 6. Pevomel led het pl sey ep ect ra te sonar cne eee 1 Theyre bot od ety ano decay alge [ert mean cue eager ial orcoeacoeia Pe £8 compen andre ese ul be epg : BE ah rg vw ETP PROJECT, EPCC-03 PACKAGE, 1.2 MMTPA PX-PTA 2 rane oer ena raion GIONEXCHANGE JSA for Sheet Piling Activity TE Ge No OTRO TA TTS “Chen OG, No PPF-G417-820-5A 230-0075 ‘9. Equipment mus be inspected before sant the operation 10.Conduct the daily routine inspection an equipment base on equipment heck to make that all parts of the equipment ae functioning proper prior 10 start working TAI the rotary pats of machine shouldbe guarded, 12, Operator medical fitness, eye test & hearing test report with other documents shall be submited before engagement. 13, Job specie PPE, sto be used, 14, Conduct STARRT/TBT peor start working 15. CCOE approved Spark arestor to be provided all construction ehicles/equipment’s 16, Ground shall be levelled condition, 17, Working area mt be barricaded during material handing. 18. Nobody ellowed to move under suspended load. 19, Hydraulic Pac sal be inspected and shall be under the shed. 20, Hydraulic Pac gauge shall be calibrated. oh er oan t7 ETP PROJECT, EPCC-03 PACKAGE, 1.2 MMTPA PX-PTA PROJECT IOCL REFINERY PARADIP dame JSA for Sheet Piling Activity as | ‘hens Do. Wo FAT 7 BNDOSA BBE GOTS : & [Hot Wari Follow IS Yor Hot Work OSA NoOT) 7 [Emergency Response | 1. Fall of peron T Tany emergency happened at site EPCE sal be informed to PMC | Site Engineer | 2. Fire, Gas Leakage ‘nd Client immediately Cl: 11/5555 Gite HSE |. Personal inary 2. Siren spstem of ICL t0 be followed, | Trae indent 3. Working ere should be aware of nearest assembly location 4. Display of emergency contact amber Superioe/engineer should be aware of emergeny contact number. Note: “Toolbox meting sal be cried Before atthe jo. {© U jebitpertormed in ight rangement of adequate Humination. ' Good housekeeping to be mainained in and around the work area and wate management tobe cared outa per the approved procure During operation westher condition sal be considered & Job stall not be performed during heavy rain wind Before string the job required permit hall be obtained rom concern autho. Pago 7of7

You might also like