0% found this document useful (0 votes)
756 views5 pages

CTR MH Estimate-Piping-Master

The document outlines an engineering design estimate with activities, descriptions, man-hours per unit, document quantities, and estimated man-hours. It includes general activities, site surveys, studies and reviews, engineering documents, and design documents with piping, underground services, and other drawings.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
756 views5 pages

CTR MH Estimate-Piping-Master

The document outlines an engineering design estimate with activities, descriptions, man-hours per unit, document quantities, and estimated man-hours. It includes general activities, site surveys, studies and reviews, engineering documents, and design documents with piping, underground services, and other drawings.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 5

Project Title: Project No: Engineering Design Estimate

CTR Sub Activity Activity/ Description Manhours per unit Doc Qty Estimated Remarks
CTR No Norms Standard Prj specific size Man-hours
Unit Eng Des Eng Des Eng Des Total
30 1 General activities
1 Meetings/ Discussions/ Reporting project 20 10 0 0 0
2 Document Handling/ Control project 5 5 0 0 0
3 Work Planning/ Scheduling project 10 5 0 0 0
4 Quality checks project 0 0 0
4.1 Interdiscipline checks (simple) doc 1 1 0 0 0
4.2 Interdiscipline checks (complex) doc 3 3 0 0 0
5 Audits (Quality/ HSE) each 5 5 0 0 0
6 Input to other disciplines 0 0 0
6.1 Projects doc 1 1 0 0 0
6.2 Process doc 2 2 0 0 0
6.3 Civil doc 2 2 0 0 0
6.4 Mechanical: Rotary/Static doc 2 2 0 0 0
6.5 Pipelines doc 2 2 0 0 0
6.6 Electrical doc 2 2 0 0 0
6.7 Control & Automation doc 1 1 0 0 0
6.8 doc 0 0 0
7 Interfaces with other projects project 5 5 0 0 0
8 Project cost estimate (input) project 5 5 0 0 0
9 0 0 0
0 0 0
30 1 General activities 0 0 0
30 2 Site Survey
1 Site visits day/pers 12 12 0 0 0
2 Travelling visit/pers 20 20 0 0 0
3 Reports report 10 5 A4 0 0 0
0 0 0
30 2 Site Survey 0 0 0
30 3 Studies & Reviews
1 Review scope/Familiarisat'n/Data gathering project 25 5 0 0 0
2 Design verification report/ input project 5 5 A4 0 0 0
3 Design and scope challenges project 16 4 A4 0 0 0
4 Feasibility study study 25 A4 0 0 0
5 Concept Selection study 25 A4 0 0 0
6 Design Basis/ Philosophies doc 5 5 A4 0 0 0
7 Technical Design Reviews
7.1 Design Reviews (Participation) review 10 5 A4 0 0 0
7.2 HAZOP review (participation) review 10 A4 0 0 0
7.3 IPF/SIL review (Participation) review 5 A4 0 0 0
7.4 Constructability review (participation) review 5 5 A4 0 0 0
7.5 Materials Selection Study and Report review 5 A4 0 0 0
7.6 Other Misc reviews review 5 A4 0 0 0
7.7 0 0 0
0 0 0
30 3 Studies & Reviews 0 0 0
30 4 Engineering Documents
1 Plot Plan
1.1 Plot Plan (update) drg 10 40 A1 0 0 0
1.2 Plot Plan (New) drg 20 80 A1 0 0 0
2 Hazardous Area Classification
2.1 Haz. Area Classification (update) drg 5 20 A1 0 0 0
2.2 Haz. Area Classification (new) drg 15 40 A1 0 0 0
3 Safety Equipment Layouts
3.1 Safety Equipment Layout (update) drg 10 20 A1 0 0 0
3.2 Safety Equipment Layout (new) drg 20 60 A1 0 0 0
4 Design Calculations
4.1 Hot-tapping calculations calcs 100 0 A4 0 0 0
4.2 Pipe wall thickness calcs. calcs 50 0 A4 0 0 0
4.3 Branch reinforcement Cals. calcs 20 0 A4 0 0 0
4.4 Support span design. calcs 20 A4 0 0 0

Discipline: Piping 05/03/2024 Page: 1 of 5


Project Title: Project No: Engineering Design Estimate

CTR Sub Activity Activity/ Description Manhours per unit Doc Qty Estimated Remarks
CTR No Norms Standard Prj specific size Man-hours
Unit Eng Des Eng Des Eng Des Total
4.5 Stress analysis. per system calcs 40 0 A4 0 0 0
4.6 0 0 0
4.7 0 0 0
5 Hot tap Specifications doc 25 A4 0 0 0
6 Interface description report (input) project 5 5 0 0 0
0 0 0
30 4 Engineering Documents 0 0 0
30 5 Design Documents
1 Piping Key Plan
1.1 Piping Key Plan (update) drg 5 20 A1 0 0 0
1.2 Piping Key Plan (new) drg 5 40 A1 0 0 0
2 Piping GA
2.1 Piping GA (update) drg 10 60 A1 0 0 0
2.2 Piping GA (new) drg 30 120 A1 0 0 0
3 U/G Services Key Plan
3.1 U/G Services Key Plan (update) drg 5 20 A1 0 0 0
3.2 U/G Services Key Plan (new) drg 5 40 A1 0 0 0
4 U/G Services Layout Drawings
4.1 U/G Services Layout (update) drg 10 40 A1 0 0 0
4.2 U/G Services Layout (new) drg 20 80 A1 0 0 0
5 Nozzle & Clip orientation sheets sheet 15 30 A3 0 0 0
6 Tie-in Schedule (app.10 Tie-ins) sheet 10 40 A3 0 0 0
7 Piping ISO drg 2 8 A3 0 0 0
8 MTO
8.1 Bulk MTO (≤ 50 items) lot 10 30 A3 0 0 0
8.2 Bulk MTO (> 50 & ≤ 100 items) lot 20 60 A3 0 0 0
8.3 ISO based MTO (≤ 50 items) lot 10 30 A3 0 0 0
8.4 ISO based MTO(> 50 & ≤ 100 items) lot 20 60 A3 0 0 0
9 Equipment Fabrication Drawings drg 10 20 A1 0 0 0
10 Demolition Drawing drg 1 5 A1 0 0 0
11 Insulation specification spec 40 A4 0 0 0
12 Flow lines
12.1 Flow line drawings drg 10 30 A1 0 0 0
12.2 Route map for flowlines drg 20 40 A1 0 0 0
13 Detail Engineering Scope of Work (input) each 5 A4 0 0 0
14 Front End Design Report (input) each 10 A4 0 0 0
15 WinPCS Package- Design Input system 5 A4 0 0 0
16 Construction Scope of Work (input) each 5 5 A4 0 0 0
17 Major Tenders/ EPC's
17.1 Tender Document Preparation (input) each 15 10 A4 0 0 0
17.2 Tender Scope of work (input) each 20 A4 0 0 0
17.3 Tender Technical Evaluation (input) each 20 A4 0 0 0
17.4 0 0 0
0 0 0
30 5 Design Documents 0 0 0
30 6 Material Requisitions
Requisition specs/ data sheets
1 Valve items
1.1 Manual valve/ Choke valve reqn 20 A4 0 0 0
1.2 Relief/ Breather valve reqn 20 A4 0 0 0
1.3 Auto drain valve reqn 20 A4 0 0 0
1.4 reqn 0 0 0
2 Misc items
2.1 Flame arrestor reqn 20 A4 0 0 0
2.2 Strainer reqn 20 A4 0 0 0
2.3 Static mixer reqn 20 A4 0 0 0
2.4 Ejector reqn 20 A4 0 0 0
2.5 Level gauge/ Thermowell reqn 20 A4 0 0 0
2.6 reqn 0 0 0
3 Safety equipment

Discipline: Piping 05/03/2024 Page: 2 of 5


Project Title: Project No: Engineering Design Estimate

CTR Sub Activity Activity/ Description Manhours per unit Doc Qty Estimated Remarks
CTR No Norms Standard Prj specific size Man-hours
Unit Eng Des Eng Des Eng Des Total
3.1 Safety shower & Eye wash reqn 20 A4 0 0 0
3.2 Fire extinguishers reqn 20 A4 0 0 0
3.3 Fire Fighting spec reqn 20 A4 0 0 0
3.4 0 0 0
4 Pipes
4.1 Piping specification reqn 15 A4 0 0 0
4.2 Pipe support specification reqn 15 A4 0 0 0
4.3 GRE piping reqn 25 A4 0 0 0
4.4 HDPE piping reqn 25 A4 0 0 0
4.5 reqn 0 0 0
4.6 reqn 0 0 0
5 Pipe fittings
5.1 Elbows/ Fittings reqn 10 A4 0 0 0
5.2 Flanges/ Spectacle blinds reqn 10 A4 0 0 0
5.3 Branch fittings/ Tees reqn 10 A4 0 0 0
5.4 Gaskets/ Insulating gaskets reqn 10 A4 0 0 0
5.5 Drip rings/ Sample conn internals reqn 10 A4 0 0 0
5.6 reqn 0 0 0
5.7 reqn 0 0 0
6 Special items
6.1 Coasaco fittings reqn 20 A4 0 0 0
6.2 Elaflex/ Todo / Hose couplings reqn 20 A4 0 0 0
6.3 Sample bomb reqn 20 A4 0 0 0
6.4 Expansion bellows reqn 30 A4 0 0 0
6.5 Spring supports reqn 30 A4 0 0 0
6.6 reqn 0 0 0
6.7 reqn 0 0 0
7 Input to packages pack 20 A4 0 0 0
8 Materials entry - assistance item 1 2 0 0 0
9 Technical Bid Analysis
9.1 Piping items (non MESC coded) Reqn 30 A3 0 0 0
9.2 Piping items (MESC coded) Reqn 20 A3 0 0 0
9.3 Pipeline items Reqn 30 A3 0 0 0
9.4 Manual valve/ Cosasco fittings Reqn 30 A3 0 0 0
9.5 Elaflex/Todo/Hose couplings/Hoses Reqn 20 A3 0 0 0
9.6 Sample bomb Reqn 20 A3 0 0 0
9.7 GRE piping Reqn 40 A3 0 0 0
9.8 Relief/ Breather valve/Flame arrestor Reqn 40 A3 0 0 0
9.9 Choke valve Reqn 50 A3 0 0 0
9.10 LG/ TW/ Auto drain valve Reqn 20 A3 0 0 0
9.11 Strainer/ Basket filter Reqn 30 A3 0 0 0
9.12 Static mixer Reqn 20 A3 0 0 0
9.13 Expansion bellows Reqn 10 A3 0 0 0
9.14 Spring supports Reqn 10 A3 0 0 0
9.15 Ejector Reqn 20 A3 0 0 0
9.16 Safety shower & Eye wash Reqn 10 A3 0 0 0
9.17 Onplot valves: ESD/PSD (input) Reqn 10 A3 0 0 0
9.18 MOV (input) Reqn 10 A3 0 0 0
9.19 Package items (simple eqpt) eqpt 5 A4 0 0 0 input
9.20 Package items (complex eqpt) eqpt 20 A4 0 0 0 input
9.21 Clarification with Vendors eqpt 5 0 0 0
9.22 Evaluation of Vendor claims eqpt 5 0 0 0
10 0 0 0
11 0 0 0
12 0 0 0
0 0 0
30 6 Material Requisitions 0 0 0
30 7 Vendor Data Control, Inspection/ Testing
1 Vendor Data Control
1.1 Review of Functional Design spec eqpt 15 5 A1 0 0 0

Discipline: Piping 05/03/2024 Page: 3 of 5


Project Title: Project No: Engineering Design Estimate

CTR Sub Activity Activity/ Description Manhours per unit Doc Qty Estimated Remarks
CTR No Norms Standard Prj specific size Man-hours
Unit Eng Des Eng Des Eng Des Total
1.2 Review of Vendor drgs- Major eqpt eqpt 20 10 0 0 0
1.3 Review of Vendor drgs- Minor eqpt eqpt 1 4 0 0 0
1.4 Review Package Vendor drgs pack 30 20 0 0 0
1.5 Vendor liaison and meetings project 10 0 0 0
1.6 Input to Vendor Data manual project 10 0 0 0
1.7 0 0 0
1.8 0 0 0
2 Factory Acceptance Testing
2.1 Major Package items day 12 0 0 0
2.2 0 0 0
3 Site Acceptance Testing
3.1 Major Package items day 12 0 0 0
3.2 0 0 0
4 0 0 0
5 0 0 0
0 0 0
30 7 Vendor Data Control, Inspection/ Testing 0 0 0
30 8 Construction/ Commissioning
1 Construction Technical support project 25 5 A4 0 0 0
2 SAP PM Works project 30 A4 0 0 0
3 Commissioning Plan (input) doc 5 A4 0 0 0
4 Commissioning procedures (input) doc 10 A4 0 0 0
5 Construction assistance day 12 0 0 0
6 Commissioning assistance day 12 0 0 0
0 0 0
30 8 Construction/ commissioning 0 0 0
30 9 Asbuilts (Pre-Design / Post Construction)
1 Pre-Design As-Built (Single) drg 1 2 0 0 0
2 Pre-Design As-Built (Multi-Sheet) drg 2 10 0 0 0
3 Asbuilt of drawings/ docs (single) drg 1 2 0 0 0
4 Asbuilt of drgs/docs (multi-sheet) drg 2 10 0 0 0
0 0 0
30 9 Asbuilts 0 0 0

Total 0 0 0

Break up of Manhours per position

Discipline Head 0 0
Dy Discipline Head 0.05 0
Principal Engineer 0.15 0
Sr Engineer 0.2 0
Engineer 0.4 0
Jr Engineer 0.2 0

Principal Designer 0.1 0


Sr Designer 0.2 0
Designer 0.4 0
Jr Designer 0.2 0
Draughtsperson 0.1 0
Total 1 1 0 0 0 0 0

Discipline: Piping 05/03/2024 Page: 4 of 5


Project Title: Project No: Engineering Design Estimate

CTR Sub Activity Activity/ Description Manhours per unit Doc Qty Estimated Remarks
CTR No Norms Standard Prj specific size Man-hours
Unit Eng Des Eng Des Eng Des Total

Break up of Manhours per position per sub-CTR


Total 30-1 30-2 30-3 30-4 30-5 30-6 30-7 30-8 30-9
Discipline Head 0 0 0 0 0 0 0 0 0 0
Dy Discipline Head 0 0 0 0 0 0 0 0 0 0
Principal Engineer 0 0 0 0 0 0 0 0 0 0
Sr Engineer 0 0 0 0 0 0 0 0 0 0
Engineer 0 0 0 0 0 0 0 0 0 0
Jr Engineer 0 0 0 0 0 0 0 0 0 0
Sub-total 0 0 0 0 0 0 0 0 0 0

Principal Designer 0 0 0 0 0 0 0 0 0 0
Sr Designer 0 0 0 0 0 0 0 0 0 0
Designer 0 0 0 0 0 0 0 0 0 0
Jr Designer 0 0 0 0 0 0 0 0 0 0
Draughtsperson 0 0 0 0 0 0 0 0 0 0
Sub-total 0 0 0 0 0 0 0 0 0 0
Total 0 0 0 0 0 0 0 0 0 0

CTR Basis
1

Assumptions/ Exclusions
1