0% found this document useful (0 votes)
58 views1 page

BIO-N DWG-Model2

The document shows architectural drawings of a building with labeled dimensions and materials. It includes elevations of the front and sides with details of the roof, walls, floors, and features like water tanks.

Uploaded by

aldrin.oppo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views1 page

BIO-N DWG-Model2

The document shows architectural drawings of a building with labeled dimensions and materials. It includes elevations of the front and sides with details of the roof, walls, floors, and features like water tanks.

Uploaded by

aldrin.oppo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

A B C D E 1 2 3 1 2 3 E D C B A

4.2
RIDGE ROLL LINE RIDGE ROLL LINE RIDGE ROLL LINE
RIDGE ROLL LINE

1.125m x 2.44m 1.125m x 2.44m


1.65

1.65

1.65

1.65
TOP OF ROOF BEAM CORRUGATED TOP OF ROOF BEAM TOP OF ROOF BEAM TOP OF ROOF BEAM CORRUGATED
(REFER ON EXISTING) G.I ROOFING GAUGE 24 (REFER ON EXISTING) HARDIEFLEX GABLE END (REFER ON EXISTING) HARDIEFLEX GABLE END (REFER ON EXISTING) G.I ROOFING GAUGE 24
4.95

4.95

4.95

4.95
PVC PVC PVC PVC
3.00

3.00

3.00

3.00
EXISTING LABORATORY W/ ROOFING TO VERTICAL VERTICAL EXISTING LABORATORY W/ ROOFING TO EXISTING LABORATORY W/ ROOFING TO VERTICAL VERTICAL EXISTING LABORATORY W/ ROOFING TO
BE REPAIRED WITH REPAINTING OF WATER WATER BE REPAIRED WITH REPAINTING OF BE REPAIRED WITH REPAINTING OF WATER WATER BE REPAIRED WITH REPAINTING OF
CONCRETE WALLS AND CEILING TANK TANK CONCRETE WALLS AND CEILING CONCRETE WALLS AND CEILING TANK TANK CONCRETE WALLS AND CEILING
FIN. FLOOR LINE 2 CU.M. FIN. FLOOR LINE 2 CU.M. FIN. FLOOR LINE 2 CU.M. FIN. FLOOR LINE 2 CU.M.
1
0.30

0.30

0.30

0.30
NGL NGL NGL NGL
5.0

BIO-N LABORATORY BIO-N LABORATORY BIO-N LABORATORY BIO-N LABORATORY


4 FRONT ELEVATION 5 RIGHT ELEVATION 7 LEFT ELEVATION 6 REAR ELEVATION
SCALE 1:100 M. SCALE 1:100 M. SCALE 1:100 M. SCALE 1:100 M.
S-1 S-1 S-1 S-1

A B C D E A B C D E A B C D E
13.40 13.40 13.40
3.30 3.30 3.30 3.30 3.30 3.30 3.30 3.30 3.30 3.30 3.30 3.30
ROOF LINE ROOF LINE

1 1
1

2.5
D
2.50

D1

5.0

TRUSS

TRUSS

TRUSS

TRUSS

TRUSS
5.0

2 2 2

2.5
1.125m x 2.44m
2.50

CORRUGATED
G.I ROOFING GAUGE 24
D
3
3 W1 D 3

ROOF LINE ROOF LINE

GA. 16 x 50mm x 150mm .50MM X 0.910M X


CHANNEL PURLINS SP. 0.65 2.44M PRE-
m.4.5mm x 38mm x 38mm PAINTED GUTTER
ANGULAR CLEATS

BIO-N LABORATORY BIO-N LABORATORY


BIO-N LABORATORY
1 FLOOR PLAN 2 ROOF PLAN 3 ROOF FRAMING PLAN
SCALE 1:100 M. SCALE 1:100 M.
S-1
SCALE 1:100 M. S-1 S-1

PREPARED BY: SIGNED & SEALED PROJECT TITLE : RECOMMENDING APPROVAL: APPROVED BY: SHEET NUMBER
FROM THE OFFICE OF: REVIEWED BY:

REPUBLIC OF THE PHILIPPINES Plant Nursery Enhancement Project (Agri-Facilities):


PROVINCE OF BOHOL A
ARCHITECT / ENGINEER Rehabilitation of BIO-N Laboratory Production Cum
City of Tagbilaran 02-02
ENGR. GENE C. FLORES P.R.C NO. at BOATech Center, Ubay, Bohol
OFFICE OF THE PROVINCIAL AGRICULTURIST MARICEL S. WAHING LIZA M. QUIROG, MNSA ERICO ARISTOTLE C. AUMENTADO
P.T.R NO.
AT-I / AGRICULTURAL & HEAD, VERTICAL DIVISION, PEO DATE LOCATION : BOATECH 2 4
SHT.______OF______SHTS.
NEW CAPITOL SITE, TAGBILARAN CITY BIOSYSTEMS ENGINEER PROVINCIAL AGRICULTURIST GOVERNOR
PLACE GABI, UBAY, BOHOL KAQI
CAD BY:_________________

You might also like