Balama BI Instrutions For Preparing The Art: Engcorp, Lda Task Risk Analysis - Art

The document provides instructions for preparing a risk analysis task sheet for a manufacturing job in Balama, Mozambique. It lists 25 common risks for the task such as drowning, falls, fires, explosions, weather conditions, prolonged hours, injuries from equipment, chemicals and more. Performers must be aware of the analysis and sign off on it for it to be valid for up to 6 days.

Uploaded by

Fantasminho
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views5 pages

Balama BI Instrutions For Preparing The Art: Engcorp, Lda Task Risk Analysis - Art

The document provides instructions for preparing a risk analysis task sheet for a manufacturing job in Balama, Mozambique. It lists 25 common risks for the task such as drowning, falls, fires, explosions, weather conditions, prolonged hours, injuries from equipment, chemicals and more. Performers must be aware of the analysis and sign off on it for it to be valid for up to 6 days.

Uploaded by

Fantasminho
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

ENGCORP, LDA TASK RISK ANALYSIS - ART

Task to be performed: Manufacture date:

Place of execution: Balama BI Expiration date:

INSTRUTIONS FOR PREPARING THE ART


It has maximum validly of 6 days ( provided that all performers involved in the task throughout the days are aware of the document and have signed it).

If there is a change in the work environment or the emergence of new risks during the task, it must be revised.

It must be filled in at the place where the activity will be carried out.

It must always be kept in front of the service, accessible to all performers.

As an example, 25 very common risks in the execution of tasks are mentioned below, but the analysis should not be limited to these.

RISKS IN THE EXECUTION OF TASKS


Drowning Contact with moving parts Exposure to gases, dust, or fumes Fire or Explosion Fall or Trip
Animal attack Contact with hot surface Exposure to noise Prolonged working hours Struck by lightning
Run over/ Hit by a Contact with chemicals Exposure to weather condition Inadequate posture Struck by pressurized hose vehicle Contact with sharp objects Communication failure
inadequate Pinching or Crushing Struck by object
Collide with Intense physical effort lighting Projection of sparks
Burial or Engulfment
Electric shock

TASK DETAILS
ITEM TASK STEPS RISK CONTROL MEASURES

COMMENTS