HEIGHT WORK PERMIT
Project Name                                           Contractor Name/ Contact No
Location                                Date:                      Time: From                To
Tools and Equipment involved:
Description of work:
The above signing person will be responsible to ensure that the above described work will be done under all the
safety precaution mentioned on the PTW and required by the Project.
         The following precautions are to be taken
 Sr No                   SAFETY PRECAUTIONS (Please Tick)                       Yes    No / NA          Remark
   1       All people erecting in scaffolding shall be trained and
           physically fit.
   2       Safety Harness/belt checked and good working condition
   3       Safety shoes (nonslip). Helmet with chin strip available with
           employees.
   4       All lifting / tightening tools, hand tools / equipment
           checked and in good condition.
   5       Access and exist marked and without obstruction.(Ladder)
   6       Ensure Scaffolding (Supported, Platform, and Railing) with valid
           tag available.
   7       Ensure proper scaffolding and ladders
   8       Unwanted and rubbish material removed from working
           platform.
   9       Electrical cable/ welding, cutting hose/ compressed air
           hose properly secured and lay down without
           obstruction.
  10       Signboards provided on work place.
  11       Employees aware about hazards and safe working
           practices while working at height.
  12       Checked safe condition of hand tools /power tools.
  13       Life line is provided for height work.
Site Engineer          Safety Officer           Project Manager    Site Engineer      Safety Officer      Project
(Contractor)           / Supervisor             (Contractor)       /Supervisor        /Supervisor         Manager
                       (Contractor)                                (Kumar             (Kumar              (Kumar
                                                                   Properties)        Properties)         Properties)
         Permit Extension – Date                      Time –From                To           Sign
Site Engineer          Safety Officer           Project Manager    Site Engineer      Safety Officer      Project
(Contractor)           / Supervisor             (Contractor)       /Supervisor        /Supervisor         Manager
                       (Contractor)                                (Kumar             (Kumar              (Kumar
                                                                   Properties)        Properties)         Properties)