Declaration: By submitting this assessment (Parts 1 – 4) for marking I declare that it is entirely my own work. I understand that falsely claiming that
the work is my own is malpractice and can lead to NEBOSH imposing severe penalties (see the NEBOSH Malpractice Policy for further information).
Important note: You must refer to the document ‘Unit IG2: risk assessment – Guidance and information for learners and Learning Partners’ while
completing all parts of this assessment. Your Learning Partner should provide you with a copy, but it can also be downloaded from the relevant
resources section for this qualification on the NEBOSH website.
Part 1: Background
The company has two working shifts including day shift and night shift. The day shift workers
have to work 08:00 to 17:00 and the weekend shift for the employees who work on weekends
from 09:00 to 16:00. The night shift for the staff from 19:00 to 06:00. They have two 15 minutes
breaks and have one long 50 minutes break.
After completion of the plant visit I referred to ISO 14001. ISO 9001, ISO 45001. By referring to
these documents I got the knowledge of implementing further control measures.
Organisation name:
Date of assessment:
Scope of risk assessment:
Hazard category Who might be harmed What are you already doing? What further controls/actions are required? Timescales
and hazard and how? for further Responsible
actions to be person’s job title
completed
(within …)
1.FIRE Plant operators, Plant ● Provided proper ventilation. 1. Construct a separate storage area 1) 3 months Plant Manager
engineers, Fire for storing the flammable liquids. (1,4)
Storing marshals, NDT workers ● Only closed containers are 2) 1 month
flammable liquids and workers who work used for storing the 2. Automatic smoke and heat Project manager
such as diesel, inside and outside of flammable liquids. detectors should be installed. 3) 2 month (2, 3)
petrol and the the plant.
leaks of the ● Fire marshals provided. 3. Install drip trays under leaking oil 4) 2 months Safety officer
flammable liquids sump and bunds. (5, 6, 8)
also cause fire Storage of large volumes ● Roll call system has been 5) 1 month
and explosions. of flammable liquids if implemented. 4. Fire sprinklers and hose reels Purchase manager
any leakage or spark should be installed inside the plant. 6) 1 week (7)
from drilling and welding
machines and smoke 5. Means of escape should be 7) 2 months
spark can cause installed with the clearly signed
massive damage to the routes and the sign boards have to 8) 2 months
plant and the workers work on batteries to illuminate the
who work in the plant. It escape route.
causes injuries in the
body, skin burns and 6. Arrange an assembly point at a safe
severe wounds. location.
2. ELECTRICITY Electrical engineers, ● Electrical works are 1. Install Ultra-Fast Earthing switch 1)2 months Plant manager
Electrical maintenance handled by competent which will help to detect an internal (1, 2)
Electrical workers, Supervisors, persons. arc fault. 2) 1 month
installation can technicians and Safety officer
cause a short instrumentation ● Conducted formal visual 2. Install residual circuit breaker. 3) 1 week (3, 4, 5, 7)
circuit and it will department workers and inspection.
lead to arc flash the people who work in 3. Develop a policy of conducting 4) 1 week Plant supervisor
and it cause the plant will be affected. ● Arc flash clothing has been monthly inspections. (6)
massive fire and provided for the workers to 5) 1 month
explosion. protect them from the heat 4. Implement a policy of routine visual HSE manager
Arc flash hazard can and flames. inspection for the electrical 6) 1 week (8)
occur while doing work equipment every before and after
with electrical installation ● Sign boards indicate arcing use. 7) 1 month
and working with drilling hazards have been placed. 5. Implement a policy for the electrical
and welding machines. equipment with permit-to-work 8) 1 month
While doing work with system.
electrical installation of
devices can cause short 6. Develop a policy of lockout and tag
circuits and it may lead system for the electrical equipment.
4. NOISE The noise hazard mainly ● Absorption mat and rubber 1. Build an acoustic haven for the 1) 4 months Plant manager
affects the machine mat were placed under the workers. (1, 2, 5)
Excessive noise operators, supervisors pumps. 2) 2 weeks
produced by the and the workers who 2. Exhaust gases producing machines Plant engineer
machines such work nearby the ● Routine inspections have should be filled with a silencer on 3) 3 months (3)
as generators, excessive noise been provided. the exhaust.
compressor, producing machines. 4) 1 month Safety officer
motors, pumps, ● Warning sign boards 3. Lost and damaged machineries (4, 6)
drilling, cutting indicate that the excessive should be replaced. 5) 3 months
and welding While working exposure noise producing area has HSE advisor
machines to the excessive noise been placed. 4. To check the noise level, a sound 6) 1 month (7)
from the machineries metre should be provided.
and equipment can lead ● Provided ear plugs for the 7) 1 month Plant supervisor
to temporary reduction in workers. 5. Build a separate building for the (8)
hearing sensitivity as cutting and drilling works. 8) 1 month
6. CONFINED NDT workers, Plant ● Hole watchers have been 1. Purchase walky-talky to make 1) 1 month Purchase manager
SPACE inspectors, provided. communication between the Hole (1)
Draughtsman, watcher and the workers who work 2) 1 month
For the housekeeping workers, ● Permit to work system has inside the confined space. Plant manager
maintenance helpers, cleaners and been executed. 3) 1 week (2)
purpose in pipeline workers will be 2. Proper ventilation and lighting
process column affected. ● Proper housekeeping should be provided. 4) 1 week Safety officer
and storage tanks provided for the confined (3, 5)
workers have to space. 3. Conduct atmospheric tests before 5) 2 months
work inside the Workers have to work and after entry. Plant supervisor
confined space inside the confined 6) 1 month (4,8)
and having lack space for the 4. For the confined space works allow
of oxygen and manintaning purposes in a minimum of five people. 7) 3 weeks HR manager
poisonous gas. pipelines and storage (6)
tanks. An enclosed 5. Safe and quick access and egress 8) 1 week
nature of the place method should be provided. HSE manager
having a lack of oxygen (7)
and poor ventilation and 6. Appoint competent workers for the
light. Poisonous gas can confined space works.
easily affect the confined
space workers. It can
7. RADIATION NDT Technicians, ● Reporting and record 1. Install positive pressure air fans, 1) 2 months Plant engineer
riggers, Plant keeping has been done. radon sump and extraction system. (1)
While doing work supervisors, drilling and 2) 3 months
with drilling and welding workers will be ● Radiation caution sign 2. Build radiation protection shielding Plant manager
welding machines affected by the radiation boards have been placed. materials as floor, wall, ceiling and 3) 1 month (2)
such as fracking hazard. doors.
process and gas ● Ensure that exposure does 4) 2 months Project manager
extraction works not exceed the relevant 3. Personal monitoring equipment (3, 4, 7)
radiation emitted Fracking processes can radiation dose limit. should be provided. 5) 2 weeks
from the drilling produce a significant Safety officer
and welding fire amount of radioactive ● Shields and personal 4. Install industrial radiography camera 6) 1 month (5)
sparks. materials to the protective equipment are for inspecting pipe welding.
environment. While provided. 7) 1 week HR manager
extracting oil from the 5. Health surveillance should be (6)
rigs that contain conducted periodically. 8) 3 weeks
radioactive materials HSE advisor
such as radon. . When 6. Hire a physically first and qualified (8)
the radon inhaled by the person for the radiation exposure
workers can cause works.
8. HAZARDOUS Riggers, Plant operators, ● Training and instruction has 1. Local exhaust ventilation system 1) 2 months Project manager
SUBSTANCES Plant engineers and the been provided to all the should be installed. (1, 4, 8)
workers who work workers. 2) 2 weeks
Exposure to the nearby the fracking 2. Purchase half-masks that contain Purchase manager
hazardous areas will be affected. ● The workers are aware of filtering materials. 3) 2 weeks (2)
substance by personal hygiene
hydraulic fracking importance. 3. Every before and after work 4) 1 month Safety officer
Doing hydraulic atmospheric tests should be (3, 5)
fracturing in rigs can ● Ensure tag in and out conducted. 5) 2 weeks
release a significant system. HSE manager
amount of toxic 4. Install eye washers. 6) 1 month (6)
substance to the ● Personal protective
atmosphere such as equipment has been 5. Implement a policy of conducting 7) 1 month HR manager
ethylbenzene, toluene provided. health surveillance. (7)
and siolica. The acute 8) 10 days
exposure can cause 6. Arrange a first aid and rescue team
headache , allergies, for the emergency situation of
skin diseases and hazardous substance hazard in the
asthma and cardiac workplace.
9. WORK Plant supervisor, Plant ● Proper lighting conditions 1. Eliminate the pinch point 1)3 months Plant engineer
EQUIPMENT engineer, Plant operators provided for the workers in entanglement areas and install (1)
and NDT technicians will the moving parts machinery automatic material handling 2) 2 months
Using mechanical be affected. areas. machines. Project manager
equipment such 3) 2 months (2, 3, 4)
as pump, Usage of machines that ● Adequate space provided 2. Install fixed guard machines to
coperssor, are unguarded can between the worker and the prevent direct contact with moving 4) 2 months Safety officer
generator, drilling, cause injuries. Moving machinery. parts. (5, 6)
welding machines parts of the machineries 5) 2 weeks
and heat include belts, gear, roller, ● Provided an eye catching 3. For the crushing machines, install Plant supervisor
exchangers. chain, electrically emergency control button two hand control machines. 6) 1 month (7)
charged parts, near the machinery.
entanglement area and 4. Perimeter guards should be 7) 1 week HSE advisor
pinch point in the provided for drilling and welding (8)
generators and works. 8) 3 weeks
compressor. Heat from
drilling and welding 5. Implement a policy of periodic
machines can affect the maintenance to the machineries.
worker. It can result in
10. MANUAL NDT workers, Plant ● Trolley provided for 1. Purchase hydraulic trolleys, lever 1)2 months Project manager
HANDLING engineers, Mechanical transferring the materials. hoist, web sling, pulley for the lifting (1, 3)
maintenance workers, rig purposes. 2) 2 weeks
While working workers will be affected. ● Ensure that maximum load Safety officer
using the body to handling capacity is 25 Kg. 2. Proper inspection should be 3) 3 weeks (2, 7)
lift, carry, push For the maintenance provided for the lifting machines.
and pull heavy purposes in pipeline ● Good housekeeping 4) 1 week Plant supervisor
pipes, materials workers have to replace provided. 3. Develop a policy for lifting (4, 5, 8)
and equipment. the pipe, they have to procedures and plans. 5) 5 days
use body force to lift the ● Personal protective HSE advisor
pipes. Improper manual equipment is provided. 4. Arrange the workplace to allow 6) 3 weeks (6)
handling can cause more space for load and equipment
tendon and ligament handling activity. 7) 2 months
injuries, back injuries, it
can cause WRULDs 8) 10 days
11.MOVEMENT All the drivers, Plant ● Ensure stable and secured 1. Develop a policy of examining tires, 1)1 month Plant engineer
OF PEOPLE supervisor, Plant loads. oil level and oil radiator leaks. (1, 2)
AND engineers and the 2) 2 weeks
EQUIPMENT workers walking nearby ● Ensure that the vehicle 2. Provide proper maintenance to the Project manager
the vehicle areas. does not exceed the speed forklift. 3) 2 weeks (3)
Driving forklift, limit.
driving too fast While driving the forklift 3. Banksman should be provided for 4) 2 weeks Plant supervisor
and reversing with carrying loads on ● Sign boards and barriers guiding the driver. (4, 5, 8)
and poor visibility. high forks a small have been placed. 5) 2 weeks
imbalance load and 4. Check the safety of the Plant manager
turning the forklift can ● Proper visibility of path environment. 6) 1 month (6)
cause accidents and if head provided.
12. SLIP AND All the workers who were ● Proper housekeeping 1. Sufficient lighting conditions should 1)1 month Plant engineer
TRIP walking in the area of oil provided. be provided. (1)
spilled. 2) 2 months
Slips and trips ● Slippery area sign boards 2. Drip trays should be placed under Project manager
can occur while have been placed. the leakage of oil sump and bunds. 3) 2 weeks (2)
moving around While working workers
the workplace. moving around the area ● Personal protective 3. Proper inspection should be 4) 3 days Safety officer
especially incase of an oil spill or equipment is provided. provided for the pipelines and (3)
spillage of oil on any other slippery area vessels. 5) 1 week
the floor. can cause slip and trip in Plant supervisor
the workplace. It will 4. Frequently clean the oil spillage 6) 1 week (4, 5, 6)
reus;lt in broken bones, area and walkways.
13. SUBSTANCE Workers who are 1. Implement a policy of taking serious 1)1 week Plant manager
ABUSE AT addicted to the ● Organisation has a policy action who breached the company’s (1)
WORK consumption of alcohol, against alcohol, tobacco alcohol and drug policy. 2) 1 month
tobacco and other drugs and other drug Project manager
Alcohol, tobacco in the workplace will be consumption in the 2. CCTV cameras should be placed in 3) 1 month (2)
and other drugs affected and also the workplace. all the areas.
are consumed by workers who interact 4) 1 week Plant supervisor
the workers while with drug consumers ● Company has CCTV in 3. Breath analysers should be (3, 4, 8)
working in the also affected by some of the areas. purchased to detect the drug 5) 3 weeks
workplace. substance abuse at consumers. HSE advisor
work. ● Warning sign boards 6) 3 weeks (5, 6)
against the consumption of 4. Conduct regular drug and alcohol
Alcohol, tobacco and alcohol and other drugs test in the workplace. 7) 1 month HSE manager
other drugs consumed in have been placed. (7)
the workplace acan 8) 1 week
14. MENTAL ILL Plant operators, 1. Make a policy of selecting employee 1) 2 weeks Project manager
● Organisation has a positive
HEALTH manager and all the of the month and encourage them. (1)
atmosphere.
workers will be affected 2) 2 weeks
Over workload by the mentall-ill heath. 2. Weekly interaction sessions should Plant manager
● Sick pay provided.
and work related be arranged between the 3) 1 month (2)
stress, anxiety Over workload and work management and the workers.
● Monthly leave rotation has
starts from high pressure from the higher 4) 1 month HSE advisor
been provided.
level mental ill departments would result 3. Arrangement should be made to (3, 8)
health in mental-ill health, allow workers to recover from high 5) 1 week
● Workers can take rest if
anxiety, depression, stress situations. Safety officer
needed.
headache and irritability, 6) 1 month (4)
15. LONE NDT workers, riggers 1. For the high risk activities 1)2 weeks Project manager
WORKING and confined space implement a policy of no lone (1, 3)
● Provided toolbox talk
workers. working. 2) 1 month
before every work.
Workers have to Plant engineer
work alone Maintenance purposes 2. Proper ventilation and lighting 3) 1 month (2)
● Supervision provides for
inside the rigs of pipeline workers have conditions should be provided.
the lone workers.
and some to work sometimes 4) 2 months Safety officer
pipeline sectors alone. Oil rigs and 3. Provide walky-talky for (4, 5, 6)
● Sign boards and barriers
confined space also communication purposes. 5) 1 month
have been placed.
have workers separated HR manager
from their colleagues. 4. Safe and quick access and egress 6) 1 month (7)
● PPE such as respirators,
Toxic gases can easily should be built for the confined
gloves has been provided.
affect the person who space. 7) 1 month Plant supervisor
works alone. There is a (8)
Moral, general legal and financial arguments Petrokenz Pvt. Ltd has the moral responsibility for the health and safety of the workers. Our
organisation has our own health and safety policy that states the moral obligations towards the
employees in a positive manner. If any accident or incident occurred in the plant will affect the
victim’s friends and family members and their daily basic needs. If an accident occurred inside the
plant this will affect their co workers too. The accident will impact his/her colleagues. This can result
in decrease in morale of the workers, they feel unsafe in the workplace and it can result in staff
turnover, less productivity, high chance of occurring accintes. Thus the organisation must have to
look after the health and safety of the workers in the workplace. It is the organisational responsibility
to proactively monitor to prevent the accident occurrence and ill health effect in the workplace.
The organisation is legally obligated to the Regional legislation and International standards.
Violating the legislation will result in occurrence of accident and hazard in the workplace and also
the enforcement agencies will take actions against the organisation such as disciplinary notices,
warning messages, halting the works, fines and penalties, temporary shutdown and permanent
shutdown. The organisation has the duty to provide a safe working environment and equipment.
The organisation has to provide an overall health and safety of the workers. These are the legal
reasons to provide a safe environment to the workers in the workplace.
Action Construct a separate area for storing the flammable liquids (hazard category-Fire)
Specific legal arguments 1. C167 Safety and Health in Construction Convention 1988 (No.167) Article-27, states
that sufficient storage should be provided for flammable liquids, solids and gas.
2. ILO Convention C164 Prevention of Major Industrial Accident Convention 1986 states
that any potential fuel should be stored away from the heat source.
3. R177 Chemical Recommendation 1990 (No.177) states the competent authority should
ensure that criteria are established for safety in storage of hazardous chemical
● The construction nature and integrity of storage containers.
● The compatibility and segregation of stored chemicals.
Breaching these rules will result in fire accidents in the workplace and lead to enforcement action
taken by the enforcement agencies.
Consideration of likelihood AND severity In our organisation we don’t have any separate storage area for storing the flammable liquids. The
likelihood of occurrence of accident from the non-isolated storing of flammable liquid is very
probable. Drilling and welding spark splashes into the flammable liquids can cause a massive fire
and explosion inside the plant. If any leakage of flammable liquids and the property change in the
flammable liquid also can cause fire and explosion. A small fire accident can affect the drilling and
I think the action of constructing separate storage areas for the flammable liquid will reduce the
chance of exploding too much. The action will not fully control the risk but it can control the risk at
its greatest extent.
Action Install Ultra-Fast Earthing switch which will help to detect an internal arc fault. (hazard
category-Electricity)
Specific legal arguments 1. C167-Safety and Health inConstruction Convention, 1988 (No.167) of
● Article-26 states that all electrical equipment and installation shall be constructed,
installed and maintained by a competent person, so used as against danger.
● Article-13 states that the safety of the workplace states that all appropriate
precautions shall be taken to ensure that all workplaces are safe without the health
and safety of the workers.
2. Electricity at work regulation 1989, states that the purpose of this regulation is to
concentrate on what can be done by employers to achieve electrical safety on work sites
and the need of taking control.
3. As per the International Labour Organisation’s Convention C155 and
Recommendation R164 the company has the duty to provide safe working conditions for
the workers.
Violating these rules will result in enforcement actions taken by the enforcement agencies against
the organisation.
Consideration of likelihood AND severity The likelihood of an accident occurring from the electricity is very high. Because for the analysing
purposes we must have to install the electrical devices inside the rigs and have to use drilling and
welding machines. It can lead to short circuit hazard, it can cause arc flash and it will result in fire
and explosion. The accident will affect the electrical engineers, drilling workers, NDT technicians,
electrical installation workers, supervisors and the workers who work nearby the area and it can
damage the whole plant.
The severity of the risk can be classified as Major to Catastrophic. If an arc flash accident
occurred in the plant it would cause environmental damage and financial loss. It will cause injuries
Action Apply guardrails to the scaffoldings for preventing falling of people from height (hazard category -
Work at height)
Specific legal arguments 1. ILO Recommendation R175- Safety and Health in Construction Recommendation,
1988 (No.175) says that:
● working platforms, gangways and stairways of scaffolding should be of such
dimensions and so constructed and guarded as to protect against falling or being
endangered by falling objects
● Every scaffold should be properly designed, erected and maintained so as to prevent
collapse or accidental displacement when properly used.
2. The Article 14 of ILO C167 - Safety and Health in Construction Convention, 1988
(No.167) states that all scaffolds and ladders shall be constructed and used in accordance
I think the action of applying guardrails will not completely control the risk; it can reduce the chance
of getting injured too much. The action can control the risk at its greatest extent.
Part 4: Review, communicate and check
Suggested word counts for each section:
● Planned review date or period and reasoning for this: 50 - 100 words
● How the risk assessment findings will be communicated and who needs to know the information: 100 - 150 words
Planned review date/period with reasoning As per our organisation’s health and safety policy, the review of risk assessment is conducted every
12 months. I did my risk assessment on may 2022. I’m scheduling the next review of risk
assessment on the date of 2023.
Before the date comes, i can assure you that the below changes will be considered while reviewing
the risk assessment, they are :
How the risk assessment findings will be My risk assessment finding will be communicated through the meeting that the staff including Chief
communicated AND who you need to tell safety officer, Plant engineer, Plant managers, Plant supervisor, HSE manager, and one the
workers representative. I will present my risk assessment finding and document through the
presentation and make sure that my new control measures are understood by the staff without any
doubt. Training and instructions will be provided by the HSE advisors by training programmes to all
the workers. The finding of the risk assessment and new control measures will be available in the
next tool box talk. I will post a notice of the risk assessment finding on the organisation’s health and
safety notice board so the workers can easily access it. I will upload one copy of the risk
assessment document on the company’s intranet. I will send a copy of the risk assessment as an
email to the higher authorities.
How you will follow up on the risk For the checking process, I will set a daily reminder for the 10 days before the actions due to be
assessment to check that the actions have completed by the incharge. I will ask the responsible person for each control measure and if it is not
been carried out
done or delayed. I will explain the problem that we are going to face. The action was not
implemented because of any financial reason. I will speak to the financial department and request
them to provide the source and I will give 3 more weeks to complete the process. Still the work is