C4B(450X750)
S. No.   Section Force   N (kN)   MYY (kNm) MZZ (kNm)
  1       Section Force   437.1        3.6      13.8
  2       Section Force   341.0       -10.7      -1.2
  3       Section Force   437.1        3.6      13.8
                                                         CRACK WIDTH
  4       Section Force   437.1        3.6      13.8
  5       Section Force   437.1        3.6      13.8
  6       Section Force   437.1        3.6      13.8
  7       Section Force   437.1        3.6      13.8
  8       Section Force   437.1        3.6      13.8
  9       Section Force   437.1        3.6      13.8
  10      Section Force   341.0       -10.7      -1.2
  11      Section Force   437.1        3.6      13.8
  12      Section Force   341.0       -10.7      -1.2
  13      Section Force   454.9       81.1      80.0
  14      Section Force   203.5       -97.3     -68.8
  15      Section Force   364.0       41.9      191.6
                                                         SLS COMBINATION
  16      Section Force   325.7       -36.6    -175.8
  17      Section Force   390.2       99.8      92.1
  18      Section Force   299.6       -94.5     -76.3
  19      Section Force   390.2       99.8      92.1
  20      Section Force   299.6       -94.5     -76.3
  21      Section Force   390.2       99.8      92.1
  22      Section Force   203.5       -97.3     -68.8
  23      Section Force   364.0       41.9      191.6
  24      Section Force   325.7       -36.6    -175.8
  25      Section Force   655.7        5.4      20.7
  26      Section Force   156.0      -141.2    -105.9
  27      Section Force   546.1       62.9      287.4
                                                         ULS COMBINATION
  28      Section Force   281.7       -56.5    -268.4
  29      Section Force   378.3       148.1     133.4
  30      Section Force   449.4      -141.8    -114.5
  31      Section Force   585.2       149.7     138.1
  32      Section Force   242.5      -143.3    -119.2
  33      Section Force   585.2       149.7     138.1
  34      Section Force   305.3      -146.0    -103.2
  35      Section Force   546.1       62.9      287.4
  36      Section Force   281.7       -56.5    -268.4
Oasys Results:
Development Length (Ldc) for 32mm dia bar = 93.3mm which is <600mm. :Hence (OK)
Shear Check
                                         SHEAR DESIGN OF RECTANGULAR/SQUARE COLUMN
                              1.     DETAILS OF COLUMN
                               LONGER DIMENSION (l)                             =    750       mm     LONGITUDINAL DIRECTION
                              SHORTER DIMENSION (s)                             =    450       mm     TRANSVERSE DIRECTION
                             GRADE OF CONCRETE (fck)                            =     40      N/mm2
                             GRADE OF MAIN STEEL (fy)                           =    500      N/mm2
                           PERCENTAGE OF STEEL (As % )                          =    3.31       %
                                    CLEAR COVER                                 =     40       mm
                      DIA OF LONGITUDINAL BAR        (ø main)                   =     32       mm
                         DIA OF SHEAR STIRRUPS TO BE USED                       =     10       mm
                   GRADE OF STEEL TO BE USED AS STIRRUPS      (fy)              =    415      N/mm2
                   GROSS CROSS - SECTIONAL AREA OF COLUMN (Ag)                  =   337500     mm2
                         2.        SHEAR CAPACITY OF COLUMN
                  PERCENTAGE OF TENSILE STEEL OUT OF TOTAL STEEL                =      50       %
                        PERCENTAGE OF TENSILE STEEL (Ast %)                     =    1.655      %
                   PERMISSIBLE SHEAR STRENGTH OF CONCRETE (τᴄ)'                 =    0.821    N/mm2    (Refer Table - 19/ P - 73 of IS 456-2000)
                      MINIMUM AXIAL COMPRESSIVE FORCE (Pu)                      =   156.01      KN
                             ENHANCEMENT FACTOR (δ)                             =   1.0347             (Refer CL - 40.2.2 / P - 72 of IS 456-2000)
                  FINAL DESIGN SHEAR STRENGTH OF CONCRETE (τᴄ)                  =    0.849    N/mm2
                   EFFECTIVE DEPTH OF COLUMN ALONG LONGER SIDE                  =     684      mm
                  EFFECTIVE DEPTH OF COLUMN ALONG SHORTER SIDE                  =     384      mm
                   SHEAR CAPACITY OF COLUMN ALONG LONGER SIDE                   =    0.000      KN
                 SHEAR CAPACITY OF COLUMN ALONG TRANSVERSE SIDE                 =    0.000      KN
       3.   SHEAR FORCE DUE TO PLASTIC HINGE FORMATION AT THE ENDS OF BEAM
                  PERCENTAGE OF STEEL IN THE Transverse BEAM (pt)               =    0.70       %
                 PERCENTAGE OF STEEL IN THE Longitudinal BEAM (pt)              =    0.45       %
                    GRADE OF CONCRETE IN ADJOINING BEAMS (fck)                  =     40      N/mm2
  3.(a) MOMENT CARRYING CAPACITY OF LONGITUDINAL BEAM FRAMING INTO THE COLUMN
                                      WIDTH                                     =     400      mm
                                     DEPTH                                      =     750      mm
                                   CLEAR COVER                                  =      30      mm
                              DIA OF STIRRUPS USED                              =      12      mm
                   ∴          DIA OF MAIN BAR USED                              =      25      mm
                          EFFECTIVE DEPTH OF THE BEAM                           =    695.5     mm
                         REINFORCEMENT PROVIDED IN THE BEAM                     =   1947.4    mm2
                     MOMENT CARRYING CAPACITY OF THE BEAM                       =   537.619   KN-m
   3.(b) MOMENT CARRYING CAPACITY OF TRANSVERSE BEAM FRAMING INTO THE COLUMN
                                     WIDTH                                      =     400      mm
                                     DEPTH                                      =     600      mm
                                   CLEAR COVER                                  =      30      mm
                              DIA OF STIRRUPS USED                              =      10      mm
                   ∴          DIA OF MAIN BAR USED                              =      25      mm
                          EFFECTIVE DEPTH OF THE BEAM                           =    547.5     mm
                         REINFORCEMENT PROVIDED IN THE BEAM                     =    985.5    mm2
                     MOMENT CARRYING CAPACITY OF THE BEAM                       =   221.507   KN-m
                   3.(c) EARTHQUAKE IN THE LONGITUDINAL DIRECTION
                         BOTH LONGITUDINAL BEAMS ARE PRESENT                                         =          YES
              NO. OF BARS ALONG THE LONGITUDINAL DIRECTION OF COLUMN                                 =           0
                        FACTORED SHEAR FORCE AS PER ANALYSIS                                         =         46.14          KN
                                   HEIGHT OF STOREY                                                  =         4.865          m
              SHEAR FORCE CORRESPONDING TO PLASTIC HINGE FORMATION                                   =        232.066         KN
                         REQUIREMENT OF SHEAR REINFORCEMENT                                          =          YES
                       SHEAR FORCE TO BE RESISTED BY THE STIRRUPS                                    =        232.066         KN
                               DIA OF STIRRUPS PROVIDED                                              =          10            mm
                                       NO. OF TIES                                                   =           5
                                   SPACING REQUIRED                                                  =        417.90        mm c/c
                     3.(d) EARTHQUAKE IN THE TRANSVERSE DIRECTION
                           BOTH TRANSVERSE BEAMS ARE PRESENT                                                     NO
                NO. OF BARS ALONG THE TRANSVERSE DIRECTION OF COLUMN                                 =            0
                         FACTORED SHEAR FORCE AS PER ANALYSIS                                        =          25.96         KN
                                    HEIGHT OF STOREY                                                 =          4.865         m
               SHEAR FORCE CORRESPONDING TO PLASTIC HINGE FORMATION                                  =         63.743         KN
                          REQUIREMENT OF SHEAR REINFORCEMENT                                         =           YES
                        SHEAR FORCE TO BE RESISTED BY THE STIRRUPS                                   =         63.743         KN
                                DIA OF STIRRUPS PROVIDED                                             =           10           mm
                                        NO. OF TIES                                                  =            7
                                    SPACING REQUIRED                                                 =        1195.79       mm c/c
                     3.(e) Maximum Spacing of Hoops as per IS 13920                                  =         225            mm
                                Final Spacing Calculated                                             =        225.00          mm
                                 Final Spacing Provided                                              =          75            mm
                                   Check For Spacing                                                 =          OK
      4.    MINIMUM NOMINAL LINKS As Per (CL - 26.5.32.(c) / P - 49, IS 456 - 2000)
                    Spacing Shall be Minimum of
1                 Least Lateral Dimension of Column        =             450          mm
2                16 X Minimum Dia Longitudinal Bar         =             320          mm          Minimum Dia Longitudinal Bar             =         20       mm
3                           Standard Value                 =             300          mm
     Final Nominal Spacing Required as per IS 456          =             300          mm
            Final Nominal Spacing Provided                 =              75          mm                               Check For Spacing              =        OK
    Minimum Dia of Lateral Tie Shall be Maximum of
1                Largest Longitudinal Bar Dia / 4              =            8         mm
2                              6 mm                                         6         mm
              Final Selecting Dia of Tie                       =           10         mm                            Check For dia of tie              =        OK
                     GOVERNING CASE FOR NOMINAL SHEAR STIRRUPS                                              Minimum Nominal Links as Per IS 456 - 2000 Requirements
                                                Finally Providing Nominal Shear Stirrups of Dia     10 mm @ 75 mm c/c
                             CONFINING LINKS CALCULATIONS
                          DIA OF CONFINING STIRRUPS USED                                             =          10            mm
               LONGER DIMENSION OF THE RECTANGULAR CONFINING HOOP                                    =           h
                         h ∴ALONG LONGITUDINAL DIRECTION                                             =         155           mm
                          h ALONG TRANSVERSE DIRECTION                                               =        131.50         mm
                               FINALLY SELECTED h VALUE                                              =         155           mm            (Higher One of the Two Values)
           AREA OF CONFINED CONCRETE CORE IN RECTANGULAR HOOP (Ak)                                   =        247900         mm2
                   SPACING OF THE CONFINING STIRRUPS CALCULATED                                      =        80.806         mm            Spacing Requirements of Hoops
                              FINAL SPACING PROVIDED                                                 =          75           mm          (s/4)        =      112.5      mm
                               CHECK FOR SPACING                                                     =          OK                     minimum        =        75       mm
       CHECK FOR CONFINING SPACING WRT SPACING PROVIDED IN NOMINAL ZONE                              =          OK                     maximum        =       100       mm