F. Estimate
F. Estimate
FY 2079/2080
NCA (Ha) 13.3875
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Nos/
S.N. Name of Structures Units Amount Nrs Weightage % Remarks
Length
1 Well 2 Nos 1,859,933.18 13.6
6 Distribution System
Government of Nepal
Ministry of Energy, Water Resources and Irrigation
Department of Water Resources and Irrigation
GON Item Input Contractor
Description of Works Qty Unit Total Grand total Unit Rate
Norms Code Resource description quantity unit rate amount Overhead
Pulchok, Lalitpur 6 7 8 9 10 11 12 13 14 15
1. Site clearance
Excavating 15-20cm of the top soil including disposal Labour Unskilled 0.160 MD 815.00 130.40 134.00
00-01 1.1 1 sq.m 134.31 134.31
outside of the construction site Tools & equipment @ 3% of Unskilled Labour 3.91
2. Earth work in excavation
Earthwork in excavation for soft soil with disposal Labour Unskilled 1.000 MD 815.00 815.00 839.00
2.9 2.1 1 Cu.m 839.45 839.45
Tools & equipment @ 3% of Unskilled Labour 24.45
Earthwork in excavation for all purposes in hard clay and Labour Unskilled 0.800 MD 815.00 652.00 671.00
2.2 2.2 moorum rock mixed soil including a lead of 10 m and a 1 Cu.m 671.56 671.56
lift of 1.5 m Tools & equipment @ 3% of Unskilled Labour 19.56
Earthwork in excavation for all purposes in hard gravel Labour Unskilled 1.360 MD 815.00 1,108.40 1,141.00
2.21 2.3 1 Cu.m 1,141.65 1,141.65
mixed soil including a lead of 10 m and a lift of 1.5 m Tools & equipment @ 3% of Unskilled Labour 33.25
Earthwork in excavation for all purposes in boulder Labour Unskilled 1.590 MD 815.00 1,295.85 1,334.00
2.14 2.4 1 Cu.m 1,334.73 1,334.73
mixed soil including a lead of 10 m and a lift of 1.5 m Tools & equipment @ 3% of Unskilled Labour 38.88
Earth filling, including a lead of 10 m, with ordinary soil Labour Unskilled 0.500 MD 815.00 407.50 419.00
2.6 a 2.5 in 15 cm thick layers, spreading and manual compaction 1 Cu.m 419.73 419.73
after each layer with watering Tools & equipment @ 3% of Unskilled Labour 12.23
Earth filling, including a lead of 10 m, with ordinary soil Labour Unskilled 0.250 MD 815.00 203.75 209.00
2.6b 2.6 in 15 cm thick layers, spreading and manual compaction 1 Cu.m 209.86 209.86
after each layer without sprinkling water Tools & equipment @ 3% of Unskilled Labour 6.11
Earthwork in excavation for all purposes in hard rock Labour Unskilled 5.000 MD 815.00 4,075.00 4,197.00
2.25 a 2.6 without chisel without blasting including a lead of 10 m 1 Cu.m 4,197.25 4,197.25
and a lift of 1.5 m Tools & equipment @ 3% of Unskilled Labour 122.25
Earthwork in excavation for all purposes in hard rock Labour Unskilled 24.200 MD 815.00 19,723.00 20,314.00
2.25b 2.7 with chisel without blasting including a lead of 10 m and 1 Cu.m 20,314.69 20,314.69
a lift of 1.5 m Tools & equipment @ 3% of Unskilled Labour 591.69
Government of Nepal
Ministry of Energy, Water Resources and Irrigation
Department of Water Resources and Irrigation
GON Item Input Contractor
Description of Works Qty Unit Total Grand total Unit Rate
Norms Code Resource description quantity unit rate amount Overhead
Pulchok, Lalitpur 6 7 8 9 10 11 12 13 14 15
Government of Nepal
Ministry of Energy, Water Resources and Irrigation
Department of Water Resources and Irrigation
GON Item Input Contractor
Description of Works Qty Unit Total Grand total Unit Rate
Norms Code Resource description quantity unit rate amount Overhead
Concreting of Pulchok,
super structure,
Lalitpurvertical faces,wall of 6 7 8 9 10 11 12 13 14 15
ratio 1:1:2 (M25) including of supply of materials Cu.m
7.4c 5.4 1 Cu.m Aggregate: 21,831.65 21,831.65
and haulage distance up to 30m with crushed
Materials 20mm 0.640 Cu.m 2,768.00 1,771.52
aggregate for ring
10mm 0.210 Cu.m 2,768.00 581.28
sand 0.425 Cu.m 3,196.00 1,358.30
Government of Nepal
Ministry of Energy, Water Resources and Irrigation
Department of Water Resources and Irrigation
GON Item Input Contractor
Description of Works Qty Unit Total Grand total Unit Rate
Norms Code Resource description quantity unit rate amount Overhead
Pulchok, Lalitpur 6 7 8 9 10 11 12 13 14 15
Concreting of found ...vert. faces, walls and Skilled Mason 0.300 MD 990.00 297.00 13,462.00
Labour
abutments (plum concrete) 1:2:4 including supply Unskilled 4.000 MD 815.00 3,260.00
of materials & haulage distance up to 30m Cement 0.320 MT 19,055.00 6,097.60
Stone 0.130 Cu.m 2,168.00 281.84
7 .1 5.4 1 Cu.m 13,462.34 13,462.34
Aggregate: Cu.m
Materials
20mm 0.570 Cu.m 2,768.00 1,577.76
10mm 0.190 Cu.m 2,768.00 525.92
sand 0.445 Cu.m 3,196.00 1,422.22
Skilled Mason 12.000 MD 990.00 11,880.00 121.00
Cutting, bending, placing in position according to Labour
Unskilled 12.000 MD 815.00 9,780.00
7.5 5.6 the drawing and binding of M.S. rod for R.C.C. 1000 KG 121,844.78 121,844.78
M.S.Bar 1.050 MT 94,325.31 99,041.58
works including a lead of 30 m materials
Binding Wire 10.000 KG 114.32 1,143.20
6. Frameworks
Skilled Mason 1.286 MD 990.00 1,273.14 745.00
Labour
Unskilled 1.902 MD 815.00 1,550.13 3,129.07
Making wooden forms for floor and slab including
8-1d 6.2 supply & selection of material, fixing nailing, 10 sq.m nails 2.500 KG 122.32 305.80 7,452.27
placing separators, dismantalling forms and hauling materials Plywood 6.12 m2 796.12 4,872.26
4,323.20
up to 30m distance( no of use = 6 times) Timber framework 0.24500 CUM 66,506.56 16,294.11
7. wood works
Carpenter 34.000 MD 990.00 33,660.00 227,258.00
Labour
7.1 Febrication and installation of stops logs 1 Cu.m unskilled 3.400 MD 815.00 2,771.00 227,258.18 227,258.18
materials salwood 1.100 CUM 173,479.25 190,827.18
8. Flooring works
Stone soling with Skilled 0.000 MD 990.00 - 3,824.00
Labour
Unskilled 1.500 MD 815.00 1,222.50
(11-16) 8.2 1 Cu.m 3,824.10 3,824.10
Block stone 1.200 cu.m 2,168.00 2,601.60
materials
Sand 0.000 cum 3,196.00 -
Government of Nepal
Ministry of Energy, Water Resources and Irrigation
Department of Water Resources and Irrigation
GON Item Input Contractor
Description of Works Qty Unit Total Grand total Unit Rate
Norms Code Resource description quantity unit rate amount Overhead
Pulchok, Lalitpur 6 7 8 9 10 11 12 13 14 15
Boulder soling and Levelling in Foundation with Skilled 0.000 MD 990.00 - 3,824.00
Labour
50m lead Unskilled 1.500 MD 815.00 1,222.50
(6-5) 8.3 1 Cu.m 3,824.10 3,824.10
Block stone 1.200 Cu.m 2,168.00 2,601.60
materials
Sand 0.000 cum 3,196.00 -
9. Plastering Works
12.5mm thick cement plastering works in 1:3 ratio Skilled 12.000 MD 990.00 11,880.00 409.00
Labour
in wall and floor Unskilled 16.000 MD 815.00 13,040.00
12-1Ga 9.1 100 sq.m 40,920.26 40,920.26
Cement 0.625 MT 19,055.00 11,909.38
materials
Sand 1.280 cum 3,196.00 4,090.88
20mm thick cement sand plastering works in 1:3 Skilled 14.000 MD 990.00 13,860.00 538.00
Labour
ratio in wall and floor Unskilled 19.000 MD 815.00 15,485.00
12-4Kha 9.2 100 sq.m 53,870.00 53,870.00
cement 0.960 MT 19,055.00 18,292.80
materials
Sand 1.950 cum 3,196.00 6,232.20
3mm thick fine cement rubbing work Skilled 1.000 MD 990.00 990.00 281.87
Labour
9.3 10 sq.m Unskilled 1.000 MD 815.00 815.00 2,818.73 2,818.73
materials cement 0.053 MT 19,055.00 1,013.73
10. HDPE Pipeline works
Supply, laying, levelling, jointing of various Plumber 2.000 M.D 990.00 1,980.00
diameter 160 mm(6 kg/cm²) HDEP pipes Labour Plumber Helper 2.000 M.D 815.00 1,630.00
Unskilled 4.000 M.D 815.00 3,260.00
8,970.46 8,970.46 179.41
10.1 50 m materials Petrol 1.000 ltr 100.00 100.00
Mechanical Jack 2.000 day 990.00 1,980.00
Equipment Tools & Eqpt. 2.51% % 815.00 20.46
17.2 HDPE 160/6 50.000 m 949.64 47,482.00 47,482.00 47,482.00 949.64
Suppll, laying, levelling, jointing of various Plumber 1.000 M.D 990.00 990.00
diameter 90 mm(4 kg/cm²) HDEP pipes Labour Plumber Helper 1.000 M.D 815.00 815.00
Unskilled 2.000 M.D 815.00 1,630.00
5,440.46 5,440.46 108.81
10.2 50 m materials Petrol 0.050 ltr 100.00 5.00
Mechanical Jack 2.000 day 990.00 1,980.00
Equipment Tools & Eqpt. 2.51% % 815.00 20.46
17.2 HDPE 90/6 50.000 m #REF! #REF! #REF! #REF! #REF!
Supply, laying, levelling, jointing of various Plumber 1.000 M.D 990.00 990.00
diameter 75 mm(4 kg/cm²) HDEP pipes Labour Plumber Helper 1.000 M.D 815.00 815.00
Unskilled 2.000 M.D 815.00 1,630.00
5,440.46 5,440.46 108.81
10.3 50 m materials Petrol 0.050 ltr 100.00 5.00
Mechanical Jack 2.000 day 990.00 1,980.00
Equipment Tools & Eqpt. 2.51% % 815.00 20.46
17.2 HDPE 75/6 50.000 m #REF! #REF! #REF! #REF! #REF!
Government of Nepal
Ministry of Energy, Water Resources and Irrigation
Department of Water Resources and Irrigation
GON Item Input Contractor
Description of Works Qty Unit Total Grand total Unit Rate
Norms Code Resource description quantity unit rate amount Overhead
Pulchok, Lalitpur 6 7 8 9 10 11 12 13 14 15
Supply, laying, levelling, jointing of various Plumber 1.000 M.D 990.00 990.00
diameter 63 mm (4kg/cm²) HDEP pipes Labour Plumber Helper 1.000 M.D 815.00 815.00
Unskilled 2.000 M.D 815.00 1,630.00
5,440.46 5,440.46 108.81
10.4 50 m materials Petrol 0.050 ltr 100.00 5.00
Mechanical Jack 2.000 day 990.00 1,980.00
Equipment Tools & Eqpt. 2.51% % 815.00 20.46
17.2 HDPE 63/6 50.000 m #REF! #REF! #REF! #REF! #REF!
Supply, laying, levelling, jointing of various Plumber 1.500 M.D 990.00 1,485.00
diameter 50 mm (6 kg/cm²) HDEP pipes Labour Plumber Helper 1.500 M.D 815.00 1,222.50
Unskilled 3.000 M.D 815.00 2,445.00
7,189.96 7,189.96 7.19
10.5 1000 m materials Petrol 0.370 ltr 100.00 37.00
Mechanical Jack 2.000 day 990.00 1,980.00
Equipment Tools & Eqpt. 2.51% % 815.00 20.46
17.2 HDPE 50/6 1000 m #REF! #REF! #REF! #REF! #REF!
Supply, laying, levelling, jointing of various Plumber 1.500 M.D 990.00 1,485.00
diameter 40 mm (6 kg/cm²) HDEP pipes Labour Plumber Helper 1.500 M.D 815.00 1,222.50
Unskilled 3.000 M.D 815.00 2,445.00
7,189.96 7,189.96 7.19
10.6 1000 m materials Petrol 0.370 ltr 100.00 37.00
Mechanical Jack 2.000 day 990.00 1,980.00
Equipment Tools & Eqpt. 2.51% % 815.00 20.46
17.2 HDPE 40/6 1000 m #REF! #REF! #REF! #REF! #REF!
Supply, laying, levelling, jointing of various Plumber 1.000 M.D 990.00 990.00
diameter 32 mm (10 kg/cm²) HDEP pipes Labour Plumber Helper 1.000 M.D 815.00 815.00
Unskilled 3.000 M.D 815.00 2,445.00
6,275.46 6,275.46 6.28
10.6 1000 m materials Petrol 0.250 ltr 100.00 25.00
Mechanical Jack 2.000 day 990.00 1,980.00
Equipment Tools & Eqpt. 2.51% % 815.00 20.46
17.2 HDPE 32/10 1000 m #REF! #REF! #REF! #REF! #REF!
Supply, laying, levelling, jointing of various Plumber 1.000 M.D 990.00 990.00
diameter 25 mm (10 kg/cm²) HDEP pipes Labour Plumber Helper 1.000 M.D 815.00 815.00
Unskilled 2.000 M.D 815.00 1,630.00
5,460.46 5,460.46 5.46
10.6 1000 m materials Petrol 0.250 ltr 100.00 25.00
Mechanical Jack 2.000 day 990.00 1,980.00
Equipment Tools & Eqpt. 2.51% % 815.00 20.46
17.2 HDPE 25/10 1000.000 m #REF! #REF! #REF! #REF! #REF!
Government of Nepal
Ministry of Energy, Water Resources and Irrigation
Department of Water Resources and Irrigation
GON Item Input Contractor
Description of Works Qty Unit Total Grand total Unit Rate
Norms Code Resource description quantity unit rate amount Overhead
Pulchok, Lalitpur 6 7 8 9 10 11 12 13 14 15
Supply, laying, levelling, jointing of 3 inch GI pipes Plumber 1.250 M.D 990.00 1,237.50
as per specification Labour Plumber Helper 2.000 M.D 815.00 1,630.00
Unskilled 3.000 M.D 815.00 2,445.00
5,976.56 5,976.56 199.22
10.7 30 m materials Red level paint 10.00% LC 5,312.50 531.25
Supply, laying, levelling, jointing of 2 inch GI pipes Plumber 0.750 M.D 990.00 742.50
as per specification Labour Plumber Helper 2.000 M.D 815.00 1,630.00
Unskilled 2.000 M.D 815.00 1,630.00
4,502.81 4,502.81 150.09
10.8 30 m materials Red level paint 10.00% LC 4,002.50 400.25
Supply, laying, levelling, jointing of 1 inch GI pipes Plumber 0.500 M.D 990.00 495.00
as per specification Labour Plumber Helper 1.500 M.D 815.00 1,222.50
Unskilled 1.500 M.D 815.00 1,222.50
3,307.50 3,307.50 110.25
10.9 30 m materials Red level paint 10.00% LC 2,940.00 294.00
Barbed wire fencing works with 5 rows & two Skilled 1.000 M.D 990.00 990.00 #REF!
Labour
diagonal barbed wires 15 column at 2m spacing. Unskilled 2.000 M.D 815.00 1,630.00
(24-7) size of angle column is 50 mm*50mm*2.1m 30 m Angle member 79.128 kg #REF! #REF! #REF! #REF!
Equipment Barbed wire 250 m #REF! #REF!
17 U-Hook 77.000 Nr #REF! #REF!
11. Gabion Works
3m x1.5 m x0.75m size Gabion box fabrication Skilled 0.600 M.D 990.00 594.00 #REF!
Labour
m2/ Unskilled 0.300 M.D 815.00 244.50
12.4 including cutting of wires, Mesh wire 8 swg, 15.75 #REF! #REF!
Selvedge wire 6 swg (rectangular Mesh type Box Gabion GI Wire (Heav 31.750 KG #REF! #REF!
materials
150mm x 150mm) Selvede Wire(Heavy) KG #REF! #REF!
Skilled 0.500 M.D 990.00 495.00 2,663.00
Labour
12.5 Filling of Gabion box with boulder in HW 1 Cu.m 2,663.00 2,663.00
16-11
Government of Nepal
Ministry of Energy, Water Resources and Irrigation
Department of Water Resources and Irrigation
GON Item Input Contractor
Description of Works Qty Unit Total Grand total Unit Rate
Norms Code Resource description quantity unit rate amount Overhead
Pulchok, Lalitpur 6 7 8 9 10 11 12 13 14 15
Labour
12.5 Filling of Gabion box with boulder in HW 1 Cu.m Unskilled 0.000 M.D 815.00 - 2,663.00 2,663.00
16-11 materials Block stone 1.000 Cu.m 2,168.00 2,168.00
Government of Nepal
Ministry of Energy, Water Resources and Irrigation
Department of Water Resources and Irrigation
GON Item Input Contractor
Description of Works Qty Unit Total Grand total Unit Rate
Norms Code Resource description quantity unit rate amount Overhead
Pulchok, Lalitpur 6 7 8 9 10 11 12 13 14 15
Supply and laying of Geotextile (Labour adopted Skilled 0.000 M.D 990.00 - #REF!
Labour
as laying one layer of polythene sheet(500 gauge)) Unskilled 0.050 M.D 815.00 40.75
12.6 1 sq.m #REF! #REF!
materials Geotextile 1.150 KG #REF! #REF!
Machinary Tools 3.00% lab. Cost 815.00 24.45
Skilled 0.450 M.D 990.00 445.50 3,653.00
Labour
12.7 Filling of Filter Material 1 Cu.m Unskilled 0.200 M.D 815.00 163.00 3,653.30 3,653.30
materials 20mm Aggregates 1.100 Cu.m 2,768.00 3,044.80
4 Solar module complete set as per design specification Set 2 4.00 8.00
5 Armoured copper cable 6 sq.mm. 3 core rm. 100 650.00 65,000.00
Measurement
S.N. Description No. Lengt Width Height Quantity unit Rate Amount Remarks
h (m) (m)
1 Earthwork in excavation in BMS soil
for foundation work.
Wall 4 2.30 0.40 0.70 2.57
2.57 m3
for 1 nos house 2.57 m3 m3 75.55 194.16
2 Earthwork in back filling 60% of excavation work 1.54 m3
for 1 nos house 1.54 m3 m3 75.55 116.34
3 Stone soling work.
Wall foundation 4 2.30 0.40 0.20 0.73
for flooring works 1 1.90 1.90 0.20 0.72
1.45 m3
for 1 nos house 1.45 m3 m3 4,397.71 6,376.67
R.R.Masonry in 1:4 cement sand
mortar including supply of materals all
4 complete.
Foundation to plinth 4 2.30 0.40 1.00 3.68
Main wall 4 2.30 0.30 2.30 6.34
Foot step 2 0.75 0.30 0.20 0.09
Sub-Total 10.11
Deduct door 1 0.75 0.30 2.00 0.45
Deduct Ventilator 1 0.60 0.30 0.45 0.08
Lintel 1 2.15 0.30 0.15 0.09
Deduction total 0.62
Net Quantity of Masonry 9.49
for 1 nos house 9.49 m3 14,002.96 132,888.09
PCC work for RCC in 1:2:4 cement
5 concrete.
Roof slab with sun shade(0.5)m 1 3.65 2.70 0.10 0.98
Floor 1 1.90 1.90 0.10 0.36
Lintel 1 2.15 0.30 0.15 0.09
1.43
for 1 nos house 1.43 m3 16,021.21 22,910.33
Measurement
S.N. Description No. Lengt Width Height Quantity unit Rate Amount Remarks
h (m) (m)
Supplying and fitting sal wood frame
6 for doors and windows.
Door 1 4.95 0.10 0.075 0.037
Ventilator 1 2.10 0.10 0.075 0.015
0.052
for 1 nos house 0.052 m3 239,208.61 12,438.84
Supplying and fitting sal wood
7 panneled door shutter.~2.5cm thick
Door 1 0.63 1.90 1.197
Ventilator 1 0.48 0.33 0.158
1.355
for 1 nos house 1.355 m2 14,313.84 19,395.25
8 Reinforcement steel works.
10mm dia. Main bar for Roof slab 24 2.65 0.62 39.432
10mm dia.dist.bar 18 3.60 0.62 40.176
12mm dia. Main bar for Beam 16 2.60 0.89 37.024
8mm dia. Ring bar 58 0.50 0.39 11.310
10mm dia.main bar for lintel 4 2.15 0.62 5.332
8mm dia. Ring bar for lintel. 11 0.53 0.39 2.265
135.54
for 1 nos house 135.54 m3 Kg. 140.12 18,991.72
9 Wooden formwork all complete.
Lintel 2 2.15 0.15 0.645
Lintel 1 1.35 0.30 0.405
Slab 1 2.00 2.00 4.000
Slab outer side 2 3.65 0.30 2.190
Slab outer side 1 2.60 0.30 0.780
Slab outer side 1 2.60 0.75 1.950
Slab around 1 12.70 0.10 1.270
11.240
for 1 nos house 11.240 m2 893.07 10,038.10
Measurement
S.N. Description No. Lengt Width Height Quantity unit Rate Amount Remarks
h (m) (m)
12.5mm thick 1:3 cement sand plaster
10 works.
upto plinth 4 2.70 0.60 6.480
step 1 1.15 0.30 0.345
floor 1 2.70 2.70 7.290
Deduction walls -4 2.30 0.30 -2.760
Door -2 0.75 2.00 -3.000
Ventilator -2 0.60 0.45 -0.540
Wall inside 4 2.00 2.30 18.400
Wall outside 4 2.60 2.30 23.920
Ceilling 1 3.65 3.20 11.680
Deduction walls -4 2.30 0.30 -2.760
Slab edges 1 13.70 0.10 1.370
Door around 1 5.50 0.30 1.650
Ventilator around 2 2.10 1.30 5.460
67.54 m2
for 1 nos house 67.54 m2 462.85 31,258.57
Washing and painting in walls and
11 doors and ventilator etc all complete.
for 1 nos house 1.00 job 40,000.00 40,000.00
Total for 1 Pump House 294,608.07
Total for 2 Pump House 589,216.14
FY 2079/2080
Quantity Estimate of Delivery Line
Stage 1 : 2
Length : 1215 m size : 100 mmØ 4" GI Pipe
No of Sets : 2
Measurement
Width
S.N. Description No. Length Height Quantity unit Rate Amount Remarks
(m) (m) (m)
1 Earthwork in excavation in BMS soil for
foundation work.
support blocks 102 0.50 0.30 0.30 4.59 Cum 1,312.89 6,026.16
2 R.R.Masonry in 1:4 cement sand mortar
including supply of materals all complete.
support blocks 102 0.50 0.30 0.80 12.24 Cum 14,002.96 171,396.23
3 PCC 1:2:4
for caping support blocks 102 0.50 0.30 0.05 0.76 Cum 16,021.21 12,176.11
4 Supply of dia.4" GI pipe all complete 2.1 1215.00 2550.00 Rm 2,402.70 6,126,885.00
5 work
Laying & joining of dia.4" GI pipe all
complete work 2550.00 RM 285.59 728,254.50
6 Supplying and fixing all required fittings
and accessories including non return
valves etc. to join the pipe as per
requirements, all complete. 1 1.00 Job 50,000.00 50,000.00
Total 7,094,738.00
Detail Quantity and Cost Estimate
FY 2079/2080
Quantity Estimate of Reservoir Tank
Measurement
S.N. Description No. Length Width Height Quantity unit Rate Amount Remarks
(m) (m) (m)
Foundation excavation
Reservoir 1 7.50 5.50 1.35 55.68
For Valve chamber 1 1.30 1.30 1.35 2.28
Fancing post cc 18 0.45 0.45 0.60 2.18
Flushing pipe 1 3.00 0.90 0.75 2.02
62.16
1 Dry foundation excavation in boulder mix
soil including disposal by machine 0% 0.00 Cum. 75.55 -
2 Foundation excavation in soft rock
including disposal by machine 100% 62.16 Cum. 141.79 8,813.66
3 Structure Back fill 30% 18.65 Cum. 75.55 1,408.85
4 Dry stone Soling
Reservoir 1 7.50 5.50 0.15 6.18
For Valve chamber 1 1.30 1.30 0.15 0.25
6.43 Cum. 4,397.71 28,277.27
5 PCC in (1:3:6)
Reservoir 1 7.50 5.50 0.05 2.06
For valve chamber 1 0.80 0.80 0.05 0.03
2.09 Cum. 14,036.31 29,335.88
6 RCC / P.C.C.1:1.5:3 For foundation & wall
Reservoir Bed 1 7.40 5.40 0.20 7.99
Reservoir Wall 2 7.40 0.20 2.25 6.66
Reservoir Wall 2 5.00 0.20 2.25 4.50
For valve chamber slab 1 0.80 0.80 0.10 0.06
Fancing post cc 18 0.45 0.45 0.60 2.18
Capping of valve chamber 1 2.00 0.30 0.05 0.03
21.42 Cum. 17,745.25 380,103.25
7 Form works
Reservoir foundation 2 12.80 0.2 5.12
Reservoir inside Wall 2 12.00 2.25 54.00
Reservoir outside Wall 2 12.80 1.80 46.08
For valve chamber cover 1 3.20 0.05 0.16
Measurement
S.N. Description No. Length Width Height Quantity unit Rate Amount Remarks
(m) (m) (m)
Fancing post cc 18 1.80 0.60 19.44
124.80 Sqm. 893.07 111,455.13
8 Reinforcement steel
10 mm dia main bar in mesh/ both Layer 35 5.1 0.617 110.13
25 7.1 0.617 109.51
10 mm dia main bar in wall d/layer 240 2.85 0.617 422.02
10 mm dis. Bar 23 24 0.617 333.18
974.84
Add lap & chairs @ 5 % 48.74
1023.58 Kgs 140.12 143,424.02
9 R.R. masonry work in (1:4)
wall 2 0.80 0.30 0.50 0.24
wall 2 0.50 0.30 0.50 0.15
0.39 Cum. 14,002.96 5,461.15
10 12.5 mm thick Plaster in (1:3) C/S mortar
#REF!
#REF!
#REF!
#REF!
#REF!
Measurement
S.N. Description No. Length Width Height Quantity unit Rate Amount Remarks
(m) (m) (m)
Foundation excavation
Reservoir 1 6.50 4.50 1.35 39.48
For Valve chamber 1 1.30 1.30 1.35 2.28
Fancing post cc 16 0.45 0.45 0.60 1.94
Flushing pipe 1 3.00 0.90 0.75 2.02
45.72
1 Dry foundation excavation in boulder mix
soil including disposal by machine 80% 36.57 Cum. 75.55 2,762.86
2 Foundation excavation in soft rock
including disposal by machine 20% 9.14 Cum. 141.79 1,295.96
3 Structure Back fill 30% 13.72 Cum. 75.55 1,036.24
4 Dry stone Soling
Reservoir 1 6.50 4.50 0.15 4.38
For Valve chamber 1 1.30 1.30 0.15 0.25
4.63 Cum. 4,397.71 20,361.39
5 PCC in (1:3:6)
Reservoir 1 6.50 4.50 0.05 1.46
For valve chamber 1 0.80 0.80 0.05 0.03
1.49 Cum. 14,036.31 20,914.10
6 RCC / P.C.C.1:1.5:3 For foundation & wall
Reservoir Bed 1 6.20 6.20 0.20 7.68
Reservoir Wall 2 6.40 0.20 2.00 5.12
Reservoir Wall 2 4.00 0.20 2.00 3.20
For valve chamber slab 1 0.80 0.80 0.10 0.06
Fancing post cc 16 0.45 0.45 0.60 1.94
Capping of valve chamber 1 2.00 0.30 0.05 0.03
18.03 Cum. 17,745.25 319,946.85
7 Form works
Reservoir foundation 4 6.20 0.2 4.96
Reservoir inside Wall 2 10.00 2.00 40.00
Reservoir outside Wall 2 12.80 1.67 42.75
For valve chamber cover 1 3.20 0.10 0.32
Fancing post cc 16 1.80 0.60 17.28
105.31 Sqm. 893.07 94,049.20
8 Reinforcement steel
10 mm dia main bar in mesh/ both Layer 30 4.1 0.617 75.89
20 6.1 0.617 75.27
10 mm dia main bar in wall d/layer 200 2.6 0.617 320.84
10 mm dis. Bar 20 20 0.617 246.80
718.80
Add lap & chairs @ 5 % 35.94
754.74 Kgs 140.12 105,754.16
Jwanetaar Solar Lift ISP
Measurement
S.N. Description No. Length Width Height Quantity unit Rate Amount Remarks
(m) (m) (m)
9 R.R. masonry work in (1:4)
wall 2 0.80 0.30 0.50 0.24
wall 2 0.50 0.30 0.50 0.15
0.39 Cum. 14,002.96 5,461.15
10 12.5 mm thick Plaster in (1:3) C/S mortar
Measurement
S.N. Description No. Length Width Height Quantity unit Rate Amount Remarks
(m) (m) (m)
Main, Sub-Main and Tertiaries
75 mm dia 10kg/cm2 1078.00
63 mm dia 6kg/cm2 550.00 For outlet
40 mm dia 4kg/cm2 220.00
32 mm dia 6kg/cm2 352.00
25 mm dia 10kg/cm2 2329.00
4529.00
1 Earthwork excavation in gravel mix soil 50% 4529.00 0.40 0.60 543.48 Cum. 1,141.64 620,458.50 WUA
2 Foundation excavation in soft soil 50% 4529.00 0.40 0.60 543.48 Cum. 839.44 456,218.85 WUA
3 Back fill
30 % of Excavation 326.09 Cum. 209.86 68,432.82 WUA
4 Supply of HDP pipe of
75 mm HDPE pipe PN-6 PE-100, NS-40 1 1078.00 1078.00 Rm 245.22 264,347.16
63 mm HDPE pipe PN-6,PE-100 1 550.00 550.00 Rm 171.32 94,226.00
40mm HDPE PN-10 PE-100 1.05 220.00 234.00 Rm 109.52 25,627.68
32 mm HDPE pipe PN-10 PE-100 1.05 352.00 372.00 Rm 69.96 26,025.12
25 mm HDPE pipe PN-12.5 PE-100 1.05 2329.00 2448.00 Rm 51.65 126,439.20
5 Laying and fitting etc. complete of HDP
pipe of
75 mm HDPE pipe PN-6 PE-100, NS-40 Rm 81.80
88,180.40
1078.00
63 mm HDPE pipe PN-6,PE-100 550.00 Rm 82.61 45,435.50
40mm HDPE PN-10 PE-100 234.00 Rm 6.15 1,439.10
32 mm HDPE pipe PN-10 PE-100 372.00 Rm 5.07 1,886.04
25 mm HDPE pipe PN-12.5 PE-100 2448.00 Rm 4.11 10,061.28
6 Supply and fitting etc. complete of
necessry fittings 20% of Pipe cost 1.00 L.S. 107,333.03
Total 1,936,110.68
Detail Quantity and Cost Estimate
FY 2079/2080
Quantity Estimate of Reservoir Tank
Length : 1.50 m
Breadth: 1.50 m 11 nos
Thickness at base : 0.15 m for each sub-mains
Thickness of wall : 0.15 m
Height : 1.2 m
Measurement
S.N. Description No. Length Width Height Quantity unit Rate Amount Remarks
(m) (m) (m)
1 Dry foundation excavation in boulder mix
soil including disposal
11 1.80 1.80 1.20 42.76
42.76 Cum. 1,141.65 48,816.95 WUA
2 Dry stone Soling
11 1.80 1.80 0.15 5.34
5.34 Cum. 4,397.71 23,483.77
3 RCC in (1:2:4)
bed 11 1.80 1.80 0.15 5.34
cover 11 1.80 1.80 0.15 5.34
10.68 Cum. 16,021.21 171,106.52
4 Reinforcement steel
For cover
10 mm dia U main bar in mesh/ both Laye 1936 3.45 0.617 4121.06
8 mm dia dist bar 77 1.70 0.617 80.76
4201.82 Kgs 140.12 588,759.01
5 R.R. masonry work in (1:4)
wall 22 1.80 0.15 1.20 7.12
wall 22 1.65 0.15 1.20 6.53
13.65 Cum. 14,002.96 191,140.40
6 12.5 mm thick Plaster in (1:3) C/S mortar
#REF!
#REF!
#REF!
#REF!
#REF!
###
### FY 2079/2080
Quantity Estimate of Outlets 0 Nos.
Measurement
S.N. Description No. Length Width Height Quantity unit Rate Amount Remarks
(m) (m) (m)
1 Dry foundation excavation in gravel mix
soil (gravel>10cm) chamber 0 0.60 0.60 0.40 0.00
sub_Total: 0.00 m3 1,141.65 - WUA
2 Dry stone Soling
0 0.60 0.60 0.15 0.00
0.00 Cum. 4,397.71 -
3 RCC in (1:2:4)
bed 0 0.60 0.60 0.10 0.00
cover 0 0.60 0.60 0.10 0.00
sub_Total: 0.00 m3 16,021.21 -
4 Reinforcement steel
For cover @ kg/m
10 mm dia main bar in mesh/ both Layer 0 0.50 0.617 0.00
0 0.50 0.617 0.00
sub Total per post : 0.00 Kg 140.12 -
5 R.R. masonry work in (1:4)
wall 0 0.60 0.30 0.30 0.00
wall 0 0.30 0.30 0.30 0.00
0.00 Cum. 14,002.96 -
6 GI fittings supplying & fitting work
20 mm (3/4") GI Socket 0 0.00 Nos 67.10 -
4" long GI Nipple 20 mm (3/4") Ø 0 0.00 Nos 68.20 -
20 mm (3/4") GI Tee 0 0.00 Nos 116.60 -
20 mm (3/4") ball valve 0 0.00 Nos 596.20 -
Government of Nepal
Ministry of Irrigation
Department of Irrigation
Western Regional Irrigation Directorate
Irrigation Development Division
Tanahun
ABSTRACT OF COST
###
### #REF!
S.N. Description of work Quantity Unit Rate Amount Remarks
A #REF!
1 #REF! #REF! Cum. 784.3 #REF!
2 #REF! #REF! Cum. 96.6 #REF!
3 #REF! #REF! Cum. 113.9 #REF!
4 #REF! #REF! Cum. 22,314.0 #REF!
5 PCC (1:1.5:3) work for RCC #REF! Cum. 17,745.0 #REF!
6 Reinforcement work #REF! Kgs 140.0 #REF!
7 Form work #REF! Sqm. 893.0 #REF!
8 #REF! #REF! Sqm. 277.0 #REF!
9 #REF! #REF! Cum. 3,062.0 #REF!
10 #REF! #REF! Rm 3,000.0 #REF!
11 #REF! #REF! job 125,000.0 #REF!
12 #REF! #REF! Sqm. 81.3 #REF!
13 #REF! #REF! Kgs 218.5 #REF!
14 #REF! #REF! Cum. 2,961.8 #REF!
15 #REF! #REF! Cum. 96.6 #REF!
Sub- Total #REF!
Government of Nepal
Ministry of Irrigation
Department of Irrigation
Western Regional Irrigation Directorate
Irrigation Development Division
Tanahun
ABSTRACT OF COST
###
### #REF!
S.N. Description of work Quantity Unit Rate Amount Remarks
B #REF!
Dry foundation excavation in boulder mix soil
1 0.00 Cum. 96.6 -
including disposal by machine
Foundation excavation in soft rock including
2 62.16 Cum. 784.3 48,752.08
disposal by machine
3 Structure Back fill 18.65 Cum. 241.0 4,494.16
4 Dry stone Soling 6.43 Cum. 4,397.0 28,272.71
5 PCC in 1:3:6 in foundation 2.09 Cum. 14,036.0 29,335.24
6 RCC / P.C.C.1:1.5:3 For foundation & wall 21.42 Cum. 17,745.0 380,097.90
Reinforcement work, cutting, bending, binding
7 1023.58 kgs 140.0 143,301.20
and placing at site.
8 Form work for suttering 124.80 Sqm. 893.0 111,446.40
9 R.R. masonry work in (1:4) 0.39 Cum. 14,002.0 5,460.78
10 12.5 mm thick Plaster in (1:3) C/S mortar 90.00 Sqm. 462.0 41,580.00
11 3mm thick fine cement rubbing works 90.00 Sqm. 321.0 28,890.00
Government of Nepal
Ministry of Irrigation
Department of Irrigation
Western Regional Irrigation Directorate
Irrigation Development Division
Tanahun
ABSTRACT OF COST
###
### #REF!
S.N. Description of work Quantity Unit Rate Amount Remarks
B #REF! #REF! m
1 #REF! #REF! Cum. 83.9 #REF!
2 #REF! #REF! Cum. 784.3 #REF!
3 #REF! #REF! Cum. 241.0 #REF!
4 Supply of dia.4" GI pipe all complete work 2550.00 Rm 2,402.7 6,126,885.00
Laying & joining of dia.4" GI pipe all complete
5 2550.00 Rm 285.6 728,254.50
work
6 #REF! #REF! 1,643.8 #REF!
7 #REF! #REF! 229.1 #REF!
8 Supply of 125 mm dia.10 kg/cm2 HDPE pipe #REF! Rm 515.6 #REF!
Laying and Fitting of 125 mm dia.10 kg/cm2
9 #REF! Rm 124.7 #REF!
HDPE pipe
10 Supply of 90 mm dia.4 kg/cm2 HDPE pipe #REF! Rm 346.3 #REF!
Laying and Fitting of 90 mm dia.4 kg/cm2
11 #REF! Rm 81.8 #REF!
HDPE pipe
12 Supply of 75 mm dia.4 kg/cm2 HDPE pipe #REF! Rm 245.2 #REF!
Laying and Fitting of 75 mm dia.4 kg/cm2
13 #REF! Rm 81.8 #REF!
HDPE pipe
14 Supply of 63 mm dia.4 kg/cm2 HDPE pipe #REF! Rm 171.3 #REF!
Laying and Fitting of 63 mm dia.4 kg/cm2
15 #REF! Rm 82.6 #REF!
HDPE pipe
16 Supply of 50 mm dia.6 kg/cm2 HDPE pipe #REF! Rm 123.6 #REF!
Laying and Fitting of 50 mm dia.6 kg/cm2
17 #REF! Rm 6.2 #REF!
HDPE pipe
18 Supply of 40 mm dia.6 kg/cm2 HDPE pipe #REF! Rm 109.5 #REF!
Laying and Fitting of 40 mm dia.6 kg/cm2
19 #REF! Rm 6.2 #REF!
HDPE pipe
20 Supply of 32 mm dia.6 kg/cm2 HDPE pipe #REF! Rm 70.0 #REF!
Laying and Fitting of 32 mm dia.6 kg/cm2
21 #REF! Rm 5.1 #REF!
HDPE pipe
#REF!
22 Supply of 25 mm dia.10kg/cm2 HDPE pipe #REF! Rm 50.5 #REF! Participation
#REF!
C Solar Pump Set
Given Data
Works: Supply, Installation and Comissioning/Testing of Solar Component
Location: Tanahun
Government of Nepal
Ministry of Irrigation
Department of Irrigation
Western Regional Irrigation Directorate
Irrigation Development Division
Tanahun
ABSTRACT OF COST
###
### #REF!
S.N. Description of work Quantity Unit Rate Amount Remarks
Q= 8 lit./sec or 140,800 to 2,60,000 l/d (max.)
Dynamic Head (Hd)= 77 m
Solar Irrad.= 6 hrs.
315 Wp 48 Nos.
Poly crystalline Trina Solar Panels (PV Module) 315
1 Wp 24V (maximum solar power requirement of Nos. 48 31,500.00 1,512,000.00
about 15600 watt
Solartech
guaranteed to deliver max. 8 liter/s discharge at 84
2 meter head including static head and loses etc. incl. Nos. 1 595,000.00 595,000.00
controller with at least 2 years warranty and
Converter 10-15 KW
m Frames
UV Cable,
Aluminiu
Installation Materials including Armoured cable and
3 Set 1 245,000.00 245,000.00
Accessories, Solar Panel mounting frames etc.
Pokhara/Narayangha
Transportation from
Transportation to Road head (site at 9 km south t to Risingpatan
7 from Khairenitar at along Prithvi Highway), Job 1 35,000.00 35,000.00
Installation and Commissioning
Government of Nepal
Ministry of Irrigation
Department of Irrigation
Western Regional Irrigation Directorate
Irrigation Development Division
Tanahun
ABSTRACT OF COST
###
### #REF!
S.N. Description of work Quantity Unit Rate Amount Remarks
D #REF! #REF! No
E/W excavation in fundation in gravel mixed
1 0.00 Cum. 1,312.9 -
soil including disposal , 10m lead & 1.5m lift
2 PCC (1:3:6) work #REF! Cum. 14,036.0 #REF!
3 PCC (1:2:4) work 0.00 Cum. 15,213.0 -
4 Reinforcement 0.00 Kg 140.0 -
5 Form work 0.00 Sqm. 893.0 -
6 Backfilling #REF! Cum. 241.0 #REF!
#REF!
Government of Nepal
Ministry of Irrigation
Department of Irrigation
Western Regional Irrigation Directorate
Irrigation Development Division
Tanahun
ABSTRACT OF COST
###
### #REF!
S.N. Description of work Quantity Unit Rate Amount Remarks
E Earthwork Excavation WUA Cont.
1 E/W excavation for foundation in GM soil #REF! m3 82.5 #REF!
2 #REF! #REF! m3
770.7 #REF!
4 #REF! #REF! m3
209.0 #REF!
#REF!
3.4
Earthwork in excavation for soft rock by 1 Cu.m 123.30 18.49 141.80 141.79
machine
3.5
Earthwork in excavation for medium rock by 1 Cu.m 398.70 59.80 458.51 458.50
machine
3.6
Earthwork in excavation for hard rock by 1 Cu.m 597.60 89.64 687.24 687.24
Rate Analysis
GON Item Input Contractor
Description of Works Qty Unit Total Grand total Unit Rate
Norms Code Resource description quantity unit rate amount Overhead
1 2 3
Earthwork in excavation for hard rock by 4 5 6 7 8 9 10 11 12 13 14 15
3.6 1 Cu.m 597.60 89.64 687.24 687.24
machine
9. Plastering Works
12.5mm thick cement plastering works in 1:3 Skilled 12.000 MD 990.00 11,880.00
Labour
ratio in wall and floor Unskilled 16.000 MD 815.00 13,040.00
12.1b 9.1 100 sq.m 40,248.26 6,037.24 46,285.49 462.85
Cement 0.625 MT 19,055.00 11,909.38
materials
Sand 1.280 cum 2,671.00 3,418.88
20mm thick cement sand plastering works in 1:3 Skilled 14.000 MD 990.00 13,860.00
Labour
ratio in wall and floor Unskilled 19.000 MD 815.00 15,485.00
12.4a 9.2 100 sq.m 52,846.25 7,926.94 60,773.19 607.73
cement 0.960 MT 19,055.00 18,292.80
materials
Sand 1.950 cum 2,671.00 5,208.45
Rate Analysis
GON Item Input Contractor
Description of Works Qty Unit Total Grand total Unit Rate
Norms Code Resource description quantity unit rate amount Overhead
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
3mm thick fine cement rubbing work Skilled 10.000 MD 990.00 9,900.00
Labour
14.8 9.3 100 sq.m Unskilled 10.000 MD 815.00 8,150.00 27,920.49 4,188.07 32,108.56 321.08
materials cement 0.518 MT 19,055.00 9,870.49
Rate Analysis
GON Item Input Contractor
Description of Works Qty Unit Total Grand total Unit Rate
Norms Code Resource description quantity unit rate amount Overhead
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
10. HDPE Pipeline works
160 mm HDPE pipe PN-6 , PE-100, NS-40 Plumber 2.000 M.D 990.00 1,980.00
Labour Plumber Helper 2.000 M.D 815.00 1,630.00
Unskilled 4.000 M.D 815.00 3,260.00
7,182.44 1,077.37 8,259.80 165.19
17.2 10.1 50 m materials Petrol 1.000 ltr 110.00 110.00
Tools & Eqpt. 1.000 day 30.00 30.00
Equipment Miscellaneous 2.51% % 6,870.00 172.44
HDPE 160/6 50.000 m 949.64 47,482.00 47,482.00 7,122.30 54,604.30 1,092.08
110 mm HDPE pipe PN-6 PE-100, NS-40 Plumber 1.500 M.D 990.00 1,485.00
Labour Plumber Helper 1.500 M.D 815.00 1,222.50
Unskilled 3.000 M.D 815.00 2,445.00
5,421.83 813.27 6,235.10 124.70
17.2 10.1 50 m materials Petrol 1.000 ltr 110.00 110.00
Tools & Eqpt. 1.000 day 30.00 30.00
Equipment Miscellaneous 2.51% % 5,152.50 129.33
HDPE 110/6 50.000 m 448.38 22,419.00 22,419.00 3,362.85 25,781.85 515.63
90 mm HDPE pipe PN-6 PE-100, NS-40 Plumber 1.000 M.D 990.00 990.00
Labour Plumber Helper 1.000 M.D 815.00 815.00
Unskilled 2.000 M.D 815.00 1,630.00
3,556.72 533.51 4,090.23 81.80
17.2 10.2 50 m materials Petrol 0.050 ltr 110.00 5.50
Tools & Eqpt. 1.000 day 30.00 30.00
Equipment Miscellaneous 2.51% % 3,435.00 86.22
HDPE 90/6 50.000 m 301.10 15,055.00 15,055.00 2,258.25 17,313.25 346.26
75 mm HDPE pipe PN-6 PE-100, NS-40 Plumber 1.000 M.D 990.00 990.00
Labour Plumber Helper 1.000 M.D 815.00 815.00
Unskilled 2.000 M.D 815.00 1,630.00
3,556.72 533.51 4,090.23 81.80
17.2 10.3 50 m materials Petrol 0.050 ltr 110.00 5.50
Tools & Eqpt. 1.000 day 30.00 30.00
Equipment Miscellaneous 2.51% % 3,435.00 86.22
HDPE 75/6 50.0 m 213.24 10,662.00 10,662.00 1,599.30 12,261.30 245.22
Supply, laying, levelling, jointing of various Plumber 1.000 M.D 990.00 990.00
diameter 25 mm (10 kg/cm²) HDEP pipes Labour Plumber Helper 1.000 M.D 815.00 815.00
Unskilled 2.000 M.D 815.00 1,630.00
3,578.72 536.81 4,115.53 4.11
17.2 10.8 1000 m materialsPetrol 0.250 ltr 110.00 27.50
Tools & Eqpt. 1.000 day 30.00 30.00
Equipment Miscellaneous 2.51% % 3,435.00 86.22
HDPE 25/10 1000 m 44.92 44,920.00 44,920.00 6,738.00 51,658.00 51.65
Supply, laying, levelling, jointing of various Plumber 1.000 M.D 990.00 990.00
diameter 20 mm (10 kg/cm²) HDEP pipes Labour Plumber Helper 1.000 M.D 815.00 815.00
Unskilled 2.000 M.D 815.00 1,630.00
3,578.72 536.81 4,115.53 4.11
17.2 10.9 1000 m materials Petrol 0.250 ltr 110.00 27.50
Tools & Eqpt. 1.000 day 30.00 30.00
Equipment Miscellaneous 2.51% % 3,435.00 86.22
HDPE 20/10 1000 m 34.97 34,970.00 34,970.00 5,245.50 40,215.50 40.21
Supply laying, levelling, jointing of (125mm) 5 Plumber 2.000 M.D 990.00 1,980.00
inch GI pipes as per specification Labour Plumber Helper 2.500 M.D 815.00 2,037.50
Unskilled 5.000 M.D 815.00 4,075.00
9,104.06 1,365.61 10,469.67 348.98
17.2 10.10 30 m materials Red level paint 10.00% LC 8,092.50 809.25
Supply laying, levelling, jointing of (100mm) 4 Plumber 1.750 M.D 990.00 1,732.50
inch GI pipes as per specification Labour Plumber Helper 2.000 M.D 815.00 1,630.00
Unskilled 4.000 M.D 815.00 3,260.00
7,450.31 1,117.55 8,567.86 285.59
17.2 10.11 30 m materials Red level paint 10.00% LC 6,622.50 662.25
Supply, laying, levelling, jointing of (65,80mm) Plumber 1.250 M.D 990.00 1,237.50
3 inch GI pipes as per specification Labour Plumber Helper 2.000 M.D 815.00 1,630.00
Supply laying, levelling, jointing of (40, 50mm) Plumber 0.750 M.D 990.00 742.50
2 inch GI pipes as per specification Labour Plumber Helper 2.000 M.D 815.00 1,630.00
Unskilled 2.000 M.D 815.00 1,630.00
4,502.81 675.42 5,178.23 172.60
17.2 10.13 30 m materials Red level paint 10.00% LC 4,002.50 400.25
Supply, laying, levelling, jointing of (25, 32mm) Plumber 0.500 M.D 990.00 495.00
1 inch GI pipes as per specification Labour Plumber Helper 1.500 M.D 815.00 1,222.50
Unskilled 1.500 M.D 815.00 1,222.50
3,307.50 496.13 3,803.63 126.78
17.2 10.14 30 m materials Red level paint 10.00% LC 2,940.00 294.00