STATE                        : O D I S HA
STAT ION                     : BHUBANESWAR.
NAME OF THE DIVISION         : WATCO DIVISION-I, BHUBANESWAR.
NAME OF THE SUB: DIVISION    : WATCO SUB DIVN, C.S PUR, BBSR
NAME OF THE WORK             : Renovation of Toilet & Bathroom to GA
                                 Deptt. E type Block No.14       Qtr. No-
                                 1/1,2/1,3/1,4/1 at New Govt. colony near
                                 Sainik School, Bhubaneswar.
ESTIMATED AMOUNT       RS.   : 60345.00
CH HEAD                      : 13-2216-05
                               SI.NO-153
YEAR                         : 2021-22
WORK I.D                     :
THIS ESTIMATE HAS BEEN FRAMED BY SUPERINTENDING ENGINEER P.H. DIVISION,
BHUBANESWAR TO MEET THE PROBABLE EXPENDITURE FOR THE WORK:-
Renovation of Toilet & Bathroom to GA Deptt. E type Block No.14 Qtr. No- 1/1,2/1,3/1,4/1
                at New Govt. colony near Sainik School, Bhubaneswar.
REPORT:-
                               This estimate has been framed as per the request made by the
                  occupant basing on the requirement., for which the allotee is complaining
                  several times for renovation work. Accordingly provisions have been kept
                  in this estimate for execution of work.
SPECIFICATION:-
                         The work shall be executed as per P.H.D. & P.W.D. specifiaction.
AMOUNT:-
                          The total amount of this estimate stands at     Rs.        60345.00
RATE:-
                                    Prevailing schedule of rate and revised rate of labour,
                  transportation charges, cost of materials have been followed for
                  preparation of this estimate. At most places the market rate have been
                  followed to derive the rates.
TIME:-
                               It will take fifteen days time to complete the work if funds and
                  materials are readily available during the execution of work.
       Asst Manager                   Manager                General Manager
      WATCO Section              WATCO Sub-Division          WATCO Divison-I
    Sikharchandi, BBSR             C.S Pur, BBSR              Bhubaneswar.
                                            DETAILED ESTIMATE FOR THE WORK
    Renovation of Toilet & Bathroom to GA Deptt. E type Block No.14 Qtr. No- 1/1,2/1,3/1,4/1 at New Govt. colony
                                        near Sainik School, Bhubaneswar.
ASSOCIATION OFFICE-30/08/2022
Sl                                                                                                                                   Amount.
                                  Description of item.                                                   Qty.    Unit. Rate.(Rs.)
no.                                                                                                                                     (Rs.)
 1                                          2                                                             3       4        5          6
 1 Supplying all labour, T&P for dismantling and removing old tiled flooring including
    removing the base coarse and stacking the useful materials for reuse and removing
    the debris within 50m lead
    Bath
    4X1.20X1.20                                                                                  5.76
    Sill- 4 x 0.75 x 0.30                                                                        0.90
    Latrine
    4X1.20X1.20                                                                                  5.76
    Sill- 4 x 0.75 x 0.30                                                                        0.90
                                                                                                 13.32   14.76   Sqm     108.90        1607.36
2 Supplying all labour, T&P for dismantling and removing old tiled cladding from walls
  including racking out joints 12mm deep stacking the useful materials for reuse and
  removing the debris within 50m lead
  Bath
  1x4.40 x 2.10                                                                        9.24              9.24    Sqm     52.90         488.80
3 Supplying all materials,labour and T&P for cutting grooves in pucca floor and walls
  for taking P.V.C./G.I pipes and mending good the damages including cost of all
  materials, labour, T&P etc. all complete as per P.H. specification and direction of
  Engineer-in-charge.                                                                                    9.00    Mtr     182.40       5677.80
4 Providing and fixing to wall or ceiling and floor UPVC pipes class conforming to
  UPVC-ASTM Standard (Sch-80) and pipe fittings of the following nominal bore with
  clamps including making good the wall, ceiling and floor all complete as per
  specification complete.
a 20mm. dia UPVC pipe                                                                                            MTR     155.80        488.80
5
    Supplying fitting, fixing ceramic floor tiles in floors, treads, steps with neat
    cement slurry mixed with pigments to match the shade of tiles includeing cost
    conveyance of all materials, labour, T & P complete as per specification and
    direction of Engineer-in-charge.
    Qty same as item no-1                                                                                14.76   Sqm     761.70      11242.69
6
    Supplying fitting & fixing glazed tiles of plain white/printed on wall, dados jointed with
    neat cement slurry mixed with pigments to match the shade of the tiles including
    cost conveyance, taxes of all materials, T & P etc. as per specification and direction
    of Engineer-in-charge.
    Qty same as item no-2                                                                                9.24    Sqm     738.40       6822.82
7 Providing cement concrete (1:2:4) with 12mm size C.B.H.G. chips in floor including
  supplying all labour, materials, T & P and cost, conveyance, royalties, taxes, etc.
  allcomplete as per specification and direction of Engineer-in-charge.
    extension piece-3"                                                                                   5.00    EACH    151.60      11242.69
8 Supplying fitting fixing of following P.H. fixtures including all cost conveyance labour
  T&P & taxes etc all complete as per specification and direction of Engineer-in-
  charge.
a upvc pipe                                                                                               2      EACH    918.30       1836.60
b mirror                                                                                                  1      EACH    867.30        867.30
c towel rail                                                                                              1      EACH   2050.00       2050.00
d Towel ring                                                                                              1      EACH   3464.00     3464.00
e 22x16 WHB                                                                                       1      EACH   421.00    421.00
f cistern                                                                                         1      EACH   1673.70   1673.70
g glass shelf                                                                                     2      EACH   252.29       504.58
h long body bib cock                                                                              5      EACH    61.00       305.00
i PTMT tap                                                                                        1      EACH   780.60       708.60
j waste pipe                                                                                      1      EACH   685.00       685.00
k pillar cock                                                                                     2      EACH   3189.20     6378.40
l angular stopcock                                                                                6      EACH   220.80      1324.80
m connection pipe                                                                                 4      EACH    83.00       332.00
n 20mm upvc pipe                                                                                  12     EACH    77.55       930.60
o 110mm SWR pipe                                                                                  15     EACH   368.90      5533.50
p 110 mm bend                                                                                     2      EACH   192.40       384.80
9 Supplying all materials, labour, T&P and fitting and fixing of 30 mm PVC door
  shutter with door frame of 40mmx48mm size of approved quality including fixing
  materials and cost , transportation , taxes etc. all complete in all respect as per the
  direction of the Engineer-in-charge.                                                            8      EACH   3750.00    30000.00
10
     Supplying all materials, labour, T & P and transporting the excavated surplus
     materials by mechanical carriage and dumping it at a suitable place within 5 k.m.
     distance from work site as per direction of Engineer-in-charge.
     3.00 x 2.00 x 1.00                                                                          6.00     Cum   149.67       898.02
                                                                                                                 TOTAL     50633.80
                                                                                      Add for contigency @ 1%                506.34
                                                                                                                           51140.14
                                                                                                  Add for GST WITH 18%      9205.27
                                                                                                                           60345.41
                                                                                                                 Or Say    60345.00
     Asistant Manager                      Manager                                          General Manager
     WATCO Section                    WATCO Sub-Division                                    WATCO Division-I
     Sikharchandi BBSR               C.S Pur, Bhubaneswar                                    Bhubnaeswar
                                              BILL OF QUANTITY FOR THE WORK
    Renovation of Toilet & Bathroom to GA Deptt. E type Block No.14 Qtr. No- 1/1,2/1,3/1,4/1 at New Govt. colony
                                        near Sainik School, Bhubaneswar.
ASSOCIATION OFFICE-30/08/2022
Sl                                                                                                                            Amount.
                                  Description of item.                                            Qty.    Unit. Rate.(Rs.)
no.                                                                                                                              (Rs.)
 1                                          2                                                      3       4        5          6
 1 Supplying all labour, T&P for dismantling and removing old tiled flooring including
    removing the base coarse and stacking the useful materials for reuse and removing
    the debris within 50m lead
                                                                                                 14.76    Sqm     108.90        1607.36
2 Supplying all labour, T&P for dismantling and removing old tiled cladding from walls
  including racking out joints 12mm deep stacking the useful materials for reuse and
  removing the debris within 50m lead
  Bath                                                                                            9.24    Sqm     52.90         488.80
3 Supplying all materials,labour and T&P for cutting grooves in pucca floor and walls
  for taking P.V.C./G.I pipes and mending good the damages including cost of all
  materials, labour, T&P etc. all complete as per P.H. specification and direction of
  Engineer-in-charge.                                                                             9.00    Mtr     182.40       5677.80
4 Providing and fixing to wall or ceiling and floor UPVC pipes class conforming to
  UPVC-ASTM Standard (Sch-80) and pipe fittings of the following nominal bore with
  clamps including making good the wall, ceiling and floor all complete as per
  specification complete.
a 20mm. dia UPVC pipe                                                                            186.90   MTR     155.80        488.80
5
    Supplying fitting, fixing ceramic floor tiles in floors, treads, steps with neat
    cement slurry mixed with pigments to match the shade of tiles includeing cost
    conveyance of all materials, labour, T & P complete as per specification and
    direction of Engineer-in-charge.
    Qty same as item no-1                                                                        14.76    Sqm     761.70      11242.69
6
    Supplying fitting & fixing glazed tiles of plain white/printed on wall, dados jointed with
    neat cement slurry mixed with pigments to match the shade of the tiles including
    cost conveyance, taxes of all materials, T & P etc. as per specification and direction
    of Engineer-in-charge.
    Qty same as item no-2                                                                         9.24    Sqm     738.40       6822.82
7 Providing cement concrete (1:2:4) with 12mm size C.B.H.G. chips in floor including
  supplying all labour, materials, T & P and cost, conveyance, royalties, taxes, etc.
  allcomplete as per specification and direction of Engineer-in-charge.
    extension piece-3"                                                                            5.00    EACH    151.60      11242.69
8 Supplying fitting fixing of following P.H. fixtures including all cost conveyance labour
  T&P & taxes etc all complete as per specification and direction of Engineer-in-
  charge.
a upvc pipe                                                                                        2      EACH    918.30       1836.60
b mirror                                                                                           1      EACH    867.30        867.30
c towel rail                                                                                       1      EACH   2050.00       2050.00
d Towel ring                                                                                       1      EACH   3464.00     3464.00
e 22x16 WHB                                                                                        1      EACH    421.00     421.00
 f cistern                                                                                         1      EACH   1673.70     1673.70
g glass shelf                                                                                      2      EACH    252.29        504.58
 h long body bib cock                                                                           5        EACH       61.00             305.00
 i PTMT tap                                                                                     1        EACH      780.60             708.60
 j waste pipe                                                                                   1        EACH      685.00             685.00
 k pillar cock                                                                                  2        EACH     3189.20            6378.40
 l angular stopcock                                                                             6        EACH      220.80            1324.80
m connection pipe                                                                               4        EACH       83.00             332.00
 n 20mm upvc pipe                                                                               12       EACH       77.55             930.60
 o 110mm SWR pipe                                                                               15       EACH      368.90            5533.50
 p 110 mm bend                                                                                  2        EACH      192.40             384.80
 9 Supplying all materials, labour, T&P and fitting and fixing of 30 mm PVC door
   shutter with door frame of 40mmx48mm size of approved quality including fixing
   materials and cost , transportation , taxes etc. all complete in all respect as per the
   direction of the Engineer-in-charge.
                                                                                                8        EACH     3750.00           30000.00
10
     Supplying all materials, labour, T & P and transporting the excavated surplus
     materials by mechanical carriage and dumping it at a suitable place within 5 k.m.
     distance from work site as per direction of Engineer-in-charge.
                                                                                              6.00       Cum       149.67             898.02
                                                                                                                    TOTAL           50633.80
                                                                                                                    Or Say          50634.00
                                          QUOTED RATE BY THE TENDERER                                             Rates
Sl No                                                Description                             In Figure                 In Words
 1   Percentage excess over the total estimated value-
 2   Percentage less than the total estimated value-
 3   Percentage at par with the total estimated value-
                                                                                             Approved
     Signature of the Bidder
                                                              Manager WATCO                                 General Manager
                                                         Sub division C.s pur , BBSR                       WATCO Division-I, BBSR
1x4.40   9.24   9.24   Sqm   52.90 488.80
3   Supply
    ing all
    materi
    als,lab
    our
    and
    T&P
    for
    cutting
    groove
    s     in
    pucca
    floor
    and
    walls
    for
    taking
    P.V.C.
    /G.I
    pipes
    and
    mendi
    ng
    good
    the
    damag      9.00   Mtr   182.40   ###
4   Providi
    ng and
    fixing
    to wall
    or
    ceiling
    and
    floor
    UPVC
    pipes
    class
    confor
    ming
    to
    UPVC-
    ASTM
    Stand
    ard
    (Sch-
    80)
    and
    pipe
    fittings
    of the
    followi
    ng
a   20mm.      MTR 155.80
    dia
    UPVC
    pipe                    0.00
5   Supply
    ing
    fitting,
    fixing
    cerami
    c floor
     tiles in
    floors,
    treads,
      steps
    with
    neat
    cemen
    t slurry
    mixed
    with
    pigme
    nts to
    match
    the
    shade
    of tiles
    includ
    eing
    cost
    Qty
    same
    as
    item
    no-1        0.00   Sqm   761.70   0.00
6   Supply
    ing
    fitting
    &
    fixing
    glazed
    tiles of
    plain
    white/
    printed
    on
    wall,
    dados
    jointed
    with
    neat
    cemen
    t
    slurry
    mixed
    with
    pigme
    nts to
    match
    the
    shade
    Qty
    same
    as
    item
    no-2       9.24   Sqm   738.40   ###
7   Providi
    ng
    cemen
    t
    concre
    te
    (1:2:4)
    with
    12mm
    size
    C.B.H.
    G.
    chips
    in floor
    includi
    ng
    supplyi
    ng all
    labour,
    materi
    als, T
    &     P
    and
    cost,
    conve
    yance,
    11.07sqm x 0.0 0.55   Cum   ###   ###
8   Supply
    ing
    fitting
    fixing
    of
    followi
    ng
    P.H.
    fixture
    s
    includi
    ng all
    cost
    conve
    yance
    labour
    T&P &
    taxes
    etc all
    compl
    ete as
    per
    specifi
    cation
    and
    directi
    15mm
    dia
    C.P.
    long
    body
    bib
    cock.
    (Plaza/
    Ambar
    Deluxe
    )         8   EACH 755.00   ###
b
    15mm
    dia
    C.P.
    short
    body
    bib
    cock.
    (Plaza/
    Ambar
    Deluxe
    )         4   EACH 698.20   ###
    15mm
    dia
    C.P.
    Angula
    r stop
    cock.
    (Plaza/
    Ambar
    Deluxe
    )         4   EACH 713.40   ###
    20mm
    dia
    C.P.
    conce
    aled
    stop
    cock
    (Plaza/
    Ambar
    Deluxe
d   )         1   EACH 863.30 863.30
    15 mm
    ×100m
    m C.P.
    Revolv
    ing
    showe
    r
    with 9”
    arm.
    (Plaza/
    Ambar
    Deluxe
e   )         4   EACH 453.20   ###
f   23”
    Orissa
    pan
    (Parry
    ware/
    Nycer)    2   EACH   ###    ###
    10 ltr.
g   PVC
    Low
    Level
    Cister
    n
    compl
    ete
    (Parry
    ware/s
    limline
    )          4   EACH   ###   ###
h   22”
    ×16”
    W.H.B
    . with
    compl
    ete
    fittings
    .
    (Parry
    ware/
    Neyce
    r).
               4   SET    ###   ###
i
    450m
    m×600
    mm
    bevell
    edge
    glass
    mirror
    with
    C.P.
    screw
    & back
    sheet.             4   EACH 705.70   ###
j   600m
    m×
    125m
    m C.P.
    glass
    shelf
    with
    glass/
    acrylic
    shelf
                       4   EACH 597.10   ###
k   24" x 18" Stainl   2   EACH   ###    ###
l   C.P.
    soap
    dish.              6   EACH 220.80   ###
m   125mm dia C.P.     4   EACH 72.00 288.00
    20mm
    ×
    600m
    m C.P.
    Towel
    rail.
    (Plaza/
    Ambar
    Deluxe
n   )                 4   EACH 823.20   ###
o   C.P. Towel ring   4   EACH 427.20   ###
    Porcel
    ain
    pedest
p   al.               4   EACH   ###    ###
9   Supply
    ing all
    materi
    als,
    labour,
    T&P
    and
    fitting
    and
    fixing
    of 30
    mm
    PVC
    door
    shutter
    with
    door
    frame
    of
    40mm
    x48m
    m size
           of
    approv
    ed
    quality     8   EACH   ###   ###
10   Supply
     ing all
     materi
     als,
     labour,
     T & P
     and
     transp
     orting
     the
     excav
     ated
     surplu
     s
     materi
     als by
     mecha
     nical
     carriag
     e and
     dumpi
     ng it at
     a
     suitabl
     e
     place
     3.00 x 2.00 x 1 6.00   Cum 149.67 898.02
                                TOTAL     ###
                Add for contigency @ 1%   ###
                                          ###
                    Add for GST @ 12%     ###
                                          ###
                                   Say0Lakhs