Septic Tank and Soakaway Plans
Septic Tank and Soakaway Plans
WINDOW AND DOOR SCHEDULE 1,000 1,885 730 6,075 4,500 730 2,460 2,670 2,730 5,760 230 2,715 2,796 1,202 1,849 2,556 707 2,800 1,082
REF ELEVATION QTY FRAME MATERIAL GLAZING FIXING 230
2,100 230 770 230 1,655 230 500 230 1,800 230 3,585 230 3,266 230 1,004 500 230 2,000 230 2,670 230 2,500 230 1,400 230 3,900 230 2,715 2,796 1,202 1,849 2,556 707 2,800 1,082
23
0
23
0
0
00
1,
rw
1,
70
M/H
0
0
730
77
230
230
1,
2wvv W06 W03 W03
47
rw
0
0
23
ab ab ab
1,597 230
wc
5
61
ab
23
2,
1,700
tub
1,827
duct
1,470
1,470
0
5
W06
1,800
38
3,585
2,
3,
61
whb
5
2,800
5900 Aluminium frames 4mm clear glass steel beads screwed W04 Ensuite
3,
23
W01 01 tiles
38
Study
5
W07
to specialist detail to main frame ab ab
230
4,000
tiles
ffl:+0.00
ab
1,330
shwr
ab
0
80
1,849
1,849
ab
1,
G
2,385
vv
06
W
11
2w
rw
07
23
W
3,615
0
230 2,100
tu
3,385
5
ab
Sauna
b
07
W07
3,615
0
ab
50
1,200
6,
3,
tiles 1,800
3,
2,
50
ab
500
Dinette
w
B.I.C
96
0
0
c
80
3,
460 5,070 460
0
tiles
00
1,
3,
135°
ab
0
50
500X500 conc Ensuite ffl:+0.00
ab
2,615
0
ab
ab
70
colunms tiles
er
am 00
2,815 1,000
3,
ov
2,615
8
3,000
r
stair master
w
ab
2,800
2,800
500
sh
3,094
hb
W07 W13
be
W04
W
rc
05
5
81
4,496 ab ab ab 2,485
230
G
230
3,
ab
1,
23
50
23
0
1,400
70
45°
ab
0
W02
2,
3,
Gym
23
Kitchenette
0
tiles
2,
stair master ie Bedroom 7 Bedroom 1
50
ab
00
ab ab
3,730
230
tiles
9
10
11
4,470
17
16
15
14
13
12
ffl:+0.00 wc Tiles
0
tiles
4,266 8 ffl:+0.00
ab
ab
3,000
3,000
17R ffl:+0.00
DOWN
16G x 200 ffl:+0.00
3,230
23
rc
x 25
1, am
0
2m sliding door
0
3,960
3,500
1.2m Pocket
W06
be
50
0
50 o
7
1,
G
whb
Aluminium Sliding
3,
2,072
2,072
5
0 ve
B.I.C
38
Ensuite
11
door
2,550
W
W02
5
Aluminium frames 4mm clear glass steel beads screwed
1,500
D03
treadmill
1,
W05
06
6 tiles
machine
ie
4,
D04
15
weight
G
tu
stationary
4,730 W03
00
rw
02
5,900
W06
W02 3,900
r
W05 W06
ab
5
5
weight
bench
0
bike
to specialist detail to main frame
0
shwr
4,280
50
4
1,
2,
rw
4,050
c
50
2,
W
11
W06
23
3
0
C
07
5
Foyer W03
0
.I.
1,000 2 2wvv W07 W07
B
230
tiles
0
ab
ab ab
800
Sitting Room
80
1 730
ab
ffl:+0.00 W03 W03 W03
2,
sh
ab
UP tiles
ab
Bathroom
ab
W06 W01
rw
2wvv 2,500 1,400 230 2,370 ffl:+0.00
r
1,070 tiles
duct
500
hb
tub
730
730
1,170
shwr
ab ab ab
wc
w
1,130
2,800
0
5
W
W
2,470
Laundry
230
2,500
23
61
2m
4,
PANTRY
duct
3,062
3,062
14
2,670 Scullery
03
1,766
70
W06
4,
tub
tiles sl
D
2,000
ab
700
0
tiles id
03
ab
0
Bathroom W04 2,000 ffl:+0.00 in PTD
47
PTD STAIRS
5,
ffl:+0.00 g
Play Room
460X460 conc
1,270
do
0
97
tiles
70
wc or
colunms w
1.2m Pocket
7
Tiles
230
0
9
3,500
ab
r
W06
30
23
10 Aluminium Sliding
ffl:+0.00
1,
8 door
ab
whb
whb 11
G
ab
3,500
500 ab ab 7 rc beam over D04
3,730
W05 W06 W06
09
230
230 3,500
12
B.I.C
W
2,100
6
1,500
16G x 250
230
17R x 200
4,200
13
W06 W04
11
ab
5
1,070 1,630 1,200 1,170 45°
Sliding door
1.2m Pocket
5
Family Room Bathroom
14
1,155
0
D04
4
W07
B
4,000 Sun Lounge
10
979
979
6,930
tiles tiles dpc
.I.
rc beam by engineer
W
15
ab
2m sliding door
4,
C
0
3
2,
tiles
Aluminium frames 4mm clear glass steel beads screwed
03
LINEN
2,000
33
ramp fall 1:12
ffl:+0.00 NGL rw W03 W03 W03
30
16
4,
2 ffl:-0.100
0
18
W05
W03
0
4,000
2500
ab ab
00
2wvv
17
shwr 2wvv
breakfast nook
450 I.L
D03
to specialist detail to main frame
1,
1
46
5,885
DOWN
10
0
UP
W07 Bedroom 2
230
,4
G 100mm diametre pvc drain fall 1:40
ab
12
Verandah Tiles
ab
0
Sliding door
ab 1.2m Pocket
20
N-W ELEVATION
23
tiles
4,200
1,230 ffl:+0.00
4,
Verandah
1,770
centre stove ffl:-0.100
D04
3,
460X460 conc
230
2,000
1,400
50
tiles
PTD 230 1,070 1,200
28,350
28,350
0
1,200 ffl:-0.100
3,295
3,295
1,530
Scale 1:100
colunms
2,730
4,
07
2,800 1,500
00
230
Kitchen 770 760
W
2,000
0
ab ab rc beam over tiles
1,770 230 ffl:+0.00
0
W
27
rc beam by engineer W09 W04
1,000
15
Aluminium frames 4mm clear glass steel beads screwed
0
rw W06
2,
20
900
ab
duct
1,000
15
4,
W04 1,000 460
ab
3,500 D01
0
LINEN
2,500
ab
66
to specialist detail to main frame
23
rc beam over
0
4m sliding door
13
4,
1,800
1,800
23
0
2wvv Winery
W
nc
ab
rw
230
tiles
s co
ab
4,560 1,200 3,570
rc beam over
731
731
23
ffl:+0.00
1,460
1,030
1,030
1,030
nm 0
duct
570
0
lu 46
230 4,330 230 4,000 230 540
0
1,500
co 60X
23
23
0
9,330
504
504
460X460 conc
colunm with
2000
230
230
730
ab
cladding
3,730 1,770
0
27
W03
W05 04
2,
1400
Dining
6,230
W12
to specialist detail to main frame
0
4m sliding door
50
Lounge tiles
2,
0
ffl:+0.00
23
tiles
D01
3,170
3,170
ffl:+0.00
W03
Sun Lounge
3,970
3,970
1200
8,230
tiles
4,000
3,500
W12
ffl:+0.00
Aluminium frames 4mm clear glass steel beads screwed
rw
W06 19
W03
1400
W12
5,500 230 6,100 230 3,000
ab
1,030
1,030
ab
2000 D01 D02 1,000
ab ab ab ab 2.5m sliding door ab
4m sliding door
W04 W04 W04
230
Verandah
Aluminium frames 4mm clear glass steel beads screwed
1,000
tiles
Verandah
W07 11 ffl:-0.100
2100
12,690
1,770
1,770
1,770
460X460 conc
tiles
to specialist detail to main frame
2,000
2,000
1.2m Pocket
ffl:-0.100 Aluminium Sliding
door
colunms
11,000
D02
11,230
2.5m Aluminium
W03 W03 W06 W06 W08 sliding door
rc beam by engineer
500 rc beam by engineer W10 W10 W10 rc beam by
230
230
engineer
W07
Aluminium frames 4mm clear glass steel beads screwed 460 3,040 460 700 4,930 700
W08 01
1400
rc beam by engineer
5,000
7,230
4,000
tiles
ffl:-0.100
5,000
5,230
Aluminium frames 4mm clear glass steel beads screwed
W09 03 W06 W05
to specialist detail to main frame
2,600
1,230
1,230
C
1,000
S-E ELEVATION
230
230
340 40
230 230 230
230 470 230 2,800 230 1,070 230 4,200 230 1,500 460 230 10,060 230 230 5,540 230 230 6,825 1,768 1,037 3,295 2,082
Scale 1:100
Aluminium frames 4mm clear glass steel beads screwed 11,760 270 10,750 6,460 230 6,825 1,768 1,037 3,295 2,082
W10 03
3,000
GROUND FLOOR
1,000
Area 570sqm
W11 03
Aluminium frames 4mm clear glass steel beads screwed scale 1:100
to specialist detail to main frame
2,500
trusses by specialist
700 23°
700
Aluminium frames 4mm clear glass steel beads screwed lintel lintel
W12 03
3,000
3,200
3,200
1.2m Pocket
2,500
Aluminium Sliding
door
D04
2,000
W07
W03
6,600
W03
W04
5,900
lintel
200
200
700
lintel
Aluminium frames 4mm clear glass steel beads screwed 29,240 lintel
02
1,585
W13
2,600
to specialist detail to main frame 1,000 1,885 730 6,075 4,500 730 2,460 2,670 2,730 5,990 240 230
230 230 240
3,200
3,200
3,300
230 770 230 1,655 230 500 0 1,800 230 3,585 230 3,266 230 1,004 500 230 2,000 230 2,670 230 2,500 230 2,500 230 2,800 230 230
2,500
4m Aluminium sliding door
730
230
230
1,615
W06 W03 W03 W06 W06
1,000
ab ab ab
230
230
wc
300
300
300
ab
dpc
C
1,700
tub
duct
1,470
1,470
NGL
W06
Aluminium frames 4mm clear glass steel beads screwed 1,800 230 3,585
W14 01
1,000
1,000
1,000
whb
2,600
Ensuite
to specialist detail to main frame
2,800
W04 dpm
tiles Bedroom 5
ab ab Tiles
W07
230
4,000
4,000
4,460
4,000
4,460
floor finish on
230
ffl:+3.40 690 690 76mm coved cornice all round. 690 690
40mm screed on
ab
1,330
shwr
100mm concrete slab on 38 x 230mm s.w. bargeboards and fascias.
25mm sand blind 125 x 100mm g.i gutters
2,385 150 compacted hardcore fill
4,000 100 x 75mm g.i. r.w.p's.
515X230mm footing for 115walls
3,615
ab
MINIMUM DEPTH OF FOUNDATION TO BE 700 38x38 sawn timber brandering at 450mm centres
W07
tiles
1,200
ffl:+3.40 BRICKWORK
B.I.C
230
brickforce after 3 courses on foundations ROOF NOTES
and after 4 courses from slab level, after
Aluminium frames 4mm clear glass steel beads screwed lintol level 3 courses Q roofing tiles on timber trusses by specialist
W15 01 500X500 conc 38 x38mm s.w tiling battens at 300mm centres on
ab
310
2,600
230
to specialist detail to main frame 2,815 W07 rc beam by engineer colunm VENTILATION
2 abs over each fanless door
Prefabricated timber roof trusses by specialists at 22 degrees roof pitch
at 760mm centres on 38 x 114mm s.w.wall plates secured to
310
2,730 4,500 1,000 2 abs over each urinal, wc and shower
ab
230
1,690
1,690
W04
floor level to be at least 150mm (min) Plasterboard ceilings on 38 x38mm ceiling branderings at 400mm centres.
2,500 250mm micron black polythene dpm
depth of foundation to suite nature of the ground Roof pitch ------ 22.5 degrees
230
ab
4,496 3,030
ab
W02
3,974
Game Room ab ab Section B-B
3,730
9
10
11
4,470
17
16
15
14
13
12
3,500
3,960
tiles 4,266 Covered Balcony
3,730
8
ab
17R tiles
DOWN
Scale 1:100
Bedroom 4 ffl:+3.40 16G x 200 Study
x 25 ffl:+3.300
3,960
3,500
2m sliding door
tiles tiles
W04
0 7
5,445
ffl:+0.00 ffl:+3.400
04
2,550
2,387
D03
W02
D01
460X460 conc
6
colunms
4,280
4
3 W03 W03
1,000 2
230
ab
ab ab
800
1 730
UP
3000 W06 W01
Sliding door
1.2m Pocket
1,485
1,485
1,485
duct
4,200
500
1,070
D04
tub
730
730
shwr
ab ab ab
wc
1,130
2,115 230
duct
1,766
tub
Bar
2,115
3,000
700
ab
D02
1,270
230
wc PTD
ab
tiles Bedroom 6
230
9
to specialist detail to main frame
3,500
ab 10
Tiles
W06
8
whb
whb Bathroom
11
4,270
3,500
ab ab ffl:+3.40 7
3,730
3,500 tiles
230
12
B.I.C
2,100
6
2.5m sliding door
16G x 250
17R x 200
Bedroom 2
13
W06 W04 5
tiles
14
1,155
3,300
3,300
4
2000
1,385
(pergola above)
ffl:+3.400
15
D02
Gallery 3
1,685 1,430
ffl:+3.300
16
Balcony
tiles
4,775
2
4,000
tiles
ab ab
2m sliding door
17
ffl:+3.400 shwr
1,700
1
5,885
DOWN
UP
D03
3,385
D03 05
2400
Sliding door
ab 1.2m Pocket
D04
460X460 conc
tiles
2,000
2,000
28,350
900
900
wc
230
SHELVES
ab ab 2,430 770
1,800
tub
Ensuite
NOTES
230
duct
ffl:+3.40 D02
shwr
1,000
670
670
W07 D01
W06
wc W06
ab
230 4,800 230 5,930 230 1,070 230 3,500 whb 1,230
This drawing shall only be used with the express
1,800
5,130
05
230
ab
D04 tiles
shwr
2,500
duct
1,030
ffl:+3.40 W11
570
W09
to specialist detail to main frame Family Room tub
Sliding door
1.2m Pocket
2,000
2,000
W06
ab
whb
115
3,500
5,460
balustade balustade
3,170
3,170
1,185
2.5m Aluminium
W03
2,000
2,885
2,885
W.I.C
W06
W07 W07
W03
tiles dpc
1,200
1,030
ab
500
S-W ELEVATION
ab D02 W11 W11 W11 ab
500
230
ab
Scale 1:100
500
W03
W03
Balcony
2,000
(pergola above)
4,270
tiles
ffl:+3.300
4,770
4,770
4,770
tiles
5,000
CHIPO
W07
ab
ffl:+3.400
230 3000 230 3000 4700
+263 774 267 293 ; (04) 750 693
100mm r.c. lid min.
38mm above n.g.l.
CONSTRUCTION HOUSE 3RD FLOOR
12mm internal cement OFFICE NO.300
plaster to 230mm earth fill 600x450mm c.i. cast iron 110 LEOPOLD TAKAWIRA STREET
corrugated g.i.
W03
W03
ab
D01
75
230
230
150-300mm
1210
rock flling
PLAN OF SEPTIC TANK LID
1518
2,000
2,000
2,000
tiles
NOVEMBER
150
ffl:+3.300
S.KABAIRA T.M 2022
C
230
230
230
230
11,760 270 4,420 6,330 230 4,500 500 530 230
230 3460 230
29,240 PROPOSED MAIN HOUSE
1560
960
150-300mm
rock flling W04
W06 W06
ON STAND 887 HELENSVALE TOWNSHIP OF
STAND 272 HELENSVALE TOWNSHIP
FIRST FLOOR
230
W07 HARARE
PLAN OF SEPTIC TANK AND SOAKAWAY END ELEVATION Area 431sqm W03 W03 W03 W03
OF SOAKAWAY
SEPTIC TANK AND SOAKAWAY DETAILS scale 1:100
scale 1:100 DESCRIPTION
FLOOR PLANS
W05 W06 W06 W06 W06
ELEVATIONS
2wvv SECTION
W07 W07
dpc
W01 W02 SEPTIC TANK DETAIL
NGL G rw G rw W13 rw G rw W03 W03 rw
450 I.L 450 I.L 450 I.L 450 I.L
WINDOW SCHEDULE
To Septic Tank
100mm diametre pvc drain fall 1:40
100mm diametre pvc drain fall 1:40 To M/H 100mm diametre pvc drain fall 1:40
To M/H
To M/H
SCALE: SHEET SIZE: DRAWING NO:
Scale 1:100
GSPublisherVersion 0.1.100.100