The document discusses different bus-bar arrangements in electric circuits including single bus-bar, single bus-bar with sectionalization, main and transfer bus, double bus double breaker, sectionalized double bus, one-and-a-half breaker, ring main, and mesh arrangements. Advantages and disadvantages of each arrangement are provided.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views12 pages

Www-Engineeringeno

The document discusses different bus-bar arrangements in electric circuits including single bus-bar, single bus-bar with sectionalization, main and transfer bus, double bus double breaker, sectionalized double bus, one-and-a-half breaker, ring main, and mesh arrangements. Advantages and disadvantages of each arrangement are provided.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

 Engineering eNotes

Bus-Bar Arrangements in an Electric Circuit (With


Diagram) | Power System
Article shared by:
Different bus-bar arrangements in an electric circuit will be discussed here. All the diagrams
refer to 3-phase arrangement but are shown in single phase for simplicity.

Type # 1. Single Bus-Bar Arrangement:

This is the simplest arrangement consisting of a single set of bus-bars for the full length of the
switchboard and to this set of bus-bars are connected all the generators, trans­formers and
feeders, as illustrated by single line diagram in Fig. 1.10. Each generator and feeder is controlled
by a circuit breaker. The isolators per­mit isolation of generators, feeders and circuit breakers
from the bus-bars for maintenance. The chief advantages of such a bus-bar arrangement are low
initial cost, less maintenance and simple operation.

This website uses cookies and third party services. OK


The glaring drawback of this sys­tem is that in case of fault on the bus­-bars, whole of the supply
is affected and all the healthy feeders are disconnected. Moreover, when maintenance is to be
carried out on any of the feeder sections or on a part of bus-bar the whole supply is to be
disrupted. Thus such an ar­rangement provides least flexibility and immunity from total
shutdown.

ADVERTISEMENTS:

GoJS JavaScript Diagram


GoJS is the modern diagramming
framework for rich and interactive data
visualizations.

GoJS Open
Such bus-bar arrangement is employed for switchboards, small and medium sized substations,
small power stations and dc stations.

Type # 2. Single Bus-Bar Arrangement with Bus Sectionalization:

The bus-bar may be sectionalized by a circuit breaker and isolating switches so that a fault on
one part does not cause a complete shut­down. In large gener­ating stations, where several units
are in­stalled, it is a common practice to sectionalize the bus as illustrated in Fig. 1.11.
Normally the number of sections of a bus-bar are 2 to 3 in a substation, but actually it is limited
by the short-circuit current to be handled. In a sectionalized bus-bar arrangement only one
additional circuit breaker is required which does not cost much in comparison to the total cost of
the bus-bar system.

ADVERTISEMENTS:

Such an arrangement provides three main advantages over simple single bus-bar arrangement.
Firstly, in the event of occurrence of fault on any section of the bus-bar, the faulty section can be
isolated without affecting the supply of other section or sections.

Secondly, one section can be completely shut-down for maintenance and repairs without
affecting the supply of the other section (s). Thirdly, by adding a current limiting reactor
between the sections the fault level (MVA) can be reduced thereby circuit breakers of lower
capacity can be used.

At times air-break isolators were used in place of circuit breakers as bus-sectionalizer due to
economy, but it must be remembered that any isolation affected by them must be affected under
off-load conditions otherwise it may cause spark. It will be preferable to provide circuit breaker
as a sectionalizing switch so that uncoupling of bus-bar may be carried out safely during load
transfer.

A double isolation is however necessary when the circuit breaker is employed as sectionalizing
switch so that the maintenance work can be carried out on circuit breaker while the bus-bars are
alive.

Type # 3. Main and Transfer Bus Arrangement:

ADVERTISEMENTS:

This arrangement has been quite frequently adopted whore the loads and continuity of supply
justify additional costs. This arrangement provides additional flexibility, continuity of supply
and allows periodic maintenance without total shutdown. Such an arrangement is suitable for
highly interconnected power network in which flexibility is very important.
Figure 1.12 illustrates the main and transfer bus arrangement in a generating station. Such an
arrangement consists of two bus-bars, known as main bus-bar and transfer bus-bar used as an
auxiliary bus-bar. Each generator and feeder may be connected to either bus-bar with the help of
bus coupler which consists of a circuit breaker and isolating switches. In this arrangement a bus
coupler is usually used so that change-over from one bus-bar to the other can be carried out
under load conditions.

While transferring the load to the reserve bus, the following steps may be taken:

ADVERTISEMENTS:

1. Close the bus-coupler (circuit breaker) so as to make the two buses at the same potential.

2. Close isolators on the reserve bus.

3. Open isolators on the main bus.

The load is now transferred to the reserve or auxiliary bus and main bus is disconnected.

ADVERTISEMENTS:
바로보기

The advantages and disadvantages of the arrangement are gives below:

Advantages:

1. It ensures continuity of supply in case of bus fault. In the event of occurrence of fault on one of
the bus, the entire load can be transferred to the other bus.

2. Repair and maintenance can be carried out on the main bus without interrupting the supply
as the entire load can be transferred to the auxiliary bus.

3. Each load can be supplied from either bus.

4. The infeed and load circuit may be divided into two separate groups if required from
operational considerations.

5. The testing and maintenance of feeder circuit breakers can be done by putting them on spare
bus, thus keeping the main bus undisturbed.

6. The maintenance cost of substation is lowered.

7. The bus potential can be used for relays.

Disadvantages:

1. Additional costs.

2. The bus is maintained or expanded by transferring all of the circuits to the auxiliary bus
depending upon the remote backup relays and breakers for removing faults of the circuits.
During this condition a line fault on any of the circuits of the bus would shut-down the entire
station.

Type # 4. Double Bus Double Breaker Arrangement:

In very important power stations two cir­cuit breakers are employed for each circuit, as
illustrated in Fig. 1.13. Such a bus-bar ar­rangement does not require any bus-coupler and
permits switch­over from one bus to the other whenever desired, without inter­ruption. This bus
arrangement is very costly and its maintenance cost is also high.
This arrange­ment provides maximum flexibil­ity and reliability as the faults and maintenance
interrupt the supply to the minimum. A cir­cuit breaker can be opened for repairs and usual
checks and the load can be shifted on the other circuit breaker easily. But because of its higher
cost, this arrangement is- seldom used at the substations.

For 400 kV switchyards two main buses plus one transfer bus scheme is preferred. The transfer
bus is used for transferring power from main bus 1 to main bus 2 and vice-versa.

Type # 5. Sectionalized Double Bus Arrangement:

In this arrangement duplicate bus-bars are used with the main bus-bar in sections connected
through a bus-coupler, as illustrated in Fig. 1.14. In this arrangement, any section of bus-bar can
be isolated for maintenance, while any section may be synchronised with any other through the
auxiliary bus-bar. Sectionalization of auxiliary bus-bar is not required and would increase the
cost if done.
Type # 6. One-and a Half Breaker Arrangement:

This is an improvement over double bus double breaker arrangement and it affects saving in the
number of circuit breakers. This arrangement needs three circuit breakers for two circuits. The
number of circuit breakers per circuit comes out to be 1½ hence the name. This arrangement is
preferred in important large stations where power handled per circuit is large.

This arrangement is shown in Fig. 1.15. This arrangement provides high security against loss of
supply as a fault in a bus or in a breaker will not interrupt the supply. Possibility of addition of
circuits to the system is another advantage. The bus potential can be used as supply to relays,
however, at the time of bus fault such potential to the relay should be thrown off.
The main drawback of this arrangement is complications in relaying system because at the time
of fault two breakers are to be opened. The other drawback is that for maintenance of circuit
breakers if the load shedding is not used, two breakers are to be opened in which case the other
circuit in the line-up will be operating with one breaker from one bus only. At the time of fault in
that bus supply to the other circuit is also interrupted. The maintenance cost is higher.

The above arrangement has been used in important 400 kV and 750 kV substations.

Type # 7. Ring Main Arrangement:

This is an extension of the sectionalized bus-bar arrangement where the ends of the bus-bars are
returned upon themselves to form a ring, as illustrated in Fig. 1.16. This arrangement provides
greater flexibility as each feeder is supplied by two paths, so that the failure of a section does not
cause any interruption of the supply.
The effect of fault in one section is localised to that section alone. The rest of the sections
continue to operate. Circuit breakers can be maintained without interrupting the supply. The
cost is also not much as the numbers of breakers used are nearly the same as that of a single bus-
bar system.

The drawbacks of the system are:

(i) Difficulties in addition of any new circuit in the ring,

(ii) Possibility of overloading of the circuits on opening of any section of the breaker and

(iii) Necessity of supplying potential to relays separately to each of the circuit.

Type # 8. Mesh Arrangement:

This is an­other arrangement making economical use of circuit breakers in a substation. In this
bus-bar arrangement, the circuit breakers are installed in the mesh formed by the buses, as
illustrated in Fig. 1.17. The circuits are tapped from the node points of the mesh. In Fig. 1.17
eight circuits are controlled by four circuit breakers.
When fault occurs on any sec­tion, two circuit breakers have to open, resulting in opening of the
mesh. This arrangement provides security against bus-bar faults but lacks switching facil­ity. It
needs fewer circuit breakers than that required by one-and a half breaker arrangement. It is
preferred for substa­tions having large number of circuits.

Home ›› Electrical Engineering ›› Circuits


Related Articles:

Types of Bus-Bar Arrangements: 8 Types | Electrical Engineering


Power Supply Arrangement for AC Track Electrification | Electricity

Circuit Breakers: Operation and Mounting | Devices | Electrical Engineering


Diagram of Electric Locomotive | Electric Traction | Engineering

Electrical Engineering Circuits Bus-Bar Arrangements in an Electric Circuit

Before uploading and sharing your knowledge on this site, please read the following pages:

1. Content Guidelines 2. Prohibited Content 3. Image Guidelines 4. Plagiarism Prevention 5.


Content Filtration 6. Terms of Service 7. Disclaimer 8. Privacy Policy 9. Copyright 10. Report a
Violation 11. Account Disable 12. Uploader Agreement.

Title*

Description*

Name*
Your Email ID*

Drop files here or


Select files

protected by reCAPTCHA
Privacy - Terms

UPLOAD AND SHARE

Recent

Unconventional Machining Processes: AJM, EBM, LBM & PAM | Manufacturing

Material Properties: Alloying, Heat Treatment, Mechanical Working and Recrystallization

Design of Gating System | Casting | Manufacturing Science

Forming Process: Forming Operations of Materials | Manufacturing Science

Generative Manufacturing Process and its Types | Manufacturing Science

GUIDELINES

Home

Privacy Policy

Upload & Share

Contact Us

SUGGESTION
Report Spelling and Grammatical Errors

engineeringenotes.com All rights reserved.

You might also like