Office Quotation

The document provides a quotation from Shama Construction for various construction works including painting, ceiling installation, electrical works, carpentry works, partitions, flooring and plumbing at Findigoo Infotainment Pvt Ltd. It includes detailed itemwise estimates and terms of payment. An agreement is proposed to be signed between the contractor and owner for starting the work.

Uploaded by

itsmeasim.shaikh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
66 views7 pages

Office Quotation

The document provides a quotation from Shama Construction for various construction works including painting, ceiling installation, electrical works, carpentry works, partitions, flooring and plumbing at Findigoo Infotainment Pvt Ltd. It includes detailed itemwise estimates and terms of payment. An agreement is proposed to be signed between the contractor and owner for starting the work.

Uploaded by

itsmeasim.shaikh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

SHAMA CONSTRUCTION

Vaishali Apartment, Room No 101, Opposite Citizen English School, Hatimullah,


Vasai West, Contact Number :- 9028999759

To,
Findigoo Infotainment Pvt Ltd,
Respected Madam,
Thank You For Your Inquiry Dated:- 25-04-
2024. We are pleased to quote you the
following for
Painting Work (Plastic Paint), Armstrong False Ceiling With Lights Installation, Electrical Works
Installation, Carpentry Works , Aluminum Partition For Cabins And Conference Room, PVC
Carpet And Plumbing Works At Findigoo Infotainment Pvt Ltd, Waliv, Vasai Road ( East ).

Entire Work Will Be Completely Done Under Supervision Of Our


Professional Official Site Supervisor.

1 ) Painting Work ( Plastic Paint ):-

Unit
Sr. No Quantity Description Total
Pric
e

1 1 Painting ( Plastic Paint ) - 25,000

Inclusive Of Labour And Paint Material ( Painting Procedure :-


Scrubbing Of Entire Wall Inside, Applying Chemical For Wall Wherever
Required, Birla Putty Layer, Lambi Layer, Again Scrubbing Of Wall For Subtotal 25,000 /-
Smoothness, Applying Primer Layer, Plastic Paint , Oil Paint For
Windows Grills And Shutter, ( Colour Shade As Per Required By Client
)

1
2 ) Armstrong False Ceiling With Lights Installation:-

Sr. No Quantity Description Unit Price Total

1 560 R Feet False Ceiling Area – 35 Feet / 16 92 51,520


Feet ( 560 Running Feet )

2 10 Points Electrical Lights Points 950 9500

3 10 Led 10 Panels 15 Watt 500 5000


Led
Panel
s

( Inclusive Material & Labour ) Total 66,020 /-


Extra Electric Points Will Be Charged Extra By 950 rs Each.

3 ) Electrical Works Installation:-

Sr. No Quantity Description Unit Price Total

1 80 Points Electrical Lights Points 950 76,000

2 6 Ceiling Fans / Wall Fans 2000 12,000

( Inclusive Material & Labour ) Total 88,000 /-


Extra Electric Points Will Be Charged Extra By 950 rs Each.

2
4 ) Carpentry Works :-

Sr. No Quantity Description Unit Price Total

1 44 Sq Feet Conference Table With Storage 950 41,800

2 48 Sq Feet Computer Table With Shelf 950 45,600

3 48 Sq Feet Overhead Storage Cabinets 950 45,600

4 18 Sq Feet Storage Inside Cabin 950 17,100

5 18 Sq Feet Kitchen Platform With Storage 950 17,100

6 12 Sq Feet Kitchen Overhead Cabinets 950 11,400

Inclusive Of Material & Labour. MR Plywood With Sunmaica Total 1,78,600 /-


Marino.

5 ) Aluminum Partition For Cabins And Conference Room :-

Unit
Sr. No Quantity Description Total
Pric
e

1 630 Sq Feet Aluminum Partition With Doors 190 1,19,700

Inclusive With Material And Labour. Subtotal 1,19,700 /-


12mm Clear Glass, 6 mm Clear Glass, Aluminum Pipe 15 Gauge And
Bakelite.

3
6 ) PVC Carpet :-

Unit
Sr. No Quantity Description Total
Pric
e

1 560 Sq Feet PVC Carpet 42 23,520

Inclusive With Material And Labour, PVC Carpet.


Subtotal 23,520 /-
Sample Will Shown Before Installing.

7 ) Plumbing Works :-

Unit
Sr. No Quantity Description Total
Pric
e

1 4 Taps - -

2 1 Water Tank ( 750 Litre ) - -

Inclusive With Material And Labour, PVC Carpet.


Subtotal 13,500 /-
Sample Will Shown Before Installing.

4
Particulars Amount

1 Painting Work ( Plastic Paint ) 25,000

2 Armstrong False Ceiling With Lights Installation 66,020

3 Electrical Works Installation 88,000

4 Carpentry Works 1,78,600

5 Aluminum Partition For Cabins And Conference Room 1,19,700

6 PVC Carpet 23,520

7 Plumbing Works 13,500

8 250 Sq Feet Carpentry Work, 3 Boss Chairs And 15 Normal Chairs Lumpsum

Total 5,90,000 /-

5
Agreement Between Owner And Contractor
The said parties, for the considerations hereinafter mentioned, hereby agreed the following:
1. The Contractor agrees to provide all of the labor required to perform the following
work for: [We are pleased to quote you the following for Painting Work ( Plastic Paint ),
Armstrong False Ceiling With Lights Installation, Electrical Works Installation, Carpentry Works ,
Aluminum Partition For Cabins And Conference Room, PVC Carpet And Plumbing Works At
Findigoo Infotainment Pvt Ltd, Waliv, Vasai Road ( East ).

as shown in the above quotation and described in the specifications prepared by


Shama Construction and provided by the Owner .
2. The Owner hereby agrees to pay the Contractor, for the aforesaid materials
separately if required as per his requirements in terms of quality : [ Owner has been
informed to buy on his own in the above quotation ]
3. The Contractor agrees that the various portions of the above-described work shall be
completed on or before the following dates: Above-described work shall be started and
completed from day of . ( Excluded Holidays )
4. The Contractor agrees to provide and pay for materials, tools and equipment required
for the prosecution and timely completion of the work as per mentioned in the quotation
and agreed by the owner, all materials will be new and of good quality ( Approved by the
owner first before installing.
5. The Owner agrees to pay 40 % as advance to start the work for the above mentioned
contract. The Owner agrees to pay the Contractor 30 % & 25 % ( 1 Slot ) when required
in the contract duration till completion of the said contract amounting to 5,90,000 /- and 5
% On The Last Day Completion Of Entire Work.

6. Kind Attention ( Once the agreement is signed with both the parties and given advanced of 40
% to start the work, will not be refunded if the agreement gets cancelled by the owner (
signing authority on quotation ) for any reason and if any item cancelled from the above
quotation by the owner side then that particular item will be 50 % refunded on the
mentioned price in the quotation.
7. Owner should not discuss with any labour in terms of any payment transaction and do
not make any cash transaction with them, never share contact number with any labour
until unless required and which will be firstly put under contractor notice, everything
should be strictly followed under contractor guidance. If not followed then the contractor
will not be responsible for anything wrong happens.
Physical damages, damages of climate change and accidental damages will not be covered.

6
All types of service will be provided after completion of job for repair and maintenance
for 1 months. Physical damages, damages of climate change and accidental damages
work will be chargeable with the material cost & labour.

IN WITNESS WHEREOF, the parties hereto set their hands and agreed for the above
agreement.

By:
( Shama Construction )

By:
( Findigoo Infotainment Pvt Ltd )