HTLS Conductor Specs for Engineers
HTLS Conductor Specs for Engineers
TECHNICAL SPECIFICATIONS
SECTION-V-A
1.0 Description of High Temperature Low Sag Conductor and its Technical Requirements 1
1.5 Workmanship 7
1.7 Tolerances 8
1.8 Materials 8
2.9 Inspection 16
2.11 Packing 17
2.13 Standards 18
1.17 Strand Brittle fracture test (for carbon-fibre composite core only) 27
1.20 Dimensional Check on Core/ CoreWires and Aluminium/ Aluminium Alloy Wires 28
1.24 Torsion and Elongation Tests on Composite Core/ INVAR Core wires 29
1.25 Breaking load test on Aluminium/ Aluminium Alloy &Composite core/ INVAR Corewires
     and D.C Resistance test on Aluminium/ Aluminium Alloy wire                    29
1.26 Wrap test on Corewires(Applicable for steel/Al clad Steel/invar core only) 29
TECHNICAL SPECIFICATIONS
SECTION-V-A
1.0            Description of High Temperature Low Sag Conductor and its Technical
               Requirements
1.1            The offered HTLS Conductor shall be capable of providing the maximum
               ampacity of 1200 A at a continuous operating conductor temperature not
               exceeding the maximum permissible operating temperature for continuous
               operation of the offered HTLS Conductor and without exceeding the level of
               maximum permissible sag indicated below at Clause 1.2.1
               Wind velocity considering angle between wind & axis of conductor as 90 degrees
               = 0.56m/sec
                                             Page 1 of 35
Volume-II, Section 5A – HTLS Conductor                       Marsyangdi Corridor 220 kV Transmission Line Project
               Maximum permissible Conductor sag for 350 m span at steady state conductor
               temperature and nil wind corresponding to 50 Hz alternating current of 1200
               Amperes per conductor under ambient conditions specified above = 10.36m
mr = 0.3544938/(Rdc)½
= 0.003 for two or four Aluminium layer INVAR type HTLS conductor
where,
               The bidder in his bid shall furnish calculations for the ampacity based on the
               above for the proposed HTLS conductor.
1.2.2          The design of conductor shall be suitable for operation at a steady state
               conductor temperature experienced for a sub conductor AC current flow of 1200
               Amperes under the above ambient conditions based on ampacity calculations
               mentioned above. The bidder shall also indicate the maximum permissible
                                              Page 2 of 35
Volume-II, Section 5A – HTLS Conductor                       Marsyangdi Corridor 220 kV Transmission Line Project
               The bidder shall indicate the technical particulars and details of the construction
               of the conductor in the relevant schedule of GTP. The bidder shall also guarantee
               the DC resistance of conductor at 20 deg C and AC resistance at the calculated
               temperature corresponding to 50Hz alternating current flow of 1200 Amperes at
               specified ambient conditions (designed maximum temperature).
               The bidder shall submit the supporting calculations for the AC resistance at 1200
               Amperes and at 615 Amperes indicating details & justifications of values of
               temperature coefficient of resistance & DC to AC resistance conversion factor(s)
               with due reference to construction / geometry of the conductor.
1.4.1          The HTLS conductor shall meet the following sag tension requirements for
               ruling span of 350meters:
                                              Page 3 of 35
Volume-II, Section 5A – HTLS Conductor                       Marsyangdi Corridor 220 kV Transmission Line Project
                                              Page 4 of 35
Volume-II, Section 5A – HTLS Conductor                         Marsyangdi Corridor 220 kV Transmission Line Project
                  II) PLS CAD Method: Following values shall be considered for the purpose of
                  sag-tension calculation:-
                                                Page 5 of 35
Volume-II, Section 5A – HTLS Conductor                          Marsyangdi Corridor 220 kV Transmission Line Project
               ii) PLSCAD Sagging criteria/conditions shall be based on the sag tension limits
                   specified above at Clause 1.4.1and shall be carried out in a manner that the
                   above mentioned sag-tension limits are met in “After Creep” as well as in
                   “After Load” condition.
1.4.3          The bidder shall also furnish sag & tensions under no windfor various
               temperatures starting from 0 deg C to designed maximum temperature in steps
               of 5 deg C.
1.4.4          After award of the contract, the Supplier shall submit Sag-Tension calculations
               corresponding to specified conditions and for the ruling span and also all the
               spans as per detailed survey and spans ranging from 100 m to 1100 m in
               intervals of 50 m.
1.4.5          Besides above, the Supplier shall also furnish during detailed engineering details
               of creep characteristics in respect of the offered type of HTLS conductor based
               on laboratory investigations/ experimentation (creep test as per IEE1138 or IEC
               61395) conducted on similar type of conductor and shall indicate creep strain
               values corresponding to 1 month, 6 month, 1 year, 10 year & 20 year creep at
               everyday tension &designed maximum temperature as well as at room
               temperature.
1.4.6          The installation & stringing of the offered HTLS conductor shall be carried out by
               the transmission line contractor under supervision of the HTLS conductor
               supplier.
               The supplier shall supervise the stringing at site as per the approved stringing
               procedure. The supplier shall prepare stringing charts for the HTLS conductor
               showing the initial and final sags and tension for various temperatures and spans
               along with equivalent spans on the basis of tower schedule prepared by
               transmission line contractor and submit the same for the approval of the
               Employer. Site visit for supervision shall be carried out as per instructions of the
                                                 Page 6 of 35
Volume-II, Section 5A – HTLS Conductor                      Marsyangdi Corridor 220 kV Transmission Line Project
1.4.7          The above stringing work including installation of its fittings & accessories shall
               be supervised by a team of supplier’s engineers / supervisory staff/ workmen
               already experienced in stringing work associated with the type of HTLS
               conductor being supplied. The bidder shall furnish experience details of the
               engineers /supervisory staff proposed to be deployed.
1.4.8          The cost of conductor shall also include supply of one set of all the special tools
               & tackles required for stringing of the offered HTLS conductor.
1.5 Workmanship
1.5.1          All the conductor strands shall be smooth, uniform and free from all
               imperfections, such as spills and splits, cracks, die marks, scratches, abrasions,
               rust etc.
1.5.2          The finished conductor shall be smooth, compact, uniform and free from all
               imperfections including kinks (protrusion of wires), wire cross over, over riding,
               looseness (wire being dislocated by finger/hand pressure and/or unusual bangle
               noise on tapping), material inclusions, white rust, powder formation or black
               spot (on account of reaction with trapped rain water etc.), dirt, grit etc.
1.6.1.1        During stranding, no Aluminium/ Alloywire welds shall be made for the purpose
               of achieving the required conductor length.
1.6.1.2        No joints shall be permitted in the individual wires in the outer most layer of the
               finished conductor. However joints are permitted in the inner layer(s) of the
               conductor unavoidably broken during stranding provided such breaks are not
               associated with either inherently defective wire or with the use of short lengths
               of Aluminium/ Alloywires. Such joints shall not be more than four (4) per
               conductor length and shall not be closer than 15 meters from joint in the same
               wire or in any other Aluminium/Alloywire of the completed conductor. A record
               of such joints for each individual length of the conductor shall be maintained by
               The Contractor for Employer’s review.
                                             Page 7 of 35
Volume-II, Section 5A – HTLS Conductor                      Marsyangdi Corridor 220 kV Transmission Line Project
1.6.1.3        Joints shall be made by cold pressure butt welding and shall withstand a stress of
               not less than the breaking strength of individual strand guaranteed.
               There shall be no joint of any kind in the finished wire entering into the
               manufacture of the strand. There shall also be no joints or splices in any length
               of the complete stranded core
1.7 Tolerances
1.8 Materials
               The materials used for construction of the conductor shall be such that the
               conductor meets the specified technical and performance requirements.
1.8.2 Core
               The core wire strand(s) shall be of Zinc-5% Aluminium – Mischmetal alloy coated
               invarwires/ galvanized invar wires/ Aluminium clad invar wires/composite
               materials, etc. and shall have properties conforming to the technical
               performance requirements of the finished conductor. Bidder shall furnish
               properties and composition of the core wire strand(s) in the schedule GTP of
               BPS.
               The zinc used for galvanizing of core (if used) shall be electrolytic High Grade
               Zinc of 99.95% purity. It shall conform to and satisfy all the requirements of
               IS:209. The minimum mass of zinc coating shall conform to the requirements of
                                             Page 8 of 35
Volume-II, Section 5A – HTLS Conductor                      Marsyangdi Corridor 220 kV Transmission Line Project
               The Aluminium cladding of invar wires shall be with aluminum having purity not
               less than 99.5 % and shall be thoroughly bonded to the core wire strand(s). The
               minimum thickness of Aluminium cladding shall be 0.07mm to achieve a
               minimum conductivity of 14% of IACS. The aluminum matrix core strands shall
               conform to minimum conductivity of 24% IACS.
               Where composite material for core is offered, the materials shall be of such
               proven quality that its properties are not adversely influenced by the normal
               operating conditions of a 220 kV transmission line in tropical environment
               conditions these lines will be exposed to as detailed in Section-I. The bidder shall
               provide adequate details including specifications/test reports/operating
               experience details/performance certificates etc. in support of the suitability of
               the offered materials along with the bid.
1.9.1          The standard length of the conductor shall be indicated by the bidder in the
               guaranteed technical particulars of offer. A tolerance of +/-5% on the standard
               length offered by the Bidder shall be permitted. Standard Length shall not be
               more than 2500 m. All lengths outside this limit of tolerance shall be treated as
               random lengths.
1.9.2          Random lengths will be accepted provided no length is less than 70% of the
               standard length and the total quantity of such random lengths shall not be more
               than 10% of the total quantity ordered. At any point, the cumulative quantity
               supplied of such random lengths shall not be more than 12.5% of the total
               cumulative quantity supplied including such random lengths. However, the last
               20% of the quantity ordered shall be supplied only in standard lengths as
               specified.
1.9.3          Bidder shall also indicate the maximum single length, above the standard length,
               he can manufacture in the guaranteed technical particulars of offer. This is
               required for special stretches like river crossing etc. The Employer reserves the
               right to place orders for the above lengths on the same terms and conditions
               applicable for the standard lengths during the pendency of the Contract.
1.10.1         Based on the conductor parameters guaranteed by the bidders, average ohmic
               losses for different type of conductors offered by the bidders shall be calculated
               as per the following formula:
                                             Page 9 of 35
Volume-II, Section 5A – HTLS Conductor                        Marsyangdi Corridor 220 kV Transmission Line Project
= 314,683.20 X Rac
               Differential price evaluation for the conductors offered by the bidders shall be
               carried out considering the average ohmic losses calculated as above and
               considering US $ 2962 per kW.
               The best parameter of loss (lowest ohmic loss for conductor) corresponding to
               lowest AC resistance quoted among bidders by any technically responsive and
               qualified bidder shall be taken as basis and that quoted by the particular bidder
               shall be used to arrive at differential price to be applied for each bid.
                                              Page 10 of 35
Volume-II, Section 5A – HTLS Conductor                         Marsyangdi Corridor 220 kV Transmission Line Project
                                               Page 11 of 35
Volume-II, Section 5A – HTLS Conductor                           Marsyangdi Corridor 220 kV Transmission Line Project
2.1.2          Type tests specified under Clause 2.1.1 shall not be required to be carried out if a
               valid test certificate is available for the offered design, i.e., tests conducted
               earlier should have been conducted in accredited laboratory (accredited based
               on ISO/IEC guide 25/17025 or EN 45001 by the National Accreditation body of
               the country where laboratory is located) or witnessed by the representative (s)
               of POWERGRID or Utility.
               In the event of any discrepancy in the test report (i.e., any test report not
               applicable due to any design / material/manufacturing process change including
               substitution of components or due to noncompliance with the requirement
               stipulated in the Technical Specification) the tests shall be conducted by the
               Contractor as per the quoted as per BPS schedule 4(d).
                                               Page 12 of 35
Volume-II, Section 5A – HTLS Conductor                         Marsyangdi Corridor 220 kV Transmission Line Project
                                               Page 13 of 35
Volume-II, Section 5A – HTLS Conductor                         Marsyangdi Corridor 220 kV Transmission Line Project
                    Note:     All the above tests except (m) shall be carried out on Aluminium
                              Alloy and core / core strands after stranding only.
2.5.1          As indicated in Clause 2.1.2, no type test charges shall be payable to the
               supplier.
2.5.2          In case of failure in any type test the Supplier is either required to manufacture
               fresh sample lot and repeat the entire test successfully once or repeat that
               particular type test three times successfully on the sample selected from the
               already manufactured lot at his own expenses. In case a fresh lot is
               manufactured for testing then the lot already manufactured shall be rejected.
2.5.3          Bidder shall indicate the laboratories in which they propose to conduct the type
               tests, if required. They shall ensure that adequate facilities are available in the
               laboratories and the tests can be completed in these laboratories within the
               time schedule guaranteed by them.
                                               Page 14 of 35
Volume-II, Section 5A – HTLS Conductor                      Marsyangdi Corridor 220 kV Transmission Line Project
2.5.4          The entire cost of testing for the acceptance and routine tests and Tests during
               manufacture as well as type tests, if required, specified herein shall be treated as
               included in the quoted unit price of conductor, except for the expenses of the
               inspector/Employer's representative.
2.5.5          In case of failure in any type test, if repeat type tests are required to be
               conducted, then all the expenses for deputation of Inspector/Employer's
               representative shall be deducted from the contract price. Also if on receipt of
               the Supplier's notice of testing, the Employer's representative does not find
               material/ testing facilities to be ready for testing the expenses incurred by the
               Employer for re-deputation shall be deducted from contract price.
2.5.6          The Supplier shall intimate the Employer about carrying out of the type tests
               along with detailed testing programme at least 3 weeks in advance (in case of
               testing in India) and at least 6 weeks in advance (in case of testing abroad) of the
               schedule date of testing during which the Employer will arrange to depute his
               representative to be present at the time of carrying out the tests.
2.6.1          The Employer reserves the right of having at his own expenses any other test(s)
               of reasonable nature carried out at Supplier’s premises, at site or in any other
               place in addition to the aforesaid type, acceptance and routine tests to satisfy
               himself that the materials comply with the Specifications.
2.6.2          The Employer also reserves the right to conduct all the tests mentioned in this
               specification at his own expense on the samples drawn from the site at
               Supplier’s premises or at any other test centre. In case of evidence of non
               compliance, it shall be binding on the part of Supplier to prove the compliance of
               the items to the technical specifications by repeat tests, or correction of
               deficiencies, or replacement of defective items all without any extra cost to the
               Employer.
2.7.1          The Supplier shall offer material for selection of samples for type testing only
               after getting Quality Assurance Plan approved from Employer’s Quality
               Assurance Deptt. The sample shall be manufactured strictly in accordance with
               the Quality Assurance Plan approved by Employer.
2.7.2          The Supplier shall offer at least three drums for selection of sample required for
               conducting all the type test.
2.7.3          The Supplier is required to carry out all the acceptance tests successfully in
               presence of Employer’s representative before sample selection.
                                            Page 15 of 35
Volume-II, Section 5A – HTLS Conductor                      Marsyangdi Corridor 220 kV Transmission Line Project
2.8.1          Copies of type test reports shall be furnished in at least three copies along with
               one original. One copy will be returned duly certified by the Employer only after
               which the commercial production of the material shall start.
2.8.2          Record of routine test reports shall be maintained by the Supplier at his works
               for periodic inspection by the Employer’s representative.
2.8.3          Test Certificates of tests during manufacture shall be maintained by the Supplier.
               These shall be produced for verification as and when desired by the Employer.
2.9 Inspection
2.9.1          The Employer’s representative shall at all times be entitled to have access to the
               works and all places of manufacture, where conductor shall be manufactured
               and representative shall have full facilities for unrestricted inspection of the
               Supplier’s works, raw materials and process of manufacture for conducting
               necessary tests as detailed herein.
2.9.2          The Supplier shall keep the Employer informed in advance of the time of starting
               and of the progress of manufacture of conductor in its various stages so that
               arrangements can be made for inspection.
2.9.3          No material shall be dispatched from its point of manufacture before it has been
               satisfactorily inspected and tested, unless the inspection is waived off by the
               Employer in writing. In the latter case also the conductor shall be dispatched
               only after satisfactory testing for all tests specified herein have been completed.
2.9.4          The acceptance of any quantity of material shall in no way relieve the Supplier of
               any of his responsibilities for meeting all requirements of the Specification, and
               shall not prevent subsequent rejection it such material is later found to be
               defective.
2.10.1 The following additional test facilities shall be available at the Supplier’s works:
               c) Finished conductor shall be checked for length verification and surface finish
                  on separate rewinding machine at reduced speed (variable from 8 to 16 meters
                                            Page 16 of 35
Volume-II, Section 5A – HTLS Conductor                        Marsyangdi Corridor 220 kV Transmission Line Project
                     per minute). The rewinding facilities shall have appropriate clutch system and
                     free of vibrations, jerks etc. with traverse laying facilities.
2.11 Packing
2.11.2         After completion of stringing works, the supplier shall take back or dispose off
               the empty drums on his own, except for the drums of spare conductor, if any,
               which shall be kept by the Owner.
2.11.3         The drums shall be suitable for wheel mounting and for letting off the conductor
               under a minimum controlled tension of the order of 5 KN.
2.11.4 The Bidder should submit their proposed drum drawings along with the bid.
2.11.6         The conductor ends shall be properly sealed and secured on the side of one of
               the flanges to avoid loosening of the conductor layers during transit and
               handling.
2.11.7 Marking
               Each drum shall have the following information stenciled on it in indelible ink
               along with other essential data :
                                              Page 17 of 35
Volume-II, Section 5A – HTLS Conductor                         Marsyangdi Corridor 220 kV Transmission Line Project
               (k)           Barrel diameter at three locations & an arrow marking at the location
                             of the measurement.
               The Employer reserves the right to verify the length of conductor after unreeling
               at least ten (10) percent of the drums in a lot offered for inspection.
2.13 Standards
2.13.2         In the event of the supply of conductor conforming to standards other than
               specified, the Bidder shall confirm in his bid that these standards are equivalent
               to those specified. In case of award, salient features of comparison between the
                                               Page 18 of 35
Volume-II, Section 5A – HTLS Conductor                        Marsyangdi Corridor 220 kV Transmission Line Project
               standards proposed by the Supplier and those specified in this document will be
               provided by the Supplier to establish their equivalence.
                                              Page 19 of 35
Volume-II, Section 5A – HTLS Conductor                       Marsyangdi Corridor 220 kV Transmission Line Project
BS-3242-1970
18 Ampacity IEEE738
                                             Page 20 of 35
Volume-II, Section 5A – HTLS Conductor                            Marsyangdi Corridor 220 kV Transmission Line Project
BS British Standards,
N - 19-ND
UK
1 Rue de verembe,
Geneva
SWITZERLAND
ManakBhavan,
INDIA
Aurehoegvej-12
DK-2900, Heeleprup,
                                             Page 21 of 35
Volume-II, Section 5A – HTLS Conductor                       Marsyangdi Corridor 220 kV Transmission Line Project
DENMARK.
U.S.A.
                                             Page 22 of 35
Volume-II, Section 5A – HTLS Conductor                      Marsyangdi Corridor 220 kV Transmission Line Project
Annexure-A
               Circles perpendicular to the axis of the conductor shall be marked at two places
               on a sample of conductor of minimum 5 m length between fixing arrangement
               suitably fixed by appropriate fittings on a tensile testing machine. The load shall
               be increased at a steady rate upto 50% of minimum specified UTS and held for
               one minute. The circles drawn shall not be distorted due to relative movement
               of strands. Thereafter the load shall be increased at steady rate to minimum UTS
               and held for one minute. The Conductor sample shall not fail during this period.
               The applied load shall then be increased until the failing load is reached and the
               value recorded.
               Under the conditions as specified under (1.2) above, the conductor samples shall
               have radio interference voltage level below 1000 microvolts at one MHz when
               subjected to 50 Hz AC voltage of 154 kV line to ground under dry conditions. This
               test may be carried out with corona control rings and arcing horns.
                                            Page 23 of 35
Volume-II, Section 5A – HTLS Conductor                      Marsyangdi Corridor 220 kV Transmission Line Project
                                            Page 24 of 35
Volume-II, Section 5A – HTLS Conductor                       Marsyangdi Corridor 220 kV Transmission Line Project
               A section of conductor is to be crushed between two six inch steel platens. Load
               shall be held at 350 Kgs for 1 minute and then released. Core/ core strands shall
               be subsequently disassembled and tensile tested. Core/ core strands shall
               exhibit full strength retention vis-a-vis guaranteed breaking strength of core
               wires (after stranding).
               The conductor sample of 10-15 m shall be loaded to 20% of UTS and then
               rotated in increasing steps of +/-180 deg. In case of INVAR type HTLS conductor,
               the entire conductor shall withstand at least 16 such rotation and there shall not
               be any damage to Aluminium Alloy or INVAR core wires.
                                             Page 25 of 35
Volume-II, Section 5A – HTLS Conductor                      Marsyangdi Corridor 220 kV Transmission Line Project
               horizontal is (1.5 + 0.5) deg in the active span. Means shall be provided for
               measuring and monitoring the mid-loop (antinode) vibration amplitude at a free
               loop, not a support loop. An electronically controlled shaker shall be used to
               excite the conductor in the vertical plane. The shaker armature shall be securely
               fastened to the conductor so it is perpendicular to the conductor in the vertical
               plane. The shaker should be located in the span to allow for a minimum of six
               vibration loops between the suspension assembly and the shaker
               The test shall be carried out at one or more resonance frequencies(more than 10
               Hz) . The amplitude (peak-to-peak) at the antinode point shall be one third of
               conductor diameter. The assembly shall be vibrated for not less than 10 million
               cycles without any failure. After the test, the conductor should not exhibit any
               damage (broken strands). The conductor shall be tested to demonstrate that it
               retains at least 95% UTS.
Test Methods:-
               -After the above mentioned 100 cycles, the mechanical tension shall be
               increased up to 70 % UTS at room temperature and kept at this tension for
               24hrs. Thereafter, release to 20 % UTS.
               -A breaking load test is applied at the end of the test. Conductor strength has to
               be higher than 95 % UTS.
               -In case of carbon-fibre composites, the flexural strength should not be less than
               90% of the value guaranteed in GTP and the Glass Transition temperature shall
               not be less than 90% of the value guaranteed in GTP after thermal cycling.
                                            Page 26 of 35
Volume-II, Section 5A – HTLS Conductor                       Marsyangdi Corridor 220 kV Transmission Line Project
               Breaking load test as per clause 1.21 above shall be carried out before and after
               heating the sample in uniform heat furnace at following temperature for one
               hour. The breaking strength of the wire after heating shall not be less than the
               90% of the breaking strength before heating:-
More than 150 deg. C &upto 210 deg. C 280 degC (+5/-3 degC)
More than 210 deg. C &upto 230 deg. C 400 degC (+5/-3 degC)
1.17 Strand Brittle fracture test (for carbon-fibre composite core only)
                                            Page 27 of 35
Volume-II, Section 5A – HTLS Conductor                      Marsyangdi Corridor 220 kV Transmission Line Project
               The drums shall be visually and dimensionally checked to ensure that they
               conform to the approved drawings.
               The lay-ratios of various layers shall be checked to ensure that they conform to
               the guaranteed values furnished by the Contractor.
               The test procedure shall be as specified in IEC: 888. The material shall conform
               to the requirements of this Specification. The adherence of zinc shall be checked
               by wrapping around a mandrel four times the diameter of steel wire.
                                            Page 28 of 35
Volume-II, Section 5A – HTLS Conductor                      Marsyangdi Corridor 220 kV Transmission Line Project
1.24 Torsion and Elongation Tests on Composite Core/ INVAR Core wires
               For INVAR type HTLS conductor, the test procedures for Torsion and Elongation
               tests on core wires shall be as per clause No. 6.3.3 and Clause 6.3.2 (b) of IEC
               61232 respectively. In torsion test, the number of complete twists before
               fracture shall not be less than the value specified in the GTP on a length equal to
               100 times the standard diameter of the strand. In case test sample length is less
               or more than 100 times the stranded diameter of the strand, the minimum
               number of twists will be proportioned to the length and if number comes in the
               fraction then it will be rounded off to next higher whole number. In elongation
               test, the elongation of the strand shall not be less than the value specified in the
               GTP for a gauge length of 250 mm.
               ii) Torsion Test : The purpose of the testis to determine the resilience of the
                   composite core to twisting and to show that after the composite core has
                   experienced the prescribed twisting, it will not crack or have a loss in tensile
                   strength due to the twisting. A sample length that is 170 times the diameter
                   of the composite core being tested is mounted in the gripping fixtures. One
                   grip shall then be fixed so that it does not twist and the other end shall be
                   twisted a full 360 degrees and then fixed in this position for 2 minutes. Once
                   the twist time is completed, the core is untwisted an inspected for any crazing
                   or other damage. If no damage is observed, the composite core is then tensile
                   tested to failure and the final load recorded. For the test to be accepted, the
                   composite core must withstand at least 100% of its rated tensile strength.
                   Two samples need to be completed in order to satisfy the testing
                   requirement.
1.25           Breaking load test on Aluminium/ Aluminium Alloy &Composite core/ INVAR
               Corewires and D.C Resistance test on Aluminium/ Aluminium Alloy wire
               The above tests shall be carried out as per IEC: 888/889 or relevant international
               standards and the results shall meet the requirements of the specification.
1.26 Wrap test on Core wires (Applicable for steel/Al clad Steel/invar core only)
                                            Page 29 of 35
Volume-II, Section 5A – HTLS Conductor                      Marsyangdi Corridor 220 kV Transmission Line Project
               The wrap test on core strands shall be meet the requirements of IEC: 888. In
               case of Aluminium clad core wire, the same shall be wrapped around a mandrel
               of diameter of five times that of the strand to form a helix of eight turns. The
               strand shall be unwrapped. No breakage of strand shall occurred.
               Two Aluminium/ Aluminium Alloy wire shall be welded as per the approved
               quality plan and shall be subjected to tensile load. The breaking strength of the
               welded joint of the wire shall not be less than the guaranteed breaking strength
               of individual strands.
               The test shall be done in accordance with Grease drop point test method. The
               specimen should be drop as a droplet when kept at a temperature 40 deg. C
               above designed maximum operating temperature of the conductor for 30
               minutes. The temperature shall then be increase till one droplet drops and the
               temperature recorded.
               Test method shall be as per ASTM D7028, A Standard Test Method for Glass
               Transition Temperature of Polymer Matrix Composites by Dynamic Mechanical
               Analysis. The glass transition temperature shall be greater than the designed
               maximum temperature of the offered HTLS conductor +35 ° C.
Test method shall be as per ASTM D7264, ASTM D4475 or ISO 14125.
               Samples taken from the Aluminium /Aluminium Alloy and core coils/strands shall
               be chemically/spectrographically analysed. The same shall be in conformity to
                                            Page 30 of 35
Volume-II, Section 5A – HTLS Conductor                      Marsyangdi Corridor 220 kV Transmission Line Project
                                            Page 31 of 35
Volume-II,                                        Section 5A – HTLS Conductor                     Marsyangdi Corridor 220 kV Transmission Line Project
Annexure-B
                                         Page 32 of 35
Volume-II,                Section 5A – HTLS Conductor      Marsyangdi Corridor 220 kV Transmission Line Project
                                               Page 33 of 35
Volume-II,                Section 5A – HTLS Conductor           Marsyangdi Corridor 220 kV Transmission Line Project
SAMPLE CALCULATION
                                                Page 34 of 35
Volume-II,                Section 5A – HTLS Conductor           Marsyangdi Corridor 220 kV Transmission Line Project
Page 35 of 35