Quality Checklist For Site Works: 16 Final Plastering Task

The document provides a quality checklist for plastering tasks on the 1st and 2nd floors of a site. It lists 16 tasks to check including thickness, finishing, surface quality, testing for defects, bonding, curing and documentation. Corrective actions are to be proposed for any tasks marked 'No'.

Uploaded by

adnan-651358
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
77 views1 page

Quality Checklist For Site Works: 16 Final Plastering Task

The document provides a quality checklist for plastering tasks on the 1st and 2nd floors of a site. It lists 16 tasks to check including thickness, finishing, surface quality, testing for defects, bonding, curing and documentation. Corrective actions are to be proposed for any tasks marked 'No'.

Uploaded by

adnan-651358
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

#UNKNOWN!

QUALITY CHECKLIST FOR SITE WORKS

16 FINAL PLASTERING TASK


1ST & 2ND FLOOR

ARCHITECTURAL STRUCTURAL INTERIOR SERVICES & UTILITY

EXTRIOR

Building Unit Designation Name: Project ID:


Name of the Contractor Group: Location:
Construction Drawing Ref. No.: Quantity:

CL : 16-A
Sl.No. Description YES NO NA

x Is format CL:15-A for Plastering works complied with?


1.0 Thickness, line,level and plumb of plastered surface were checked.

2.0 Plaster Cut (Jad) finishing has been done properly


3.0 Surface of finished plastered surface was found free from cracks, stains, brush marks, Impression of Level pad or any other
surface defects
4.0 Any visible Undulations, waviness during day, Night light; When measured is it within the tolerance limit? (+ - 0.2mm)
Following Test should be conducted accordingly :
5.0 1. Visual Inspection:
5.1
Start by visually inspecting the entire plastered surface. Look for any cracks, bulges, or other defects on the surface.
5.2 Check for a consistent thickness of plaster across the entire surface. Variations in thickness can affect the appearance and
durability of the plaster.
6.0 2. Tap Test:
6.1 Use a small hammer or a solid object to gently tap the plastered surface. A hollow sound could indicate that the plaster has
debonded from the wall, while a solid sound indicates a good bond.
7.0 3. Scratch Test:
7.1 Perform a scratch test by making a shallow scratch on the plastered surface with a screwdriver or similar tool. The plaster
should be hard enough to resist the scratch. If the scratch easily penetrates the plaster, it may indicate that the plaster mix was
incorrect or that it has not cured properly.
8.0 4. Moisture Test:
8.1 Check for any signs of dampness or moisture on the plastered surface. Excessive moisture can lead to mold growth and
damage the plaster over time.
9.0 5. Squareness and Level:
9.1 Use a spirit level to check the vertical and horizontal alignment of the plastered surface. The surface should be flat, square,
and level as per the required specifications.
10.0 6. Finish Quality:
10.1
Evaluate the finish quality of the plaster. Check for smoothness, evenness, and any imperfections in the surface finish.
11.0 7. Bonding:
11.1 Check the bonding of the plaster to the substrate. The plaster should have a good bond with the underlying surface without
any signs of delamination.
12.0 8. Curing:
12.1 Ensure that the plaster has been allowed to cure properly according to the recommended curing time. Premature drying can
lead to cracking and other defects in the plaster.
13.0 9. Documentation:
13.1 Document any defects or issues found during the inspection. This documentation can be used for future reference or for
communicating with the contractor or relevant parties.

CORRECTIVE ACTION PROPOSED- Item wise.


If 'No' is marked, please specify reasons and thereafter corrective action proposed.
(Add additional sheets, if necessary)

Comments:

Contractor's Rep.: Client Rep.: Lines & Visions Int. Rep.: