Quality Checklist For Site Works: 22 Painting Task

The document provides a quality checklist for painting tasks on the 1st and 2nd floors of a site. It lists 30 items to check including preparing surfaces, applying primer and coats of paint correctly, protecting other materials, cleaning up, and using qualified workers. The contractor and client reps must sign off to verify all items were completed.

Uploaded by

adnan-651358
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views1 page

Quality Checklist For Site Works: 22 Painting Task

The document provides a quality checklist for painting tasks on the 1st and 2nd floors of a site. It lists 30 items to check including preparing surfaces, applying primer and coats of paint correctly, protecting other materials, cleaning up, and using qualified workers. The contractor and client reps must sign off to verify all items were completed.

Uploaded by

adnan-651358
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

#UNKNOWN!

QUALITY CHECKLIST FOR SITE WORKS

22 PAINTING TASK
1ST & 2ND FLOOR

ARCHITECTURAL STRUCTURAL INTERIOR SERVICES & UTILITY

EXTRIOR

Building Unit Designation Name: Project ID:


Name of the Contractor Group: Location:
Construction Drawing Ref. No.: Quantity:

CL : 22-A
YES NO NA
Sl.No. Description
x Is format CL:21-A for Tiles works complied with?
1 Check clearnce/approval from previous activity (curing).
2 Check for any wall cracks, Curing period completed or not ?
3 Check the material/paints as approved make ?
4 Check color shade approved ?
5 Cleaning of walls to be checked (Scrapping), Surface finishing ?
6 Cracks, Dampness, any leakages to be identified and repaired ?
7 Apply primary coat ?
8 Application of coat as per tech specification to be checked ?
9 Check others materials covered neatly with masking tape (protection of other materials from damage like Electrical
10 switches
Check forplate,
no of door/window
coat applied joints,
& final glass
touchpartitions,
up work arewardrobes)
completed??

11 Check for overall coverage andy brush marks ?


12 Check for cleaning in flooring, window/door glasses & joinery ?
13 Is there any fitting after painting ?
14 Check for any incomplete and addition and alteration ?
15 Check for floor polishing before final coat ( in case of Marble flooring) ?
16 Qualified & trained workforce were used ?
17 Rectification for defect with suitable crack filler done & no cracks or scales remain ?
18 Surfaces are clean, dry and free from oil & grease ?
19 MEP works completed and Clearance obtained ?
20 All surfaces are prepared by sanding to receive the painting system ?
21 All installed doors/windows, service fixtures/fittings are protected with tape/ polythene before application of paint
system
22 Approved Color and Color System is being used ?
23 The specifications/ manufacturer’s instructions are strictly being followed ?
24 The primer coats are applied evenly to the entire surface ?
25 The Stucco(putty) coats are applied evenly to the entire surface and sanding has been provided ?
26 First Coat Painting is done as per required thickness ?
27 Final Coat Painting is done as per required thickness ?
28 All painting equipment has been cleaned and washed after the completion of work ?
29 Cleaning the area and unmasking & removal of any paint marks on Fixtures/ Fittings/ Hardware etc. completed ?
30 Other issues ?

CORRECTIVE ACTION PROPOSED- Item wise.


If 'No' is marked, please specify reasons and thereafter corrective action proposed.
(Add additional sheets, if necessary)
Comments:

Contractor's Rep.: Client Rep.: Lines & Visions Int. Rep.: