TCSR 4.1
TCSR 4.1
•• PROTECTED 関係者外秘
⚫⚫⚫CONFIDENTIAL 秘
                         Toyota Construction
                         Safety Requirements
                                Version 4.1
                                3/31/2024
•• PROTECTED 関係者外秘
March 2024
     Toyota Motor
     North America
                                                   2
•• PROTECTED 関係者外秘
Revisions:
     2005-1 Mar-2005, 2006-1 May-2006, 2007-2 Mar-2007, 2009-1 Oct-2009, 2009-1.2 April-2010, 2009-1.3 July-2011,
     2013-1 May-2013, 2015-1 January-2015, 2015-2.0 September-2015, 2016-2.01 January-2016, 2019-3.0 August
     2019, 2020-3.1 July 2020, 2021-3.2 May 2021, 2021-3.3 June 2021, 2022, 3.4 March 2022, 4.0 March 2023, 4.1
     March 2024
References:
     The requirements in this handbook are based on the listed references. Information for further clarification for each
     section or standard can be obtained from the following:
Canada
México
United States
                                                                                                                            3
•• PROTECTED 関係者外秘
Introduction
     Toyota’s goal is for everyone to leave work each day as healthy as they were upon arrival. For that
     reason, ensuring safe working conditions and safe work practices are top values at Toyota. Safety is
     always the top priority at Toyota.
     The purpose, scope and contents of this document have evolved significantly since the first revision was
     published in 2005. The safety standards and best practices contained in this document have been
     accumulated over the course of 19 years and shall be used as a resource to protect Toyota Team
     Members and Contractors while performing construction and non-standard work activities.
     An alternate version of the Toyota Construction Safety Requirements document has been developed
     specifically for Toyota Team Members. The alternate version can be located at ts.toyotasupplier.com and
     should be referenced by all Toyota Team Members in maintenance, skilled groups, pilot, kaizen, and
     production groups while performing non-standard work.
Table of Contents
     Section A .................................................................................................................................................. 11
     1.0 Purpose and Scope ........................................................................................................................... 11
     1.1 Toyota Safety Expectation ................................................................................................................ 12
     1.2 Construction Safety Representation (CSMS 3.8, 3.9) ...................................................................... 12
     1.3 Contractor’s Responsibility (OSHA CFR 1926.16) ........................................................................... 13
     1.4 Toyota Acting as General Contractor/Contractor ............................................................................ 13
     1.5 Monitoring of Construction Site (CSMS 6.4, 6.5, 6.6, 6.7) ............................................................... 13
     1.6 Safety Training and Education (CSMS 4.2, OSHA 29 CFR 1926.21) ............................................... 13
     1.7 Contractor Safety Representation (CSMS 3.8, 3.9) .......................................................................... 14
     1.8 Required Documentation .................................................................................................................. 15
     1.9 Apprentice/Journeyman Ratio .......................................................................................................... 15
     Section B .................................................................................................................................................. 16
     2.0 Glossary of Terms Used/Interpretations .......................................................................................... 16
     Section C .................................................................................................................................................. 26
     3.0 General Safety Requirements (CSMS Item 0) pg.143 .................................................................... 26
     3.1 Contractor Safety and Health Program (CSMS 3.10) ....................................................................... 26
     3.1.1 ISNetworld Requirement ................................................................................................................ 26
     3.2 Contractor Safety Policy, Procedure, and Organization Charts ..................................................... 26
     3.3 Contractor Site-Specific Safety Plan (CSMS 3.22, 3.25) .................................................................. 26
     3.4 Contractor Environmental Policy ..................................................................................................... 26
     3.5 Hazard Communication/WHMIS (CSMS 3.11, OSHA 29 CFR 1926.59) ........................................... 27
     3.6 Contractor Emergency Action Procedures (CSMS 3.10, OSHA 29 CFR 1926.35) .......................... 27
                                                                                                                                                                  4
•• PROTECTED 関係者外秘
     3.7 Contractor Substance Abuse Control Program (CSMS 1.6) (Canada Excluded) ........................... 27
     3.8 Job Safety Analysis (JSA) (CSMS 3.12, 3.24, 3.26, 6.1, 6.3) ............................................................ 27
     3.8.1 Contractors Overall Job Safety Analysis (JSA) ............................................................................ 28
     3.8.2 Daily Job Safety Analysis (D-18) .................................................................................................... 28
     3.9 CPR and First Aid Trained Resource Requirement (OSHA 29 CFR 1926.23) ................................. 29
     3.10 Proof of Insurance (CSMS 1.2, 3.7) (Purchasing) .......................................................................... 29
     3.11 Project Coordination/Notification of Work ..................................................................................... 29
     3.12 Toyota Safety Orientation (CSMS 3.16, 3.17, 3.28) ........................................................................ 29
     3.13 Project Pre-Start Coordination Meetings (CSMS 6.1, 7.6) ............................................................. 30
     3.13.1 Toyota Toolbox Talks (CSMS 7.2) ................................................................................................ 30
     3.14 Weekly Construction Site Contractors Safety Meeting ................................................................. 30
     3.15 Site Visual Control (CSMS 4.3) ........................................................................................................ 30
     3.16 Means of Egress (OSHA 29 CFR 1926.34) ...................................................................................... 31
     3.17 Emergencies: Evacuation/Severe Weather/Spills/Fires (CSMS 3.10, OSHA 29 CFR 1926.35) .... 31
     3.18 Contractors Incident Reporting Procedures (CSMS 9.2) .............................................................. 31
     3.19 Housekeeping/4S (OSHA 29 CFR 1926.25)..................................................................................... 31
     3.20 Commissioning ................................................................................................................................ 32
     3.21 Handover to Toyota Facility (CSMS 10.1) ....................................................................................... 32
     3.22 Safety/Security Violations (CSMS 9.1) ............................................................................................ 32
     3.23 Smoking and Tobacco Products Policy ......................................................................................... 34
     3.24 Recording Devices ........................................................................................................................... 34
     3.25 CHIPS/CAMBIO (MEXICO ONLY) .................................................................................................... 34
     3.26 General Security Rules/Site Access ............................................................................................... 34
     3.27 Work Hour Restrictions ................................................................................................................... 34
     3.28 Speak Up Line .................................................................................................................................. 34
     Section D .................................................................................................................................................. 35
     4.0 Environment/Site Conditions ............................................................................................................ 35
     4.1 First Aid (OSHA 29 CFR 1926.23) ...................................................................................................... 35
     4.2 Sanitation (OSHA 29 CFR 1926.51) ................................................................................................... 35
     4.3 Noise Exposure (OSHA 29 CFR 1926.52) ......................................................................................... 35
     4.4 Illumination (OSHA 29 CFR 1926.56) ................................................................................................ 35
     4.5 Ventilation (OSHA 29 CFR 1926.57) .................................................................................................. 35
     4.6 Dust Control (OSHA 29 CFR 1926.55)............................................................................................... 35
     4.7 Radiation (OSHA 29 CFR 1926.53) .................................................................................................... 36
     4.8 Heat Illness Prevention...................................................................................................................... 36
     4.9 Wind .................................................................................................................................................... 36
                                                                                                                                                                   5
•• PROTECTED 関係者外秘
     Section E .................................................................................................................................................. 36
     5.0 Personal Protective Equipment (OSHA 29 CFR 1926.95) ................................................................ 36
     5.1 Requirement ....................................................................................................................................... 36
     5.2 Foot Protection (OSHA 29 CFR 1926.96) .......................................................................................... 36
     5.3 Hand Protection ................................................................................................................................. 37
     5.4 Head Protection (OSHA 29 CFR 1926.100) ....................................................................................... 37
     5.5 Hearing Protection (OSHA 29 CFR 1910.101) .................................................................................. 37
     5.6 Eye and Face protection (OSHA 29 CFR 1926.102) ......................................................................... 37
     5.7 Respiratory Protection (OSHA 29 CFR 1910.103) ............................................................................ 37
     5.8 Protective Clothing ............................................................................................................................ 38
     Section F .................................................................................................................................................. 38
     6.0 Fire Protection/Prevention ................................................................................................................ 38
     6.1 Requirement (OSHA 29 CFR 1926.150) ............................................................................................ 38
     6.2 Fire Extinguishers (OSHA 29 CFR 1926.150) ................................................................................... 38
     6.3 Flammable and Combustible Liquids (OSHA 29 CFR 1926.152) .................................................... 38
     6.4 Fuel Storage (OSHA 29 CFR 1926.151) ............................................................................................. 39
     Section G .................................................................................................................................................. 39
     7.0 Signs/Barricades (OSHA 29 CFR 1926.200) ..................................................................................... 39
     7.1 Requirement ....................................................................................................................................... 39
     7.2 Barricades .......................................................................................................................................... 39
     7.3 Yellow Caution Tape .......................................................................................................................... 39
     7.4 Red Danger Tape ............................................................................................................................... 39
     7.5 Red and White Candy Stripe Tape (Used Solely for Commissioning) ........................................... 39
     Section H .................................................................................................................................................. 40
     8.0 Materials/Handling and Storage (OSHA 29 CFR 1926.250) ............................................................. 40
     8.1 Requirement ....................................................................................................................................... 40
     8.2 Trip Hazards ....................................................................................................................................... 40
     8.3 Liquid Spills ....................................................................................................................................... 40
     Section I.................................................................................................................................................... 41
     9.0 Tools/Hand and Power (OSHA 29 CFR 1926.300) ............................................................................ 41
     9.1 Requirement ....................................................................................................................................... 41
     9.2 Condition ............................................................................................................................................ 41
     9.2.1 Cut Off Wheels ................................................................................................................................ 41
     9.2.2 Reciprocating/Band Saw ................................................................................................................ 41
     9.3 Guarding ............................................................................................................................................. 41
     9.4 Powered Tools ................................................................................................................................... 41
                                                                                                                                                                   6
•• PROTECTED 関係者外秘
                                                                                                                                                                  7
•• PROTECTED 関係者外秘
                                                                                                                                                                  8
•• PROTECTED 関係者外秘
                                                                                                                                                                  9
•• PROTECTED 関係者外秘
                                                                                                                                                                10
•• PROTECTED 関係者外秘
Appendix 79
Section A
     This document does not apply to TM-led activities with a standardized work process that includes safety
     key points (Examples: Preventive Maintenance, approved ACM activity, routine tasks with work
     instructions, and Production Processes).
     This includes Toyota Team Members, Prime or General Contractors, Subcontractors, and any Company
     providing workers for purpose of construction activity. This document is not intended for companies solely
     providing administrative or services such as: janitorial or cleaning services, secretarial services, inspection
     services, contract engineering, forklift repair, landscaping services, food services, and other similar
     services.
     This document describes only the minimum Toyota safety standards along with references to applicable
     law or governing authority. Additionally, in Mexico and Canada, the Contractor shall comply with the
     applicable law or governing authority of that jurisdiction. NOTE-(In Canada, Ont. Reg 213/91 is the
     minimum standard that must be followed for construction safety laws and regulations.) Therefore, the
     information in this document shall not be considered a comprehensive list of all necessary safety standards
                                                                                                                                                               11
•• PROTECTED 関係者外秘
     to be observed. Toyota Team Members and Contractors shall be aware of all applicable standards, enforce
     them, and ensure they have been met in all aspects of their work. The most stringent standard shall be
     enforced where a conflict arises.
     Contractors are held to a very high safety standard. Toyota employees will be held to the same high safety
     standard.
     The Contractor shall assume full responsibility and liability for the actions of its workers, Subcontractors,
     Subcontractor workers, agents, material suppliers, visitors, etc., with no limitations. This document shall not
     be interpreted to mean that Toyota assumes direct responsibility for safety compliance of any Contractor
     working on a Toyota project. Each Contractor is responsible for the safety and health of its own employees.
     The publication of this document shall in no way be interpreted as the assumption of responsibility or
     liability by Toyota Motor North America, Inc. Contractors shall be responsible for following applicable laws,
     codes, standards, regulations, etc. If a conflict between this document and any code, standard, regulation
     exists, it is the Contractor’s responsibility to bring it to the attention of Toyota Safety or the designated
     Toyota contact in charge of the project for resolution.
Toyota Safety Management is built around the principle of Find It, Fix It, No Repeats.
        •   Find It – TOYOTA expects our Team Members and Contractors to find safety hazards and
            behavioral issues by themselves before someone gets hurt. This represents that the Toyota
            Management, Contractor management and Safety representatives have a critical eye for safety.
            The ability to find and address problems proactively is essential for success at TOYOTA sites.
        •   Fix It – TOYOTA expects our Team Members and Contractors to show the importance of safety
            through rapid resolution of issues identified on audits or raised by their members. By stopping and
            addressing safety hazards quickly and communicating with the members. Safety is the highest
            priority.
        •   No Repeats – Sustained success at TOYOTA requires Team Members and Contractors to
            demonstrate PLAN-DO-CHECK-ACT, reflect on lessons learned and prevent reoccurrence of safety
            issues. When safety hazards reoccur, it represents a failure of management to implement effective
            countermeasures.
     All contractors are to ensure their workers are given free access to the Toyota Construction Safety
     Requirements and the host Toyota Facility Security Requirements. Documents are to be available for
     review and their location shall be conspicuous.
                                                                                                                 12
•• PROTECTED 関係者外秘
All TM led activity follow section 26.1 for TERA auditing requirements.
Focused JSA audits are also available in the TERA auditing system.
     1.6 Safety Training and Education (CSMS 4.2, OSHA 29 CFR 1926.21)
     All contractors shall ensure that their workers and their Subcontractors’ workers are properly trained, fully
     qualified for their work, and be prepared to provide declarations of competence (D-01), when requested.
     The employer shall instruct each employee in the recognition and avoidance of unsafe conditions and the
     regulations applicable to his or her work environment to control or eliminate any hazards or other exposure
     to illness or injury.
      All contractors shall, upon request, provide Toyota Safety access to their training programs and personal
     training records for their workers on a Toyota project site. Training records will be subject to review to
     ensure compliance with governmental regulations and Toyota policies and procedures.
     All contractor workers in the U.S. shall have OSHA1926 Construction 10 hour or equivalent (as approved
     by TMNA PE Safety) training and certification at a minimum.
     Toyota Project Leaders must also have OSHA 1926 Construction 10 hour or equivalent, CSMS, TCSR,
     and JSA training. All Toyota Team members must complete Toyota team members construction safety
     training. Retraining of Project leaders is required for CSMS, TCSR, and JSA training every three years.
                                                                                                                  13
•• PROTECTED 関係者外秘
     Toyota Job Leaders must have at least the Non-Standard and Maintenance Safety Requirements and JSA
     Training. Retraining of Toyota job leaders is required for Non-Standard and Maintenance Safety
     Requirements and JSA training every three years.
     All Toyota TMs performing non-standard work activities must take the Non-Standard and Maintenance
     Safety Requirements training. Retraining of Toyota TMs is required for Non-Standard and Maintenance
     Safety Requirements training every three years.
     All Contractor Supervisors (Superintendents, Foremen) in the U.S. shall have OSHA 1926 Construction 30
     hour or equivalent (as approved by TMNA PE Safety) training and certification at a minimum. Prime
     Contractors shall also ensure appropriate safety coverage and safety deliverables (e.g. a daily safety audit)
     for all jobs performed by ensuring an appropriate span of control.
     Examples of specific training that Employers shall provide, include but are not limited to:
               •   Aerial Lifts
               •   Confined Spaces
               •   Cranes
               •   Electrical Safe Work Practices
               •   Elevated Work Platforms
               •   Fall Protection/Fall Protection Systems
               •   Fire Prevention and Fire Extinguisher Use
               •   First Aid/CPR
               •   Forklift Operation
               •   GFCI Use and Testing
               •   Hazard Communication
               •   Hot Work Permit System
               •   Lockout
               •   Powder Actuated Tools
               •   PPE
               •   Respiratory Protection
               •   Rigging
               •   Signaling
               •   Use of Power Tools
     If a person is not trained, competent, or qualified for the task or activity he/she is performing, The employer
     with support of Toyota Safety will require the work task to cease until corrective actions have been
     implemented. No person shall be allowed to perform any work at any time without the required
     qualification or training.
     Any activity worth 20 points will require a dedicated safety representative. Reference Safety Ranking Matrix
     in Appendix.
     All safety representatives shall confirm and enforce all aspects and requirements of the Site-Specific Safety
     Plan and all Toyota requirements, applicable laws and/codes, applicable standards, and best practices in
                                                                                                                14
•• PROTECTED 関係者外秘
     the scope of work. This person shall be qualified and knowledgeable in safety and how it applies to the
     construction industry (Reference section 25.2 for Dedicated Safety Representative Qualifications and 25.4
     for Designated Safety Representative Qualifications). Contractor Safety Representatives must be easily
     identifiable by wearing green safety crosses on both sides of their hard hat. A green band stating Safety is
     also acceptable. See Visualization of Construction Contractors Matrix in Appendix.
     This safety representation requirement can be satisfied by General Contractor or Subcontractor appointed
     safety representatives, or (only when directed by Toyota) a combination of safety representatives of the
     contracting Toyota Department, Section or Group. General and Prime Contractors shall be ultimately
     accountable for the safety representation, safety programs and performance of their Subcontractors.
     Toyota Facilities shall have a designated and onsite management presence for all construction work,
     including weekend and shutdown work, to ensure Contractor adherence to the requirements in Table 1.
     Where Contractors are found to be noncompliant, it is up to the Toyota designee to provide immediate
     direction, and to suspend activities until adequate coverage is established.
     Toyota reserves the right to require additional safety coverage beyond the specifications in Table 1
     at any time based on risk.
     In addition, contractors shall submit hours worked to Toyota Construction Safety using the Man Hours
     Collection form found at the Toyota Construction Safety Sharepoint Site.
     The Toyota Safety Cross (D-09) shall be maintained by the Contractor and displayed on the Contractors’
     site visual control display for all projects. The minimum required documentation that shall be submitted
     prior to beginning work are the following: D-01 Declaration of Competent Person Form, D-08 Emergency
     Contact List, a Site-Specific Safety Plan and a completed JSA. (forms and samples located in the
     appendix)
                                                                                                                 15
•• PROTECTED 関係者外秘
Section B
     Affected Worker: A worker whose job is impacted by task specific hazards in the workplace. Specific
     hazards can include lockout, confined spaces, and others.
     Applicable Law: Refers to any acts, regulations, codes, or standards applicable in the jurisdiction where
     the work is being performed. The Contractor shall be aware of all legal requirements that apply to its work.
Atmospheric Hazard:
     Authority Having Jurisdiction (AHJ): (US/Canada) The governmental agency or sub-agency which
     regulates a construction or installation process and provides final approval of the finished construction
     project or equipment installation. The AHJ may be a state or local inspector or a representative from
     Toyota.
     Authorized Worker: A person who has the training, knowledge, and experience to lockout machinery or
     equipment to perform service or maintenance on the machine or equipment.
     Cardinal Safety Rules: Safety rules that, under no circumstances, should ever be broken. They are
     designed to protect workers in areas where a small deviation from Toyota standards could lead to deadly
     consequences.
CCO Card: Certification card issued by the National Commission for the Certification of Crane Operators
     Certified Rigger: A person who has passed stringent written and practical exams related to rigging from
     an accredited organization.
     CFR: Code of Federal Regulations. The OSHA Standards are contained in 29 CFR 1910 (General
     Industry) and 29 CFR 1926 (Construction).
     Commissioning: The progressive process utilizing the Toyota Kanban system of installation, testing, and
     buy-off, for equipment installations and initial start-up. Commissioning typically occurs after white Kanban
     is signed but before pink Kanban is signed.
                                                                                                                 16
•• PROTECTED 関係者外秘
     Commissioning Zone: The area established around the commissioning process, defined by red and white
     candy-striped tape. Please see Toyota PE Commissioning Training for additional specifications and
     requirements.
     Competent Person: (USA) (OSHA 29 CFR 1926.32(f)) (Canada) (OHSA 1.1) One who can identify
     existing and predictable hazards in the surroundings, or working conditions which are unsanitary, or
     hazardous to workers, and who has the authorization to take prompt corrective measures to eliminate
     them. – See Competent Person D-01 Form and Detailed Definition in Appendix
Confined Space: A space that meets the following requirements: (See Permit Required Confined Space)
(US)
                    •   Space is large enough and so configured that a worker can enter and perform assigned
                        work;
                    •   Space has limited or restricted means for entry or exit (example, tanks, vessels, storage
                        bins, hoppers, vaults, and pits); and,
                    •   Space is not designed for continuous human occupancy. (Sample D-19)
• That is not both designed and constructed for continuous human occupancy, and
     Construction: The activity of work that is not production, maintenance, service, or administrative, that can
     be performed by contractors, vendors, installers, maintenance, and skilled team-members.
     (Canada) Construction includes erection, alteration, repair, dismantling, demolition, structural maintenance,
     painting, land clearing, earth moving, grading, excavating, trenching, digging, boring, drilling, blasting, or
     concreting, the installation of any machinery or plant, and any work or undertaking in connection with a
     project but does not include any work or undertaking underground in a mine. Team Members located in
     Canada would not engage in construction activities.
     Construction Safety Representative: A person hired by the contractor that is qualified and
     knowledgeable in safety and how it applies to construction and the project. This knowledge shall have been
     demonstrated through a combination of experience in the construction field and formal safety
     training/education.
     Constructor: (Canada) A person who undertakes a project for an owner and includes an owner who
     undertakes all or part of a project by himself or by more than one employer.
     Contractor(s): Any person or organization hired to perform or lead construction, equipment installation, or
     decommissioning activities. This includes, but is not limited to, companies that install machines and/or are
     responsible for industrial asset disposal. For this document's purposes, the term Contractor(s) shall be
     interchangeable with the term General/Prime Contractor or Subcontractor and shall include their directors,
     officers, Supervisors, agents or workers, unless otherwise specified.
                                                                                                                 17
•• PROTECTED 関係者外秘
     Contractor Dedicated Safety Representative: A full-time, on-site safety representative that exclusively
     performs safety functions and does not physically perform construction activities. This worker must meet all
     education and qualification requirements listed in Section 25.2.
     Contractor Designated Safety Representative: A worker who is designated to be responsible for all
     safety functions when a dedicated safety representative is not required. This worker can be a foreman,
     supervisor or tradesman and must meet all education and qualification requirements listed in Section 25.4.
     Controlled Access Zone (CAZ): An area where the work may take place without a guardrail system,
     PFAS, or safety net system and where access to the area is controlled by an attendant.
     Danger Zone: The area in and around any machine, equipment, or process where there is a potential
     hazard from the unexpected motion or energization of a system. Once a person bypasses and/or removes
     the safeguarding or enters the safe guarded space, they are in the danger zone.
     Demolition: Demolition is the dismantling, razing, destroying or wrecking of any building, structure,
     machine or equipment or any part thereof. Demolition work involves many of the hazards associated with
     construction.
Emergency: A sudden, urgent, usually unexpected occurrence or occasion requiring immediate action.
Employer: A person or business that employs one or more people, especially for wages or salary.
     Fall Arrest: A system used to arrest (stop) a worker in a fall from a working level. It consists of an
     anchorage point, connectors, body harness, and may include a lanyard, deceleration device, lifeline or a
     combination of these.
     Fall Limiter: The personal fall limiter (PFL) is a compact, lightweight SRL of limited working length of
     between 6 and 9 feet and weighs between 1-2 pounds. Unlike the regular SRL, which is mounted at the
                                                                                                                18
•• PROTECTED 関係者外秘
     anchor point, the PFL attaches to the D-ring on a user’s body harness and is light enough to be carried on
     the user’s back.
     Fall Protection Plan: A written document that includes measures that shall be taken to reduce or eliminate
     fall hazards for workers.
     Fall Restraint: Equipment that prevents a worker from reaching a point where he/she will encounter a fall
     hazard.
     Fall Zone: An area (including but not limited to the area directly beneath a load) in which it is reasonably
     foreseeable that partially or completely suspended materials could fall in the event of an incident.
     Fire Watch: A person whose only job duty is observing and extinguishing if needed, Hot Work being
     performed with an appropriate size and type of fire extinguisher, extending a minimum of 30 minutes past
     the conclusion of the hot work. This person shall be trained in the use of the extinguisher and have the
     means to contact emergency services.
     First Aid: The provision of initial care of an illness or injury, usually performed by non-expert but trained
     personnel, until definitive medical treatment can be accessed.
Foreman: The worker or tradesman who oversees a construction crew for the contractor.
     Free rigging: The direct attachment to or placement of rigging equipment (slings, shackles, rings, etc.)
     onto the forks/tines of a powered industrial truck for a below-the-tines lift.
     General Contractor: A construction company that is employed by Toyota that will be responsible for the
     day-to-day oversight of the project, management of vendors and trades, and communication of information
     to involved parties throughout the course of the project. Responsibilities may include, but not be limited to:
     managing personnel on site, monitoring schedules, maintaining accurate records, and overseeing of the
     project’s safety performance
     Global Harmonization System: GHS stands for the Globally Harmonized System of Classification and
     Labelling of Chemicals. GHS defines and classifies the hazards of chemical products, and communicates
     health and safety information on labels and safety data sheets. It is an internationally agreed-upon
     standard managed by the United Nations that was set up to replace the assortment of hazardous material
     classification and labeling schemes previously used around the world.
     Ground Fault Circuit Interrupter (GFCI): a fast-acting circuit breaker designed to shut off electric power
     in the event of a ground-fault within as little as 1/40 of a second It is designed to stop the flow of electricity
     to the device when current from a current-carrying conductor(s) to ground exceeds a preset limit. GFCI’s
     are used to protect people, limiting the current to 5 ma, thereby providing protection from an otherwise
     potentially lethal shock.
     Governing Authority: (USA-OSHA) (CANADA-OHSA) (Mexico NOM) the agency prescribed to administer
     and enforce compliance with applicable law.
                                                                                                                      19
•• PROTECTED 関係者外秘
     Hazard Communication (HAZCOM): The OSHA Hazard Communication Standard, or "HAZCOM," is a set
     of regulations designed to inform workers of hazards, particularly chemical hazards, in the workplace and
     to provide information on the type of PPE required for handling chemicals. This standard is also known as
     the “Worker Right to Know Law.”
     High-Risk Activities: This includes, but is not limited to, any work that involves; Walking or climbing on
     structural steel or exiting an aerial lift basket, fire suppression bypass, energized electrical work, permit
     required confined space entry, excavation requiring sloping and shoring, helicopter lifts, steel erection,
     restricted hot work, lifting loads over 220 lbs. w/o engineered fork pockets. See Safety Ranking matrix for
     point values.
Hot Work: Any work that produces or generates an arc, spark, open flame, or heat.
     Restricted Hot Work: Hot work that is performed in an NEC Class I Division 1, or Class II Division 1 area
     (extremely high fire or explosion risk area)
     Incident: An unwanted or unplanned event that could or does cause injury to people, damage to property,
     or loss to process
     Individual: All Toyota employees and non-employees such as variable work force (VWF), contractors,
     temporary employees (temps), and co-ops, working on a project under this document's scope.
ISNetworld: Third Party Safety grading system (ISN) used to prequalify contractors for service.
     Job- Any Toyota TM performed work task assigned by a job leader for any non-standard, construction, or
     maintenance work task.
     Job Control Lock: A lock, which is placed on a group lockout box by a Lockout Job Control Leader. The
     purpose of the lock is to prevent a lockbox from being unintentionally opened during shift changes or other
     events. It is the first lock applied to the group lockbox and the last to be removed.
     Job leader: A Person leading a Toyota TM-led job. Job Leaders must have at least the Non-Standard and
     Maintenance Safety Requirements and JSA Training. Job Leaders can approve Toyota TM-led jobs that
     have been identified as low risk according to the non-production job ranking matrix.
     Job Made Wooden Ladder: A job-made wooden ladder is a ladder constructed at the construction site. It
     is not commercially manufactured. A job-made wooden ladder provides access to and from a work area. It
     is not intended to serve as a work platform. These ladders are temporary and are used only until a
     particular phase of work is completed or until permanent stairways or fixed ladders are installed.
     JSA (Job Safety Analysis): A proactive risk assessment method for analyzing the potential safety hazards
     associated with a particular job or task. Each element of the task is analyzed to determine if a potential
     hazard exists and, if necessary, what method(s) of safeguarding shall be used to counter the risk. The
     findings of this analysis are used to create a document that is then reviewed with the workers involved with
     the task. (Sample D-16 & D-18)
     Kanban: As it applies to construction, Kanban is the “visual, efficient and orderly flow of the necessary
     steps or stages of a work activity to ‘safely’ install and/or modify equipment and machinery”. It is a formal
                                                                                                                     20
•• PROTECTED 関係者外秘
     project management system Toyota utilizes for building and equipment installation and modification, and
     hand over.
     Lay-down Area: The area provided to contractor Companies for the temporary storage of equipment,
     tools, materials, and supplies, etc. while performing construction work.
     Limited Access Zone (LAZ): A defined area, which shall be established whenever a masonry wall is being
     constructed to prevent injury in the event of collapse during construction. The zone shall be restricted to
     entry by employees actively engaged in constructing the wall. No other employees shall be permitted to
     enter the zone.
     Machine(s): An assembly of linked parts or components, at least one of which moves, with the appropriate
     machine actuators, control and power circuits, etc. joined together for a specific application, in particular for
     the processing, treatment, moving or packaging of a material.
     Major Project: Any project that lasts 14 or more working days. (Note: working Saturday and Sunday
     for 2 weekends equals 4 working days.)
     Maintenance: The act of performing servicing or maintenance to keep a piece of equipment or structure in
     its normal operating condition.
Mendomi: Japanese word meaning to "take care of your workers like family"!
     Near Miss: An acute incident that does not result in an injury but had the potential to do so. Material
     damage (to the building or equipment) may have resulted from the incident.
     Non-Permit Required Confined Space: A confined space that does not present an additional life-
     threatening hazard. Documented testing shall be on file certifying that the Confined Space meets the
     requirements of a Non-Permit Required Confined Space as defined by governing agencies. (US ONLY)
     (Sample D-19)
                                                                                                                    21
•• PROTECTED 関係者外秘
     Non-Standard Work: Any work not part of a standard production process, preventive maintenance task, or
     routine activity. Non-standard work requires a Job Safety Analysis to be completed prior to starting the
     task.
     ORO: (CSMS item 0) Owner’s Representatives Office – a project management organization, usually
     located on the site of the construction project for major project. It functions as a representative and/or
     agent of Toyota for the project, and normally includes Toyota and/or contract project leaders, safety
     representatives, and other technical support staff.
     Owner: (Canada) (CSMS 1.8) includes a trustee, receiver, mortgagee, in possession, tenant, lessee, or
     occupier of any lands or premises used or to be used as a workplace, and a person who acts for or on
     behalf of an owner as an agent or delegate.
     Permit Required Confined Space: A confined space that has one or more additional life-threatening
     hazard(s) (e.g. hazardous atmosphere, risk of engulfment, entanglement, or drowning) (See Confined
     Space), (Sample D-19)
     PFAS: Personal Fall Arrest System. A system designed to prevent a worker from falling to a lower level. As
     a minimum for the Toyota site, it consists of a full body harness, lanyard, and an adequate anchorage point
     (capable of supporting 2 times the maximum anticipated load or 5,000 lbs). (See Fall Arrest & Fall
     Restraint)
     Planned Activity-Foreseeable work activity performed as a result of being scheduled or work that is not
     performed as part of a response to equipment malfunctioning or breakdown. (Reference: Non-Standard job
     ranking matrix)
     Preventive Maintenance: the act of performing regularly scheduled maintenance activities to help prevent
     unexpected failures in the future. All preventive maintenance activities have a developed work instruction
     sheet or manual with recognized safety key points.
     Prime Contractor: Any contractor on a project having a contract directly with the owner. Also known as
     General Contractors
     Project: Any work, or group of work that is performed during construction, installation, maintenance, non-
     standard work and/or decommissioning.
     (a) The construction of a building, bridge, structure, industrial establishment, mining plant, shaft, tunnel,
     caisson, trench, excavation, highway, railway, street, runway, parking lot, cofferdam, conduit, sewer,
     watermain, service connection, telegraph, telephone or electrical cable, pipeline, duct or well, or any
     combination thereof.
                                                                                                                     22
•• PROTECTED 関係者外秘
     (c) Any work or undertaking, or any lands or appurtenances used in connection with construction; The
     constructor must provide a Notice of Project to the Ministry of Labour prior to starting projects that meet the
     standards set out in Section 6(1) of the Regulation for Construction Projects, O. Reg 213/91.
     Project Leader: One who leads projects and anyone who has the authority to make decisions on the
     project. Every Toyota Project will have a project leader assigned and on site. Typically, this could be Team
     Leaders, Specialists, Group Leaders, Asst. Managers, Managers. Project Leaders are required to have at
     least the OSHA 10 Hour Outreach Course for the Construction Industry (US Only), CSMS Project Leader
     training, TCSR and JSA Training.
     Qualified Person: (USA-OSHA 29 CFR part 1926.32(I)) A person, who by possession of a recognized
     degree, certificate, third party training, professional standing, or by extensive knowledge, training and
     experience, can successfully demonstrate the ability to solve/resolve problems relating to the subject
     matter, the work, or the project.
     Qualified Rigger: A person who is competent (See Qualified Person) in the lifting and moving of objects
     that require rigging or securing of loads.
     Qualified Signal Person: A person who understands the operations and limitations of crane equipment,
     including the crane dynamics involved in swinging, raising, lowering and stopping loads and boom
     deflection from hoisting loads. The person shall be trained and competent to effectively communicate
     signals through voice, audible, or standard method hand signals.
     Recordable: Any injury or illness which meets the requirements of 29 CFR 1904, used in reporting to
     OSHA.
     Responsible Party: Contractor is responsible for their employees and activities. For Toyota performed
     work with Toyota Team members, Toyota is Responsible.
     Rigging: Any type of ropes, cables, hooks, clamps, slings, or other lifting accessories, used for lifting of
     materials and equipment.
Routine: performed as part of a regular procedure rather than for a special process
     Safety Designee: A Toyota Team Member designated to be Safety Approver for Daily JSA’s with a project
     leader. Safety designees are only applicable to Toyota TM-led non-standard work. Safety Designees must
     have training as outlined in 26.3.1.
     Scaffold Tag: A colored label(s) (green, red, or yellow) that is hung near the scaffold access ladder to
     identify the safety status of the scaffolding. (See Appendix Scaffold Tags)
     SDS: (Formerly Material Safety Data Sheet (MSDS)) These documents include several important pieces of
     information/instructions regarding the safe handling, first aid, required PPE, firefighting and chemical
     properties of a product.
     Self-Retracting Lifelines (SRL) - A deceleration device which contains a drum wound line which may be
     slowly extracted from, or retracted onto, the drum under slight tension during normal team member
                                                                                                                    23
•• PROTECTED 関係者外秘
     movement, and which after onset of a fall, automatically locks the drum and arrests the fall and is only
     intended to be anchored to an anchorage connector.
     SRL-P – a self-retracting device that encompasses all the same features as a type SRL but is intended to
     be worn by the end user on a full-body harness also known as a personal fall limiter.
     SRL-R – a self-retracting device that encompasses all features as a type SRL but includes a retrieval mode
     intended for rescue by raising or lowering the rescue user.
     Spotter: A person responsible for observing and directing a specific task or tasks and shall perform a
     spotter's duties. (see D-44 and D-30). See duties of a spotter
     Shutdown: The extended non-production period (4 days or greater) when production has stopped, and
     projects are performed at Toyota facilities. All Shutdown work should be entered/recorded in the Shutdown
     reporting system.
     Significant Incident: An incident that involves potential to cause fatality or disability (life-changing). This
     standard defines criteria, along with injury severity, to assist with TMNA determination.
     Site Visual Control: A visual display (solid board, vinyl pouches etc.) placed so the contractors and
     subcontractor’s workers have direct and immediate access to information for the safe operation of the
     project site. (Example in Appendix)
     Site Specific Safety Plan: A written plan that aligns the contractor company’s policies and procedures
     with the requirements of the TCSR for the work being performed on that specific job site.
Skates: Equipment/Machine Skates are designed/engineered to move heavy equipment and machinery
     Standard work: Work performed as part of a normal production process, preventive maintenance activity,
     or routine task with recognized safety key points.
     STOP 6 Incident: An incident that involves potential to cause fatality or disability (life-changing). This
     standard defines criteria, along with injury severity, to assist with TMNA determination. A recordable
     incident that falls into one of categories defined by TMC as the top six causes of fatal incidents.
E - Electric shock
STPS: (Mexico) Mexico’s Ministry of Labor, authority in charge of enforcing the labor legislation in Mexico.
     Subcontractor: A contractor that signs a contract with a General Contractor to perform all or part of the
     obligations of the General Contractor’s contract. The Subcontractor has all the same safety obligations and
     responsibilities as those of the General Contractor.
                                                                                                               24
•• PROTECTED 関係者外秘
     Supervisor: Member of management or person responsible for providing direct oversight or job specific
     direction. (See Foreman)
     Supplier: Someone who, via business arrangements such as award of a bid or specific service, works on
     Toyota premises to complete the requirements of the specified task or job. The terms of what they supply
     specify their task, responsibilities, and duration of the work.
     TERA (Toyota Event Response Andon): Electronic auditing program used by Toyota for Construction
     Safety Audits (D-35 Construction Safety Audit and focused audits).
     Three (3) point ladder contact: When climbing or descending, 2 feet and 1 hand on the rungs or 2 hands
     and 1 foot on the rungs.
Toyota Safety: A team member from the One Toyota Safety group.
     Toyota: A reference used within this document, which includes Toyota Motor North America, Inc. (TMNA),
     Toyota Owner’s Representative’s Office (ORO), Toyota Motor Corporation (TMC), and any of the North
     America Manufacturing Companies (NAMCs).
     Troubleshooting: A diagnostic activity, which may include testing, to identify the source of a problem with
     a machine or piece of equipment. If entry into the danger zone is required, lockout is the primary method of
     control. Entry via ACM must be approved by a TaBRA or approved D-18(JSA).
     Troubleshooting does not include repairing or making any physical alteration of any part of the equipment,
     such as the following:
                   •   Unjamming and eleventh finger use (using an additional tool held in hand)
                   •   Moving components inside the cell (such as carrier, jigs, or parts)
                   •   Making, tightening, or loosening connections
                   •   Removing or replacing components
                   •   Adjusting any part of the safety system (such as light curtains, mats, or scanners
     Unplanned Work: Unforeseen activity performed by maintenance and/or facilities related to equipment
     malfunction (for Example: Breakdowns, Fault Recovery). Failure to plan work does not justify unplanned
     work.
     Vendor/Contract Employer: Someone who has a business purpose to be on Toyota premises to perform
     a specific task.
     Visitor: A person who is on Toyota premises for a purpose other than performing any work on equipment
     or systems.
     Worker: A person who performs work as part of Non-Standard work, Maintenance, Construction,
     equipment installation, or decommissioning.
                                                                                                               25
•• PROTECTED 関係者外秘
     Work Rule: Recurrence prevention method implemented in response to an incident or best practice
     required by TMNA PE Safety. The work rule supersedes any text in the TCSR.
Section C
     All Site-Specific Safety Plans must be reviewed and updated annually by the project leader and Site Safety
     Representative. (Sample available upon request) (CSMS Item 12 check sheet)
     3.6 Contractor Emergency Action Procedures (CSMS 3.10, OSHA 29 CFR 1926.35)
     Contractors shall develop an emergency action plan to be used in the event of a fire, explosion or natural
     disaster such as a severe thunderstorm, tornado, or earthquake. The emergency action plan shall be in
     writing and shall cover those designated actions Contractors and their workers shall take to ensure worker
     safety from fire and other emergencies. The Contractor shall designate and train enough people to assist
     in the safe and orderly emergency evacuation or shelter in place event. The Contractor shall review the
     plan with each worker covered by the plan prior to worker commencing work, when the worker’s
     responsibilities or designated actions change, and when the plan is changed. The plan shall be kept in the
     workplace and available to the worker.
     3.7 Contractor Substance Abuse Control Program (CSMS 1.6) (Canada Excluded)
     Toyota has zero tolerance for drug and alcohol use/possession at all sites. Toyota is a drug free workplace
     and insists that its contractors maintain the same. The Contractor shall implement an effective substance
     abuse control program that shall include a minimum of 5 drug screening, “post-incident,” and “for cause”
     testing, while under contract at Toyota. Prior to the worker being issued a badge, or reactivating a badge,
     workers shall be in the Contractor’s drug control program. Toyota shall not be liable for any delays caused
     through the drug screen process prior to the receipt of negative test results.
     3.8 Job Safety Analysis (JSA) (CSMS 3.12, 3.24, 3.26, 6.1, 6.3)
     The Contractor may use its own JSA forms in place of the Overall JSA (D-16) and Daily JSA (D-18) if they
     meet or exceed Toyota’s requirements. Contractors may use their own form provided it contains, at a
     minimum the following fields:
        1. Company Name.
        2. Date JSA was completed.
        3. Name of Toyota Project Leader.
                                                                                                               27
•• PROTECTED 関係者外秘
        4.   Name of task/job/activity.
        5.   Steps to complete the task in sequential order.
        6.   Potential hazards associated with each step of the task.
        7.   The countermeasures or preventive action associated with each hazard.
      The local Toyota Safety Representative will review the Contractors JSA forms to determine if they meet or
     exceed Toyota criteria.
3.8.1 Contractors Overall Job Safety Analysis (JSA) (D-16 & D-17)
     Contractors shall be required to develop an overall Job Safety Analysis (JSA) (D-16) for any activities
     physically being performed during the project. The overall JSA shall be formally documented in writing. An
     overall Job Safety Analysis (JSA) is a proactive technique that, at the job task level, identifies potential
     hazards and how they will be controlled. The process requires contractors to identify, document, and
     communicate potential hazards, and the steps to eliminate or reduce that risk to an acceptable level.
     The overall JSA should be trade specific and cover the entire scope of work (recommended to cover no
     more than two weeks in length without updates).
     The overall JSA (D-16) shall be submitted to Project Management for review. Project Management will
     forward to Toyota Safety for review 2 weeks (recommended), but not less than 48 hours prior to the
     scheduled work.
     A JSA Review Checklist (D-17) must accompany the overall JSA. Toyota Project Leaders or Toyota Safety
     will check and record the ISN Grade. Toyota project leader and Toyota Safety must sign and return the
     JSA Review Checklist (D-17) with the overall (JSA D-16) to the Contractor after review. Where the JSA
     content is substandard, Toyota requests the JSA to be resubmitted with additional information. If work is
     discovered being performed without a Toyota project leader and Safety reviewed JSA, Toyota reserves the
     right to stop the work until the situation is rectified.
     The JSA and signed JSA Review checklist must be kept in the field and accessible. The overall JSA (D-16)
     shall be communicated to all workers involved with the task, and signatures of each worker shall be
     acquired prior to starting work. All JSA’s must be physically or digitally signed by the project leader and
     Toyota Safety.
     The Contractor’s Daily JSA (D-18) does not require Toyota Safety review prior to work beginning, however
     the completed form must be reviewed and signed by the contractors Supervisor/Foreman, the contractor
     safety representative, and all workers involved for one shift of work. The daily JSA must be kept
     accessible at the worksite. All JSA’s must be physically or digitally signed.
                                                                                                                28
•• PROTECTED 関係者外秘
     For all Toyota Team Member Led projects, the D-18 will be used. Project Leader will sign off on A & B
     Rank JSAs per Non-Standard Job Ranking Matrix. If there is a Toyota Safety available, they will sign for
     safety portion if no safety, Safety Designee will sign. Job Leaders are required for C Rank Jobs per Non-
     Standard Job Ranking Matrix.
     3.9 CPR and First Aid Trained Resource Requirement (OSHA 29 CFR 1926.23)
     All Contractors shall be responsible for providing a full time, qualified First Aid/CPR person who meets all
     applicable training requirements, including, but not limited to, bloodborne pathogens training, as required
     by applicable law or contract specification. The contractor shall submit a Declaration of Competency (D-01)
     of their candidate(s) for this position to Toyota Safety or their designee for review before any work begins
     on site. Toyota Safety reserves the right to reject any candidate who is not qualified or cannot otherwise
     perform the duties for the position. These credentials must be kept current and not allowed to expire while
     working at Toyota. A qualified First Aid/CPR trained person must be on the worksite when the work is being
     performed.
(CAN)
        •    Contractors must have WSIB coverage and ensure their account is up to date to be eligible for
             clearances. Clearance must be obtained before any construction work begins and the clearance
             must remain in effect for the entire time the contractor is performing work on site.
        •    Clearance certificates must be readily available upon request.
     When required by the Toyota Facility, a job planning form must be completed (D-15 or Form 4.0 Notice of
     Work Permit) (Canada), prior to beginning work on-site.
All contractors & visitors to Toyota Facilities must watch ‘Part 1 - Visitor & Contractor Safety Review’.
     All Contractors physically performing construction work at Toyota Facilities must watch ‘Part 2 -
     Construction Safety Requirements’.
                                                                                                                 29
•• PROTECTED 関係者外秘
     Documentation verifying orientation completion must be provided for every worker prior to visiting site or
     beginning work.
     Proper clothing (shirts with minimum 4” sleeves etc.), safety-toed boots, and safety eyewear shall be worn
     when accessing the plant/work site.
     Contractors shall conduct Toolbox Safety Meetings at least weekly with their personnel for safety
     awareness and discussion of special safety topics. Copies of the Toolbox Talks shall be available to Toyota
     Safety upon request.
     For any Toyota TM performed activity, Toolbox talks should be conducted when weekly work activity is
     being performed.
     As the project progresses, emergency plans shall change to accommodate new conditions at the site that
     introduce a previously unidentified hazard, including procedures which cover incidents occurring both
     before and after building enclosure timing. Contact List (D-08) shall be submitted to the Toyota Project lead
     and Toyota Safety and posted on the Contractor’s Site Control Board.
     All materials and tools shall be placed on racks, cribbing, dunnage, skids, pallets, or tables and shall be
     secured to prevent movement to help eliminate trip hazards. No items shall be left on the floor.
     Hard barricades sufficient to prevent vehicles from entering soft or uneven surfaces must be utilized if a
     minimum of 20' hard flat surface around dumpster can't be achieved. (See appendix for Roll-Off Staging
     Work Rule)
     The supplier, contractor, or other responsible party is responsible for proper storage (including time
     limitations), handling, and disposal of hazardous waste generated on site according to applicable Federal,
                                                                                                                   31
•• PROTECTED 関係者外秘
     State and Local laws and regulations. Notify Toyota Environmental for disposal requirements, where
     applicable.
     3.20 Commissioning
     The Project Leader is responsible for commissioning activities. Commissioning is the process to verify and
     validate the performance of equipment (e.g. initial power-up, debugging, confirming safety function, etc).
     All commissioning members shall review the work area with the Toyota Project Leader or designee
     responsible for the equipment, prior to commissioning activities commencing and identifying potential
     risks/hazards to all persons participating in the commissioning:
        •       All commissioning activities shall have a designated JSA (D16 or D18), which shall be signed by
                the Project Leader, Toyota Safety and all involved workers.
        •       All authorized personnel shall be identified by a badging or other identification system.
        •       Each specific commissioning zone shall have a sign-in sheet.
        •       A notice shall be sent out by the commissioning Project Leader or Contractor to Toyota
                Engineering, Toyota Safety, and other affected Stakeholders, 72 hours prior to initial equipment
                activation.
        •       Commissioning Tape (Red and White Candy Stripe tape) dimension shall create a clear barrier
                to prevent access into the hazard area.
        •       Signage shall be posted in adequate locations stating “DANGER, Do Not Enter, Commissioning
                in Progress, Authorized Personnel Only” or similar (D-25). Prior to ‘start up’, the line shall be
                inspected to ensure it is ready for commissioning and to ensure that no unauthorized personnel
                are in the hazard area.
        •       Commissioning training is required to become an authorized person.
        •       Only authorized personnel shall be in/over/under the hazard area during testing. Authorized
                personnel shall be visually identified as Commissioning Team Members (e.g. badge, sticker).
        •       If the line of visibility is obstructed, spotters shall be stationed, complete with a communication
                system to ensure a safe start up.
        •       When commissioning tests are completed the red and white candy-striped tape and
                commissioning signs shall be removed.
     Contractors shall immediately notify Toyota Project Management and Toyota Safety regarding violations of
     any applicable legal requirements by its own workers, Subcontractors or Suppliers. (D-13) If contractor is
     found to be in violation of a Toyota specific safety or security requirement, Toyota shall investigate the
     incident with the host Toyota Facility Security to determine access privileges of the party involved.
     Every contractor shall have a clearly defined progressive corrective action policy that shall address any
     collective agreement and shall meet the requirements for this project (where applicable.) Contractors shall
     inform Toyota Security of any actions taken regarding corrective action that includes removal or barring any
     worker from a Toyota site(s). In addition, Toyota reserves the right, based on the severity of the
     incident(s), to request that the contractor remove or bar worker(s) from the site for rule(s) violations.
Violations that will trigger immediate Toyota review to determine corrective actions:
Behavior
Violence
Security
                •   Insubordination
                                                                                                              33
•• PROTECTED 関係者外秘
     Any other acts that may result in injury to the worker, other workers or cause damage to Contractor or
     Toyota property could result in removal and barring from site.
H - No Hands in Pockets
                                                                                                                 34
•• PROTECTED 関係者外秘
Section D
     General Contractors or Prime Contractors shall provide or make arrangements for toilets for workers
     according to applicable law for the jurisdiction. When toilets are provided by General Contractors or Prime
     Contractors, they shall maintain an adequate cleaning schedule as to not affect the health and safety of
     their workers or other contractor workers on the site.
        •   Wet cutting and water suppression when cutting, grinding, or coring concrete.
        •   Dust extraction using vacuums with specialized filters when cutting, grinding, or coring concrete.
        •   Respiratory protection as needed if dust cannot be controlled with other methods.
        •   Using water trucks to control site dust.
        •   Using flame retardant materials when constructing dust walls.
                                                                                                                      35
•• PROTECTED 関係者外秘
     4.9 Wind
     The employer must have a plan for monitoring weather conditions and wind speeds, with a clear plan for
     stopping elevated activities (aerial lifts, crane operation, roof work) once wind speeds reach a certain
     threshold. All elevated activities with potential to be impacted by winds must be suspended if sustained
     winds reach 20 mph or 35 mph gusts.
     Never operate machinery when wind speeds exceed manufacturers recommendations. Always follow
     OSHA recommendations regarding safe wind speeds for elevated work.
Section E
     5.1 Requirement
     It is important to note that each Toyota Facility may have specific PPE requirements within its production
     areas that all workers must comply with. Proper clothing (shirts with minimum 4” sleeves etc.), safety-toed
     boots, and safety eyewear shall be worn when accessing the plant/work site. The overall or daily JSA will
     identify the task specific PPE that is to be worn based on the hazards present.
     The employer shall ensure their workers, suppliers, and visitors are familiar with all personal protective
     equipment required on the project and have been instructed how to use and maintain the equipment
     according to good safety and hygiene practices.
     Toyota will not provide any PPE to contractor employees. Where employees provide their own protective
     equipment, the employer shall be responsible for ensuring the required protection is adequate. Failure to
     wear required PPE may subject the worker to dismissal from Toyota property. Other personal protective
     equipment may be required in specific areas of the local Toyota Facility. Verify the additional PPE
     requirements with the local Toyota Facility prior to arrival at the plant.
                                                                                                                  36
•• PROTECTED 関係者外秘
     The selection and use of hand protection shall be based on an evaluation of hand position and task as it is
     relative to the exposure or tool. This can be accomplished by reviewing the task, conditions present,
     duration of use and hazards/potential hazards that have been identified through the JSA (Job Safety
     Analysis) (D-16/D-18).
Reference Glove Cut Resistance Guide in appendix as a guide to determine proper hand protection.
     When operating with D-44 Requirements, chin strap/ climbing hardhat must be used. Hard hats shall be
     replaced periodically based on manufacturers’ specifications. Toyota Safety reserves the right to ask that
     PPE be replaced if it is damaged or outdated.
Section F
                                                                                                                      38
•• PROTECTED 関係者外秘
Section G
     7.1 Requirement
     All work areas shall be posted with appropriate signs and shall be positioned conspicuously around the
     perimeter of the protected area (D-38). In addition to the warning information, signs shall contain the
     Company/Toyota group name, contact name, contact number(s), list of the hazards within, and a clear
     indication of the PPE required for entry. Safety warning signs may be attached directly to barrier fences or
     signage tape and shall be posted at all access/egress points. Barricaded areas shall have designated entry
     and exit points to prevent the need to go under or step over signage tape.
     7.2 Barricades
     Barricades or guardrails are required around excavations, openings in floors or roof areas, edges of
     platforms, roof and overhead work areas. Means of access or egress shall be available where it does not
     pose a hazard. Barricades and guardrails used for the prevention of falls shall comply with applicable
     federal, state and local laws.
     The area designated by Red Danger tape shall not completely block access to other areas of the work site.
     Pathways are to be created to allow access around the designated areas. Red Danger tape shall be
     maintained between 42 inches (1.1 m) plus or minus 3 inches (8 cm) above the walking/working level.
     7.5 Red and White Candy Stripe Tape (Used Solely for Commissioning)
     Red and White Candy Stripe tape, or Commissioning tape, is used to designate a controlled area under the
     commissioning process to indicate the unique hazards experienced during the commissioning procedure.
                                                                                                           39
•• PROTECTED 関係者外秘
     The designated area shall fully encompass the area under commissioning including any adjacent areas
     used for commissioning purposes (e.g., drive path of a vehicle, extents of a robot in teach mode, etc.).
     Workers entering the commissioning zone shall be properly trained and identified as part of the
     commissioning team for that specific process or work zone. A sign shall be posted at the entrance of the
     commissioning zone, (D-25) warning of restricted access. The sign shall be in English, Japanese, and
     Spanish. (Please see TMNA PE Commissioning Training for additional specifications and requirements.)
     Commissioning tape shall be maintained between 42 inches (1.1 m) plus or minus 3 inches (8 cm) above
     the walking/working level.
Section H
     8.1 Requirement
     The perimeter of the designated areas shall be barricaded, roped-off, or otherwise identified.
     Materials stored inside buildings under construction shall not be placed within 6 feet of any hoist way or
     inside floor openings (i.e. pits, holes, etc.) Maximum safe load limits of floors and rooftops shall not be
     exceeded. Materials shall not be stored on scaffolds or runways in excess of supplies needed for
     immediate operations. All material shall be stacked, racked, blocked, interlocked, or otherwise secured to
     prevent sliding, falling or collapse. All materials stored outside of building(s) shall be secured in the event of
     severe weather. Used lumber shall have all nails removed or hammered down before stacking.
     All refuse material shall be disposed of daily in proper containers such as dumpsters designated for
     specific materials. Dumpsters shall be staged per the Roll Off Container Matrix (See Appendix).
The contractor shall only store material in the “lay-down” area(s) approved by Toyota.
     Contractors shall relocate their material lay-down and fabrication areas upon the request of Toyota. All
     contractor material shall be removed from the site at the completion of the job.
                                                                                                                    40
•• PROTECTED 関係者外秘
Section I
     9.1 Requirement
     The employer shall be responsible for ensuring hand tools, power tools, and equipment are maintained in a
     safe working order. Ensure that all potential sources of hazardous energy that could potentially be
     contacted by hand and power tools have been removed or isolated before starting work (e.g., electrical
     wiring in walls, cabling inside Unistrut, cable trays, etc.)
     9.2 Condition
     Electrical tools shall be maintained per the manufacturers’ requirements and inspected before each use.
     Corded electrical tools shall be provided with ground fault circuit interrupter (GFCI) protection. Double
     insulated tools must also be powered by a GFCI-protected receptacle.
     If any hand or power tools are found defective, they shall be tagged and removed from the jobsite
     immediately until repairs have been made or tools replaced.
        •   Operator must keep both hands on provided handles and stay clear from falling pieces.
        •   Material to be cut shall be held in place not requiring the tool's operator.
        •   Never remove work stops or modify tool in any way outside of manufacturers guidelines.
        •   Ensure that all potential sources of hazardous energy have been removed or isolated before
            starting work (e.g., electrical wiring in walls, cabling inside Unistrut, cable trays, etc.)
     9.3 Guarding
     Proper guards shall be installed on all power tools before being used. Modified tools (i.e., missing handles,
     or homemade handles or extensions) are not permitted.
                                                                                                                 41
•• PROTECTED 関係者外秘
     9.5 Identification
     Signs/labels on all job boxes, toolboxes and equipment, to include: lifts, site carts, job trucks, etc.
                •   Operator shall be certified by the tool manufacturer or their representative, with a copy on
                    file with the contractor, available upon Toyota Safety request.
                •   All powder actuated hand tools shall be maintained in a safe working condition according to
                    manufacturer’s requirements.
                •   The powder actuated tool shall be tested in accordance with the manufacturer’s
                    recommended procedure before loading, to verify all safety devices are in proper working
                    condition.
                •   All shot casings (spent or misfired) shall be placed in an approved metal receptacle used
                    only for this purpose and disposed of daily.
                •   Powder actuated tool use is considered a hot work activity at some Toyota Facilities. Check
                    with local Toyota Fire for hot work requirements.
     Ensure all body parts are kept clear of pinch point hazards when load is in motion. Determine safe distance
     to stand away from load based on height and potential for falling. Never put hands or feet under the load.
     When the load is not in motion, proper chalking or cribbing of the load is required.
     Any contractor attempting to utilize skates must file a D-01 Competent person form to identify who can rig
     loads skates. Minimum qualifications for competency:
     • Qualified Rigger
     • Knowledge, training, and experience utilizing skates to move loads
     • Demonstrates problem solving skills related to utilizing skates.
     The use of skates to move loads is not applicable to TM led non-standard work activities. If loads need to
     be moved with skates, contact a competent contractor to perform the task.
                                                                                                                       42
•• PROTECTED 関係者外秘
Standing materials shall be secured so to prevent a falling object hazard at any working surface.
Section J
     10.1 Requirement
     A “Hot Work Permit” shall be issued by the local Toyota Facility for any work that produces an arc, spark,
     flame and/or could ignite flammable or combustible materials. All team members and contractors shall
     follow the local Toyota “Hot Work” requirements. Hot Work training may be required at some Toyota
     Facilities before a permit will be issued.
     If flammable or combustible materials are not able to be moved at least 35 feet from the hot work area, a
     plan shall be implemented to protect the material from the heat, sparks, and/or slag.
     The same precautions shall be taken when hot work is performed on walls, floors, and ceilings where direct
     penetration of sparks or heat transfer may introduce a fire hazard (Example: fire watch may be needed on
     both floors).
     10.2 Clothing/PPE
     Welders and other employees who are exposed to radiation from welding and sparks from grinding
     operations shall be suitably protected (welding hood, eye protection, gloves, leathers, leather shoes etc.)
     so the skin is covered completely to prevent burns and other damage from the work process. Special care
     shall be taken to protect fall protection equipment during welding, grinding and burning operations while still
     allowing for the fall protection devices to operate properly.
     10.3 Protection
     Flashback or flame arrestors at gauges shall be provided on all gas welding/cutting equipment. The
     contractor shall provide proper protection for the surrounding area(s) of “Hot Work” including protection for
     equipment, product, and workers. Whenever practicable, all arc welding and plasma cutting operations
     shall be shielded by noncombustible or flameproof screens which shall protect employees and other
     persons in the vicinity from the direct rays of the process.
     The employer shall provide an employee to serve as Fire Watch during hot work operations. The Fire
     Watch shall be equipped and trained by the employer, with an appropriate fire extinguisher per local Toyota
     hot work requirements. The Fire Watch shall be maintained for a minimum of 30 minutes after the welding
     or cutting has been completed, unless site conditions warrant further time. While serving as Fire Watch, the
     employee shall maintain visual contact with the hot work activity and shall not perform any other duties.
     The fire watch shall monitor areas adjacent to partitions, walls, ceilings, lower levels, or roofs where
     materials may be ignited.
     The Fire Watch shall be easily identifiable by wearing a red indicator on their hard hat during Fire Watch
     activities. At the end of the Fire Watch activity, the indicator must be removed. See Visualization of
     Construction Contractors Matrix in Appendix.
     All racks or “cages” must be protected from vehicular traffic. All storage "cages" shall be identified with the
     Employer’s name and contact number and have gas type and associated hazards listed. Oxygen cylinders
     in storage must be separated from fuel-gas cylinders or combustible materials by a minimum distance of 20
     feet or by a noncombustible barrier at least 5 feet high with a fire-resistant rating of at least one-half hour.
     Cylinders must never be stored next to a heat source of any type. Verify with local Toyota Fire/Security or
     Toyota Safety for the proper “storage area.”
     Compressed gas cylinders and storage containers shall be moved on an adequate crib or cart. For short
     distances, they may be moved by tilting and rolling on their bottom edges. When transported by vehicles,
     cylinders shall be secured in a vertical position with valve caps in place. When cylinders are hoisted, they
     shall be secured on an adequate hoisting crib. Cylinders shall never be taken inside tanks, vessels, or
     confined spaces. Gas cylinder wrenches shall be available for emergency purposes. Regulators must be
     removed, and the protective caps placed back on a cylinder when not in use. Caps must be on cylinders
     when being stored and during transport.
Section K
     11.1 Requirement
     All electrical equipment/systems, which have been connected to an electrical source of power, shall be
     considered energized until de-energized, locked out, and verified as zero energy using appropriate
     procedures (e.g., placed into an Electrically Safe Work Condition (ESWC)) unless performing diagnostics
     testing/troubleshooting or where energized work is unavoidable. If work is required on an energized
     conductor or circuit, a D-45 Energized Electrical Work Permit (EEWP) shall be utilized. All contractors who
     are required to work near or on exposed energized conductors or circuit parts shall use the guidelines
     identified in NFPA 70E, CSA Z462, NOM 029-STPS or TEMA SEI 2001-001(Toyota Electrical Safety
                                                                                                                    44
•• PROTECTED 関係者外秘
     Standard) as applicable, to determine appropriate PPE requirements and establishment of Shock and Arc
     Flash Boundaries. All workers subject to being exposed to energized electrical conductors or circuit parts
     must have received adequate training on electrical safe work practices. In addition, all workers trained in
     electrical safety/electrical safe work practices must have proof of proper training.
                •   Insertion or removal of plug-in devices into or from energized busways (e.g., no hot stabbing
                    bus with bus plug)
                •   Drilling holes, cutting openings, removing knock outs, etc. in bus plugs installed in an
                    energized busway (e.g., no compromising the external integrity of electrical enclosures or
                    plug-in devices while installed on a “hot” bus)
If an unavoidable condition exists where either must be completed the following steps must be taken:
                •   Job safety analysis conducted and reviewed with each worker for each specific task.
                •   D-45 energized electrical work permit (EEWP) with Affected SHOP General Manager
                    signature.
     Cord sets shall not be used as “permanent wiring” and shall be checked/removed at a frequency not to
     exceed 90 days.
     Extension cords shall not be connected end-to-end (daisy chained) unless specified by the cord
     manufacturer with the manufacturers’ tag fastened on the cord.
     Cord sets shall only be repaired by qualified individuals using “Listed” components (e.g., Underwriters
     Laboratory (UL)). Cord sets and power cords on portable electrical tools may be repaired only by qualified
     individuals using "Listed" components intended for the purpose and to an equivalent level of performance.
     Temporary lighting shall be protected from accidental contact or breakage and shall not be suspended by
     cords, unless cord and lights are designed for this means of suspension.
     11.4 GFCI
     Ground fault circuit interrupters (GFCI) shall be UL Listed/CSA approved and used on all cord sets, and
     corded electric tools used on the site. GFCI protection shall be provided at the supply end (plug) of the cord
     set or power cord for a portable electric tool. All portable and receptacle GFCI’s shall be tested prior to
     each use to ensure proper operation.
     All portable generators shall have ground-fault circuit-interrupter protection for personnel integral to the
     generator or receptacle or GFCI adapters or cord sets incorporating GFCI protection at the supply end
     shall be permitted when plugged directly into the generator.
                                                                                                                    45
•• PROTECTED 関係者外秘
Section L
     12.1 Requirement
     All scaffolding equipment, installations, and inspections shall comply with applicable laws and regulations.
     Employers shall train all workers using, dismantling, or erecting scaffold in accordance with applicable laws
     and manufacturers guidelines. A training record for this activity shall be available for review or submitted to
     Toyota Safety, as requested.
     All work performed from scaffolding must recognize safety hazards while working at heights. All hazards in
     proximity to work being performed shall be identified on your JSA and ensure proper controls are in place.
Any scaffolding activity performed within 25’ of a large ceiling mounted fan must perform lockout of that fan.
Any scaffolding inside of a crane bay requires the lockout of the cranes capable of operating in that area.
     12.2 Erection/Dismantling/Access
     A Competent Person Declaration Form (D-01) shall be completed by the contractor for the worker(s) who
     shall be supervising the assembling and disassembling of scaffolding.
     Personal fall protection required during scaffolding erection and dismantling. It must be attached to an
     approved anchorage point.
     Employers shall not permit their workers to climb on (unless a ladder is part of the handrail system) or work
     from, any scaffold handrail, mid-rail, or brace member. Slippery conditions on scaffolds shall be eliminated
     as soon as possible after they occur and prior to work.
                                                                                                                   46
•• PROTECTED 関係者外秘
     If you must exit the Scissor lift to drive through a man door, drive from outside the basket in the safest
     means possible. This process must be outlined in the JSA.
See Spotter Determination Matrix in Appendix to determine when a spotter shall be used.
Section M
     13.1 Requirement
     The Employer shall develop a detailed Fall Protection Plan to cover all work conducted where the workers’
     feet are at or higher than 6 feet (1.8 meters) (10 feet or 3.0 meters in Canada) above a lower level or where
     there is a potential to fall into equipment or other hazard (e.g., vertical rebar, etc.). Fall protection plans
     should include methods to control hazards. The fall protection hierarchy of controls includes: elimination,
     guardrails, fall restraint, fall arrest, or any other combination.
     All connections required to be installed at height including electrical, mechanical, and pneumatic shall be
     designed such that their installation can be made from an aerial lift or other at height device (scaffolding).
     Leaving the basket, ladder, or scaffold exposing workers to a fall hazard or climbing on top of any non-work
     platforms or structures is a last resort. This includes, but is not limited to, exiting a ladder to climb onto
     structural steel. If the need arises then STOP-CALL-WAIT, contact Toyota Safety and initiate form D-44
     form before proceeding with work. For work requiring leaving the basket, scaffold, or climbing on top of
     any non-work platforms or structures, a double lanyard system shall be used to maintain 100% tie-off.
     In Canada, guardrails shall be the first line of defense and must be constructed to meet the requirements
     set out in the OHSA Regulations for Construction Projects 213/91.
                                                                                                                  47
•• PROTECTED 関係者外秘
     Project Leaders shall confirm the floor load ratings or load capacities of all temporary and permanent
     structures prior to commencing work on or loading materials onto the floors or structures. Sufficient safe
     clearances should be allowed between machinery and adjacent aisles or passageways. Snow, ice, and
     other hazardous walking surface contaminants shall be removed or treated as soon as possible.
                                                                                                                     48
•• PROTECTED 関係者外秘
     For workers engaged in work other than roofing activity, a warning line may be used if it is 15 feet or more
     from the nearest unprotected leading edge or nearest hole. No work or work-related activity is to take place
     between the warning line and the hole or unprotected edge.
     In Canada, a warning line must not be installed closer than 3 meters from a roof edge or 2 meters from a
     platform edge where a worker is exposed to a fall.
     The employer must effectively implement a work rule prohibiting workers from going past the warning line.
     If work must take place past the warning line, then PFAS or a fall restraint system shall be provided and
     used by any workers on the roof/unprotected leading-edge side of a warning line. The warning line shall
     consist of rope, wire, or chain and supporting stanchions. Danger tape is not sufficient material to use for
     installation of a warning line.
     13.9 Covers
     During construction, if an opening is made in a walking/working surface, then it shall be covered. All covers
     in roadways and vehicular aisles shall be able to support, without failure, at least twice the maximum axle
     load of the largest vehicle expected to cross over the cover. All other covers shall be capable of
     supporting, without failure, at least twice the weight of employees, equipment, and materials that may be
     imposed on the cover at any one time. All covers shall be secured when installed. All covers shall be
     marked with the word “HOLE” or “COVER” to provide warning of the hazard.
     OSHA defines a hole as “a gap or void 2 or more inches in its least dimension in a floor, roof or other
     walking/working surface.” Covers are required to protect employees from tripping in, stepping into or
     through holes, including skylights.
                                                                                                                    49
•• PROTECTED 関係者外秘
     a recognized manner, either through signs, wires, tapes, or ropes. The contractor shall take the following
     steps to ensure that the CAZ is clearly marked or controlled by a competent person:
Section N
     14.1 Requirement
     When the need for a helicopter service is established, a pre-lift meeting shall be held at least one month
     prior to the lift date.
     14.2 Notification
     Notification shall be given to Toyota and Contractor(s) that a helicopter lift shall be taking place on a given
     date and time. A written plan shall be submitted, and a follow-up meeting held with Toyota Safety or their
                                                                                                                   50
•• PROTECTED 関係者外秘
     designee two (2) weeks prior to the lift taking place with appropriate confirmations and notices by
     Governing Authorities.
                 •   Mono-goggles and hard hats equipped with chinstraps shall be provided for all workers
                     rigging and receiving the load and anyone subject to being struck by the rotor downwash.
                 •   Any remaining loose materials within 200 feet of the staging and departure areas and flight
                     path shall be secured or removed.
                 •   Warning barricades and signage for the assigned flight path plus 200 feet on each side of
                     the flight path shall be placed.
                 •   All controlled areas shall be inspected to ensure they are clear of unauthorized persons and
                     observers with radios shall be posted to assure no one enters the area of the lift, set point or
                     flight path at all levels.
                 •   The medical facility shall be notified of the start time and finish time of the operations.
                 •   Before the lifts begin, the helicopter crane maintenance records shall be provided to Toyota
                     Safety.
                 •   For wind restrictions, refer to Sec CC.
Section O
     15.2 Equipment
     All vehicles and mechanized equipment shall prominently display the employer’s name and on-site contact
     number. For rental equipment temporary signs may be used. All equipment not designed for “over the
                                                                                                          51
•• PROTECTED 関係者外秘
     road” use shall be equipped with an operable horn, headlights (if equipped), back-up alarm, and a fire
     extinguisher as required by the manufacturer. Some Toyota Facilities may have Site Specific Guidelines
     regarding equipment and vehicles on site.
     15.3 Operation
     Vehicle/equipment operators shall not talk, text, or use a “hands free” device on cell phones while
     operating a vehicle or mechanized equipment. Vehicles shall operate with lights on at all times, if equipped,
     unless otherwise reviewed by Toyota Safety. Personnel may not ride in the bed of a pickup truck. All
     mechanized equipment shall maintain a three (3) foot (1 meter) clearance from pits, trenches or other floor
     openings. All vehicles/equipment when parked without operator will have brakes applied, placed in park, or
     wheels choked. Forks and/or bucket must be lowered all the way to ground when operators exit equipment.
     All vehicle and equipment exhaust are adequately controlled to maintain safe concentrations of carbon
     monoxide and other exhaust components.
All vehicle/equipment operators must be fit for duty and for operating mobile equipment daily.
     15.4 Inspections
     All mobile equipment shall be inspected and documented upon delivery to the project site. Any repairs shall
     be completed prior to use. All equipment shall be inspected prior to use at the beginning of each shift and a
     record of mechanical fitness shall be documented. This record shall be available for review by Toyota
     Safety when requested. If the equipment is propane fueled, the valve of the tank shall be closed during
     overnight storage.
     15.5 Forklifts
     The employer shall ensure that each forklift operator is competent to operate a forklift safely, as
     demonstrated by the successful completion of training, and hold a valid and current operating
     certification (less than 3 years old) in his/her possession. This operating certification shall be provided to
     any Toyota project member or Safety member upon request. Lift trucks shall have the rated capacity
     clearly posted on the equipment to be clearly visible to the operator. At no time shall any person be allowed
     to ride on forklifts. All attachments shall be manufacturer approved and certified for capacities. Trucks
     equipped with attachments shall be operated as partially loaded trucks when not handling a load.
     Operators shall follow all local Toyota Facilities, and/or federal/state policies when operating outside of a
     designated construction area. Minimum 2 points of rigging contact from the forklift truck to the
     machine/crate/equipment/load is required. Approved rigging must be of sufficient size and strength to
     secure the load. Free rigging to forks/tines is never allowed. Only loads within the rated capacity of the
     truck shall be handled. Any forklift found in need of repair, defective, or in any way unsafe, shall be taken
     out of service until it has been restored to a safe operating condition. See Spotter Decision Matrix for rules
     regarding spotters and forklifts.
              •   Use of a Fall Restraint system must comply with manufacturer requirements of both the aerial
                  lift and the fall restraint device, or equipment manufactured supplied fall protection shall be
                  required in Aerial Lifts.
                                                                                                                52
•• PROTECTED 関係者外秘
              •       A fall restraint device shall always be worn according to the manufacturer while operating
                      and/or working in any aerial lift.
              •       All Aerial Lifts must be equipped with a designated or pre-engineered tie-off point. That point
                      shall be used as the fall restraint connection point.
     All work performed from aerial lifts must recognize safety hazards while working at heights. All hazards in
     proximity to work being performed shall be identified on your JSA and ensure proper controls are in place.
Any aerial lift activity performed within 25’ of a large ceiling mounted fan must perform lockout of that fan.
     Any aerial lift work inside of a crane bay requires the lockout of the cranes capable of operating in that
     area.
     Red danger tape shall be used to identify the hazard area below the elevated work platform. If red danger
     tape is not practical, contact Toyota Safety to discuss other options such as cones and signs.
See Spotter Decision Matrix for rules regarding spotters and aerial lifts.
                                                                                                                      53
•• PROTECTED 関係者外秘
     While travelling from one work location to another or in designated work areas, spotters must also be
     outside of the known equipment blind spots (Reference to Appendix Visual: Known Equipment Blind Spots)
If no red danger tape is used, then a spotter can spot for only one piece of equipment at a time.
     If red danger tape and a D-38 B Danger Sign is used, one spotter can be used for all equipment inside the
     tape (If they can fulfill all required duties of a spotter.) This must be specified in the approved JSA.
Section P
                                                                                                               54
•• PROTECTED 関係者外秘
     current as-built drawings cannot be verified. If a known utility exists or is located by GPR Scanning, then it
     must be identified (flags or paint).
     Hand digging only does not require Ground Penetrating Radar. If hazardous energy exists, then hand
     digging shall be performed within a three-foot radius of the buried utility and lockout shall be performed on
     hazardous energy. Should a buried obstruction be encountered, all excavation shall stop until the Toyota
     Project Leader or representative investigates and clears the situation.
     An Excavation Permit and Pre-Excavation Form for GPR Scanning shall be required before starting the
     excavation work. (D-02, D-02A). All soil shall be classified as Type C soil until classification is determined
     by a competent person. All soil that has been previously disturbed shall be classified as Type C soil.
     16.3 Inspections
     Daily inspections of excavations, their adjacent areas, and protective systems shall be made by a
     competent person for evidence of hazardous conditions, prior to the start of work and as needed
     throughout the shift. Inspections shall also be made after every rain event or other event that has the
     potential to increase the hazards of the excavation. Contractors are responsible for communicating good or
     no good entry conditions.
     16.4 Access/Egress
     A means of egress from trench excavations shall be provided by the contractor. A stairway, ladder, ramp or
     other safe means of egress shall be in trench excavations that are 4 feet (1.2 meters) or more in depth to
     require no more than 25 feet (7.6 meters) of lateral travel for employees.
                                                                                                                  55
•• PROTECTED 関係者外秘
Section Q
     All masonry walls over eight feet in height shall be adequately braced to prevent overturning and/or to
     prevent collapse. This bracing shall remain in place until permanent supporting elements of the structure
     are in place.
     imposed load at support locations. Inspect completed formwork prior to placing concrete to assure proper
     placement and secure connections of ties and associated hardware. The contractor must verify prior to and
     during concrete placing that the method of placement and the rate of pour is consistent with formwork
     design. Never overload formwork.
     Prior to removing formwork, be certain that concrete has sufficiently set to carry its own weight and any
     imposed loads prior to stripping. The contractor must ensure that no construction loads are placed on a
     concrete structure unless it can support the loads.
     Refer to Table 1 of the OSHA Standard 29 CFR 1926.1153 for control methods when working with
     materials that contain crystalline silica. In some operations, respirators may also be needed.
Section R
Table SS-1
                                                                                                                 57
•• PROTECTED 関係者外秘
     If a meeting is required per Table SS-1 to determine management responsibility, the meeting should occur
     at the project planning/Ringi phase. Project details will be evaluated to determine management
     responsibility with agreement from TMNA Executive Management.
     18.2 Requirement
     The D-29 forms must be completed for all steel erection activities before the start of the work.
     “Double” or “Shared” connections in structural steel systems shall not be permitted without approval of
     engineer of record and Toyota. Use single plate/angle shear connection where possible. If a “double” or
     “shared” connection is required, the connection shall be detailed such that it can be erected in any
     sequential order (having extra bolts or having seats on both sides of column/beam web). Sequence
     dependent double connection safety measures are prohibited.
     During all phases of steel erection, the contractor shall provide all safety devices, (e.g., guardrails,
     handrails, hole covers, etc.) required to keep the work area safe. These devices shall not be removed from
     the project until their use is no longer required. The contractor shall implement a written fall protection plan
     that requires their worker to use fall protection 100% of the time for any work over 6 feet (2 meters) in
     elevation during all steel erection. (D-29)
     Connectors and other personnel involved in the erection of structural steel must not climb out of the basket
     of the aerial/scissor lift unless it is a last resort. If the need to climb out of the basket arises, then STOP-
     CALL-WAIT, contact Toyota Safety and initiate form D-44 form before proceeding with work.
        •   For interior structural systems not subject to wind loads during erection, an erection plan shall be
            provided by a qualified person.
        •   For structural systems subject to wind loading or in seismic zones with seismic design category D
            or greater, an erection plan and stability calculations shall be provided and stamped by a
            professional engineer.
        •   No changes shall be made to the erection stability plan without written approval from the stability
            plan originator and reviewed by Toyota.
     Erection stability plans shall include the following:
        •   Overall plan labeling members, sequence numbers, and the initial starting bay.
        •   Analysis of loads to be resisted throughout the erection period. (Environmental, construction, etc.)
            Submit stamped calculations for structural systems subject to wind loading.
        •   Description of the order of placement of structural elements, by sequence, to maintain structural
            stability including placement of joists, beams, decking bundles, plating, mechanical/electrical loads
            (Utilities, equipment, etc.)
        •   Identify members that require actions such as “hold on crane” until subsequent activities are
            completed.
                                                                                                                    58
•• PROTECTED 関係者外秘
     18.6 Multiple Lift Rigging Procedure (Also known as Christmas Treeing) (OSHA 29 CFR 1926.753)
     A multiple lift shall only be performed if the following criteria are met. A detailed plan for this procedure
     must be in JSA.
     Components of the multiple lift rigging assembly shall be specifically designed and assembled with a
     maximum capacity for total assembly and for each individual attachment point. This capacity, certified by
     the manufacturer or a qualified rigger, shall be based on the manufacturer's specifications with a 5 to 1
     safety factor for all components. The total load shall not exceed the rated capacity of the hoisting
     equipment specified in the hoisting equipment load charts or the rigging capacity specified in the rigging
     rating chart.
                                                                                                                     59
•• PROTECTED 関係者外秘
Section T
     Project Lead and Shop representative will review and approve all aspects of the D-42 to include
     utilities/connections and abandoned in place utilities. Two party verification is required. (See D-42
     Demolition Checklist)
     Where workers are required to work within a structure to be demolished or repaired which has been
     damaged, the walls, floor and ceiling/roof shall be shored and/or braced.
     A written plan detailing how exposure and the possible spread of contaminants shall be controlled is to be
     submitted and approved by Toyota Project Lead, Safety & Environmental department designated persons
     2 days before demolition begins.
     All electric, gas, water, steam, sewer, compressed air, and other service lines shall be shut off, capped and
     air gapped of 12 inches or more, if not air gapped contractor must provide Toyota written control measures
     for control provided outside the building or in the specified area(s) of demolition before demolition work is
     started. Review Toyota Site Specific Environmental Guidelines.
     During demolition, only authorized personnel are allowed in the area. Nothing shall be dropped to the floor
     unless prior authorization is received. All demolished items must be placed on the floor in a controlled
     method to prevent injury of personnel and property damage. It is permissible to drop items into dumpsters.
     For all demolition or relocating of equipment where utilities will be removed or re-routed the D-42 is
     required. Excludes equipment relocation that is not permanently installed (examples: plug in, quick
     disconnects)
Excludes equipment relocation that is not permanently installed (examples: plug in, quick disconnects)
                                                                                                                60
•• PROTECTED 関係者外秘
Section V
     20.1 Lockout
     Lockout is required where the unexpected energizing, startup, or release of stored energy could occur and
     cause injury, the employer shall implement a Control of Hazardous Energy program. It shall consist of
     energy control procedures, employee training, and periodic inspections to ensure workers are trained
     before they perform any servicing or maintenance of any machinery, supply lines, or equipment.
        •   For each job/task requiring energy control, a JSA (D-16/D-18) shall be completed and submitted to
            Toyota Project Leader (or designee) prior to beginning the work.
        •   The employer shall identify all sources of energy, using the Lockout Placard, which may affect their
            work such as hydraulic, pneumatic, thermal, electrical, gravitational, residual, chemical, radioactive,
            etc., with host Toyota Facility and Toyota Project Leader (or designee) prior to locking out.
        •   All lockout points must be identified and documented.
        •   Electric equipment and lines, pressurized lines (hydraulic, pneumatic), stored energy (electrical,
            mechanical), pressurized tanks/vats, etc., shall be considered energized/pressurized until
            determined de-energized/de-pressurized by tests or other appropriate methods or means.
        •   After all designated switches and disconnections have been opened, rendered inoperable, drained,
            blocked and/or locked out, the appropriate inspection and/or test(s) shall be conducted to ensure
            that all equipment or energy sources are de-energized.
        •   While locking out, workers shall apply their personal lockout lock and identification. This
            identification can be in the form of:
        •   A durable tag securely affixed to the lock, and have a visible means of identification (i.e. the
            Company name, employee’s name, and telephone contact information), or;
        •   Label affixed to the lock with the required information.
     Prior to locking out any existing equipment, the Contractors shall contact the Toyota Project Leader to
     coordinate lockout activities with existing Toyota facility.
     Contractors shall submit copies of their general Lockout Program to Toyota Safety or their designee, when
     requested. The Lockout Program shall meet or exceed Toyota’s Lockout Policy and all applicable
     regulations/standards/legal requirements.
                                                                                                                 61
•• PROTECTED 関係者外秘
     qualified personnel shall work on equipment requiring lockout. Toyota reserves the right to review training
     records for any employee.
        •   Multiple crews
        •   Multiple crafts
        •   Multiple Groups
        •   NAMC members working with contractors
        •   Work involving multiple shifts
     Each group lockout/shall have a Primary-Authorized-Individual (PAI) with the responsibility for the group or
     trade working under the protection of the group lockout. Each site shall have the responsibility for the
     process to develop the group lockout procedures which shall meet the following criteria:
        •   Application – Used only when individual lockout is not practical, e.g. due to the number of locks
            required.
        •   Requirement – Only one Primary-Authorized-Individual per group lockout application, even if
            multiple groups or trades are working together.
        •   Written Procedure – Requires a specific written procedure for each occasion where group lockout is
            implemented.
               • Each trade, group, or other authorized individual(s) shall be identified in this procedure.
        •   Control – Uses a group-lockout-box or multi-hasp, etc., for control per procedure.
        •   Group Safety-Locks – A single safety-lock applied to each
     For group lockout, a lockout sign in sheet or roster is required to be used. Refer to the Host Toyota Facility
     for the appropriate form to be used for group lockout.
     General Hardware Requirements Energy isolating devices, and all other hardware such as safety-locks,
     multi-hasps, wedges, chains, information tags, limiting blocks, locking pins, cribbing materials, etc., shall be
     confirmed for suitability (environment and application) to include any safety factors by applicable standards,
     by either the TMNA PE Safety, or the responsible Safety departments. The hardware shall be substantial
     enough to prevent removal unless excessive force (no less than 50 lbs.) or tools (such as bolt cutters or
     other metal cutting tools) are used.
     Safety-Lock Requirements:
     There shall be a single key per set.
     Only standardized colors listed below may be used:
                                                                                                                  62
•• PROTECTED 関係者外秘
     Management members shall ensure with 100% certainty the owner of the lock is not available, and the
     owner is aware of the lock being removed prior to its removal. The D-14 form or Toyota Facility form shall
     be completed and signed prior to lock removal. Check with local Toyota Security to determine if their
     assistance in the removal of the lock is required.
Section X
     Stairways having four or more risers or rising more than 30 inches, whichever is less, shall be equipped
     with at least one handrail and one stair rail system along each unprotected side or edge. Handrails and top
     rails of stair rail systems shall be capable of withstanding, without failure, a force of at least 200 pounds
     applied within 2 inches of the top edge, in any downward or outward direction, at any point along the top
     edge.
     Extension or step ladders constructed of fiberglass or other approved non-conductive materials with anti-
     slip footings are allowed on Toyota sites. Wooden ladders are not allowed on jobsites in Canada and
     Mexico. Ladders shall be visually inspected for structural integrity and damage before each use. Ladders
     that are faulty or defective shall be removed from the project/jobsite immediately.
     Ladders shall not be loaded beyond the maximum intended load for which they were built, or beyond the
     manufacturers’ capacity. Ladders shall only be used for the purpose for which they were designed.
     The use of a personal fall arrest system shall be required when performing work at a height of 6’(1.8m) or
     greater on a ladder on a secondary walking working surface (e.g., work being performed from a ladder on
     mezzanine where working height from ladder exceeds the height of guardrail). The use of a PFAS should
     be considered when working near guardrails while on ladders.
     Personal fall arrest systems are REQUIRED when ascending/descending a fixed ladder which has a
     continuous climbing distance of 10 feet or more, unless the ladder is a fixed ladder equipped with a cage.
     Workers shall maintain three (3) point contact while ascending/descending the ladder and shall never carry
     an object that could cause the employee to lose balance and fall. Workers shall always perform work while
     facing toward the ladder.
                                                                                                                   63
•• PROTECTED 関係者外秘
     Supporting heavy or bulky objects and over-reaching and exerting excessive force by pushing or pulling
     objects can cause loss of balance and ladder instability. If needing to perform these tasks, consider a safer
     alternative method.
     Ladders shall not be moved, shifted, or extended while occupied. The top or top step of a stepladder shall
     not be used as a step. If working from a portable ladder, PFAS must be worn above 6’(1.8m). In Canada,
     PFAs must be worn above ten feet or whenever 3 points of contact cannot be maintained.
     Ladders placed in any location where they can be displaced by workplace activities or traffic, such as in
     passageways, doorways, or driveways, shall be secured to prevent accidental displacement, or a barricade
     shall be used to keep the activities or traffic away from the ladder. The areas around the top and bottom of
     ladders shall be kept clear.
     Section Z
     22.0 Toxic and Hazardous Substances (OSHA 29 CFR 1926 Subpart Z)
     22.1 Requirement
     The employer shall obtain approval before bringing any chemical on any Toyota property. The contractor
     shall also maintain and provide SDS sheets (formerly known as MSDS) information on the chemicals they
     are using or handling at Toyota. Contractors shall be familiar with the information and train their workers
     regarding the Global Harmonization System if they will be working in areas where chemicals are used. This
     information includes descriptions, handling precautions, protective equipment, symptoms of exposure and
     first aid for each chemical.
     22.4 Storage/Labeling/Use
     All hazardous materials shall be properly labeled as per the GHS and stored in accordance with applicable
     law. Contractors shall provide all necessary PPE and train all workers in the use and limitations of the PPE,
     required for safe handling of chemicals used by their workers.
                                                                                                                 64
•• PROTECTED 関係者外秘
     22.6 Disposal
     The employer shall be responsible for proper disposal of hazardous waste in accordance with the Toyota
     Environmental Requirements for construction and applicable law. When the contractor has plans or has
     reason to believe that hazardous waste shall be generated, the contractor shall contact the local Toyota
     Environmental Department for assistance in dealing with the waste. After drumming, the hazardous
     material shall be delivered to the containment area as designated by the local Toyota Environmental
     department.
     22.7 Exposure
     Employer shall monitor work zones for exposure to toxic and hazardous substances that their workers may
     be exposed to. Some examples include the following:
                ▪   Asbestos
                ▪   Lead
                ▪   Chromium VI
                ▪   Beryllium
                ▪   Silica
     It is the employer’s responsibility to monitor for these substances and to communicate and protect its
     workers if exposure is possible. Employer shall provide all required training, control methods, personal
     protective equipment, changing rooms, and medical surveillance as required by OSHA 1926 Subpart Z.
     Section AA
     23.0 Confined Spaces (OSHA 29 CFR 1926.1203)
     23.1 Requirement
     All Confined spaces shall be considered “Permit Required,” unless otherwise identified as a (Non-Permit
     Required Space US Only). Testing and verification are the employer’s responsibility.
(US)
                •   Space is large enough and so configured that a worker can enter and perform assigned
                    work.
                •   Space has limited or restricted means for entry or exit (example, tanks, vessels, storage
                    bins, hoppers, vaults, and pits)
                •   Space is not designed for continuous human occupancy. (Sample D-19)
                •   Space that is not both designed and constructed for continuous human occupancy, and
                •   In which atmospheric hazards may occur because of its construction, location or contents or
                    because of work that is being performed inside.
                                                                                                                65
•• PROTECTED 関係者外秘
(Mexico)
     The Mexican Standard NOM-033-STPS-2015, defines a confined space as “The place without natural
     ventilation, or with poor natural ventilation, in which one or more persons can perform a certain task inside,
     with limited or restricted means for their access or exit, which is not designed to be occupied continuously.”
                •   Confined Space Type I: One in which there is no risk due to deficiency or enrichment of
                    oxygen, or explosive or flammable atmospheres, and in which the concentrations of
                    dangerous chemical substances are lower than the action level.
                •   Confined Space Type II: One that has the potential to cause work injuries and / or illnesses
                    and may even be immediately dangerous to life and health. These can present a dangerous
                    atmosphere.
     In advance of any confined space entry (permitted or non-permitted), the Contractor shall submit a copy of
     its written confined space entry procedures to Toyota Safety and contact appropriate Toyota member for
     confined space permit review. All contractor confined space programs shall meet or exceed the Toyota
     confined space program requirements. Refer to the Host Toyota Facility for specific requirements regarding
     confined space procedures.
     The confined space shall be tested for hazardous atmospheres/atmospheric hazards. The sampling shall
     be conducted WITHOUT ENTERING THE CONFINED SPACE. The person responsible for sampling shall
     be knowledgeable of the gas meter and proper calibration requirements of the equipment.
     The employer shall document the testing results and have them available for Toyota Safety review.
     (Sample D-19). If the space meets the criteria for a non-permit required confined space, the employer may
     proceed with entry. If the space fails the criteria for a Non-Permit Required Confined Space, an entry
     permit shall be completed prior to entering the space. In a Permit Required Confined Space, continuous
     atmospheric monitoring must be performed. Some Toyota Facilities require additional confined space entry
     instruction. Please consult your Toyota Safety contact for possible requirements. The checklist/permit
     (Sample D-19) shall be posted in the work area where confined space entry work is done. They are valid
     for one shift only and are not valid for more than 12 hours. Evaluation and permitting is the responsibility of
     the employer.
                                                                                                                  66
•• PROTECTED 関係者外秘
     23.3 Responsibilities
     It is the responsibility of the employer to understand the duties and responsibilities of the entrant, attendant,
     and entry supervisor.
Section CC
     24.1.1 Lifts of loads less than 220 pounds or engineered equipment with fork pockets
        • Sequential job steps documented in daily JSA
                 o Control measures to secure load
        • No D-26 Required
         •   Load greater than 1 ton that is being upended or down ended AND center of gravity is moving or
             unknown.
         •   Unbalanced load of 5 tons or greater AND does not have engineered lift points.
         •   Lift exceeds 70% of the rated capacity of the crane.
         •   Lift being made in poor soil or unknown ground condition.
         •   Lift requires the use of more than 1 crane or the use of a crane and an additional hoisting device.
                                                                                                                    67
•• PROTECTED 関係者外秘
                                                         Critical Lift
                     When clear instructions from manufacturer to safely lift the load are NOT
                     provided, a RANK A lift is defined by one (1) of the following conditions
                     being present:
                              Load greater than 1 Ton i s bei ng upended AND center of gravi ty i s
                              movi ng or unknown
                              Unbal anced l oad of 5 tons or greater AND does not have engi neered
                              l i ft poi nts
     24.1.5 D-26
     The D-26 shall be submitted with the JSA to the Toyota Project Leader and Toyota Safety or Safety
     designee for Team member-led work, prior to the work being performed.
     The D-26 shall accompany the JSA at the work location and shall be reviewed with all involved personnel
     performing the lift.
     It is permitted to perform a single D-26 for lifts of same/similar equipment or objects when a single D-26
     can cover the hazards of each lift.
        •   Lifting same/similar robots utilizing the same lifting points, rigging methods, and lifting equipment
            and no unique hazard is present between lifts. (Example of unique hazard: different end effectors
            that change center of gravity)
                                                                                                                    68
•• PROTECTED 関係者外秘
        •   Lifting same/similar structural steel members utilizing the same rigging methods and lifting
            equipment where no unique hazard is present between lifts. (Example: One project with lifts of
            Beams, Columns, Joists, and Decking would require- (1) D-26 for all Beams, (1) D-26 for all
            Columns, (1) D-26 for all Joists, (1) D-26 for all Decking)
     Any deviation from the lift plan must require STOP, CALL, WAIT, the D-26 revised and communicated to all
     personnel involved in the lift.
     For Emergency repairs, a D26 Lift plan and Daily JSA(D18) shall be completed and reviewed with the
     group performing the work at the time of repair.
     Any cabinets, lockers or similar type storage containers or a combination thereof greater than 4’ in height
     that weigh greater than 220lbs. (including contents), or the overall weight is unknown, require a Daily
     JSA(D-18), Lifting Checklist (D-26) completed and a qualified rigger to lift the load.
     All loads shall be considered in transit until the load has been lowered and landed safely. No persons,
     including spotters shall position themselves within 1.5 m away (5’ minimum) from the load and at 45* offset
     around the load when the load is in transit. Never position yourself between the load and a fixed object.
     If using a forklift and you are removing the load, always ensure forks are level and disengaged from the
     cabinet to prevent tipping over.
     All lockers with wheels must be secured to the lockers when installed. All lockers with wheels must account
     for the additional hazards of wheels. To include the potential changing/shifting of load.
                                                 Locker Stickers
                                                     (ENG)
                                                                                                                      69
•• PROTECTED 関係者外秘
     24.2 Riggers
     A qualified rigger is defined as:
• can successfully demonstrate the ability to solve problems related to rigging loads.
         •   A person who has passed stringent written and practical exams related to rigging from an
             accredited organization.
         •   This requirement is not applicable in Canada and Mexico due to lack of certified rigger equivalency.
             In Canada and Mexico, employers shall ensure riggers are qualified.
             •   Prior to moving a crane into an area, the contractor must evaluate the underground conditions
                 for crane stability and the possibility of damage to the underground facilities or injury to
                 personnel.
             •   Access to areas where lifting operations are carried out shall be restricted by barriers and signs
                 must be posted.
             •   The swing radius of the load must be known, and unauthorized personnel shall be restricted
                 from accessing the area.
             •   Where hand signals are used, they shall be those prescribed in the relevant standard.
             •   A copy of the manufacturer’s manual for each make, and model, logbook, and load chart must
                 be in the cabin of the crane. The load chart must be accessible and legible.
             •   Loads shall not be lifted over persons.
             •   Outdoor lifting operations shall be carried out during daylight hours only.
                                                                                                                 70
•• PROTECTED 関係者外秘
             •   Cranes should only be moved with the boom extended or with a load attached according to
                 manufacturer’s guidelines.
             •   If a malfunction occurs, operations shall cease until the crane has been evaluated and repaired,
                 if necessary, by a licensed mechanic.
             •   Operators shall follow the manufacturer’s instructions for entering and exiting the cab.
             •   Operators shall not exit the cab of the crane if a load is suspended.
             •   Lifts shall not be made in winds that exceed the manufacturer’s recommendations or in winds
                 greater than 20 mph.
             •   Booms shall be lowered if lightning is present within 10 miles.
             •   No one shall work, stand, or walk under a suspended crane load.
             •   No one shall be on the crane when it is in use.
     24.5 Conditions
     Upon arrival, before first use, if the crane changes possession, or is reconfigured the operator is
     responsible for completing the Crane Operator’s Review (D-27) to ensure equipment is safe for use.
     Operators shall verify and document that equipment placement areas shall support the weight of the
     equipment and loads prior to any hoisting(D-26). The documentation shall be submitted to Toyota Safety.
     The Operator shall mark boundaries for the minimum approach distance (MAD) with items such as flags or
     range limit/range control warning devices. The operator shall not operate the crane beyond those
     boundaries. All overhead power lines and obstructions shall be located and marked prior to placement of
     the crane and incorporated in the minimum approach distance planning.
     Operators shall comply with the manufacturer’s specifications and limitations applicable to the operation of
     all cranes, especially as it relates to high wind speeds. All Toyota Facility local rules shall apply as to
     weather and lightning conditions.
     24.6 Operations
     The operator shall maintain a 20-foot (6.5 meters) clearance from any power line (up to 350 Kilovolt). A
     qualified rigger and a qualified signal person shall be used on all lifts. For all critical lifts, a certified rigger
     must be used.
     Where caught between hazards exist, tag lines or other suitable devices shall be used to control loads
     being handled by hoisting equipment. A safe working zone shall be established, and barricades erected to
     prevent inadvertent entry by unauthorized personnel. Operators must use a spotter per the Spotter
     Decision Matrix (D-30) in the Appendix of this document.
24.7 Qualifications
                                                                                                                             71
•• PROTECTED 関係者外秘
     Required – Knowledge of applicable consensus standards i.e. NFPA 70E/CSA Z462, if electrical work will
     fall under his/her scope, knowledge of OSHA Subpart R and ANSI/AISC 360 if steel erection of structural
     steel buildings will fall under his/her scope.
     Preferred – A recognized, independent third-party safety certification. Examples: CSP/ASP, SMS, CHST,
     STSC, CSHO, CSHT, CRSP, etc.
     Preferred – OSHA 500 Construction Industry Train the Trainer (indicates the ability to communicate safety
     information to others) (U.S.)
Experience
     Required – Minimum of 5 years direct experience with the specific type of hazards that can reasonably be
     expected in the contractor’s daily work.
            1. Example - If the contractor will perform site prep, the contractor’s Safety Representative should
               be knowledgeable in trenching and shoring, earth moving equipment, dust control measures,
               etc. If performing crane work, the Safety Representative should have extensive knowledge of
               crane safety, rigging requirements, signaling requirements, etc.
     Expected – Minimum 3 years’ experience conducting safety related activities including, not limited to:
                                                                                                                72
•• PROTECTED 関係者外秘
     Preferred – Experience leading successful interactions with any Federal/Provincial/State inspections, e.g.
     OSHA, Ministry of Labor, Fire Marshall, etc.
     Dedicated Contractor Construction Safety Representative resumes and Dedicated Subcontractor Safety
     Representative resumes should be sent to the Project Leader and should be considered approved on a per
     project basis. Dedicated Construction Safety Representative badges and Dedicated Subcontractor Safety
     Representative badges will be deactivated when their current assignment is complete.
     25.3 Workers
     All Contractor construction workers shall possess proof of training in an OSHA 10-hour Outreach Course
     for the Construction Industry (U.S.).
     25.4 Designated Contractor Construction Safety Representative – See Table in Section 1.7
     Required – OSHA 30 Construction Industry Outreach Program (U.S.)
     Required - Minimum of 5 years direct experience with the specific type of hazards that can reasonably be
     expected in the contractor’s daily work.
     Work being performed has any type of work instructions (Standardized Work, Alternative Control Methods
     (ACMs) etc.) with safety key points, Team Members will follow that work plan. For the work that does not, a
     Daily JSA(D-18) is required.
     All non-hazardous work does not require a JSA. Non-hazardous work can be defined by answering “No” to
     the following questions:
                                                                                                                73
•• PROTECTED 関係者外秘
        •   Does your job involve jammed parts, parts under pressure, gravity, or stored energy present in a
            machine?
        •   Are you working from heights that require fall protection to be worn (>6' or >10' in Canada)?
        •   Are you troubleshooting with guards removed or bypassed while the machine has power?
        •   Does the job require you to lift objects that require rigging?
        •   Do you need to wear more than your shop required PPE?
        •   Are tools required to perform the task (Production tasks Only)
        •   Does your job require you to use more than hand (A Tools) and power Tools (B Tools) Only (for
            Maintenance tasks only)?
        •   Do you need to lift any objects greater than 50 lbs.?
If you answer yes to any of the questions above, a JSA (D-18) must be completed.
All jobs/projects are required to be classified using the Non-Standard Job Safety Rankings Matrix (below).
                                                                                                               74
•• PROTECTED 関係者外秘
     After ranking the job, The JSA must be approved. The project leader and Toyota Safety/designee is
     responsible for approving all Rank A and B jobs. The Job leader is responsible for approving all C-Rank
     job activity. Once approved, work can begin. All applicable D-forms must be completed before starting
     work. For all A&B ranked planned activity a D-35 audit shall be completed using the TERA application.
                           YES
                 Not applicable to TCSR .                NO                 Answer YES to ANY question you MUST
                                                                                                                           Answer NO to ALL questions, NO JSA required
                       Follow WIS.                     Go to 1b.                      complete a D-18
                No Additional Requirements
Rank your Job based on the work activities Safety Check per TCSR
                                        · Lifting any Cabinet/locker/ storage bin >4' & >220 lbs. or unknown weight
                                                                                                                            ãProper PPE
                                        ·Non-Production Lifts > than 220 lbs. w/o engineered lift points or non-
                                        palletized load without known center of gravity (D-26 required)
                                                                                                                            ã COHE Training
                        A
                                        · Swapping Robots with Rigging >220 lbs.
                                        · Fall Protection Equipment used w/o certified anchorage point
                                                                                                                            ã Machine/Tool Safety Cert
                                        ·Permit Required Confined Space Entry
                                        ·Rigging loads > 220 lbs.
                                        · Trenching/Excavation
                                                                                                                            ã Energized Electrical Work
                                        · Live Electrical Work > 50 volts or when energized work permit req'd               (D-45 EEWP)
                                        · Heavy Equipment Operation
                                        ·D-44 Exiting Aerial Lift Walking or Climbing Strucural Steel                       ã Rigging, Lifting, Hoisting, Crane Activity
                                        · Stored Energy(gravity) or parts under pressure(jammed)
                                                                                                                            (D-26Lift Checklist)
                                        · Building Karakuri/Minomi w/ external power or counterbalance
                                        · Hanging screens/Andon displays
                                                                                                                            ã Confined Space Entry(w Permit)
                                        · Moving/installing/removing guardrails/logistics fencing
                                        · Hot Work
                        B               · Demolition
                                        · Elevated work from a lift (fall protection required)
                                        · Fall protection used with a certified anchor point
                                                                                                                            ã PIV (Spotter Decision Matrix)
                                                                                                                            ãBarricading
                                        · Ladder Usage > 6' (10' Canada) (fall protection required)                          (Danger/Warning Signage and Tape)
                                        · All jobs using tools from the "C and/or D" Tool Classification
                                        · Commissioning
                                                                                                                            ãHot Work(Hot Work Permit)
                                        · Building Karakuri/Minomi -simple motion devices without power
                       C
                                        · Hanging general signage (floor level)
                                        · All jobs using tools from the B Tool Classification (Maintenance Tasks N/A)
                                                                                                                            ãAerial Lift Usage
                                        · Lifting/Rigging Objects <220 lbs. but > 50 lbs. or lifting object >220 lbs.
                                        with engineered fork pockets
                                                                                                                             (D-44 If leaving work basket or walking on structural
                                        · Non-Permit required confined space entry                                          steel)
                                                                                                                                                                                     75
•• PROTECTED 関係者外秘
     26.2 Troubleshooting
     For all troubleshooting that involves the removal of covers/guards or bypassing a safety device with power
     on, while within 6’ of crush and/or pinch point of equipment, the following conditions must be met:
Utilize approved ACM or D-18 (JSA) approval process for A-rank work tasks.
     If repairs are needed or covers/guards need to be reinstalled, follow CoHE using isolation or approved
     ACM for the specific task needing to be performed.
         •   Skilled COHE
         •   Fall Protection
         •   Hot Work
         •   Rigging/Lifting
         •   Mobile Equipment/PIV
                                                                                                              76
•• PROTECTED 関係者外秘
        •   Aerial Lift
        •   Crane
        •   ESWP
        •   Confined Space
        •   Scaffolding
     26.3.4 Workers
     Any TM that is performing non-standard work activity must take the following training:
                                                                                              77
•• PROTECTED 関係者外秘
                     Appendix
                        03/31/2024
                                           78
•• PROTECTED 関係者外秘
     Index Forms
     The forms in the Appendix are to be used as needed to provide information and
     Planning. These forms are available electronically.
     Each Toyota Facility may have their own forms for specific activities. Check with
     Toyota Safety before beginning work to determine which form should be used.
                                                                                         79
•• PROTECTED 関係者外秘
           Work Rules
          Roll-Off Containers                                    144
          Lineman’s Belt                                         145
          Loading and Unloading Equipment to Delivery Trucks     146
          ISN Variance Request (US)                              147
          Summary - Find It. Fix It. No Repeats.                 148
                                                                       80
•• PROTECTED 関係者外秘
                                                 81
•• PROTECTED 関係者外秘
COMPETENT PERSONS
29 CFR 1926.32(f)
     "Competent person" means one who is capable of identifying existing and predictable hazards in the surroundings or
     working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take
     prompt corrective measures to eliminate them.
     The Competent Person procedure establishes the requirements for the designation of Competent Persons who will be
     responsible for complying with specialized activities such as testing, repairs, machinery/equipment maintenance,
     operations inspections, and maintenance of an incident prevention program.
     Each Contractor is responsible for designating the Competent Person for each required specialized activity as
     required by OSHA. The Contractor will ensure that the required qualifications are met, performance is evaluated, and
     a Competent Person is available for each required activity. The Contractor will ensure that the designation of the
     Competent Person is documented on a Competent Person Designation Form and is available for review by the
     Toyota Safety and the state or federal entity having jurisdiction over the Project.
     The Contractor shall ensure that all requirements of the designation of Competent Persons on the project are
     implemented, documented, monitored, evaluated, and modified as needed.
     The designated Competent Person is responsible for complying with the required testing, repairs,
     machinery/equipment maintenance, and the maintenance of an incident prevention process that includes, but is not
     limited to the following equipment and activities covered by OSHA:
                                                                                                                        82
•• PROTECTED 関係者外秘
                                   83
     Pre-Excavation Plan
         Area of Work:
                                                                                                                                                 •• PROTECTED 関係者外秘
         Utility Identification
                                      Located Impact
        1 Gas
        2 Electrical
                                                                                                    D-02A Pre-Excavation Plan for GPR Scanning
        3 Water
        4 Communications
        5 Sewer
        6 Storm
        7 Other
84
     Pre-Excavation Plan
                                                                                                                                                           •• PROTECTED 関係者外秘
         Utility Identification
                         Located Impact
        1 Gas            O       Impacted
        2 Electrical     O       No impact
        3 Water          O       No impact
                                                                                                    D-02B (Example) Pre-Excavation Plan for GPR Scanning
        4 Communications O       No impact
        5 Sewer          O       No impact
        6 Storm          O       No impact
        7 Other          N/A N/A
85
•• PROTECTED 関係者外秘
D-03A Utility Tie In Request Form (Verify with local Toyota Facility for current form)
                                                                                              86
•• PROTECTED 関係者外秘
                            87
•• PROTECTED 関係者外秘
                                   88
•• PROTECTED 関係者外秘
                                  89
•• PROTECTED 関係者外秘
                                                         90
•• PROTECTED 関係者外秘
                                                         91
•• PROTECTED 関係者外秘
                                                                                                                                    VIOLATION DATE:
                                                                                                                                    VIOLATION TYPE:
                                                                                                                          VIOLATION TIME (24hr Clock):
                                                                                                                                              PLANT:
                                                                                                                                       DEPARTMENT:
                                                                                                                       PERSON OBSERVING VIOLATION
                                                                                                                                     COMPANY NAME
                                                                                                                                    WORKERS NAME:
                                                                                                                                SUPERVISORS NAME:                                     PHONE:
            D13: This report to be completed by the Superintendent/Foreman and submitted within 24hrs MAX.
WAS AN INJURY A RESULT OF THIS VIOLATION: YES (attach to form CSF D12) No
VIOLATION DESCRIPTION
WORKERS STATEMENT:
ACTION BY TOYOTA:
                                                                                                                                                                                                       92
•• PROTECTED 関係者外秘
                                            93
•• PROTECTED 関係者外秘
                                94
•• PROTECTED 関係者外秘
                                               95
•• PROTECTED 関係者外秘
                                        96
•• PROTECTED 関係者外秘
                                      97
•• PROTECTED 関係者外秘
                                                           98
•• PROTECTED 関係者外秘
                                                          99
•• PROTECTED 関係者外秘
                                       100
•• PROTECTED 関係者外秘
                           101
•• PROTECTED 関係者外秘
                     102
•• PROTECTED 関係者外秘
                                    103
•• PROTECTED 関係者外秘
                 TOYOTA Construc tion Proc edure                                                                             PLEE & Safety Approvals
               Proc edure Department:           Produc tion Engineering PLEE                                                 PLEE             SAF      Date
                  Proc edure Name:          Struc tural Steel Pre- Detailing Meeting                              GM
                 Proc edure Number:                     Effec tive Date:                                          AGM
         D-29A Revision
                Pre-Detail
                        Number:
                                Meeting
                                      Revision Date:                                                              MGR
SS Fabricator:
                The Structural Steel Pre-Detail Meeting shall include the above listed participants, as applicable, as well as any others involved in the
                design, detailing, fabrication, erection of structural steel, joists and decking associated with the Project.
                The topics listed below shall be discussed during the meeting at a minimum.
                General
                    Roles and Responsibilities
                    Key Contacts
                    Communication Protocol
                                        RFI Process
                                        Distribution
                Shop Drawings
                    What to Submit
                    Format Requirements
                    Shop Drawing Submitted by Sequence
                    How Many Copies
                    Sealed Calculations (if applicable)
                    Shop Drawing Approval Timing
                Anchor Bolts
                     SS Contractor to Fabricate and Supply Anchor Bolts and Setting Diagrams
                     Foundation Contractor to Install Anchor Bolts (as applicable)
                     SS Fabricator and Erector Shall be Responsible to Field Survey Existing Construction Where New Construction Joins Existing
                Cutting Openings
                     Fire Watch Required
                     Weathertight Enclosures Required
                     Coordination of Openings with Owner
                                                                                                                                                              104
•• PROTECTED 関係者外秘
          Connections
              Use Single Plate Shear Connections or Similar Wherever Possible
              "Shared" or "Double" Connections Through Column Webs or to Beams Over Columns shall NOT be permitted Without
              Approval of EOR and Toyota.
              If a "Shared" or "Double" Connection is Required, the Connection Must be Detailed so That it can be Erected in Any
              Sequential Order (Having Extra Bolts or Seats on Both Sides of the Column/Beam Web).
          Deck Fastening
              Field, Edges, Corners, and Attachment at Eves
              Deck Support Angles at Columns
          Erection Tolerances of Structural Steel
          Erection Sequencing
          Fabrication QC/QA
              Reports
              3rd Party Inspections
Other Topics
       Engineer Of Record
       Representative          Name                                     Signature                              Date
       Controlling Contractor
       Representative         Name                                      Signature                              Date
       SS Contractor
       Representative          Name                                     Signature                              Date
       SS Detailer
       Representative          Name                                     Signature                              Date
       SS Fabricator
       Representative          Name                                     Signature                              Date
       Joist/Decking Mfg.
       Representative          Name                                     Signature                              Date
                                                                                                                                   105
•• PROTECTED 関係者外秘
                                  106
•• PROTECTED 関係者外秘
            Cranes
                 The Crane Operator must be trained and certified for the size of the crane.
                 Qualified Riggers must be utilized.
                 Will a signal person be required?
                 The operator and signal person must agree on type and means of signals they will use.
                 Is there enough room to assemble / disassemble the crane?
                 Will the assembly / disassembly of the crane be directed by a person that meets the criteria for
                 both a competent and qualified person?
                 Are there any Critical Lifts?
                 Has the CSF D-26 been completed?
            Site-Specific Erection Plan
                The SSEP must be developed by a Qualified Person.
                The plan be posted at the job site, available to all involved in the erection activities.
                If applicable, the plan must provide Alternate Means of providing Employee Protection.
                The plan must include the description of the crane selection and placement procedures.
                The plan must include a description of Steel Erection Activities and Procedures.
                        Employees are not working directly below suspended loads
                        Employees engaged in the Initial Connection are identified and trained
                        Employees necessary for the hooking and unhooking of the loads are identified
                        Temporary column / beam connections
                The plan must list Emergency Rescue Procedures.
                        Self-Rescue          Stair Tower          Aerial / Scissor lifts       Man Basket
                        Emergency Response Team               First Aid Trained Personnel           Local Emergency Response
                                                                                                                                                    107
•• PROTECTED 関係者外秘
             Safety Representation
                 Must have at minimum: OSHA 30 Hour, CPR, First Aid, OSHA Subpart R - Steel Erection,
                 OSHA Subpart M - Fall Protection, OSHA Subpart N - Cranes & Derricks
                 Minimum 2 years field experience
              Fall Protection
                  Will a competent person in fall protection be on site at all times?
                  Were fall protection systems designed by a Qualified Person?
                  Will the erection areas be properly signed and barricaded?
                  Are methods in place for securing loose items aloft?
          Controlling Contractor
                                    Name                                   Signature                          Date
          Toyota Project
          Leader Review             Name                                   Signature                          Date
          Toyota Construction
          Safety Review             Name                                   Signature                          Date
                                                                                                                              108
                                     TOYOTA Construction Procedure                                                PLEE & Safety Approvals
•• PROTECTED Procedure
             関係者外秘     Section:                                                                                         SAF            PLEE       Date
                  Procedure Name:          Structural Steel Daily Pre- Start- up Meeting                     GM
                 Procedure Number:                       Effective Date:                                    AGM
                General Contractor:
                SS Contractor:
                Foundation Approval
                     The concrete in footings, piers, and walls must have cured to Adequate Strength for steel erection.
                     75% of concrete strength verified by Engineer or testing prior to starting the erecting?
                     Project Engineer has approved anchor bolt repairs, replacements, and modifications?
                     Has the Controlling Contractor provided Written Notification to the steel erector for the above?
                Site Layout
                     Has the Controlling Contractor provided adequate Access and means to maintain Access
                     to the site?
                     Is the area firm, properly graded, well drained and accessible?
                     Will the areas of crane placement support the weight of the crane and loads?
                     Is there adequate room for the erection tasks and required support equipment?
                     Has the Controlling Contractor means and methods for Pedestrian and Vehicular Control?
                Pre-planning
                     Has the Sequence of Erection Activities for the day been discussed?
                     Has the Erection Stability Plan been reviewed with raising gang?
                     Do all affected persons understand no variance to the Erection Stability Plan without
                     written approval for the EOR or Qualified person?
                     Has the path for overhead loads and how effected workers are notified been discussed?
                     Are there special procedures required for Hazardous non-routine Tasks?
                     Procedures in the event of Rescue or Emergency Response provided and reviewed?
                     Has all utilities in the area of work, been identified and protection provided if necessary?
                Cranes
                     Has the Crane Operator been trained and certified for the size of the crane?
                     Will a Qualified Rigger be used?
                     Will a signal person be required?
                     Has the operator and signal person agreed on type and means of signals they will use?
                     Is there enough room to assemble / disassemble the crane?
                     Will the assembly / disassembly of the crane be directed by a person that meets the criteria for              Y          N
                     both a competent and qualified person?
                                                                                                                                                         109
•• PROTECTED 関係者外秘
Fall Protection
          Controlling Contractor
                                    Name                                 Signature                               Date
          Toyota Project
          Leader Review             Name                                 Signature                               Date
          Toyota Construction
          Safety Review             Name                                 Signature                               Date
                                                                                                                           110
•• PROTECTED 関係者外秘
Scissor Lifts √
                                    Working in a                                        Cranes                                           √
                                                                                                                                                                                            Detail in JSA if
                                  construction area                              Civil Equipment                                                                        √                pedestrian must be in
                                                                                                                                                                                             taped area
                                                                                    Scissor Lifts                                        √
            Exterior
                                                                                      Aerial Lift                                        √
                                                                                        Forklift                                                                        √
                                                                                 Civil Equipment                                                                        √                  No pedestrians
                                     Driving on an
                                                                                                                              Vehicle Escort                                                permitted on
                                      established                                       Cranes                                                                          √                    established
                                                                                                                              w/ flashing light
                                       roadway                                                                                                                                               roadways.
                                                                                    Scissor Lifts                                                                       √
                                                                                      Aerial Lift                                                                       √
      Civil Equipment:
      • Dedicated spotter is required for loaders, bulldozers, skid steer, and other civil equipment operating outside of designated construction area but not on established roadway.
      • Areas with significant construction traffic require traffic control person in addition to spotters when accessing established roadways or aisleways
      • JSA to dictate use of any additional spotters based on risk
      • No pedestrian permitted inside designated construction area where civil equipment is in operation without specific tasks documented on a JSA.
            •If pedestrians must enter, an escort is required.
      Note:
      No spotters permitted inside taped work zone unless performing rescue or specific instructions per JSA
      Spotters are not required when operating forklifts as part of a normal production process.
      A 1:1 spotter oper ratio is required when no barricading tape is used around a work zone.
      If danger tape is used, one spotter can be used for all equipment if all spotter duties can fulfilled.
                                                                                                                                                                                                            111
•• PROTECTED 関係者外秘
     2. Section C1 - JSA
          1       Posted, easy access                                       Yes             1           1
          2       Required documents on control board                       Yes             1           1
          3       Additional Comments for this section:
                                                                       Section Points       2           2.0
                                                                                                                                112
•• PROTECTED 関係者外秘
2 Trip Hazards: Cords neatly run, areas clean Yes 0.5 0.5
                                                                                                       113
•• PROTECTED 関係者外秘
                                                                                       115
•• PROTECTED 関係者外秘
                              116
•• PROTECTED 関係者外秘
                     117
•• PROTECTED 関係者外秘
                                                118
•• PROTECTED 関係者外秘
                                    119
•• PROTECTED 関係者外秘
                                 120
•• PROTECTED 関係者外秘
D-44 Exiting Aerial Lift / Walking or Climbing Structural Steel Check Sheet
                                                                                   121
•• PROTECTED 関係者外秘
                                                    122
•• PROTECTED 関係者外秘
                                                                123
•• PROTECTED 関係者外秘
                                                                                                     124
•• PROTECTED 関係者外秘
                                                                                                       125
•• PROTECTED 関係者外秘
                                                                     126
•• PROTECTED 関係者外秘
     Section P Excavations-
     Sloping, Shoring Examples
           Slope Configurations
           1. All simple slope excavation 20 feet or less in depth shall have a maximum
           allowable slope of ¾:1.
           Exception: Simple slope excavations which are open 24 hours or less (short term)
           and which are 12 feet or less in depth shall have a maximum allowable slope of ½:1.
           2. All benched excavations 20 feet or less in depth shall have a maximum allowable
           slope of 3/4 to 1 and maximum bench dimensions as follows:
                                                                                            127
•• PROTECTED 関係者外秘
SIMPLE BENCH
MULTIPLE BENCH
          3. All excavations 8 feet or less in depth which have unsupported vertically sided
          lower portions shall have a maximum vertical side of 3½ feet.
          All excavations more than 8 feet but not more than 12 feet in depth with unsupported
          vertically sided lower portions shall have a maximum allowable slope of 1:1 and a
          maximum vertical side of 3½ feet.
                                                                                               128
•• PROTECTED 関係者外秘
          All excavations 20 feet or less in depth which have vertically sided lower portions
          that are supported or shielded shall have a maximum allowable slope of ¾:1. The
          support or shield system must extend at least 18 inches above the top of the vertical
          side.
          4. All other simple slope, compound slope, and vertically sided lower portion
          excavations shall be in accordance with the other options permitted under §
          1926.652(b).
          Excavations Made in Type B Soil
          1. All simple slope excavations 20 feet or less in depth shall have a maximum
          allowable slope of 1:1.
SIMPLE SLOPE
          2. All benched excavations 20 feet or less in depth shall have a maximum allowable
          slope of 1:1 and maximum bench dimensions as follows:
                                                                                            129
•• PROTECTED 関係者外秘
SINGLE BENCH
MULTIPLE BENCH
          3. All excavations 20 feet or less in depth which have vertically sided lower portions
          shall be shielded or supported to a height at least 18 inches above the top of the
          vertical side. All such excavations shall have a maximum allowable slope of 1:1.
          4. All other sloped excavations shall be in accordance with the other options
          permitted in § 1926.652(b).
                                                                                              130
•• PROTECTED 関係者外秘
                1. All simple slope excavations 20 feet or less in depth shall have a maximum
                allowable slope of 1½:1.
SIMPLE SLOPE
                2. All excavations 20 feet or less in depth which have vertically sided lower
                portions shall be shielded or supported to a height at least 18 inches above
                the top of the vertical side. All such excavations shall have a maximum
                allowable slope of 1½:1.
                3. All other sloped excavations shall be in accordance with the other options
                permitted in § 1926.652(b)
                                                                                                131
•• PROTECTED 関係者外秘
          1. All excavations 20 feet or less in depth made in layered soils shall have a
          maximum allowable slope for each layer as set forth below.
B OVER A
C OVER A
C OVER B
A OVER B
                                                                                           132
•• PROTECTED 関係者外秘
A OVER C
B OVER C
          2. All other sloped excavations shall be in accordance with the other options
          permitted in § 1926.652(b).
                                                                                          133
•• PROTECTED 関係者外秘
                                               134
•• PROTECTED 関係者外秘
Scaffold Tags
       Red Tag –
        No access allowed. Scaffold is being erected or dismantled, or a major safety defect has been found.
       Yellow Tag –
        Scaffold does not meet all Federal, State/Provincial and Local requirements. Access requires
        Personal fall protection to be used at all times.
       Green Tag –
        Scaffold meets all Federal, State/Provincial and Local requirements, and is safe to use.
                                                                                                        135
•• PROTECTED 関係者外秘
                                                                               136
•• PROTECTED 関係者外秘
                     137
•• PROTECTED 関係者外秘
                                   138
•• PROTECTED 関係者外秘
                             139
•• PROTECTED 関係者外秘
                                   140
•• PROTECTED 関係者外秘
                     141
•• PROTECTED 関係者外秘
                                                        142
•• PROTECTED 関係者外秘
          Key Considerations:
            1 Ensure that utilizing skates is a last resot and all other methods to move materials have been considered.
             2    Skates must be rated for the weight of the material being moved and designed for planned use.
             3    Manufacturer rating must be visible on skates or PE stamp must be obtained for shop built skates.
             4    Appropriate method must be used to secure material to skates - no vice grip style clamps.
             5    Identify all parts of the skate move on JSA.
                  • Skate to be used(multidirectional, fixed wheel, etc.)
                  • Determine the travel path
                  • Identify hazards (uneven floors, dips in concrete, etc.)on the route
                  • Develop CM plan for hazards
             6    Utilize bracing between skates when necessary to prevent separation - 4 post Gantry, etc.
             7    Ensure all body parts are kept clear of equipment being moved at all times. Determine safe distance to stand
                  away from load based on height and potential for falling. No hands/feet under suspended load.
             8    Perform Stop, Call, Wait if need to reach in or under load arises. All 4 corners of load must have proper
                  chalking and cribbing.
             9    D-26 Lifting form required for setting on/removing from skates.
                  If load gets stuck, STOP,CALL WAIT. Determine next steps to move load safely. Review JSA and D-26. Update
            10    JSA where needed and create D-26 for lifting from skates.
          This work requirement does not apply to TM-led non-standard work. If loads need to be moved with skates, contact a
          competent contractor to perform the task.
                  No PE Rating
                                                                                                                                   143
•• PROTECTED 関係者外秘
Work Rules
                                                 144
•• PROTECTED 関係者外秘
                                145
•• PROTECTED 関係者外秘
                                                         146
•• PROTECTED 関係者外秘
                                 147
•• PROTECTED 関係者外秘
Toyota Safety Management is built around the principle of Find It, Fix It, No Repeats.
        •   Find It – TOYOTA expects our Team Members and Contractors to find safety hazards and
            behavioral issues by themselves before someone gets hurt. This represents that the Toyota
            Management, Contractor management and Safety representatives have a critical eye for
            safety. The ability to find and address problems proactively is essential for success at
            TOYOTA sites.
        •   Fix It – TOYOTA expects our Team Members and Contractors to show the importance of
            safety through rapid resolution of issues identified on audits or raised by their members. By
            stopping and addressing safety hazards quickly and communicating with the members.
            Safety is the highest priority.
        •   No Repeats – Sustained success at TOYOTA requires Team Members and Contractors to
            demonstrate PLAN-DO-CHECK-ACT, reflect on lessons learned and prevent reoccurrence of
            safety issues. When safety hazards reoccur, it represents a failure of management to
            implement effective countermeasures.
148