NERC Inverter-Based Resource (IBR) Webinar
Series:
Session 5: Modeling Part 1 – Modeling Requirements, Model Creation, Model Usability
June 20, 2023
                                                                          RELIABILITY | RESILIENCE | SECURITY
Modeling Part 1 -
Modeling
Requirements,
Model Creation,
Model Usability
                         1. SOFTWARE
                         2. GRID EXPERIENCE
                         3. MODEL VALIDATION
                         4. ADAPTABILITY
                         5. CHALLENGES
Presentación comercial
                         1. SOFTWARE   P0-E Offers Modeling support for the following programs
                                                    Software
                                                •   DIgSILENT Power Factory
                                                •   PSCAD
                                                •   PSS/E   (WECC and User Defined)
                                                •   PSLF
                                                •   EMTP-RV
                                                •   TSAT-SSAT
                                                •   EMTP-ATP
                                                •   ANATEM
Presentación comercial
                         2. GRID CODE EXPERIENCE
                           •   USA
                           •   Australia
                           •   España
                           •   Portugal
                           •   Alemania
                           •   Francia
                           •   UK
                           •   Japón
                           •   Omán
                           •   Jordania
                           •   México
                           •   Brasil
                           •   Uruguay
                           •   Bolivia
                           •   Argentina
                           •   Chile        P-E tries to proactively maintain model compliance but
                           •   Egipto
                                            It is challenging to track proposed updates in the US and
                           •   Tailandia
                           •   Vietnam      worldwide
Presentación comercial
                         4. MODEL VALIDATION
                                    SW      UWM   GENERIC              Application
                            DIgSILENT                       Static studies
                            Power Factory                   Dynamic studies (RMS)
                                                            WECC: Dynamic studies (RMS)
                            PSS/E
                                                            Dynamic studies (RMS)
                            PSCAD                           Dynamic studies (EMT)
                            EMTP-RV                         Dynamic studies (EMT)
                            PSLF                            WECC: Dynamic studies (RMS)
Presentación comercial
                         • P-E provides general purpose models that must be
                           parametrized for site specific conditions.
                         • The Power-Electronics Grid Team is based in Valencia, Spain
                           and can assist with modeling issues and project specific
                           requirements
                         • Power-Electronics uses it’s world-wide experience in places like
                           Chile and Australia to advance the US modeling work
                         • P-E inverter models are benchmarked again our Hardware-in-
                           the-Loop
                         HIL                                  PSCAD
Presentación comercial
¡THANKS!
9   RELIABILITY | RESILIENCE | SECURITY
Facility Model Creation
and Usability
Roadblocks
 Billy F. Yancey III
 VP Technical Services and Compliance
 June 20, 2023
 NERC IBR Webinar Series
                     Facility Model Creation Process
The facility model creation process is an iterative process with interaction between multiple parties, i.e., Developers,
                                             OEMs, EORs, Consultants, etc.
        Preliminary Design            Bridging the gaps towards seamless preliminary design to interconnection
                                                                                                                         Interconnection Request
                                                                     request.
                 Request for Information              S          G   Model Creation             Distribution
                                                                                                Distribution
                                                                                                                         Model Testing and
                 and Review                                                                                              Benchmarking
          Balance of Plant Design                         Steady State Model (PSSE/PSLF)                      ERCOT Model Quality Test
          Voltage control strategy of plant               Short Circuit Model (Aspen)                         PJM Model Testing
          Generator models (PSSE, PSLF,                   Dynamic Model (PSSE/PSLF/TSAT)                      ISO-NE Model Testing (PP 5-6)
           TSAT, PSCAD, Aspen, etc.)                       Transient Model (PSCAD)                             HECO Model Testing standards
                                                                                                                IEEE P2800 requirements
                        Facility Model Creation Process
    The request for information and review can be a time-consuming process. This is where critical assumptions are
      sometimes made that can have significant impacts on projects and could lead to need to restudy during the
                     interconnection process or even further down the road during commissioning.
                                                                        RFI Challenges
       Request for Information
       and Review                        BOP Design                                      Generator Models
                                             Typically, very preliminary and                 Depending on requirements
 Balance of Plant Design                     subject to change leading to                     within a region, dynamic and
 Voltage control strategy of plant           assumptions                                      transient models may take
 Generator Models (PSSE, PSLF, TSAT,        Inverter selection is still                      extended time to provide due
  PSCAD, Aspen, etc.)                         being negotiated and                             to availability of necessary
                                              finalized                                        controls
                                             Power Plant Controller (PPC)
                                              is most of the time not even
                                              in the discussion at this point
                            Facility Model Creation Process
      Model creation is typically an iterative process. The assumptions made during the request for information gathering
      are pre-tested to ensure they meet the necessary requirements and additional equipment/ controls are not needed
                                     before moving to full model testing and benchmarking.
                                                                   Model Creation Challenges
S         G   Model Creation                Steady State Model (PSSE/ PSLF)              Short Circuit Model (Aspen)
                                                 MPT sizing and OLTC control                 Utilities requested IBRs to be
                                                 Need for additional reactive                 modeled as current limited
     Steady State Model (PSSE/PSLF)              devices                                      generators
     Short Circuit Model (Aspen)                Quantity of IBRs and OEM                    Moved to Voltage control
     Dynamic Model (PSSE/PSLF)                   selection                                    current source (VCCS)
     Transient Model (PSCAD)                                                                 Recently requested of
                                                                                               converter interface resources
                                                                                               (CIR)
                           Facility Model Creation Process
      Model creation is typically an iterative process. The assumptions made during the request for information gathering
      are pre-tested to ensure they meet the necessary requirements and additional equipment/ controls are not needed
                                     before moving to full model testing and benchmarking.
                                                                                 Model Creation Challenges
                                        Dynamic Model (PSSE/ PSLF/ TSAT)                                  Transient Model (PSCAD)
S         G   Model Creation                Control parameters set as default without any guidance on          Similar concerns to dynamic model
                                             tuning to meet requirements                                        Some OEM documentation not clear on P
                                            Minimal to no documentation related to tests to                     and Q initialization
     Steady State Model (PSSE/PSLF)         demonstrated compliance with latest requirements                   Some parameters are hidden as
     Short Circuit Model (Aspen)           Still concerns surrounding VRT response requirement                 compared to dynamic model and
     Dynamic Model (PSSE/PSLF/TSAT)         (ERCOT)                                                             adjustments for benchmarking can be
     Transient Model (PSCAD)               Protection settings set to default without ranges provided          challenging
                                            Hybrid PPCs
                                            OEMs provide PPC with model even though it is not
                                             available or typically installed.
                                            No clarity on integrating external PPC
                                            UDM vs GM
Thank You
16   RELIABILITY | RESILIENCE | SECURITY
Establishing Modeling Requirements
ATC’s Experience in MISO
P R E S E N T E D B Y:
Tom Dagenais
Director, System Planning - ATC
June 20, 2023
                                  - ATC Proprietary -   atcllc.com
     Introducing ATC
     • Wisconsin-based company
     • Over 5 million electric
       consumers in service area
     • Over 500 employees
       making sure you have the
       energy you need, when
       you need it
18                                - ATC Proprietary -   atcllc.com
ATC Service Territory Resource Interconnection Projects:
Queues 2019-2022
19                       - ATC Proprietary -       atcllc.com
PSS/E vs. PSCAD Analysis
        PSS/E Simulation                                           PSCAD Simulation
                           Plot looks stable in PSS/E but is
                           seen to be oscillating in PSCAD.
• PSCAD provides a much
  more detailed look at what is
  happening on the system
                                  After adding a transmission system fix,
                                    PSCAD also shows a stable result.
 20                                 - ATC Proprietary -                               atcllc.com
Streamlining the Process: SCR
We can’t study everything… so we prioritize based on SCR and WSCR
• Short Circuit Ratio (SCR)
• Weighted Short Circuit Ratio (WSCR)
 21                               - ATC Proprietary -           atcllc.com   21
Maintaining Reliability
• Reliability issues are real and are here today – and will become more
  challenging in the future
• ATC among the first to include IBR requirements in our local planning criteria
• ATC has developed a PSCAD model
  verification process to screen out modeling
  issues before studies begin
       Includes a checklist, process guide, and
        PSCAD test component
       Publicly available through ATCLLC.COM
• When more widely adopted, this will be seen
  as a typical part of doing business
 22                                       - ATC Proprietary -             atcllc.com   22
23   - ATC Proprietary -   atcllc.com
          Feel free to reach out to us if
     interested in participating in the NERC
                 IRPS or EMTTF!
24                          RELIABILITY | RESILIENCE | SECURITY