GAMBAR ROZAK RRQ New
GAMBAR ROZAK RRQ New
5.60
1.65
1.90
16.00
16.00
1.75
1.50
1.75
3.50
1.75
1.80
3.50
1.70
2.50 2.00 0.50 3.50 3.00 1.50 0.90 1.60 14.50
30.00
RENCANA PONDASI
RENCANA PONDASI
30.00
30.00
SLOOF S2 15/30
1.60
PBKT
0.90
1.75
1.50
RE
3.50
3.00
SLOOF S2 15/30
PBKT
1.50
3.50
3.00
0.50
2.00
ROLLAG
1.50
ROLLAG
ROLLAG
SLOOF S2 15/30
2.50
2.50
PBKT
5.60 1.90 1.50 3.50 3.50
16.00
30.00
2.50 1.50 3.00 1.50 3.50 1.75 16.25
S1 S1 S1 S1 S1 S1 S1 S1 S1
S1
S1
5.60
5.60
S1 S1 S1 S1
S1
S1
S1
S1
S1
1.65
1.90
S1
S1
S1
S1
16.00
16.00
S1
S1
S1
1.75
1.50
S1
ROLLAG S1 S1 S1
1.75
S1
S1
S1
ROLLAG
S1
S1
3.50
S1
S1
1.75
S1 S1 S1
ROLLAG S1
1.80
S1
S1 S1
S1
S1
3.50
S1
S1
S1
S1
S1
1.70
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
2.50 2.00 0.50 3.50 3.00 1.50 0.90 1.60 14.50
30.00
R
RENCANA SLOOF
30.00
2.50 1.50 3.00 1.50 3.50 1.75 16.25
RB RB RB RB
RB
5.60
5.60
B1 B1 B1 RB
RB
RB
RB
1.65
RB
1.90
B1
RB
B1
RB RB
RB
16.00
16.00
1.75
1.50
RB
RB
RB RB RB RB
1.75
B1
B1
RB
RB
RB
RB
3.50
RB
1.75
B1
RB
RB
RB B1 B1
B1
1.80
RB
RB
RB
RB
3.50
RB RB
RB
1.70
RB RB RB RB RB RB RB RB
2.50 2.00 0.50 3.50 3.00 1.50 0.90 1.60 14.50
30.00
R
R ENCANA BALOK
16.00
5.60 1.65 1.75 1.75 1.75 1.80 1.70
KP KP KP KP KP
KP KP
14.50
KP KP
16.25
KP KP
PONDASI
KP KP KP
30.00
30.00
1.60
RENCANA
KP
0.90
KP KP KP
1.75
KP KP
1.50
K1 K1
R
KP K1 KP
KP KP K1 KP KP
3.50
3.00
KP KP
K1 KP K1
1.50
3.50
KP KP KP KP KP
3.00
KP KP
K1 K1
0.50
KP K1
KP KP
2.00
ROLLAG
1.50
ROLLAG
KP KP
ROLLAG
K2 K2
2.50
2.50
KP KP KP KP KP
5.60 1.90 1.50 3.50 3.50
16.00
30.00
2.50 1.50 3.00 1.50 3.50 1.75 16.25
5.60
5.60
1.65
1.90
16.00
16.00
1.75
1.50
1.75
3.50
1.75
1.80
3.50
1.70
2.50 2.00 0.50 3.50 3.00 1.50 0.90 1.60 14.50
30.00
REN
RENCANA DAK BETON
30.00
2.50 1.50 3.00 1.50 3.50 1.75 16.25
5.60
5.60
RENCANA RANGKA ATAP
1.65
1.90
16.00
16.00
1.75
1.50
1.75
3.50
1.75
1.80
3.50
1.70
2.50 2.00 0.50 3.50 3.00 1.50 0.90 1.60 14.50
30.00
5.60
1.65
1.90
16.00
16.00
1.75
1.50
1.75
3.50
1.75
1.80
3.50
1.70
2.50 2.00 0.50 3.50 3.00 1.50 0.90 1.60 14.50
30.00
ATAP
RENCANAATAP
RENCANA
150 150
KERAMIK
TRASRAM
RABAT 5cm TRASRAM
SLOOF 15/30 SPESI
SLOOF 15/30
KERAMIK
630
630
RABAT 5cm
SPESI
300
300
TANAH URUG
TANAH URUG
800
800
BATU GUNUNG BATU GUNUNG
100
100
ANSTAMPING ANSTAMPING
100
100
PASIR URUG PASIR URUG
300 300
700 700
DETAIL PONDASI BATU KALI SAMPING DETAIL PONDASI BATU KALI TENGAH
K1 K2 KP
250
200
150
150 150
DETAIL KOLOM
B1 S1
RB
300
300
250
250
150
150
150 150 200 200
120 120
POTONGAN A-A
76
10
76
PINTU PVC
POTONGAN B-B
30.00
2.50 1.50 3.00 1.50 3.50 1.75 16.25
5.60
5.60
1.65
1.90
16.00
16.00
1.75
1.50
1.75
3.50
1.75
1.80
3.50
1.70
2.50 2.00 0.50 3.50 3.00 1.50 0.90 1.60 14.50
30.00
RENCANA KERAMIK
30.00
5.60 2.50 1.50 3.00 1.50 3.50 1.75 16.25
5.60
1.65
1.90
16.00
16.00
1.75
1.50
1.75
3.50
1.75
1.80
3.50
1.70
2.50 2.00 0.50 3.50 3.00 1.50 0.90 1.60 14.50
30.00
RENCANA PLAFOND
30.00
2.50 1.50 3.00 1.50 3.50 1.75 16.25
5.60
5.60
1.65
1.90
16.00
16.00
1.75
1.50
1.75
3.50
1.75
1.80
3.50
1.70
2.50 2.00 0.50 3.50 3.00 1.50 0.90 1.60 14.50
30.00
DENAH KUSEN
30.00
2.50 1.50 3.00 1.50 3.50 1.75 16.25
5.60
5.60
1.65
1.90
16.00
16.00
1.75
1.50
1.75
3.50
1.75
1.80
3.50
1.70
2.50 2.00 0.50 3.50 3.00 1.50 0.90 1.60 14.50
30.00
KETERANGAN :
- INSTALASI MEKANIKAL INI ASUMSI ARSITEKTURAL
30.00
5.60 2.50 1.50 3.00 1.50 3.50 1.75 16.25
5.60
1.65
1.90
16.00
16.00
1.75
1.50
1.75
3.50
1.75
1.80
3.50
1.70
2.50 2.00 0.50 3.50 3.00 1.50 0.90 1.60 14.50
30.00
RENCANA KERAMIK
30.00
2.50 1.50 3.00 1.50 3.50 1.75 16.25
MA
5.60
5.60
1.65
1.90
16.00
16.00
1.75
1.50
1.75
PA
3.50
1.75
1.80
3.50
1.70
2.50 2.00 0.50 3.50 3.00 1.50 0.90 1.60 14.50
30.00
5.60
5.60
1.65
1.90
16.00
16.00
1.75
1.50
1.75
3.50
1.75
1.80
3.50
1.70
2.50 2.00 0.50 3.50 3.00 1.50 0.90 1.60 14.50
30.00
5.60
5.60
1.65
1.90
16.00
16.00
1.75
1.50
1.75
3.50
1.75
1.80
3.50
1.70
2.50 2.00 0.50 3.50 3.00 1.50 0.90 1.60 14.50
30.00
40
70
70
400
320
KACA ES 5mm
40
KACA BENING 5mm
2100
2020
2100
1900
1900
2700
2700
2700
2300
70
70
40
40
40
600
600
600
600
400
400
320
340
KACA BENING 5mm
40
150 150 150 150
2300 700
800 1200
40 620 40
40 720 40 40 540 40 540 40 40 2220 40
100
100
100
100
70 600 70 70 420 70 70 420 70
800 1200 2240 KACA ES
2300 KUSEN ALUMINIUM
KACA BENING 5mm KACA BENING 5mm KACA BENING 5mm
DAUN JENDELA ALUMUNIUM DAUN JENDELA ALUMUNIUM KUSEN ALUMINIUM
KUSEN ALUMINIUM KUSEN ALUMINIUM
DETAIL JENDELA 1 (J1) DETAIL JENDELA 2 (J2) DETAIL JENDELA 8 (J8) DETAIL BOUVENLIGHTS (BV)
40
40
70
40
40
70
70
2470
2350
2550
KACA BENING 5mm
2640
2620
2700
2700
2700
2620
2500
2700
2620
2500
2700
40
700
620
640
700
KACA BENING 5mm KACA BENING 5mm KACA BENING 5mm
70
40
150
40
40
70
70
40
40
450
420
40 713 40 714 40 713 40 40 640 40 640 40
100
100
100
100
100
420 70 450 70
70 593 70 70 594 70 70 593 70 70 420 70 70 420 70 450 650 1095 1095 660
733 734 733 1400 2950
KACA BENING 5mm KACA BENING 5mm KACA BENING 5mm
2300 KUSEN ALUMINIUM DAUN JENDELA ALUMUNIUM KUSEN ALUMINIUM
KACA BENING 5mm KACA BENING 5mm KUSEN ALUMINIUM
DAUN JENDELA ALUMUNIUM DAUN JENDELA ALUMUNIUM
KUSEN ALUMINIUM KUSEN ALUMINIUM
DETAIL JENDELA 5 (J5) DETAIL JENDELA 6 (J6) DETAIL JENDELA 7 (J7)
DETAIL JENDELA 3 (J3) DETAIL JENDELA 4 (J4)
40
120
40
120
800
600
20
20
KACA BENING 5mm
2340
2700
1020
2660
2040
2400
1120
2360
NAT 0.5cm X 2cm
DAUN PINTU KAYU 4cm
20
800
600
200
200
30 820 580 40
150 150
120 580 120
30
2400
100
40 320 120 52 52 52 52 52 120 120 52 52 52 52 52 120 320 40
30 52 52 52 52 52 52 52 52 52 52 52 52 30
70 70
100
40 800 30 460 30
1500
30 30 30 30 NAT 0.5cm X 2cm
340 1600 340 KUSEN ALUMINIUM DAUN PINTU KAYU 4cm
2400 KUSEN ALUMINIUM
DAUN PINTU KAYU 4cm
DETAIL PINTU JENDELA 2 (P2)
DETAIL PINTU JENDELA 1 (PJ1)
40
40
120
120
600
600
40
KACA BENING 5mm
20
20
2040
2040
2400
2400
1120
1120
2360
2360
NAT 0.5cm X 2cm NAT 0.5cm X 2cm
DAUN PINTU KAYU 4cm DAUN PINTU KAYU 4cm
2000
PINTU PVC
1960
1000 = TINGGI HANDLE
20
600
600
200
200
30 820 480 40 820 780
150 150
120 580 120 120 580 120 730
30
100
100
100
70 70 40 700 40
DAUN PINTU PVC
40 800 30 360 30 40 800 40
1400 880 KUSEN ALUMINIUM
NAT 0.5cm X 2cm NAT 0.5cm X 2cm
KUSEN ALUMINIUM DAUN PINTU KAYU 4cm KUSEN ALUMINIUM DAUN PINTU KAYU 4cm
DETAIL PINTU JENDELA 3 (PJ3) DETAIL PINTU 1 (P1) DETAIL PINTU 2 (P2)
PENGGANTUNG
RA
DETAIL-A 40 NG
MO X40 KA
DU X0 HO
L .5m LLO
60 m W
X1 GA
20 LV
CM M
AL VALU
UM W GAL
OLLO
KA H
RANG 0.5mm CM
0X
40X4 L 60X120
U
MOD
60
0
SAMBUNGAN ANTAR HOLLOW
DENGAN SISTIM SCREW
60
0
1200
150
150
150
150
300
300
100
100
300
300
300
300
300
300
1350
1350
KERAMIK
300
300
30X30 CM
-0.05
1600
1600
KERAMIK
300
300
30X30 CM
300
300
-0.05
300
300
150
150
150
150
300
300
150
150
850
850
850
600
600
600
3050
3050
3050
3050
600
600
600
2150
600
600
600
400
400
400
50
300 300 300 300 300 100 300 300 300 300 300
150 1500 150 150 1600 150
POTONGAN A-A POTONGAN B-B
850
850
850
850
600
600
600
3050
3050
3050
3050
600
600
600
2150
600
600
600
400
400
400
50
275 300 300 300 300 300 300 300 300 150
150 1475 150 150 1350 150
POTONGAN A-A POTONGAN B-B
150 1750 150
2200 150
250 300 300 300 300 300
100 300 300 300 300 300 300 300
150
150
150
150
150
300
300
KERAMIK
600
30X60 CM
+0.80
KERAMIK
300
300
30X30 CM
1350
1350
1250
-0.05
300
300
300
KERAMIK
300
30X60 CM
300
300
+0.80
50
150
150
250 300 300 300 300 300
DETAIL DAPUR
850
850
850
850
600
600
600
3050
3050
3050
3050
600
600
600
2150
600
600
600
400
400
400
50
250 300 300 300 300 300 300 300 300 300 150
150 1750 150 150 1350 150
POTONGAN A-A POTONGAN B-B
KACA BENING 5mm
DAUN PINTU KAYU 4cm
∅6 - 100 ∅6 - 100
800
800
800
800
∅6 - 100 ∅6 - 100
100 300 300 300 300 300 300 300 600 300 300 50
2200 150 150 1250
POTONGAN A-A DAPUR POTONGAN B-B DAPUR
2700
700 700
100
700
700
1200
1000
A
HANDLE PLAT BORDES TEBAL 3.2mm
100
100
500
500
700 700
∅16-150 ∅16-150
30
1700
1500
1700
1500
100
SIKU 30X30X3
100 2500 100 100 1000 100
DENAH RANGKA PENUTUP TANDON
POTONGAN A-A POTONGAN B-B
640
PIPA Ø4" TIPE AW
EX. MASPION
150
640
1300
1000
BAK KONTROL
SUMUR RESAPAN PLAT BETON T=6cm PIPA Ø4" TIPE AW
PLAT BETON T=8cm
EX. MASPION
PIPA ∅4" TYPE AW EX. WAVIN
150
60
80
400
150 600 150 600 150 600 150
2400
600
DENAH SEPTICTANK
POT BAK KONTROL
PIPA PVC Ø4" PIPA HAWA GALVANISH Ø3"
Ø8-150
TUTUP BETON T=10cm
Ø8-150
Ø10-150
Ø10-150
200
MT
2480
1200
100
DARI SALURAN
CLOSED KM
KE PERESAPAN (PIPA
PVC Ø4")
1000
1250
1300
TANAH URUG
400
600
TRASRAM 1200
RABAT T=5cm Ø8-150 SELIMUT BETON
150
Ø8-150
PASIR
50
80
600 600 600 800
150 150 150 150
2400 1200
1200
DET. TUTUP SUMUR RESAPAN
POT. SEPTICTANK POT. RESAPAN
2700
700 700
100
700
700
1200
1000
A
HANDLE PLAT BORDES TEBAL 3.2mm
100
100
500
500
700 700
∅16-150 ∅16-150
30
1700
1500
1700
1500
100
SIKU 30X30X3
100 2500 100 100 1000 100
DENAH RANGKA PENUTUP TANDON
POTONGAN A-A POTONGAN B-B
640
PIPA Ø4" TIPE AW
EX. MASPION
150
640
1300
1000
BAK KONTROL
SUMUR RESAPAN PLAT BETON T=6cm PIPA Ø4" TIPE AW
PLAT BETON T=8cm
EX. MASPION
PIPA ∅4" TYPE AW EX. WAVIN
150
60
80
400
150 600 150 600 150 600 150
2400
600
DENAH SEPTICTANK
POT BAK KONTROL
PIPA PVC Ø4" PIPA HAWA GALVANISH Ø3"
Ø8-150
TUTUP BETON T=10cm
Ø8-150
Ø10-150
Ø10-150
200
MT
2480
1200
100
DARI SALURAN
CLOSED KM
KE PERESAPAN (PIPA
PVC Ø4")
1000
1250
1300
TANAH URUG
400
600
TRASRAM 1200
RABAT T=5cm Ø8-150 SELIMUT BETON
150
Ø8-150
PASIR
50
80
600 600 600 800
150 150 150 150
2400 1200
1200
DET. TUTUP SUMUR RESAPAN
POT. SEPTICTANK POT. RESAPAN