Raemulan VAP BOQ
Raemulan VAP BOQ
DU55
UNIT COST
QTY (2 units)
NO. PARTICULAR UNIT TAG MATERIAL
I DIRECT COST
STAGE 1
Site Clearing / Layout
Layout, Clearing & Grubbing sm
Bar, Def. 10mm dia Gr.40 kg OSM
Tie Wire #18 kg csm
Excavation
Excavation cm
Backfilling
Backfilling and Compaction cm
Soil Poisoning
Soil Poisoning Application (Wall Footing) sm
Soil Poisoning ltr csm
Soil Poisoning Application (Slab-on-Grade) sm
Soil Poisoning ltr csm
Gravel Bedding
Gravel Bedding (Wall Footing) cm
Gravel, G-1 cm csm
Gravel Bedding (Slab-on-Grade) cm
Gravel, G-1 cm csm
Wall Footing
Concreting cm
Ready Mix Concrete (3000 psi) G1
28days ORD cm OSM
Reinforcement kg
Bar, Def. 10mm dia Gr.40 kg OSM
Tie Wire #18 kg csm
Reinforcement (Starter Bars) kg
Bar, Def. 10mm dia Gr.40 kg OSM
Tie Wire #18 kg csm
Slab-on-grade
Concreting cm
Ready Mix Concrete (3000 psi) G1
28days ORD cm OSM
Reinforcement kg
Bar, Def. 10mm dia Gr.40 kg OSM
Tie Wire #18 kg csm
Padding Form sm
C-Purlins 2mm x 2" x 4" x 6m pc csm
Waterline Rough-in (SOG)
Waterline Rough-in Installation (SOG) lm
Pipe, PPR 3/4" x 4m pc OSM
Pipe, PPR 1/2" x 4m pc OSM
Elbow, PPR 3/4" x 90deg pc OSM
Elbow, PPR 1/2" x 90deg pc OSM
Elbow Reducer, PPR 3/4" x 1/2" pc OSM
Tee, PPR 3/4" pc OSM
Tee, PPR 1/2" pc OSM
Coupler, PPR 3/4" pc OSM
Coupler Reducer, PPR 3/4" x 1/2" pc OSM
Solvent Cement, 400cc can csm
Sewerline Rough-in (SOG)
Sewerline Rough-in Installation (SOG) lm
Pipe, PVC Orange 4" x 3.0m (with hub) S-
1000 pc OSM
Pipe, PVC Orange 3" x 3.0m (with hub) S-
1000 pc OSM
Pipe, PVC Orange 2" x 3.0m (with hub) S-
1000 pc OSM
Coupler, PVC Orange 4" pc OSM
Elbow, PVC Orange 4" x 90deg pc OSM
Elbow, PVC Orange 4" x 45deg pc OSM
Elbow, PVC Orange 3" x 90deg pc OSM
Elbow, PVC Orange 3" x 45deg pc OSM
Elbow, PVC Orange 2" x 90deg pc OSM
Wye, PVC Orange 4" pc OSM
Wye Reducer, PVC Orange 4" x 2" pc OSM
Clean Out, PVC Orange 4" (with O-ring) pc OSM
P-trap , PVC Orange 2" pc OSM
Solvent Cement, 400cc can csm
Electrical Rough-in (SOG)
Electrical Rough-in Installation (SOG) lm
Pipe, PVC Orange 1" x 3m pc OSM
Pipe, PVC Orange 1/2" x 3m pc OSM
Long Elbow, PVC Orange 1" pc OSM
Long Elbow, PVC Orange 1/2" pc OSM
Coupler, PVC Orange 1" pc OSM
Coupler, PVC Orange 1/2" pc OSM
Male Adapter , PVC Electrical 1" pc OSM
Locknut and Bushing , PVC Electrical 1" pc OSM
Solvent Cement, 400cc can csm
Tie Wire #16 kg csm
Porch
Concreting cm
Cement, Portland 40kgs bag OSM
Sand, White cm csm
Gravel, 3/4" cm csm
Reinforcement kg
Bar, Def. 10mm dia Gr.40 kg OSM
Tie Wire #18 kg csm
Stepping Pad
Concreting cm
Cement, Portland 40kgs bag OSM
Sand, White cm csm
Gravel, 3/4" cm csm
Reinforcement kg
Bar, Def. 10mm dia Gr.40 kg OSM
Tie Wire #18 kg csm
Service Area
Concreting cm
Cement, Portland 40kgs bag OSM
Sand, White cm csm
Gravel, 3/4" cm csm
Reinforcement kg
Bar, Def. 10mm dia Gr.40 kg OSM
Tie Wire #18 kg csm
Carport
Excavation cm
Hauling cm
Gravel Bedding (Carport) cm
Gravel, G-1 cm csm
Concreting cm
Ready Mix Concrete (3000 psi) G1
28days ORD cm OSM
Reinforcement kg
Bar, Def. 10mm dia Gr.40 kg OSM
Tie Wire #18 kg csm
Tire Track
Concreting cm
Cement, Portland 40kgs bag OSM
Sand, White cm csm
Gravel, 3/4" cm csm
Reinforcement kg
Bar, Def. 10mm dia Gr.40 kg OSM
Tie Wire #18 kg csm
Catch Basin
Excavation (Catch Basin) cm
Hauling cm
Catch Basin lot
Cement, Portland 40kgs bag OSM
Sand, White cm csm
Gravel, G-1 cm csm
Bar, Def. 10mm dia Gr.40 kg OSM
Tie Wire #18 kg csm
CHB, Ordinary 4" pc csm
Angle Bar, 3.0mm thk x 38mm x 38mm x
6.0m pc csm
Septic Tank
Excavation (Septic Tank) cm
Hauling cm
Concreting cm
Cement, Portland 40kgs bag OSM
Sand, White cm csm
Gravel, G-1 cm csm
Plastering sm
Cement, Portland 40kgs cm OSM
Sand, White cm csm
CHB Laying sm
CHB, Ordinary 6" pc csm
Cement, Portland 40kgs bag OSM
Sand, White cm csm
Reinforcement kg
Bar, Def. 12mm dia Gr.40 kg OSM
Bar, Def. 10mm dia Gr.40 kg OSM
Tie Wire #18 kg csm
Formworks sm
Plywood, Ordinary 1/4" x 4' x 8' pc csm
Lumber, Good 2" x 4" x 8' pc csm
Lumber, Good 2" x 2" x 8' pc csm
Nail, Common Wire 3" kg csm
Plumbing
Tee, PVC Orange 4" pc OSM
Clean Out, PVC Orange 4" (with O-ring) pc OSM
STAGE 2
CHB Laying (1st Lift) - Exterior Wall
CHB Laying - Exterior (1st Lift) sm
CHB Hauling sm
CHB, LBB Stretcher Block 6" 750psi pc OSM
Mortar sm
Cement, Portland 40kgs bag OSM
Sand, White cm csm
Reinforcement kg
Bar, Def. 10mm dia Gr.40 kg OSM
Tie Wire #18 kg csm
CHB Laying (1st Lift) - Interior Wall
CHB Laying - Interior (1st Lift) sm
CHB Hauling sm
CHB, LBB Stretcher Block 6" 750psi pc OSM
CHB, LBB Stretcher Block 4" 750psi pc OSM
Mortar sm
Cement, Portland 40kgs bag OSM
Sand, White cm csm
Reinforcement kg
Bar, Def. 10mm dia Gr.40 kg OSM
Tie Wire #18 kg csm
Beam (1st Lift)
Concreting cm
Ready Mix Concrete (3000 psi) G3/4
28days PCD cm OSM
Pumpcrete Rental cm OSM
Reinforcement kg
Bar, Def. 12mm dia Gr.40 kg OSM
Bar, Def. 10mm dia Gr.40 kg OSM
Bar, Def. 8mm dia Gr.33 kg OSM
Tie Wire #18 kg csm
Formworks sm
Plywood, Ordinary 1/4" x 4' x 8' pc csm
Lumber, Good 2" x 3" x 10' pc csm
Nail, Common Wire 3" kg csm
Stiffiner/Lintel Beam (1st Lift)
Concreting cm
Cement, Portland 40kgs cm OSM
Gravel, 3/4" cm csm
Sand, White cm csm
Reinforcement kg
Bar, Def. 10mm dia Gr.40 kg OSM
Tie Wire #18 kg csm
Formworks sm
Plywood, Ordinary 1/4" x 4' x 8' pc csm
Lumber, Good 2" x 3" x 10' pc csm
Nail, Common Wire 3" kg csm
Suspended Slab (inc. Cantilever Slab)
Concreting cm
Ready Mix Concrete (3000 psi) G3/4
28days PCD cm OSM
Pumpcrete Rental cm OSM
Reinforcement kg
Bar, Def. 10mm dia Gr.40 kg OSM
Tie Wire #18 kg csm
Formworks sm
Forms & Shoring set csm
Waterline Rough-in (1st Lift)
Waterline Rough-in Installation lot
Pipe, PPR 3/4" x 4m pc OSM
Pipe, PPR 1/2" x 4m pc OSM
Elbow, PPR 3/4" x 90deg pc OSM
Elbow, PPR with Tread 3/4" x 90deg pc OSM
Elbow, PPR with Tread 1/2" x 90deg pc OSM
Tee, PPR with Tread 3/4" pc OSM
End Cap, PPR 1/2" pc OSM
Gate Valve, PPR 3/4" pc OSM
Gate Valve, PPR 1/2" pc OSM
Sewerline Rough-in (1st Lift)
Sewerline Rough-in Installation lot
Pipe, PVC Orange 2" x 3.0m (with hub) S-
1000 pc OSM
Elbow, PVC Orange 2" x 90deg pc OSM
Clean Out, PVC Orange 4" (with O-ring) pc OSM
P-trap , PVC Orange 2" pc OSM
Solvent Cement, 400cc can csm
Electrical Rough-in (1st Lift)
Electrical Rough-in Installation lot
Pipe, PVC Orange 1/2" x 3m pc OSM
Pipe, PVC Flexible Orange 1/2" lm OSM
Long Elbow, PVC Orange 1/2" pc OSM
Coupler, PVC Orange 1/2" pc OSM
Male Adapter , PVC Electrical 1/2" pc OSM
Locknut and Bushing , PVC Electrical 1/2" pc OSM
Box, Utility 2"x 4" pc csm
Box, Junction 4" x 4" (with cover) pc csm
Solvent Cement, 400cc can csm
Tie Wire #16 kg csm
STAGE 3
CHB Laying (2nd Lift) - Exterior Wall
CHB Laying - Exterior (2nd Lift) sm
CHB Hauling sm
CHB, LBB Stretcher Block 6" 750psi pc OSM
Mortar sm
Cement, Portland 40kgs bag OSM
Sand, White cm csm
Reinforcement kg
Bar, Def. 10mm dia Gr.40 kg OSM
Tie Wire #18 kg csm
CHB Laying (2nd Lift) - Interior Wall
CHB Laying - Interior (2nd Lift) sm
CHB Hauling sm
CHB, LBB Stretcher Block 4" 750psi pc OSM
Mortar sm
Cement, Portland 40kgs bag OSM
Sand, White cm csm
Reinforcement kg
Bar, Def. 10mm dia Gr.40 kg OSM
Tie Wire #18 kg csm
Beam (2nd Lift)
Concreting cm
Cement, Portland 40kgs bag OSM
Gravel, 3/4" cm csm
Sand, White cm csm
Reinforcement kg
Bar, Def. 10mm dia Gr.40 kg OSM
Tie Wire #18 kg csm
Formworks sm
Plywood, Ordinary 1/4" x 4' x 8' pc csm
Lumber, Good 2" x 3" x 10' pc csm
Nail, Common Wire 3" kg csm
Lintel Beam (2nd Lift)
Concreting cm
Cement, Portland 40kgs cm OSM
Gravel, 3/4" cm csm
Sand, White cm csm
Reinforcement kg
Bar, Def. 10mm dia Gr.40 kg OSM
Tie Wire #18 kg csm
Formworks sm
Plywood, Ordinary 1/4" x 4' x 8' pc csm
Lumber, Good 2" x 3" x 10' pc csm
Nail, Common Wire 3" kg csm
Roof Slab
Concreting cm
Cement, Portland 40kgs cm OSM
Gravel, 3/4" cm csm
Sand, White cm csm
Reinforcement kg
Bar, Def. 10mm dia Gr.40 kg OSM
Tie Wire #18 kg csm
Formworks sm
Plywood, Ordinary 1/4" x 4' x 8' pc csm
Lumber, Good 2" x 3" x 10' pc csm
Nail, Common Wire 3" kg csm
Concrete Canopy
Concreting cm
Cement, Portland 40kgs cm OSM
Gravel, 3/4" cm csm
Sand, White cm csm
Reinforcement kg
Bar, Def. 10mm dia Gr.40 kg OSM
Tie Wire #18 kg csm
Formworks sm
Plywood, Ordinary 1/4" x 4' x 8' pc csm
Lumber, Good 2" x 3" x 10' pc csm
Nail, Common Wire 3" kg csm
Waterline Rough-in (2nd Lift)
Waterline Rough-in Installation lm
Pipe, PPR 1/2" x 4m pc OSM
Elbow, PPR 1/2" x 90deg pc OSM
Elbow, PPR with Tread 1/2" x 90deg pc OSM
Tee Reducer, PPR 3/4" x 1/2" pc OSM
Tee, PPR with Tread 1/2" pc OSM
End Cap, PPR 1/2" pc OSM
Sewerline Rough-in (2nd Lift - Downspout)
Sewerline Rough-in Installation lm
Pipe, PVC Orange 4" x 3.0m (with hub) S-
1000 pc OSM
Pipe, PVC Orange 2" x 3.0m (with hub) S-
1000 pc OSM
Coupler, PVC Orange 2" pc OSM
Elbow, PVC Orange 4" x 90deg pc OSM
Elbow, PVC Orange 4" x 45deg pc OSM
Elbow, PVC Orange 2" x 90deg pc OSM
Elbow, PVC Orange 2" x 45deg pc OSM
Wye, PVC Orange 4" pc OSM
Wye Reducer, PVC Orange 4" x 2" pc OSM
Clean Out, PVC Orange 4" (with O-ring) pc OSM
P-trap , PVC Orange 2" pc OSM
Solvent Cement, 400cc can csm
Electrical Rough-in (2nd Lift)
Electrical Rough-in Installation lot
Pipe, PVC Orange 1/2" x 3m pc OSM
Pipe, PVC Flexible Orange 1/2" pc OSM
Coupler, PVC Orange 1/2" pc OSM
Male Adapter , PVC Electrical 1/2" pc OSM
Locknut and Bushing , PVC Electrical 1/2" pc OSM
Box, Utility 2"x 4" pc csm
Box, Junction 4" x 4" (with cover) pc csm
Solvent Cement, 400cc can csm
Tie Wire #16 kg csm
STAGE 4
Roof Framing
Roof Framing Installation (Left Unit) sm
Roof Framing (Exec. Duplex 55 LBB - Left
Unit) inc bolts & primer NCSP 2015 pc OSM
Roof Framing Installation (Right Unit) sm
Roof Framing (Exec. Duplex 55 LBB -
Right Unit) inc bolts & primer NCSP 2015 pc OSM
Roofing Sheet
Roof Sheet Installation sm