Construction of Hyderabad - Sukkur (306 KM), 6-Lane Divided, Fenced Motorway Engineer'S Estimate
Construction of Hyderabad - Sukkur (306 KM), 6-Lane Divided, Fenced Motorway Engineer'S Estimate
ENGINEER'S ESTIMATE
102c Removal of Trees 601mm or over Girth Each 51,450 4,078.46 209,836,767
110 Improved Subgrade CBR > 25% C.M 3,522,091 837.36 2,949,258,120
SP-117c Sodding / Grass over Embankment Slope S.M 6,600,000 112.20 740,520,000
203b Asphaltic Base Course Plant mix (Class B) C.M 1,709,844 18,465.29 31,572,765,315
209a Breaking of Existing Road Pavement Structure C.M 5,000 610.05 3,050,250
302a Cut -Back Asphalt for Bituminous Prime Coat S.M 9,520,825 121.92 1,160,778,984
303a Cut -Back Asphalt for Bituminous Tack Coat S.M 18,090,065 48.83 883,337,874
305a Asphaltic Concrete for Wearing Course (Class "A") C.M 440,204 19,165.18 8,436,588,897
404 b Reinforcement as per AASHTO M-31 Grade 60 TON 6,240 115,560.17 721,095,461
 401a1ii        Concrete Class A1 (3000 psi) Approach Slab                              CM               163                    10,892.71                  1,775,512
                                                                                                                                                                                    162.57
 401a3i         Concrete Class A3( 4000 psi) Pile                                       CM             2,538                    10,659.05                27,052,669
                                                                                                                                                                                   2537.90
                Concrete Class A3 (4000 psi) Transom and Wing
401a3iii                                                                                CM               406                    11,932.26                  4,844,498
                Wall                                                                                                                                                                405.86
                Concrete Class A3 (4000 psi) Diaphragms and Deck
401a3iii                                                                                CM             1,999                    11,932.26                23,852,588
                slab                                                                                                                                                               1998.66
401a3iii        Concrete Class A3( 4000 psi) Piers                                      CM               179                    11,932.26                  2,135,875
                                                                                                                                                                                    179.29
401a3iii        Concrete Class A3 (4000 psi) Abutment Girder Seat                       CM               600                    11,932.26                  7,159,356
                                                                                                                                                                                    599.95
  404 b         Reinforcement as per AASHTO M-31 Grade-60                              TON             1,591                  115,560.17                183,856,230
                                                                                                                                                                                   1591.47
                Expansion Joint with Two Extruded Aluminium Alloy
  406cii                                                                                LM               237                    58,210.69                13,795,934
                Sections for 50mm movement (USA/EU MAKE)
                                                                                                                                                                                    236.89
                Elastomeric Bearing Pads (According to size &                       Centimeter
  406ei                                                                                              1,029,600                          6.47               6,661,512
                thickness) - USA/EU Make                                              Cube
                                                                                                                                                                              1029600.00
                Cast in Place Piles 1.2M dia in normal soil (Boring
  407d3                                                                                 LM             2,244                    12,273.88                27,542,587
                only)
                                                                                                                                                                                   2244.00
   407l         Pile Load Test Upto 800 Ton                                            Each               6                 1,363,639.28                   8,181,836
                                                                                                                                                                                      6.00
  407k          Pile Proof Load Test Upto 550 Ton                                      Each               6                   906,035.51                   5,436,213
                                                                                                                                                                                      6.00
SP 418 a Galvanized Iron Drain pipe, 100mm dia                                         Each              106               1,151.00                          122,006
                                                                                                                                                                                    106.00
 401a1ii        Concrete Class A1 (3000 psi) Approach Slab                              CM               106               10,892.71                 1,154,627
                                                                                                                                                                                   105.91
 401a3i         Concrete Class A3( 4000 psi) Pile                                       CM             23,886              10,659.05               254,602,068
                                                                                                                                                                              23886.16
401a3iii        Concrete Class A3 (4000 psi) Abutment Girder Seat                       CM               462               11,932.26                 5,512,704
                                                                                                                                                                                   461.85
  401d          Concrete Class D1 (5000 psi) Prestressed 'I' Shaped                     CM             28,979              14,852.62               430,414,075
                                                                                                                                                                              28979.35
                Prestressing Steel (Pre-cast prestressed girder)
  405 a                                                                                 Ton            1,392              225,307.81               313,628,472
                grade 270 ksi, Grade 1860
                                                                                                                                                                               1391.50
   407l         Pile Load Test upto 800 TON                                            Each               1              1,363,639.28                1,363,639
                                                                                                                                                                                     1.00
  407k          Pile Load Test upto 550 TON                                            Each               1               906,035.51                  906,036
                                                                                                                                                                                     1.00
SP 418 a Galvanized Iron Drain pipe, 100mm dia                                         Each              317               1,151.00                   364,867
                                                                                                                                                                                   316.80
401a3iii        Concrete Class A3 (4000 psi) Pilecap                                    CM             41,037             11,932.26                489,664,154             24,287             16,750
                Concrete Class A3 (4000 psi) Transom and Wing
401a3iii                                                                                CM             15,230             11,932.26                181,728,320              9,544              5,686
                Wall
                Concrete Class A3 (4000 psi) Diaphragms and Deck
401a3iii                                                                                CM             59,846             11,932.26                714,098,032             32,308             27,538
                slab
 401a1ii        Concrete Class A1 (3000 psi) Approach Slab                              CM             8,384              10,892.71                 91,324,481              4,304              4,079
401a3i Concrete Class A3( 4000 psi) Pile CM 121,008 10,659.05 1,289,830,322 68,710 52,298
401a3iii Concrete Class A3( 4000 psi) Piers CM 4,829 11,932.26 57,620,884 3,219 1,610
401a1ii Concrete Class A1(3000psi) N.J.Barrier CM 7,672 11,584.85 88,878,969 4,436 3,236
401a3iii Concrete Class A3(4000 psi) Abutment Girder Seat CM 29,245 11,932.26 348,958,944 15,190 14,055
401a3iii Concrete Bearing Pads, Concrete Class A3 CM 188 11,932.26 2,243,265 107 81
  401d          Concrete Class D1 (5000 psi)                                            CM             98,520             14,852.62               1,463,280,122            60,734             37,786
                Pre-Stressing Wire Strand 3/8"-1/2" Dia Complete In
  405 a                                                                                 Ton            5,314             225,307.81               1,197,285,702             3,222              2,092
                All Respect.
  405 b         Launching of Precast- Prestressed Girders                               Ton           236,433              1,328.51                314,103,605             145,753            90,680
  404 b         Reinforcement as per AASHTO M-31 Grade-60                              TON             67,508             115,560.17              7,801,235,956            39,381             28,127
                Expansion Joint With Two Extruded Aluminium Alloy
  406cii                                                              LM       12,421                                     58,210.69                723,034,980              6,883              5,538
                Sections For 50mm Movement (Usa/Eu Make)
                Elastomeric Bearing Pads (According to size &      Centimete
  406ei                                                                      38,630,592                                       6.47                 249,939,930           22,246,224          16,384,368
                thickness) - USA/EU Make                               r
                Cast-in place pile upto 1.00 m dia in normal Soil
  407d1                                                               LM       46,200                                      5,655.24                261,272,088             30,360             15,840
                (boring only)
                Cast-in place pile upto 1.1 to 1.5 m dia in normal
  407d3                                                               LM       64,680                                     12,273.88                793,874,558             33,000             31,680
                Soil (boring only)
   407l         Pile Load Test upto 800 TON                                            Each              98             1,363,639.28               133,636,649               50                 48
407k Pile Load Test upto 550 TON Each 98 906,035.51 88,791,480 50 48
SP 416 Providing and fixing CI Pipes100mm dia LM 15,543 1,452.49 22,576,052 8,987 6,556
SP 418 a Galvanized Iron Drain pipe, 100mm dia Each 1,344 1,151.00 1,546,944 793 552
401 a3iii Concrete Class A3 (Elevated) Wall, Top Slab CM 157,816 11,932.26 1,883,101,544 157,816
404 b Reinforcement as per AASHTO M-31 Grade 60 TON 29,267 115,560.17 3,382,099,495 29,267
406 dii PVC Waterstop 8" Size LM 34,676 716.51 24,845,701 34,676
401 a3iii Concrete Class A3 (Elevated) Wall, Top Slab CM 28,620 11,932.26 341,501,281 28,620
404 b Reinforcement as per AASHTO M-31 Grade 60 TON 5,985 115,560.17 691,627,617 5,985
406 dii PVC Waterstop 8" Size LM 13,752 716.51 9,853,446 13,752
404 b Reinforcement as per AASHTO M-31 Grade 60 TON 2,092 115,560.17 241,751,876 2,092
401a1ii Concrete Class A1, (on Ground) C.M 61,935 10,892.71 674,639,994
401b Concrete Class B for Toe walls & Drains. C.M 2,500 7,648.50 19,121,250
404 b Reinforcement as per AASHTO M-31 Grade 60 TON 3,682 115,560.17 425,492,546
509d Grouted Rip Rap, Class "A" C.M 31,720 5,217.22 165,490,218
404h Reinforcement (Structural Shapes) As Per ASTM-A-3 Kg. 139 143.42 19,935
604d Steel Post for Guard Rail Each 134,104 5,043.63 676,370,958
607a Traffic Road Signs, Triangular Category -1 Each 800 15,605.04 12,484,032
  607b          Traffic Road Signs, Circular, Category - 2                             Each                     800             18,971.47                15,177,176
                                                                                                                                                                                     75.00
607e Traffic Road Signs Rectangular Category - 3(c ) S.M 500 24,774.94 12,387,470
607f Additional Panel size 60cm x 30cm Each 200 4,116.49 823,298
  607g          Additional Panel size 90cm x 30cm                                      Each                     200                 5,881.34               1,176,268
                Pavement Marking in Reflective TP Paint for line of
 608 h2                                                                                  M             1,839,465                     167.40             307,926,441
                15cm width
                Pavement Marking in Reflective TP Paint for 4m
  608 j2                                                                               Each                      51                 2,008.98                 102,458
                Arrows
                Reflectorised Plastic Pavement Studs (Raised
  609ci                                                                                Each              131,305                     278.01              36,504,103
                Profile Type - Single)
SP- Gantry Sign Type-II as shown on drawing Each 32 655,691.06 20,982,114 450,000,000.00
160,000,000
                                              Total                                                                                              4,040,000,000.00
                                                                                                                                                                                    -31.00
  Note:
                Toll plaza and its allied works are incorporated on provisional sum basis. Contractor shall visit the respective sites and prepare adequate shop
                drawings of all activities involved in the execution of the toll plaza along with appropriate Bill of Quantities and rates, complete in all respect as
                stated above and submit to the Engineer for approval. No activity will be commenced prior to the approval of the Engineer.
                                                                                                                                                                                                      600.00
BILL No. 8a Electrical Works (Road Lighting Network based on LED Road Lighting Fixtures)
                Conduits / Pipes
  803(a)        PVC pipe/conduit Class-D 100 mm dia with accessories s                  Rm                 10,000                     1,689              16,890,000
803(b) PVC pipe conduit Class-B 100 mm dia with accessorie Rm 478,500 1,001 478,978,500
BILL No. 8a Electrical Works (Road Lighting Network based on LED Road Lighting Fixtures)
805.00 Road lighting control panel with angle iron frame cladded Job 480 203,375 97,620,000
3.10 Providing and fixing of copper deposited steel rod earth p Each 68 8,951 608,668
                a) 50mm dia UPVC Conduit (Class D) for road crossing                    RM.                   3,800                     664                2,523,200
                b) 100mm dia UPVC Conduit (Class D)                                     RM.                   5,500                   2,041               11,225,500
     -          01 No. Incoming 32 Amp (Adj.) MCCB, TP, RC= 16kA                       Each               4                 221,689                   886,756
     -          8 Nos. Outgoing 16 Amp (Adj.) MCCB, TP, RC=16 kA
     -          01 No. Outgoing 16 Amp (Adj.) MCCB, TP, RC =16 kA (Sp
     -          02 No. Outgoing 10/20 Amp (spare) MCB, SP, RC=10 kA
     -          03 Nos. outgoing 20 Amp (AC-3) magnetic Contactor
     -          06 Nos. Push button (ON/OFF)
                LED BBP 500 Phillips Type 100 Watt for canopy light, in
                all respect with all allied accessories or approved                    Each                     760                  50,000              38,000,000
                equivalent. The fitting shall be approved by the Engineer.
            -
            -
   Construction of Hyderabad – Sukkur (306 Km), 6-Lane Divided, fenced Motorway
                                       ENGINEER'S ESTIMATE
                                               SUMMARY
   Bill No.                           Description                             Amount (Rs.)
               Provision for escalation @ 6.5% for 2nd year and 13% for
      -                                                                            12,639,224,431.00                         162,041,338,863.00    4,213,074,810.44     8,426,149,620.88
               3rd year on A
               Physical contingency (Quantity variation) @ 2% of
      -                                                                             3,240,826,777.00                           3,240,826,777.26                        12,639,224,431.31
               Construction cost (A)
      -        NH & MP Logistics (Vehicles & equipment)                               500,000,000.00                           3,240,826,777.26
                                                          SUB-TOTAL:               20,353,266,499
A.3 FINANCING COSTS
                                                          SUB-TOTAL:                 8,776,469,053
               CONCESSIONAIRE PROJECT COST (A.1 + A.2 + A.3):                     191,171,074,415
B. GOVERNMENT COSTS
191,471,074,414.51 0.0015
                                                                                                               191,471.07
                                                                                                               148,171.07
                                                                                                                29,634.21
                                                                                                                59,268.43
                                                                                                                59,268.43
                                                                                                               148,171.07
   Construction of Hyderabad – Sukkur (306 Km), 6-Lane Divided, fenced Motorway
                                       ENGINEER'S ESTIMATE
                                               SUMMARY
   Bill No.                           Description                             Amount (Rs.)
               Provision for escalation @ 6.5% for 2nd year and 13% for
      -                                                                            12,639,224,431.00                       162,041,338,863.00   4,213,074,810.44     8,426,149,620.88
               3rd year on A
               Physical contingency (Quantity variation) @ 2% of
      -                                                                             3,240,826,777.00                         3,240,826,777.26                       12,639,224,431.31
               Construction cost (A)
      -        NH & MP Logistics (Vehicles & equipment)                               500,000,000.00                         3,240,826,777.26
                                                          SUB-TOTAL:               20,353,266,499
A.3 FINANCING COSTS
                                                          SUB-TOTAL:                 8,776,469,053
               CONCESSIONAIRE PROJECT COST (A.1 + A.2 + A.3):                     191,171,074,415
B. GOVERNMENT COSTS
Sub-Total
191,471,074,414.51 0.0015
287,206,611.62
                                                                               191,758,281,026.13
                                                                           Proposed Allocation           Total Proposed
 Fiscal Year    Proposed Allocation (Government Part) (in Millions)       (Concessionaire Part)            Allocation
                                                                               (in Millions)              (in millions)