Karada Twin Structural
Karada Twin Structural
majidalbana@hotmail.com
+9647702724811
Notes
job title
Commercial Tower
Structural
Drawings
DRWG. TITLE:
SCALE As Shown
DATE 10 /2022
Notes
job title
Commercial Tower
Structural
Drawings
SCALE As Shown
DATE 10 /2022
15
CONTACT WITH EARTH OR BELOW D.P.C LEVEL. Nylon Sheet x MECH MECHANICAL
Nylon Sheet
0
7. FOR TYP. SECTIONS & DETAILS SEE ST-G2. x MIN MINIMUM
x
3. REINFORCMENT STEEL CONFORM TO ASTM A615 & A616 OR A617 BARS SHOULD BE GRADE x x 2Ø10 x
mm MILLIMETRES
x
400 FY=410N/mm (60000psi). x SEC SECTION
FOUNDATION AND EARTH WORK :- 150mmSub-base 90%
150mmSub-base 90%
4. PLACING OF REINFORCEMENT SHOULD BE ACCORDING TO ACI-315 DETAILING MANUAL. Ø10/200
1. FOUNDATION DESIGN BASED ACCORDING TO THE SOIL REPORT PREPARED BY THE 2Ø10
& RESEARCH ( ( ) 2023 \ 1 \ \ 4 ). 5. MINIMUM BARS COVER :-
CONSTRUCTION OF PARTITION
2. BEARING CAPACITY ACCORDING TO THE SOIL REPORT IS (10K/ m²) AT DEPTH OF (-4.00m) ON GROUND SLAB
BELOW THE EXISTING N.G.L. MEMBER (mm) Typical Sec. Of Ramp
provid construction joint for max.(5mx5m)
3. A WELL COMPACTED SUB-BASE LAYERS OF A TOTAL THICK AS INDICATED IN THE DWG. SLABS 25
SHOULD BE USED UNDER FOOTING WITH FOLLOWING SPECIFICATIONS :- BEAMS & GIRDERS 40 2Ø16
THE DIMENSION OF THE SUB-BASE LAYERS SHOULD BE LARGER THAN THE DIMENSIONS OF Ø10 @ 200
COLUMNS 40 Ø10 @ 200
THE FOUNDATION FROM ALL SIDES BY 0.25m.
INTERIOR WALLS 25
THE VALUE OF CALIFORNIA BEARING RATIO (C.B.R) SHALL NOT BE LESS THAN (35% ASTM D) 2Ø16
1883 AT 95% OF THE MAXIMUM DRY DENSITY ESTABLISHED ACCORDING TO (ASTM D)1557. EXTERIOR FACE OF WALL 40
FORMED FOUNDATION 50 Arround all windos for loovers
LIQUID LIMIT ≤ 25%.
NON-FORMED FOUNDATION 75
PLASTICITY INDEX ≤ 6%. 3-Ø16(typ.)
ORGANIC MATERIAL ≤ 2%. T&B
6. MINIMUM BARS SPACING :-
SO3 ≤ 5%. 2-Ø16
CLEAR SPACING BETWEEN PARALLEL BARS SHALL NOT BE LESS THAN BAR DIAMETER Ø16@200
OR 4/3 OF MAXIMUM AGGREGATE SIZE BUT NOT LESS THAN 25mm.
TOTAL SOLUBLE SALTS ≤ 5%.
CLEAR SPACING BETWEEN LAYERS OF BARS TO BE NOT LESS THAN 25mm AND THE
GYPSUM CONTENT ≤ 10.75%.
UPPER BARS SHOULD BE OVER THE LOWER BARS .
RELATIVE COMPACTION 95% ( MODIFIED PROCTOR).
IN COLUMNS CLEAR DISTANCE BETWEEN LONGITUDINAL BARS SHOULD BE NOT LESS TYPICAL REINF. AROUND TYPICAL UP STAND DETAIL
4. SULPHATE RESISTANT CEMENT TYPE 5 SHOULD BE USED IN ALL CONCERET WORK IN THAN 1.5 BAR DIAMETER NOR LESS THAN 40mm.
CONTACT WITH EARTH OR BELOW D.P.C. LEVEL.
OPENNINGS UP TO 600 ROOF OPENNINGS
7. MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-
5. BACKFILL AROUND FOOTINGS AND UTILITY TRENCH WITHIN THE BUILDING AREA SHOULD
BE DONE WITH APPROVED SELECTED CLASSIFIED MATERIAL FREE OF CLAY AND SHOULD
BE MECHANICALLY COMPACTED IN LAYERS, NOT EXCEEDING 250mm LOOSE THICKNESS BAR DIA.(mm) 10 12 16 18 20 22 25
TO 90% OF MAXIMUM PROCTOR DENSITY. LAP LENGTH (mm) IN 400 500 600 650 700 800 900
COLUMNS
LAP LENGTH (mm) IN PROVID 2-Ø6 PLATE (300 * 250 * 3 )
400 600 700 800 900 1000 1250
ELSE WHERE AT EVERY 5TH COURSE OF BRICK AT EVERY 5TH COURSE OF BRICK
CONSTRUCTION JOINT AND WATERPROOFING :-
1. CONSTRUCTION JOINT :- LAP LOCATION IN SLABS AND BEAMS :-
CONSTRUCTION JOINT IN FLOORS SHOULD BE LOCATED WITHIN THE MIDDLE THIRD OF * AT SUPPORT FOR BOTTOM BARS.
SPANS OF SLABS ,BEAMS & GIRDERS,JOINT IN GIRDER SHOULD BE OFFSET A MINIMUM
DISTANCE OF TWO TIMES THE WIDTH OF INTERSECTING BEAMS. * AT MID SPAN FOR TOP BARS.
AT CONSTRUCTION JOINTS SURFACES SHOULD BE ROUGHENED BY BROOMING OUT LAP LOCATION IN FOUNDATION :-
MORTAR, EXPOSING 12mm OF COARSE AGGREGATE TWO HOURS AFTER PLACING
* AT SUPPORT FOR TOP BARS.
CONCRETE.
* AT MID SPAN FOR BOTTOM BARS.
CONSTRUCTION JOINTS FOR STRUCTURAL SLAB / FOUNDATION / WALLS ETC. AND
VOLUME OF CASTING IN A POUR SHOULD BE APPROVED BY THE ENGINEER. CONECTION BETWEEN BRICK WALL CONECTION BETWEEN BRICK WALL
8. VERTICAL REINFORCEMENT IN COLUMN :-
AND R.C. COLUMN AND R.C. COLUMN
CONSTRUCTION JOINTS SHOULD BE DOWELED, KEYED AND THOROUGHLY CLEANED, ALL
CONSTRUCTION JOINTS SHOULD BE CONSTRUCTED IN ACCORDANCE WITH THE TYPICAL
WHERE COLUMN FACE ARE OFFSET 75mm OR MORE SPLICE OF VERTICAL BARS proposel 1 proposel 2
TO THE OFFSET FACE SHOULD BE MADE BY SEPARATE DOWELS OVER LAP AS SPECIFIED
CONSTRUCTION JOINT DETAILS SHOWN ON THE STRUCTURAL DRAWINGS,CONTRACTOR ABOVE.
HAVE TO PREPARE ANY MISSING DETAILS NOT COVERED IN THE STRUCTURAL DRAWINGS
AND SUBMIT FOR ENGINEER'S APPROVAL. WHERE A LONGITUDINAL BARS ARE OFFSET AT SPLICE THE SLOPE OF INCLINED ADJACENT
PORTION SHALL NOT EXCEED 1:6 (HORIZANTAL:VERTICAL). no. date initials revision
2. WATERPROOFING :-
CHANGING OF REINFORCEMENT BETWEEN FLOORS WHERE SUCH SITUATION OCCURS
WATER STOPS SHOULD BE USED AT ALL CONSTRUCTION,CONTRACTION & EXPANSION THE REINFORCEMENT OFF SHOULD BE CUT OFF AT DISTANCE 75mm BELOW FLOOR
JOINTS,WHERE WATERPROOFING SYSTEM IS APPLIED ALL INTERSECTION PIECES OF LEVEL SPACED 100mm AND PLACED BEFOR THE POINT OF BEND. A
WATER STOPS SHOULD BE FACTORY MOLDED.
a job title
WHERE LONGITUDINAL BARS OFFSET,PROVIDE 4TIES. A
ALL CONCRETE WORKS IN CONTACT WITH SOIL FOR NORMAL STRUCTURE SHOULD BE Ø10@200
COATED WITH PROTECTIVE LAYER. 9. HOT & COLD WETHERING SHOULD BE ACCORDING TO ACI-305R-99. B
h
(A)
10. ALL REINFORCING BAR BENDS TO BE MADE COLD. 250 250 drawing title
a B
11. IN ONE-WAY SLAB, SHRINKAGE & TEMPERATURE REINF. STEEL EXTENDING IN THE LONG
. all dim. from ARCH D.W.G. DIRECTION SHALL BE PLACED IN THE PLACE OF, AND TIED TO THE MAIN REINF.
EXTENDING IN THE SHORT DIRECTION.
L<2000, h=200 , A=B=2-Ø12
SEC. ( a - a )
designed
GENERAL NOTES
project manager
L<5000, h=400 , A=2-Ø12 , B=2-Ø16 ENG : DR-Majid Albana
checked scale date
12. MIXING & PLACING CONCRETE SHOULD BE DONE ACCORDING TO ACI - 318M - 95 (CHAPTER 5)
CONDUIT OR PIPE SIZE SHALL NOT EXCEED 30% OF SLAB THICKNESS UNLESS SPECIFICALLY LINTEL REINFORCEMENT job no. sheet no.
2
drawn
DETAILED,OTHERWISE CONCENTRATIONS OF CONDUITS OR PIPES SHOULD BE AVOIDED EXCEPT
WHERE DETAILED OPENINGS ARE PROVIDED, ALL SUBJECTED TO ENGINEER'S APPROVAL. approved
EXCAVATION, BACK FILLING & FOUNDATION
1. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INVESTIGATE OR TO CHECK THE SOIL GEOTECHNICAL PROPERTIES BY HAVING SPECIALIST
AND AFTER COMMENCING OF THE UNDERGROUND WORK.
THE DESIGN LOADS NEW SLAB TO BE POURED FREE END SLAB
(CANTILEVER SLAB)
2
3. THE SITE SHOULD BE CLEARED OF ALL BOULDERS, DEBRIS, DECOMPOSABLE MATERIAL SUCH AS WOOD, GRASS, PLANTS, ...ETC. False Ceiling & MECHANICAL DIVISIONS 0.50 KN/m
OLD SLAB
ALL EXISTING MISCELLANEOUS FILL SHOULD BE REMOVED FROM AREAS WHERE STRUCTURAL SUPPORT IS REQUIRED. ANY SOIL EXTERNAL & INTERNAL PARTITION WALL 2.5 KN/m
2
50% SUPPORTING
AT STRIPED LEVEL THAT SOFTENS DUE TO RAINFALL, GROUND WATER, DISTURBANCE OR ANY OTHER CAUSE SHOULD BE EXCAVATED Bricks
AND REPLACED WITH CONTROLLED BOTTOM
FILL. OF EXCAVATIONS SHOULD BE SMOOTH AND FREE OF LOOSE EARTH OR SAND. TOTAL --------------------- 4.00 KN/m
2
FREE END SLAB
(CANTILEVER SLAB)
ANY LOOSE OR SOFT AREAS SHOULD BE COMPACTED TO THE REQUIRED DENSITY.
4. IF DURING CONSTRUCTION ANY SIGNIFICANT VARIATIONS FROM WHAT IS REPORTED IN THE GEOTECHNICAL SOIL REPORT, 2) LIVE LOADS: OLD SLAB
THE ENGINEERS SHOULD BE NOTIFIED TO VISIT THE SITE AND ASSESS THE SITUATION. COLUMN COLUMN
25% SUPPORTING
5. PRIOR TO PLACEMENT OF BLINDING CONCRETE FOR FOUNDATIONS, WHEREVER POSSIBLE, BOTTOM OF EXCAVATIONS SHALL BE RESIDENTIAL AREAS 3.0 KN/m
2
FREE END SLAB
(CANTILEVER SLAB)
COMPACTED BY HEAVY VIBRATORY ROLLER TO 95% MIN. OF MODIFIED PROCTER DENSITY FOR COHESIVE AND WELL GRADED SOILS. 2
STAIRCASE 5.0 KN/m
100 MM BLINDING CONCRETE THICK E BE POURED UNDER THE RAFT FOOTINGS.
6. PROVIDE A POLYETHYLENE FILM (0.2MM) BELOW ALL GROUND LEVEL SLABS. FILM TO BE FIRMLY ANCHORED TO GROUND DETAIL FOR SLAB SUPPORTING COLUMN COLUMN
(BACK PROPPING)
AND ADEQUATELY LAPPED.
7. BEFORE ANY BACKFILLING, ALL FORMS SHOULD BE REMOVED BUT IN NO CASE LESS THAN 24HOURS AFTER PLACING CONCRETE.
ALL DEBRIS SHOULD BE CLEANED OUT.
8. USE WELL GRADED, NON COHESIVE SOILS FOR BACKFILLING. BACKFILL MATERIALS SHOULD NOT CONTAIN ANY ROOTS, CONSTRUCTION 3) WIND LOADS:
DEBRIS, DELETERIOUS MATERIALS, ORGANIC MATTERS, COBBLES OR BOULDERS(SIZE>80MM). THE FINES PERCENTAGE SHOULD NOT
EXCEED 15% AND THE SOIL SHOULD BE NON PLASTIC. The main wind force resisting system (MWFRS) and all components and cladding (C&C) are determined in accordance to the ASCE (2016).
All other parameters related to wind load are estimated according to (UnifiedFacilities Criteria (UFC) 2013).
9. IT IS EXPECTED THAT THE LAND WILL BE GRADED AND LEVELED TO THE FINAL FINISHED GRADE.
Based on aforementioned codes and standards, wind parameters for Baghdad city
10. CLEAN SAND, FREE OF SALTS AND ORGANIC MATERIALS, AND WITH LESS THAN 10% PASSING THE NO. 200 SIEVE, IS CONSIDERED Table 1.1:
Wind Parameters for Baghdad that are Adopted in the Analysis.
SUITABLE MATERIAL. BACKFILL MATERIALS SHOULD BE PLACED IN LOOSE LIFTS HAVING THICKNESS OF NOT MORE THAN 25 cm GENERAL NOTES :-
COMPACTED TO THE REQUIRED DENSITY, USE VIBRATORY ROLLER FOR COMPACTING GRANULAR SOILS.
Table 1.1
Wind Parameter NOTATION NOTATION Reference Frameworks removal time :
TO AVOID STRESSING THE DUCT.
ALL STRUCTURAL FILL MATERIAL SHALL BE COMPACTED TO A DRY DENSITY OF AT LEAST 95% OF THE MAXIMUM DRY DENSITY
Basic Wind Speed V 161 km/h ASCE (2016), (Unified Facilities Criteria (UFC) 2013) Type of framework Min. period before striking formworks
OBTAINED BY THE MODIFIED PROCTOR TEST, USE NUCLEAR DENSITY GAUGES AS PER ASTMD-2922 TO MONITOR COMPACTION WORKS.
NO BACKFILLING SHALL BE PERFORMED BEFORE CASTING OF THE SLABS THAT SUPPORT THE RETAINING WALLS. Exposure Category B ASCE (2016) Vertical framework of the column 24 hrs
13. ALL SERVICE LINES SHALL BE LAID OUT IN A CLEAN SAND BED COMPACTED TO THE REQUIRED DENSITY.
14. UTILITY TRENCHING SHALL BE SUCH THAT DUCT RUNS CAN BE MADE AS STRAIGHT AS POSSIBLE, BOTH HORIZONTALLY AND VERTICALLY,
4) SEISMIC LOADS:
AND IF A DEFLECTION MUST BE MADE IN A DUCT LINE, THE DEFLECTIONS SHOULD BE ALONG A SMOOTH AND GRADUAL CURVE Seismic Design Categories (SDCs) are adopted from ASCE (2016). All other parameters related to seismic zone are estimated according to
(Iraqi seismic code (2017).
Table 1.2:Seismic Parameters for Baghdad that are Adopted in the Analysis. no. date initials revision
6) CONSTRUCTION JOINTS AND CONTROL JOINTS: Table 1.2
seismic Parameter NOTATION
NOTATION Reference
1. CONSTRUCTION JOINTS IN FLOOR SHALL BE LOCATED WITHIN THE
MIDDLE THIRD OF SPANS OF SLABS, BEAMS AND GIRDERS, U.N.O. ON DWGS. Seismic Design Category D ASCE (2016), the soil type has been Assumed
2. BEAMS, GIRDERS AND HAUNCHES SHALL BE PLACED MONOLITHICALLY Response Modification Coefficient R 3.5 ASCE (2016)
AS PART OF A SLAB SYSTEM, UNLESS OTHERWISE SHOWN IN Topographic Factor Kzt 1 ASCE (2016)
DESIGN DRAWINGS OR SPECIFICATIONS. ASCE (2016)
Overstrength Factor 2.5
3. CONTROL JOINTS IN SLAB ON GRADE SHALL BE SPACED AT 6.00 Importance Factor I 1 ASCE (2016) job title
METERS (MAX.) INTERVAL ON BOTH DIRECTIONS. THE RESULTING Mapped Maximum Considered Ss 0.30 Iraqi seismic code 2017
PANEL SHOULD BE APPROXIMATELY SQUARE. A CHECKERED BOARD PATTERN.
Earthquake (MCER), 5%
4. IN WALLS HAVING FREQUENT OPENINGS, SPACING OF CONTROL damped, spectral response
JOINTS 6.00 METERS APART IS CONSIDERED MAXIMUM. THE acceleration parameter at short
SPACING IN WALLS WITHOUT WINDOWS SHOULD NOT BE MORE THAN periods (A)
7.50 METERS AND A JOINT WITHIN 3.00 METERS OF EACH Maximum Considered S1 0.10 Iraqi seismic code 2017
CORNER IS DESIRABLE. Earthquake (MCER), 5% drawing title
5. VERTICAL CONSTRUCTION JOINT SPACING IN WALLS SHALL NOT BE damped, spectral response
MORE THAN 12.00 METERS AND LOCATED WITHIN THE MIDDLE acceleration parameter at a
THIRD OF THE SPAN BETWEEN COLUMNS.
4.55
W1 W1 W1 W1
W1 W1
13.90
Ø25@250 B. MESH
Ø25@200 T. MESH
6.57
ADDITIONAL
Ø25@250 mm
BOTTOM L=3m
Ø25@250 B. MESH
7.00
ADDITIONAL
Ø25@250mm
BOTTOM L=3m
3.0
job title
3.0 (A)
drawing title
Foundation Plan
PLAN OF FOUNDATION
REINFORCEMENT&SEC.
designed project manager
ENG : DR-Majid Albana
checked scale date
approved 4 ST/D/04
A B C D E F G H I J
ؤ
job title
(A)
drawing title
approved 5 ST/D/05
B
B
Lift
Lift
12 - Ø20
Ø12@200
Ø12@200 2100
10 - Ø16
Ø12@200
12 - Ø20
300
Ø50mm@20cm c/c
Bottom (Y-Direction) MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :- job title
(A)
BAR DIA.(mm) 10 12 16 18 20 22 25
drawing title
approved
ENG : Majid Albana
6 ST/D/06
A'
B'
250
12 No. Ø12
0
6 /15
Ø1
00
2/2
0.500
Ø1
A'
بور ملس
Slab Reinf.
250
250
Ø12@150
50 Slab Reinf.
6/1
250
Ø1
Ø12/200 0 Slab Reinf.
2/20
Ø1 0
2/20
Ø1
Ø12/200
job title
(A)
drawing title
Stairs detail
. all dim. from ARCH D.W.G. designed
ENG : DR-Majid Albana
checked
project manager
scale date
1-100 10 /2022
drawn job no. sheet no.
approved
7 ST/D/07
A B C D E F G H I J
ؤ
W3 W3
1
C1 C1 C1 C1 C1 C1 C1 C1
C1
SCHEDULE OF COLUMNS AND WALLS
W1 W1 W1 W1
W1
W1
COLUMNS SIZE
C2 OR WALLS LENGTH WIDTH REMARK
ID (mm) (mm)
C1 850 850 just in basement
C2 850 450
C3 850 450
C3
2 W1 250 2500 lift
C2 C2 C2 C2 C2 C2 C2
C3 W3 300 2200
Notes
C2 C2 C2 C2 C2 C2 C2 3
C3
C3
4
C2 C2 C2 C2 C2 C2 C2
C3 C3
W3
W3
W3
C2 C2 5
C2 C2 C2 C2 C2
W3 W3 W3
W3
job title
(A)
drawing title
scale date
approved 8 ST/D/08
14 - Ø25 16 - Ø25
Ø10@200 Ø10@200
2Ties/Set 2Ties/Set
Main Bar Roof Floor
Ties
Column Reinf.
Rest See
C 50 850 850
Section
450 450
3 rd Floor
Ground Level
850 450 300
foundation
level
job title
(A)
drawing title
SCHEDULE OF COLUMN
Typ. Sec. For Column
designed project manager
ENG : DR-Majid Albana
TYPICAL INTERNAL COLUMN TO BEAM DETAIL TYPICAL EDGE COLUMN TO BEAM DETAIL checked scale date
1-100 10 /2022
drawn job no. sheet no.
8
1
f16@150 f16@150
0.4
0.4
Reinf. conc. Raft
foundation .
5 cm plain concrete
0.4
W2
2layers Bitumen 1cm thick. min
with bitumen felts between them
(1:2:4) 10cm Blinding
w/c = 0.45 , coarse agg. 5-19 mm
VAR.
Ø16@20
cm C/C
0.10
0.25
0.09
0.25
job title
approved
10 ST/D/10
L1 (CLEAR SPAN) L2 (CLEAR SPAN) L3 (CLEAR SPAN)
SAME LAYER
SAME LAYER
SAME LAYER
BAR D
TOP AT DISC. BAR E BAR E BAR F
SUPPORT BAR C BAR C BAR C
TOP BARS TOP AT TOP BARS TOP AT TOP BARS TOP AT
SUPPORT SUPPORT SUPPORT
50 50
40Ø
40Ø 40mm CLEAR 40Ø
17Ø
17Ø
90° ACI
90° ACI
D
D
COVER (TYP.) HOOK
17Ø
17Ø
HOOK SPLICE SPLICE SPLICE
SAME LAYER
SAME LAYER
CANTILEVER 0.05 L1 0.10 L1 0.10 L2 0.10 L3 0.05 L3
0.10 L2
50
FOR STIRRUPS SEE SCHEDULE
50 50 FOR STIRRUPS SEE SCHEDULE
50 50 FOR STIRRUPS SEE SCHEDULE
NOTES:
1. REFER TO BEAM SCHEDULE FOR No. AND SIZE OF TOP AND BOTTOM BARS REQUIRED PER BEAM.
2. PROVIDE 60mm CENTRE TO CENTRE WHEN SCHEDULES CALL FOR 2 LAYERS OF REBARS. TYPICAL BEAM LONGITUDINAL SECTION
3. FOR CANTILEVER BEAMS OR RIBS, BARS SHOULD BE EXTENDED UP TO ONE HALF THE CANTILEVER SPAN. NOT TO SCALE
W
D
D
D
W W
Type (2)
TYPICAL INTERNAL BEAM SECTION
TYPICAL EDGE BEAM SECTION
N.T.S
N.T.S
Type (4)
job title
TYPICAL EDGE INV. BEAM SECTION TYPICAL BEAM LONGITUDINAL SECTION
N.T.S (A)
drawing title
approved
11
A B C D E F G H I J
ؤ
2-16
B2 B2 B2 B2 B2 B2
B2 B2 0.7
1
10@250 mm
4-12
2-16
0.30
B3 B1 5-25
W2 W2
Ø12@150 B&T MESH
Ø12@150 B. MESH
Ø12@200 T. MESH
0.7
10@250 mm 4-25
B1
850
B1 4-12
3 2-25
Ø12@150 B. MESH Ø12@150 B. MESH
Ø12@150 B. MESH Ø12@150 B. MESH Ø12@150 B. MESH Ø12@150 B. MESH
Ø12@200 T. MESH
B2:Sect:1 just BASEMENT floor
Ø16@200 B. MESH
B3
B3
4
Ø12@150 B. MESH Ø12@150 B. MESH
Ø12@150 B. MESH Ø12@150 B. MESH Ø12@150 B. MESH Ø12@150 B. MESH
25 mm
25 mm 25 mm camber
25 mm 25 mm
25 mm
25 mm 25 mm camber camber camber
camber Ø12@200 . MESH
camber camber
camber
200
400
5
200
3000
Ø12@150 B. MESH
B1
B1
2Ø25
25 mm
Camber slab camber 25 mm
1.5
12Ø16 mm
SLAB THICKNESS = 200 mm
12@250 mm
colum Reinf.
MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :- job title
approved
11 ST/D/11
3.00 3.00
58.00
+36.90
29.00 29.00
3.18 6.42
B 6.47 6.47 6.47 6.47
B 6.42 3.18
6.27 6.27
4.00
3.00 3.00
0.18
2.29
1.40
2.00 2.00
1.40
+32.60
2.50 2.50
+28.30
13.90
4.00 4.00
4.00
3.00
+24.00
4.00
3.00
+19.70
4.00
3.00
+15.40
10.29
29.45 29.45
40.00
4.00
3.00
+11.10
4.00
3.00
+6.80
25.33 25.33
2.80
2.50
10.29
6.00
3.00 3.00
+0.50
±0.00
3.00
_ 2.80
5.35
5.00
BASEMENT plan B
SECTION B-B
no. date initials revision
job title
(A)
drawing title
PLAN OF BASEMENT & SECTION
approved
12 ST/D/12
2-20 2-16
0.7 0.7
10@250 mm 10@250 mm
4-12 4-12
2-25 2-16
0.30 0.30
A B C D E F G H I J
ؤ
B4 B2 5-25
52.00
B26.42 B2 B2 B2 B2 B2 B2
B26.51 6.47 6.27
1 0.7
10@250 mm
4-12
B2 B2 5-25
0.40
B3 B5
B5 B5 B5 B5 ADD Ø20@200 T L= 4.5m
3-25 5-25
B2
2
Ø12@150 B. MESH Ø12@150 B. MESH
Ø12@150 B. MESH Ø12@150 B. MESH Ø12@150 B. MESH Ø12@150 B. MESH
Ø12@150 B. MESH
Ø12@200 T. MESH
ADD Ø20@200 T L= 4.5m
0.8 0.7
B1
B2 B1 10@250 mm 10@250 mm
4-12 4-12
3
Ø12@150 B. MESH Ø12@150 B. MESH
Ø12@150 B. MESH Ø12@150 B. MESH Ø12@150 B. MESH Ø12@150 B. MESH
6-25 2-25
Ø12@200 T. MESH
0.40 0.30
Ø16@200 B. MESH
4 B2 B3
Ø12@150 B. MESH Ø12@150 B. MESH
ADD Ø20@200 T L= 4.5m Ø12@150 B. MESH Ø12@150 B. MESH Ø12@150 B. MESH Ø12@150 B. MESH
ADD Ø16@200 T L=7.5
25 mm camber
B2 25 mm camber
5
400
200
200
3000
B3 B1
B3 Ø12@150 B. MESH
B1
ADDITIONAL
Ø12@200 mm
TOP L=4m
BAR DIA.(mm) 10 12 16 18 20 22 25
(A)
TOP REINFORCEMENT
Slab Reinf.
LAP LENGTH (mm) IN COLUMNS 400 500 600 650 700 800 900 drawing title
LAP LENGTH (mm) IN SLAB & BEAMS 400 600 700 800 900 1000 1250 PLAN OF SLAB
0.7 0.7
10@250 mm 10@250 mm
4-12 4-12
2-25 2-16
0.30 0.30
A B C D E F G H I J
ؤ
B4 B2
B2 B2 B2 B2 B2 B2
B2 B2
1
B2 B2
ADD Ø20@200 T L= 4.5m
B3
ADD Ø20@200 T L= 4.5m
3-25 5-25
2
Ø12@150 B. MESH Ø12@150 B. MESH
Ø12@150 B. MESH Ø12@150 B. MESH Ø12@150 B. MESH Ø12@150 B. MESH
Ø12@150 B. MESH
Ø12@200 T. MESH
0.8 0.7
B1 10@250 mm 10@250 mm
B1 B2 B2
4-12 4-12
3
Ø12@150 B. MESH Ø12@150 B. MESH
Ø12@150 B. MESH Ø12@150 B. MESH Ø12@150 B. MESH Ø12@150 B. MESH
6-25 2-25
Ø12@200 T. MESH
0.40 0.45
4 B2 B3
Ø12@150 B. MESH Ø12@150 B. MESH
Ø12@150 B. MESH Ø12@150 B. MESH Ø12@150 B. MESH Ø12@150 B. MESH
ADD Ø16@200 T L=7.5
Ø12@200 . MESH
ADD Ø16@200 T
200
25 mm camber
B2 25 mm camber
5
400
200
3000
B3 B1
B3 Ø12@150 B. MESH
B1
ADDITIONAL
Ø12@200 mm
TOP L=4m
BAR DIA.(mm) 10 12 16 18 20 22 25
(A)
TOP REINFORCEMENT
Slab Reinf.
LAP LENGTH (mm) IN COLUMNS 400 500 600 650 700 800 900 drawing title
LAP LENGTH (mm) IN SLAB & BEAMS 400 600 700 800 900 1000 1250 PLAN OF SLAB
5
1
C1 C1 C1 C1 C1 C1 C1 C1
C1
4.68
B2
0.4
B2 B2 B2 B2 B2 B2 B2 0.8
2 10@250 mm 1.0
2
C2 C2 C3 6-12
C2 C2 C2 C2 C2
C3 2 4-12
10@250 mm
0.4
6-25
5
0.30
3-20
0.30
B2
250
sec. 2-2
Ø12@150
400
250
25 mm
None Bearing Wall
Brick Wall 24cm
None Bearing Wall
Brick Wall 24cm
Camber slab camber 25 mm
250
1000
3Ø12T&B
300
Ø10@200 Ø12@150
250
Ø12@200 H
Beam Ø16@200 V Beam
Ø16@200 H
colum Reinf.
MINIMUM LAP LENGTH (UNLESS NOTED ON DRAWINGS) SHOULD BE AS TABLE BELWO :-
LAP LENGTH (mm) IN SLAB & BEAMS 400 600 700 800 900 1000 1250 (A)
drawing title
BOTTOM REINFORCEMENT
PLAN OF SLAB
REINFORCEMENT&SEC.
. all dim. from ARCH D.W.G. designed
ENG : DR-Majid Albana
checked
project manager
scale date
1-100 10 /2022
drawn job no. sheet no.
approved
15 ST/D/15