SWIMMING POOL SERVICES DESIGN
SWIMMING POOL CONTROL ROOM
Pipe 63 mm Pipe 63 mm Pipe 63 mm Pipe 63 mm Pipe 63 mm
Pipe 63 mm Pipe 63 mm Pipe 63 mm Pipe 63 mm
Pipe 63 mm
Pipe 63 mm
Pipe 63 mm
Pipe 63 mm
Pipe 63 mm
RETURN INLET 5
RETURN INLET 4
SKIMMER 3
SKIMMER 1
MAIN MAIN
DRAIN 4 DRAIN 2
Pipe 63 mm
Pipe 63 mm
PUMP 2
PUMP 1
RETURN INLET 3
PUMPS
Pipe 63 mm
Pipe 63 mm
Pipe 63 mm
RETURN INLET 2
RETURN INLET 1
36'' Sand filter
36'' Sand filter
FILTER 1
FILTER 2
80 - 100 m3/ hr
SKIMMER 4
SKIMMER 2
RECIRCULATE
RECIRCULATE
CIRCULATION
CIRCULATION
RINCAGE
RINCAGE
RINSE
RINSE
MAIN
FILTRATION
FILTRATION
BACKWASH
BACKWASH
LAVAGE
LAVAGE
FILTER
FILTER
MAIN Filter Works
WASTE
EGOUT
WASTE
EGOUT
CLOSED
CLOSED
FERME
FERME
WINTER
WINTER
HIVER
HIVER
DRAIN 3 DRAIN 1
To Drain
To Drain
FILTERS
Pipe 90 mm
Pipe 63 mm Pipe 63 mm Pipe 63 mm Pipe 63 mm
SWIMMING POOL CHEMICAL PUMP
(CHLORINE)
PROJECT: REV. No. REVISION NOTES REV. BY DATE
BEEOGK INTEGRATED SERVICES MECHANICAL DRAWING SHEET No. DRAWN: ONYENUFORO STEPHEN PROJECT NO.:
PROPOSED RESIDENTIAL DEVELOPMENT LIMITED.
FOR CONSTAIN W.A PLC. DRAWING TITLE: DESIGNED: ADEYEMI AKINPELUMI SCALE: N/A
AT GWARIMPA DISTRICT,
Project Managers and M&E Engineers. MD/64
Plot 985, Algamji Estate, Phase 4, Wuye, Abuja SWIMMING POOL SERVICES DESIGN
CADASTRAL ZONE 2 LIFE CAMP, FCT ABUJA Tel: 07031946788 CHECKED: ENGR. KAREEM, A. G. DATE: JANUARY 2024