This chart provides a notional illustration of the interfaces among the three major decision support systems used to develop, produce, and field a system for national defense. It shows the planning, programming, budgeting, and execution process with oversight at different levels. The chart is intended as a classroom aid to outline the complex defense acquisition process.

Uploaded by

Nasr Pooya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views1 page

Chart Front - 2

This chart provides a notional illustration of the interfaces among the three major decision support systems used to develop, produce, and field a system for national defense. It shows the planning, programming, budgeting, and execution process with oversight at different levels. The chart is intended as a classroom aid to outline the complex defense acquisition process.

Uploaded by

Nasr Pooya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Downloaded from http://www.everyspec.

com
ver. 5.2. August 2005

Integrated Defense Acquisition, Technology, & Logistics Life Cycle Management Framework
Planning,
Programming, This chart is a classroom aid for Defense Acquisition University students. It provides a notional illustration of the
Budgeting & Execution
DEPSECDEF Oversight
DOD Decision Support Systems
Effective Interaction is Essential
The Milestone Decision Authority may authorize entry into the acquisition process at any point, consistent with phase-specific entrance criteria and statutory requirements interfaces among the three major decision support systems used to develop, produce, and field a system for national
defense. Defense acquisition is a complex process with many more activities than shown here, and many concurrent
DoD 7000.14-R activities that cannot be properly displayed on a two-dimensional chart. Supporting information is on the back of this
chart. For more information see the Acquisition, Technology & Logistics Knowledge Sharing System (http://akss.dau.mil).

Joint Capabilities Defense Concept Refinement Phase Technology Development Phase System Development & Demonstration Phase Production & Deployment Phase Operations & Support Phase
Integration & Acquisition
For space systems see
Develop a system or increment of capability; reduce integration and manufacturing risk; ensure operational supportability; Execute a support program that meets operational support performance requirements and
Development System System Refine initial concept. Develop Technology Reduce technology risk and determine appropriate set of reduce logistics footprint; implement human systems integration; design for producibility; ensure affordability and protection of Achieve operational capability that satisfies
National Security Space
technologies to integrate into a full system. sustains the system in the most cost-effective manner over its total life cycle. Dispose of the
VCJCS Oversight USD(AT&L) Oversight Acquisition Policy 03-01 Development Strategy mission needs.
CJCSI 3170.01E DoDD 5000.1 MS MS critical program information; and demonstrate system integration, interoperability, safety, and utility. MS system in the most cost-effective manner at the end of its useful life.

A B System Integration System Demonstration C Low-Rate Initial Production FRP Full-Rate Production/Deployment Sustainment Disposal
Decision Points/Milestones CD DRR DR
Joint Capabilities Integration & Development System - Acronyms
Strategic Guidance System Threat System Threat System Threat
Joint Family of Joint Future Concepts
CDD – Capability Development Document
CPD – Capability Production Document
DCR – DOTMLPF Change Recommendation
DOTMLPF – Doctrine, Organization, Training,
JCD – Joint Capabilities Document
JROC – Joint Requirements Oversight
Council
MUA – Military Utility Assessment
Architecture
Products
NCOW-RM

Global
Net-Ready Information
Assessment
Force Survivability Architecture
Products
NCOW-RM

Global
Net-Ready Information
Assessment
Force Survivability Architecture
Products
NCOW-RM

Global
Net-Ready Information
IOC
Assessment
Force Survivability
FOC
FOC

Functional Concepts of Operations KPP Grid KIPs Protection KPP KPP Grid KIPs Protection KPP KPP Grid KIPs Protection KPP
Capabilities Area Analysis

Functional
Joint Tasks
Materiel, Leadership, Personnel, and Facilities
FOC- Full Operational Capability
ICD – Initial Capabilities Document
IOC – Initial Operational Capability
NCOW-RM – Net Centric Operations
Warfare- Reference Model
KIP – Key Interface Profiles
KPP – Key Performance Parameter
Information
Assurance
KPP Information
Assurance
KPP Information
Assurance
KPP

Integrated

Integration & Needs


Analysis
Architectures
Family of Joint Future Concepts
Concept of Operations Draft
Joint Staff Certifications Service/JROC Family of Joint Future Concepts
Concept of Operations Threshold/objective tradeoffs –
Joint Staff Certifications Service/JROC
Family of Joint Future Concepts
Concept of Operations Threshold/objective tradeoffs –
Joint Staff Certifications Service/JROC Validated and approved CDD
Ideas for Analysis of ICD Automated Standards Profile
J-6 Interoperability & Supportability
Validation & CDD J-6 Interoperability & Supportability Validation & CPD Automated Standards Profile
J-6 Interoperability & Supportability Validation & and CPD for each increment
Development CDD Revised Performance Attributes
Ideas for J-8 Insensitive Munitions Automated Standards Profile Revised Performance Attributes J-8 Insensitive Munitions J-8 Insensitive Munitions
JCD Materiel/ Approval Approval
Non-materiel Materiel
Non-Materiel
Capability Roadmap J-2 Intelligence/Threat Approval Capability Roadmap J-2 Intelligence/Threat Capability Roadmap J-2 Intelligence/Threat of an evolutionary acquisition
Approaches Approaches KPPs KPPs
(DOTMLPF Approaches
Analysis)

System Functional Solution


Analysis
Approach 1
Approach 2
Approach N
Service/JROC
Validation &
Approval
Draft CDD is shown to illustrate
the importance of an early start
Information
Support
Plan
MUA
for
Advanced Concept Technology
Information
Support
Plan
MUA
for
Advanced Concept Technology
Information
Support
Plan
on this critical document. All Demonstrations/Advanced Demonstrations/Advanced
(need driven) Post
documents are initiated as drafts
at the working level.
Technology Demonstrations Technology Demonstrations

Independent DCR
Analysis Non-materiel
approaches
Initiate Evolutionary Acquisition Strategy Evolutionary Acquisition Strategy
B C

Clinger-Cohen Act
- Compliance (all IT)
Clinger-Cohen Act
- Compliance (all IT)
Clinger-Cohen Act
- Compliance (all IT)
Clinger-Cohen Act
- Compliance (all IT)
DRR
Increment II FRP

- Certification (MAIS) - Certification (MAIS) - Certification (MAIS) - Certification (MAIS)


B C
DAB/ Exit DAB/ Exit DAB/ Exit DAB/ Exit DAB/ Exit DAB/
DSAB/ MDA ADM Criteria DSAB/ MDA ADM APB Criteria DSAB/ MDA ADM Criteria DSAB/ MDA ADM APB Criteria DSAB/ MDA ADM APB Criteria DSAB/ MDA ADM DRR
Increment III FRP

ITAB Met ITAB Met ITAB Met ITAB Met ITAB Met ITAB
Oversight & Exit
Criteria
Exit
Criteria
Acquisition Strategy
Exit
Criteria
Exit
Criteria
Acquisition Strategy
Exit
Criteria
Acquisition Strategy
Exit
Criteria

Review Technology Development •Program Structure •Research & Tech Protection


Oversight & Review Acronyms
•Program Structure •Research & Tech Protection •Program Structure •Research & Tech Protection

Total Life
Strategy •Acquisition Approach •Information Assurance •Acquisition Approach •Information Assurance •Acquisition Approach •Information Assurance
•Capability Needs •Product Support ADM – Acquisition Decision Memorandum FRPDR – Full-Rate Production Decision Review •Capability Needs •Product Support •Capability Needs •Product Support
•Program Strategy
TLCSM TLCSM TLCSM TLCSM Cycle Systems
•T&E Considerations •Human Systems Integration AoA – Analysis of Alternatives ITAB – Information Technology Acquisition •T&E Considerations •Human Systems Integration •T&E Considerations •Human Systems Integration
•Cost, schedule & performance •Risk Management •ESOH APB – Acquisition Program Baseline Board •Risk Management •ESOH •Risk Management •ESOH
goals & exit criteria for first
Management
•Resource Management •MOSA CD – Concept Decision LRIP – Low Rate Initial Production •Resource Management •MOSA •Resource Management •MOSA
tech demonstration DAB – Defense Acquisition Board MAIS – Major Automated Information System
•Systems Engineering •Business Considerations •Systems Engineering •Business Considerations •Systems Engineering •Business Considerations
AoA •Test Plan •Interoperability •Best Practices
DSAB – Defense Space Acquisition Board MDA – Milestone Decision Authority
•Interoperability •Best Practices •Interoperability •Best Practices
DRR – Design Readiness Review MOSA – Modular Open Systems Approach
Plan •Information Technology •Relief, Exemptions & Waivers DSAB – Defense Space Acquisition Board T&E – Test and Evaluation •Information Technology •Relief, Exemptions & Waivers •Information Technology •Relief, Exemptions & Waivers
ESOH – Environment, Safety & Occupational TLCSM – Total Life Cycle Systems Management
Health
Purpose of LRIP:
AoA AoA AoA • Establish Production Base AoA
updated updated • Ramp to Production Rate MAIS only
n/a MAIS • Produce systems for IOT&E
Draft Draft Draft Draft
Study Acq Source RFP Technology Source RFP System Development Source RFP Source RFP
Contracting Contracts Plan Selection
RFP
Development Acq
Plan
Selection RFP & Demonstration
Acq
Plan
Selection RFP
LRIP
Contract
Acq
Plan
Selection RFP
Production
Contract
Post Production Software Support Contracts
Plan Contract Plan Contract Plan Plan
RFP – Sustainment Contracts
Request for Integrated Integrated Integrated Integrated
Proposal Baseline Baseline Baseline Baseline
Review Review Review Review

Major Preliminary Best Preferred Tech System Prototypes/ Prototypes/ Initial Low-Rate Initial Final Full-Rate
Integrated Materiel System Performance Engineering Engineering Production Production Production Production
Products Architecture Approach(es)
Concept Demos Spec
Dev Models Dev Models Baseline Systems Baseline Systems
Post-Deployment
Review

Define Refine Product Support Plan Demonstrate Product Support Capability Product Support Package/PBL Implementation Product Support/PBL Management
Set •Public-Private Partnering •Continuous Tech Refreshment Operations & Sustainment
Evaluate Product Supportability Develop Initial Product Support •Statutory/Regulatory •Product Support Elements •Footprint Reduction
Logistics/ Supportability
Objectives
Support Capabilities Objectives/
Constraints
Strategy
Product Support
Strategy
•Source of Support -Supply Support
•Legacy Considerations -Maintenance
-Training
-Support Data
•Supply Chain Management
•Product Support Elements
•Product Support Elements
•Support and Cost Baseline
•Supply Chain Management
•PBA Modifications
•Assessment of PSI/PSPs
•Obsolescence Management
•Configuration Control
•Peacetime
•Training
•Joint Operations
•Crises
•Contract for Sustainment (organic & commercial) •Supply Chain Management •Data Management
Sustainment
-Manpower & personnel
FRP
CD
INPUTS OUTPUTS
A INPUTS OUTPUTS
B INPUTS
DRR
Performance Based Logistics (PBL) Strategy (Preferred Product Support Approach) OUTPUTS
C OTRR
DR
Pre-IOC & Post IOC Supportability Assessments
•ICD •Prelim Sys Spec •ICD & Draft CDD •Sys Performance Spec •Sys Performance Spec Performance Based Business Case Product Support Integrator/ •Initial Prod Baseline Independent IOT&E
•AoA Plan •T&E Strategy •Preferred Sys Concept •LFT&E Waiver Request •Exit Criteria Agreements Analysis Product Support Provider •Test Reports

Defense •Exit Criteria


•Alternative Maintenance
& Logistics Concepts
•SEP
•Support & Maintenance
Concepts & Technologies
•Exit Criteria
•T&E Strategy
•Support & Maintenance
•TEMP
•Validated Sys Support &
Maintenance Objectives &
•Validated Sys Support &
Maintenance Objectives &
Requirements
Logistics & Technical Acronyms
ASR – Alternative Systems Review OT&E – Operational Test & Evaluation
•TEMP
•Elements of Product
Support
Full-Up System Level LFT&E

JITC Interoperability
BLRIP
Report to
Congress
FOT&E Disposal Most
BLRIP – Beyond Low Rate Initial Production OTRR – Operational Test Readiness Review Acceptable

Acquisition •Inputs to:


-draft CDD
-AoA
Concepts & Technologies
•AoA
•SEP
Requirements
•SEP •PESHE •PPP •TRA
•Inputs to:
•APB
•CDD
•SEP
CDR – Critical Design Review
CI – Configuration Item
DT&E – Developmental Test & Evaluation
PESHE – Programmatic Environment,
Safety & Occupational Health Evaluation
PDR – Preliminary Design Review
•Risk Assessment
•SEP •TRA
•PESHE
Certification Testing
J-6 Interoperability LFTE
Recycle/Reuse

-TDS •TDS -IBR -ISP -STA -CDD •ISP EOA – Early Operational Assessment PCA – Physical Configuration Audit •Inputs to: & Supportability Validation Report to

System -Cost/Manpower Est.


-Acq Strategy
-Affordability Assessment
-Cost/Manpower Est.
•TEMP ESOH – Environmental, Safety & Occupational Health
FCA – Functional Configuration Audit
FMECA – Failure Mode Effects & Criticality Analysis
FOT&E – Follow-on Test & Evaluation
PRR – Production Readiness Review
PPP – Program Protection Plan
RCM – Reliability Centered Maintenance
RMS – Reliability, Maintainability & FCA
-CPD -STA -ISP
-Cost/Manpower Est.
Congress Reprocessing

Landfill
Disposal
(event driven) ITR ASR SRR FTA – Failure Tree Analysis
IOT&E – Initial Operational Test & Evaluation
Supportability
SEP – Systems Engineering Plan
SVR PRR
INPUTS OUTPUTS INPUTS OUTPUTS Least
Interpret User Needs, Analyze/Assess Interpret User Needs. Demo & Validate Sys Interpret User Needs, ISR – In-Service Review SFR – System Functional Review Combined DT&E/OT&E/LFT&E
•Test Results •Production Baseline •Service Use Data •Data for In-Service Review Acceptable
Analyze Operational Concepts Versus Analyze Operational Concepts & Technology Refine System ISP – Information Support Plan SRR – System Requirements Review Demonstrate System to
ITR – Initial Technical Review STA – System Threat Assessment •Exit Criteria •Test Reports •User Feedback •Input to CDD for next increment
Capabilities & Defined User Needs & Capabilities & Maturity Versus Performance Specs & Specified User Needs &
JITC – Joint Interoperability Test Command SVR – System Verification Review •APB •CPD •SEP •TEMP •TEMP •PESHE •SEP •Failure Reports •Modifications/upgrades to fielded
Environmental Constraints Environmental Constraints Environmental Constraints Defined User Needs Environmental Constraints Environmental Constraints
LFT&E – Live Fire Test & Evaluation T&E – Test & Evaluation •Input to: systems
Technical Trades Trades Trades Trades Trades
LORA – Level of Repair Analysis
LRIP – Low Rate Initial Production
TEMP – Test & Evaluation Master Plan
TDS – Technology Development Strategy Trades
•Product Support Package
- Cost/Manpower Est.
•Discrepancy Reports
•SEP •SEP
Systems Engineering SRR MTA – Maintenance Task Analysis TRA – Technology Readiness Assessment
OA – Operational Assessment TRR – Test Readiness Review System DT&E, LFT&E & OAs, In-Service
Test & Evaluation Develop Concept Assess/Analyze Develop System Perf
Demo/Model Develop System PCA
Performance (& Constraints) Concept & Verify (& Constraints) Spec & Verify System Functionality Review
Integrated System Versus Functional Specs & Analyze Deficiencies Verify & Validate Monitor and Collect
Supportability Definition & Verification System Concept’s Enabling/Critical Tech
Performance Spec System Verification Plan
& Constraints Compliance
To Determine Corrective Production All Service Implement and
Objectives Performance Verification Plan to Specs Field
Actions Configuration Use Data
SFR TRR
Trades Trades
Decompose Concept Assess/Analyze Develop Functional Demo System Evolve Functional Integrated DT&E, LFT&E &
Performance into System Concept
FMECA Performance Specs into
Definitions for Enabling/ Functionality EOAs Verify Performance
Functional Definition & Versus Functional Critical Technologies & CI Functional (Design to) Compliance to Specs Modify Configuration
Versus Plan FTA Analyze Data to Assess Risk of
Verification Objectives Capabilities Associated Verification Plan Specs and CI Verification Plan (Hardware/Software/Specs)
RCM To Correct Deficiencies Determine Improved System
PDR Root Cause

Decompose Concept Assess/Analyze Decompose Functional Demo Enabling/ Evolve CI Functional Individual CI
LORA Specs into Product
Functional Definition into Enabling/Critical Definitions into Critical Critical Technology Verification
Component Concepts & Components Versus Component Definition Components MTA (Build to) Documentation DT&E
LFT&E Determine Integrate & Test
Assessment Objectives Capabilities & Tech Verification Plan Versus Plan and Inspection Plan
Waiver System Risk/
(if appropriate) CDR Hazard Severity
Corrective Action

Develop Component Concepts, Develop System Concepts, Fabricate, Assemble,


i.e., Enabling/Critical i.e., Enabling/Critical Technologies, Code to “Build-to”
Technologies, Constraints Update Constraints & Full Documentation Develop
• Process Change – Hardware/Support
Funding in
& Cost/Risk Drivers Cost/Risk Drivers Corrective
Action • Materiel Change

Economic Analysis FYDP Cost Acronyms


CARD – Cost Analysis Requirements Description Economic Analysis
Economic Analysis
(MAIS Only) (MAIS Only) CCA – Component Cost Assessment (MAIS Only)
ICE – Independent Cost Estimate
CARD Affordability MAIS – Major Automated Information System CARD Affordability CARD Affordability
(Designated POE CCA ICE Assessment POE – Program Office Estimate (Designated POE CCA ICE Assessment (Designated POE CCA ICE Assessment
Programs) RDT&E – Research, Development, Test & Evaluation Programs) Programs)
Cost
PMO POM Input Cost Estimation Parametric Actual Costs
Analogy Engineering
Methods
PMO Budget Estimate

Types of RDT&E – Advanced Technology Development RDT&E – Adv Component Dev & Prototypes RDT&E – Systems Development & Demonstration
Procurement Operations &
Funds RDT&E – Management & Support
RDT&E – Management & Support
RDT&E – Management & Support Maintenance

Appropriated Funds To Support Contracts


Planning, Military
Departments & August
Planning, Programming, Budgeting & Execution Acronyms
BCP – Budget Change Proposals
FYDP – Future Years Defense Program
PCP – Program Change Proposals
PDM – Program Decision Memorandum

Programming, Defense Agencies POM/Budget Formulation


Changes to On Year
POM/Budget Submit
Changes to On Year
September - November
MBI – Major Budget Issues
OMB – Office of Management & Budget
PBD – Program Budget Decision
PMO – Program Management Office
POM – Program Objectives Memorandum
SLRG – Senior Leadership Review Group
DoD Testimony DoD Appeals Allocation

Budgeting, Strategic Planning Joint Programming ISSUES SLRG Reviews PDM(s)


Office of the
& Execution Secretary of Defense
Joint Planning Document Guidance
Off Year Optional
Guidance
Off Year Optional Final DoD
Apportionment
MBI FYDP
Process & Joint Staff National Military Strategy
National Defense Strategy
October April / May FYDP
updated
PBD Cycle
October - November
PBDs
November December
Budget updated
Congress Congress
(biennial calendar driven) President’s Budget Authorization Appropriation
Authorization/
OMB Appropriation
On Year White Budget to Committees Committees Committees
National Security Strategy Fiscal Guidance January Congress Acts Passed
Off Year
House
February (1st Monday) February - September
For single copies of this chart send request to DAUPubs@dau.mil Send recommendations to improve the content of this chart to wallchart@dau.mil

You might also like