0% found this document useful (0 votes)
80 views1 page

RFI Format Final

Uploaded by

Thashreef AC
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
80 views1 page

RFI Format Final

Uploaded by

Thashreef AC
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

REQUEST FOR INSPECTION

Project Construction of Remaining Work of Mahlah - Ghobrat Al Tam - lsmaya Road in Wilayat Damaa and Altaeen - Ash Sharqiyah North

Request No.

Kind Attention Resident Engineer, Renardet S.A. & Partners Consulting Engineers LLC

Discipline ROAD STRUCTURE PROTECTION UTILITIES SURVEY LAB OTHERS Spec. Ref.

Drawing No. Rev No. BOQ Ref.

Please Inspect the works as listed below on Date Time

Location Chainage

Submitted by (Contractor Representative) Received by (Consultant Representative)

Name/Sign Name/Sign

Date & Time Date & Time

Consultant Comments Signature/Date

Site Inspector

Land Surveyor

Geologist

Resident Engineer's Comment(s):

APPROVED APPROVED WITH COMMENTS NOT APPROVED

Date Resident Engineer Name/Signature

Request received by Contractor:


Name Signature
Designation Date
Distribution White - Consultant, Light Pink – AHC, Light Blue – DG MM, Light Yellow – QS Light Green - File