Rebar Cutting List
Rebar Cutting List
Footing
Location: Level: Page:
Foundation Lvl
Prepared by: Checked by:
F2 YBARS 10.5m a a - - - - - - - - - - - - - -
b c b
F2 10.5m a a - - - - - - - - - - - - - -
b c b
F3 a a - - - - - - - - - - - - - -
b c b
F3 a a - - - - - - - - - - - - - -
b c b
F4 a a - - - - - - - - - - - - - -
b c b
F4 a a - - - - - - - - - - - - - -
b c b
b c
Top Bars CONT-1 a - - - - - - - - - - - - - -
c b
Top Bars CONT-2 - - - - - - - - - - - - - -
a
b c
SCENARIO 1: c
A1 20Ø 8 pcs 10.5m 240 95 10165 10,500 12 1 96 2.466 2,485.73 - - - 96 - - -
STARTER BARS 1
a
b
SCENARIO 1: c
B1 20Ø 8 pcs 5m 240 95 4665 5,335 12 1 96 2.466 1,183.68 - - - - - - -
STARTER BARS 2
a
b
SCENARIO 1:
A2 20Ø 6 pcs 7.5m a 7,500 7,500 12 1 72 2.466 1,331.64 - 72 - - - - -
SPLICE 1
SCENARIO 1:
B2 20Ø 6 pcs 12m a 12,000 12,000 12 1 72 2.466 2,130.62 - - - - 72 - -
SPLICE 2
SCENARIO 2: c
A1 20Ø 6 pcs 10.5m 240 95 10165 10,835 - - 2.466 - - - - - - - -
STARTER BARS 1
a
b
SCENARIO 2: c
B1 20Ø 2 pcs 7.5m 240 95 7165 7,835 - - 2.466 - - - - - - - -
STARTER BARS 1
a
SCENARIO 2: c
C1 20Ø 8 pcs 6m 240 95 5665 6,335 - - 2.466 - - - - - - - -
STARTER BARS 2
a
SCENARIO 2:
A2 20Ø 4 pcs 12m a 12,000 12,000 - - 2.466 - - - - - - - -
SPLICE 1
SCENARIO 2:
B2 20Ø 2 pcs 7.5m a 7,500 7,500 - - 2.466 - - - - - - - -
SPLICE 1
SCENARIO 2:
C2 20Ø 2 pcs 10.5m a 10,500 10,500 - - 2.466 - - - - - - - -
SPLICE 1
SCENARIO 2:
D2 20Ø 4 pcs 7.5m a 7,500 7,500 - - 2.466 - - - - - - - -
SPLICE 2
SCENARIO 2:
E2 20Ø 2 pcs 12m a 12,000 12,000 - - 2.466 - - - - - - - -
SPLICE 2
Foundation to Tie Beam Foundation to Tie Beam
Footing Column Depth of Footing Depth of
Height Ties Spacing DIMENSION OF COLUMN BAR DIA CC COVER CORNER OTHER Count Space Count Space Depth of CC of Footing Column Ties Spacing
Rebars Beam V.Bars V.Bars from external from Inner Rebars Height from Beam
(mm) from NGL (mm)
(m) @50 @100 Rest @ 175 O.C LENGTH WIDTH
(mm) (mm) (mm) (mm) ties V.Bar ties V.Bar C6 Footing (m) (mm)
(mm) NGL (m) (mm) @50 @100 Rest @
12 1.97 300 2 6 14 500 250 10 40 20 20 4 2 2.5 75 12 1.97 300 2 6
Formula: Formula:
500 L = 2A + 2B + Hook(2) - 3(2db) - 2(3db) --> "External Ties" H1 = 4.47 - 0.3 - 0.075 - 0.012(2) 600L = 2A + 2B + Hook(2) - 3(2
250 Hook = (3db +75) or 9db --> "pick the highest answer" H1 = 4.071 m 300Hook = (3db +75) or 9db
C/c Spacing A = [ A - 2(Corner V.bar/2) + 2(Ties Dia/2) ] / 4 170 mm C = Irebars (A / Pcs of ORe
.1 x 2) C = C/c Spacing A + 2(Corner V.Bars/2) + 2(Ties Dia) = 2(Answer) - 2(Other Vbars/2) H2 = 4.47 - (2 x 0.05 x 2) - (6 x 0.1 x 2) L = 2C + 2B + Hook(2) - 3(2
L = 2C + 2B + Hook(2) - 3(2db) - 2(3db) --> "Inner Ties" 40 mm H2 = 2.671 m Solution:
520A = 600 mm - 80 mm = 520
Solution: # of Pcs @175mm 220B = 300 mm - 80 mm = 220
420 A = 500 mm - 80 mm = 420 mm = (2.671 / 0.175 ) -1 db = 10 mm ø
170 B = 250 mm - 80 mm = 170 mm = 14.263 pcs or 14 pcs 206C = 2(520 / 5 - 1 )= 206 mm
db = 10 mm ø
420 mm
A = 500 mm
C/c Spacing A = 420 - 20 - 20 / 4 = 95 mm Answer:
240 mm
140 C = 95 + 20 + 20 = 140 mm starter ties = 2 pcs L = 2A + 2B + Hook(2) - 3(2
240 240 C = 2(140) - 2(20) = 240 mm Total # of Ties L = 2(520) + 2(220) + 2[(3x
= (2 x 2) + (6 x 2) + 14 + 2 L = 1570 mm or 1.57 --> "
Answer: = 32 pcs
L = 2A + 2B + Hook(2) - 3(2db) - 2(3db) L = 2C + 2B + Hook(2) - 3(2
L = 2(420) + 2(170) + 2[(3x10) + 75] - 3(2x10) - 2(3x10) Joint Confinement = 3 pcs L = 2(206) + 2(220) + 2(75)
40 mm
L = 1270 mm or 1.27 m --> "External ties" Grand total # of Ties L = 952 mm or 0.952 m
= 32 + 3
L = 2C + 2B + Hook(2) - 3(2db) - 2(3db) = 35 pcs
L = 2(240) + 2(170) + 2[(3x10) + 75] - 3(2x10) - 2(3x10) B = 250 mm
L = 910 mm or 0.91 m --> "Inner Ties or Cross Ties"
FLR LEVEL
NUMBER OF LENGTH DIMENSION (mm) TOTAL PCS PRODUCED NUMBER
MARKET LENGTH
SCHEDUL DIAM.
DESCRIPTION PCS AT TO CUT SHAPE OF REBAR TOTAL NUMBER OF FOR EACH RAW MARKET RAW UNIT WT. WEIGHT
E SIZE EACH FROM hook count 90° bend x count 135° bend x SETS LENGTH LENGTH
A B (3db+75) or (9db) 2db 3db 6 7.5 9 10.5 12 13.5 15
OUTER
FND TO GF TIES 10Ø 37 pcs 10.5m 170 170 210 60 60 770 1 13 3 0.616 19.40 - - - 3 - - -
INNER
TIES 10Ø 37 pcs 10.5m 130 130 210 60 60 610 1 17 3 0.616 19.40 - - - 3 - - -
OUTER
TIES 10Ø 41 pcs 10.5m 170 170 210 60 60 770 1 13 4 0.616 25.87 - - - 4 - - -
GF TO 2F
INNER
TIES 10Ø 41 pcs 10.5m 130 130 210 60 60 610 1 17 3 0.616 19.40 - - - 3 - - -
C1
OUTER
TIES 10Ø 41 pcs 10.5m 170 170 210 60 60 770 1 13 4 0.616 25.87 - - - 4 - - -
2F TO 3F
INNER
TIES 10Ø 41 pcs 10.5m 130 130 210 60 60 610 1 17 3 0.616 19.40 - - - 3 - - -
OUTER
TIES 10Ø 41 pcs 10.5m 170 170 210 60 60 770 1 13 4 0.616 25.87 - - - 4 - - -
3F TO 4F
INNER
TIES 10Ø 41 pcs 10.5m 130 130 210 60 60 610 1 17 3 0.616 19.40 - - - 3 - - -
FLR LEVEL
NUMBER OF LENGTH DIMENSION (mm) TOTAL PCS PRODUCED NUMBER
MARKET LENGTH
SCHEDUL DIAM.
DESCRIPTION PCS AT TO CUT SHAPE OF REBAR TOTAL NUMBER OF FOR EACH RAW MARKET RAW UNIT WT. WEIGHT
E SIZE EACH FROM hook count 90° bend x count 135° bend x SETS LENGTH LENGTH
A B (3db+75) or (9db) 2db 3db 6 7.5 9 10.5 12 13.5 15
OUTER
FND TO GF TIES 10Ø 35 pcs 10.5m 220 120 210 60 60 770 1 13 3 0.616 19.40 - - - 3 - - -
INNER
TIES 10Ø 35 pcs 5m 120 150 20 30 220 1 22 2 0.616 6.16 - - - - - - -
OUTER
TIES 10Ø 35 pcs 10.5m 220 120 210 60 60 770 1 13 3 0.616 19.40 - - - 3 - - -
GF TO 2F
INNER
TIES 10Ø 35 pcs 5m 120 150 20 30 220 1 22 2 0.616 6.16 - - - - - - -
C2
OUTER
TIES 10Ø 35 pcs 10.5m 220 120 210 60 60 770 1 13 3 0.616 19.40 - - - 3 - - -
2F TO 3F
INNER
TIES 10Ø 35 pcs 5m 120 150 20 30 220 1 22 2 0.616 6.16 - - - - - - -
OUTER
TIES 10Ø 35 pcs 10.5m 220 120 210 60 60 770 1 13 3 0.616 19.40 - - - 3 - - -
3F TO 4F
INNER
TIES 10Ø 35 pcs 5m 120 150 20 30 220 1 22 2 0.616 6.16 - - - - - - -
Project: Structure: Date:
Footing
Location: Level: Page:
Foundation Lvl
Prepared by: Checked by:
PCS
LENGTH DIMENSION (mm) TOTAL NUMBER MARKET LENGTH
MARK ON DIAM. NUMBER OF PRODUCED
DESCRIPTION
DWG SIZE PCS AT EACH
TO CUT SHAPE OF REBAR TOTAL NUMBER OF MARKET RAW UNIT WT. WEIGHT
FROM a b c d FOR EACH 6 7.5 9 10.5 12 15
SETS LENGTH
RAW LENGTH
B-1 CONTINUOS
BOT-
REBARS @ 16Ø 2 pcs 6m a 200 76 10,224 10,500 3 1.0 6.0 1.578 56.81 6 - - - - -
BOTTOM CONT-1
b c
B-1 CONTINUOS
BOT-
REBARS @ 16Ø 2 pcs 6m 9,000 9,000 3 1.0 6.0 1.578 56.81 6 - - - - -
BOTTOM CONT-2
a
c
B-1 CONTINUOS
BOT-
REBARS @ 16Ø 2 pcs 6m a 200 76 6,472 6,748 3 1.0 6.0 1.578 56.81 6 - - - - -
BOTTOM CONT-3
c b
b c
B-1 CONTINUOS TOP-
REBARS @ TOP CONT-1
16Ø 2 pcs 6m a 200 76 11,724 12,000 3 1.0 6.0 1.578 56.81 6 - - - - -
c b
B-1 CONTINUOS TOP-
16Ø 2 pcs 6m 200 76 4,320 4,596 3 1.0 6.0 1.578 56.81 6 - - - - -
REBARS @ TOP CONT-3 a
b c
TOP- d
B-1 TOP EXTRA 16Ø 1 pcs 10.5m a 200 76 2,126 100 2,502 3 4.0 1.0 1.578 16.57 - - - 1 - -
EXTR-1
TOP- b
B-1 TOP EXTRA 16Ø 1 pcs 9m a a 100 4,150 4,350 3 2.0 2.0 1.578 28.40 - - 2 - - -
EXTR-2
TOP- b
B-1 TOP EXTRA 16Ø 1 pcs 9m a a 100 4,150 4,350 3 2.0 2.0 1.578 28.40 - - 2 - - -
EXTR-2
c b
TOP- d
B-1 TOP EXTRA 16Ø 1 pcs 10.5m a 200 76 2,126 100 2,502 3 4.0 1.0 1.578 16.57 - - - 1 - -
EXTR-1
BOT-
B-1 BOT EXTRA 16Ø 1 pcs 10.5m 100 4,440 4,640 3 2.0 2.0 1.578 33.14 - - - 2 - -
EXTR-1 a a
b
BOT-
B-1 BOT EXTRA 16Ø 1 pcs 10.5m a 100 4,560 4,760 3 2.0 2.0 1.578 33.14 - - - 2 - -
EXTR-2 a
b
BOT-
B-1 BOT EXTRA 16Ø 1 pcs 10.5m a 100 4,440 4,640 3 2.0 2.0 1.578 33.14 - - - 2 - -
EXTR-1 a
b
DIMENSION (mm) PCS MARKET LENGTH
FLR LEVEL
NUMBER OF LENGTH TOTAL NUMBER
DESCRIPTION SCHEDULE DIAM. SHAPE OF REBAR TOTAL PRODUCED UNIT WT. WEIGHT
PCS AT TO CUT NUMBER OF MARKET
SIZE FOR EACH
EACH FROM A B hook count 90° bend x count 135° bend x SETS RAW LENGTH 6 7.5 9 10.5 12 13.5 15
(3db+75) or (9db) 2db 3db RAW LENGTH
OUTER TIES 10Ø 34 pcs 10.5m 220 120 210 60 60 770 1 13 3 0.616 19.40 - - - 3 - - -
3RD FLOOR LEVEL
OUTER TIES 10Ø 34 pcs 10.5m 220 120 210 60 60 770 1 13 3 0.616 19.40 - - - 3 - - -
B2
4TH FLOOR LEVEL
OUTER TIES 10Ø 34 pcs 10.5m 220 120 210 60 60 770 1 13 3 0.616 19.40 - - - 3 - - -
ROOF
OUTER TIES 10Ø 34 pcs 10.5m 220 120 210 60 60 770 1 13 3 0.616 19.40 - - - 3 - - -
Project: Structure: Date:
Footing
Location: Level: Page:
Foundation Lvl
Prepared by: Checked by:
PCS
LENGTH DIMENSION (mm) TOTAL NUMBER MARKET LENGTH
MARK ON DIAM. NUMBER OF PRODUCED
DESCRIPTION
DWG SIZE PCS AT EACH
TO CUT SHAPE OF REBAR TOTAL NUMBER OF MARKET RAW UNIT WT. WEIGHT
FROM a b c d FOR EACH 6 7.5 9 10.5 12 15
SETS LENGTH
RAW LENGTH
Bottom Starter b c
BOT-A 12Ø 61 pcs 9m 144 57 8,799 9,000 1 1.0 61.0 0.888 487.51 - - 61 - - -
parallel to Grid 1 a
Bottom Starter b c
BOT-A 12Ø 64 pcs 10.5m 144 57 10,299 10,500 1 1.0 64.0 0.888 596.74 - - - 64 - -
parallel to Grid 1 a
Bottom Starter b c
BOT-A 12Ø 52 pcs 10.5m 144 57 10,299 10,500 1 1.0 52.0 0.888 484.85 - - - 52 - -
parallel to Grid A a
c
Top Bars along b c
"Discontinuous" A 12Ø 92 pcs 12m d 144 57 1,152 150 1,503 1 7.0 14.0 0.888 149.18 - - - - 14 -
a
edges
c
Top Bars along b c
"Discontinuous" D 12Ø 92 pcs 12m d 144 57 1,152 150 1,503 1 7.0 14.0 0.888 149.18 - - - - 14 -
a
edges
c
Top Bars along b c
"Discontinuous" 1 12Ø 75 pcs 9m d 144 57 1,402 150 1,753 1 5.0 15.0 0.888 119.88 - - 15 - - -
a
edges
c
Top Bars along b c
"Discontinuous" 4 12Ø 75 pcs 9m d 144 57 1,402 150 1,753 1 5.0 15.0 0.888 119.88 - - 15 - - -
a
edges
c
Top Bars along
"Continuous" C 12Ø 106 pcs 6m b 150 2,375 2,675 1 2.0 53.0 0.888 282.38 53 - - - - -
a a
edges
c
Top Bars along
"Continuous" B 12Ø 106 pcs 6m b 150 2,375 2,675 1 2.0 53.0 0.888 282.38 53 - - - - -
a a
edges
c
c
Top Bars along
"Continuous" 2 12Ø 85 pcs 10.5m b 150 2,875 3,175 1 3.0 29.0 0.888 270.40 - - - 29 - -
a a
edges
c
Top Bars along
"Continuous" 3 12Ø 85 pcs 10.5m b 150 2,875 3,175 1 3.0 29.0 0.888 270.40 - - - 29 - -
a a
edges
BAR SIZES
BAR SIZES
Fc' = 3ksi
Fc' = 4ksi
Fc' = 5ksi
Fc' = 3ksi
Fc' = 4ksi
Fc' = 5ksi
ALL MEMBERS U.N.O
db
90-degree
bend
Diameter
ext
dh
db
180-degree
bend
Diameter
ext
dh
BACK
CONTINUES BEA
S BEAM
CONSIDERING
EXT
NSIDERING 2H RULE
EXTRA BARS FOR BE
NOT
THIS DRAWIN
OR BEAM
NOT CONSIDERING 2H RULE
THIS DRAWING IS APPLICABLE FOR BEAMS ALONG GRID A/A'/B
G GRID A/A'/B/C/D
BACK
BACK