RATTAN BAMBOO ALUMINUM RAILINGS WITH GLASS ALUMINUM RAILINGS WITH GLASS RATTAN
PARTITION WALL RATTAN PAINTED FINISH RATTAN
MAIN TOP OF ROOF ELEV = +8.64 MAIN TOP OF ROOF ELEV = +8.64
TOP OF ROOF ELEV = +7.10 TOP OF ROOF ELEV = +7.10
WOODEN TOP CHORD ELEV = +6.22 WOODEN TOP CHORD ELEV = +6.22
WOODEN BOTTOM CHORD ELEV = +6.02 WOODEN BOTTOM CHORD ELEV = +6.02
ELEVATED SECOND FLOOR FINISHED LINE ELEV = +3.00 ELEVATED SECOND FLOOR FINISHED LINE ELEV = +3.00
ELEVATED CEILING LINE ELEV = +2.75 ELEVATED CEILING LINE ELEV = +2.75
SECOND FLOOR FINISHED LINE ELEV = +2.40 SECOND FLOOR FINISHED LINE ELEV = +2.40
CEILING LINE ELEV = +2.15 CEILING LINE ELEV = +2.15
GROUND FLOOR FINISHED LINE ELEV = +0.20 GROUND FLOOR FINISHED LINE ELEV = +0.20
NGL ELEV = +0.00 NGL ELEV = +0.00
FRONT ELEVATION LEFT SIDE ELEVATION
SCALE 1:100 MTS SCALE 1:100 MTS
LOGO NAME PLATE TITLE SUBJECT SHEET CONTENT SHEET NO.
CHRISTIAN ANGELO D. GAMIZ A PROPOSED BEACH FRONT ECO- RESORT
VINZ ELIAZAR C CAMMAYO DEVELOPMENT IN STA. ANA, CAGAYAN DESIGN 6
COURSE AND YEAR PLATE NO: DUE DATE: INSTRUCTOR
BS-ARCHITECTURE 3A MIDTERM EXAM PLATE AR. GERRLENE C. CABALONGA, UAP