0% found this document useful (0 votes)
23 views13 pages

Download

Uploaded by

Sarojaram Prasad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views13 pages

Download

Uploaded by

Sarojaram Prasad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

Annexure ‘A’

REVIEW OF PROGRESS OF ABSS STATION WORKS


GSU/HYB
Sl. Station Execu. Name of Work Agency Cost Cost after Origin Extende Physical Financial Remarks
Agency (Rs) Variation al due d progress Progress
date duration (%) (%)
of validity
work upto
1 KACHEDGUDA GSU Hyderabad Division: M/s Sikka 55,28,440.00 No variation 18/03/ Sept-24 35% 35%
(KCG) Architectural, Financial and Associates 24
DPR consultancy for major
upgradation of Kacheguda
Railway station.
2 UMDANAGAR GSU Provision of new Facade, TUDI 6,43,89,566.92 7,81,18,981.05 19/02/ Nov -24 24% 21%
(UR) development of station bldg Infrastructu 24
on 2nd entry, circulating re
area development, Hyderabad
provision of passenger lifts
and escalators,
Improvement to PF surface,
provision of additional COP,
interior renovations of
concorse, waiting halls, VIP
lounge, provision of toilets
for Divyangjan, new
signages and new furniture
etc.
3 MAHABOOBNAGA GSU Provision of new Facade, TUDI 7,02,53,233.25 No variation 19/02/ June - 10% 5% Due to doubling, works
R development of station bldg Infrastructu 24 24 delayed. Will be
(MBNR) on 2nd entry, circulating re resolved at the earliest.
area development, Hyderabad
Provision of 12M FOB for
future roof plaza, provision
of passenger lifts and
escalators, Improvement to
PF surface, provision of
additional COP, interior
renovations of concorse,
waiting halls, VIP lounge,
provision of toilets for
Divyangjan, new signages
and new furniture etc.

Page 5 of 13
Sl. Station Execu. Name of Work Agency Cost Cost after Origin Extende Physical Financial Remarks
Agency (Rs) Variation al due d progress Progress
date duration (%) (%)
of validity
work upto
4 MALAKPET GSU Provision of new Facade, K Suresh 4,89,46,551.772 6,13,02,767.33 27/02/ Nov-24. 21% 17% FOB work
(MXT) development of station Babu 24
bldg on 2nd entry, Either side 5 Mts gap
circulating area should be given & the
development, Provision of work shall be carried on.
12M FOB for future roof Parking issue at
plaza, Integration of Metro Platform No.2
connectivity, provision of
passenger lifts and 30% area provide for
escalators, Improvement to parking for the time being.
PF surface, provision of Remaining 70% area
additional COP, interior work shall be started and
renovations of concorse, completed. After this,
waiting halls, VIP lounge, work in 30% area can be
provision of toilets for started by providing
Divyangjan, new signages parking as per feasibility.
and new furniture etc. (CPM & Sr.DCM)
Shifting of S&T Cables
Within 10 days cables
will be shifted.
(Sr.DSTE)
5 MALKAJGIRI GSU Provision of new Facade, Afsar 5,65,86,419.42 6,93,87,626.64 19/02/ Oct-24 20% 22% Drawings for Façade
(MJF) development of station bldg Riyaz 24
on 2nd entry, circulating Will be completed and
area development, provided by 13th May,
Provision of 12M FOB for 2024.
future roof plaza, provision Drawings of Entrance –
of passenger lifts and Exit Gate
escalators, Improvement to
PF surface, provision of Will be provided by 13th
additional COP, interior May, 2024.
renovations of concorse,
Difficulty in carrying out
waiting halls, VIP lounge,
FOB & COP work
provision of toilets for
Divyangjan, new signages Either side 5 Mts gap
and new furniture etc. should be given & the
work shall be carried on.

Page 6 of 13
Sl. Station Execu. Name of Work Agency Cost Cost after Origin Extende Physical Financial Remarks
Agency (Rs) Variation al due d progress Progress
date duration (%) (%)
of validity
work upto
6 HUPPUGUDA GSU Provision of new Facade, K Suresh 5,16,56,575.844 6,45,73,811.96 27/02/ Oct-24. 22% 15%
(HPG) circulating area Babu 24
development, Provision of
12M FOB for future roof
plaza, provision of
passenger lifts and
escalators, Improvement to
PF surface, provision of
additional COP, interior
renovations of concorse,
waiting halls, VIP lounge,
provision of toilets for
Divyangjan, new signages
and new furniture etc.
7 MEDCHAL GSU Provision of new Facade, Afsar 41,81,141.00 5,22,27,464.09 19/02/ Oct-24. 27% 22%
(MED) development of station bldg Riyaz 24
on 2nd entry, circulating
area development,
Provision of 12M FOB for
future roof plaza, provision
of passenger lifts and
escalators, Improvements
to PF surface, provision of
additional COP, interior
renovations of concorse,
waiting halls, VIP lounge,
provision of toilets for
Divyangjan, new signages
and new furniture etc.
8 YAKUTPURA GSU Provision of new Facade, K Suresh 26,75,482.102 5,31,70,042.22 28/02/ Nov-24 17% 14%
(YKA) circulating area Babu 24
development, provision of
passenger lifts and
escalators, Improvements
to PF surface, provision of
additional COP, interior
renovations of concorse,
waiting halls, VIP lounge,
provision of toilets for
Divyangjan, new signages
and new furniture etc.

Page 7 of 13
Sl. Station Execu. Name of Work Agency Cost Cost after Origin Extende Physical Financial Remarks
Agency (Rs) Variation al due d progress Progress
date duration (%) (%)
of validity
work upto
9 MEDAK GSU Provision of new Facade, Afsar Tender opened on
(MDAK) circulating area Riyaz 08.04.2024.
development, provision of TCP under finalisation
passenger lifts
,Improvements to PF
surface, provision of
additional COP, interior
renovations of concorse,
waiting halls, VIP lounge,
provision of toilets for
Divyangjan, new signages
and new furniture etc.

Page 8 of 13
Annexure ‘B’

REVIEW OF PROGRESS OF ABSS STATION WORKS

HYB DIVISION
Sl. Station Execu. Scope of work Agency Cost Certified Original Extended Physical Financial Remarks
Agency (Rs) Variation due date duration progres Progress
of work validity s
upto
1 KURNOOL Div. 1.Improvements to TUDI 70329848.59 96428051.06 19/2/24 Oct -24 21.0% 8.7% Façade drawings
CITY Circulating area(Relocation Infrastructure Will be provided by the
(KRNT) of Parking Area, Compound -HYB Consultant
Wall etc.,)
2.Concourse Area Drawings for FOB
Improvements Will be provided by 25th
3.Façade Works May, 2024
4.Granite & VDC Works as
Part of Platform
Improvements (Under
Covered Surface)
5.New Building, Circulating
Area, Approach Roads to be
Provided as Part of Second
Entry
6.Improvements to
Passenger Amenities ( Pay
& Use Toilet Block etc.,)
7.Entrance Arch
2 SBB Div. 1.Improvements to GV 34204923.37 48143860.26 19/2/24 Oct-24 16% 7.8% IOW issues
JOGULAMBA Circulating area(Relocation Construction
(SBBJ) of Parking Area, New s HYB To be sort with Sr.DEN/DEN
Retaining Wall needs to be
Constructed etc.,)
2.Concourse Area S&T Cable issue on filed
Improvements side
3.Façade Works
4.Granite Works as Part of One S&T Staff should be
Platform Improvements available to monitor the
5.Improvements to cables while carryout the
Passenger Amenities work (Sr.DSTE)
6.Entrance Arch

Page 9 of 13
Sl. Station Execu. Scope of work Agency Cost Certified Original Extended Physical Financial Remarks
Agency (Rs) Variation due date duration progres Progress
of work validity s
upto
3 GADWAL Div. 1.Improvements to A Arjun Rao 62249427.36 88222844.92 11/03/24 Nov-24 21% 19% Façade drawings
(GWD) Circulating area(Relocation HYB
of Parking Area, Compound Will be provided by 15th
Wall etc.,) May, 2024 (Sr.DEN/Co-ord)
2.Concourse Area
Improvements
3.Façade Works
4.Granite & VDC Works as
Part of Platform
Improvements (Under
Covered Surface)
5.New Building, Circulating
Area, Approach Roads to be
Provided as Part of Second
Entry
6.Improvements to
Passenger Amenities ( Pay
& Use Toilet Block etc.,)
7.Entrance Arch
4 JADCHERLA Div. 1.Improvements to TUDI 57803639.42 81061506.67 19/02/24 Oct-24 26% 16% S&T cables at Façade to be
(JCL) Circulating area(Relocation Infrastructure shifted
of Parking Area,Compound -HYB
Wall etc.,) shifted by 20th May, 2024
2.Concourse Area (Sr.DSTE)
Improvements
3.Façade Works
4.Granite & VDC Works as Corner Electrical Box to be
Part of Platform shifted
Improvements (Under
Covered Surface) shifted by 30th May, 2024
5.New Building, Circulating (Sr.DEE/M)
Area, Approach Roads to be S&T Cables shifting for Lift
Provided as Part of Second work
Entry
6.Improvements to shifted by 30th May, 2024
Passenger Amenities (Pay (Sr.DSTE)
& Use Toilet Block etc.,)
7.Entrance Arch

Page 10 of 13
Sl. Station Execu. Scope of work Agency Cost Certified Original Extended Physical Financial Remarks
Agency (Rs) Variation due date duration progres Progress
of work validity s
upto
5 SHADNAGAR Div. 1.Improvements to Sri Balaji 49766306.90 68802002.62 28/02/24 Nov-24 19% 4.6% Shifting of Electrical
(SHNR) Circulating area(Relocation Construction Cables
of Parking Area, Compound
Wall etc.,) Shifted by 30th June, 2024
2.Concourse Area (Sr.DEE/M)
Improvements Problem with parking area
3.Façade Works
4.Granite & VDC Works as Sr.DCM/HYB is not given
Part of Platform any decision by 15th May,
Improvements (Under 2024, DEN/Lines can carry
Covered Surfaces) out the work.
5.New Building, Circulating
Area, Approach Roads to be S&T Cables shifting for Lift
Provided as Part of Second work
Entry Shifted by 30th May, 2024
6.Improvements to (Sr.DSTE)
Passenger Amenities ( Pay
& Use Toilet Block etc.,)
Amenities(New Pay & Use
Toilet Block etc.,)
7.Entrance Arch
6 KAMAREDDI Div. 1.Improvements to F-Tech 72619660.47 95454829.00 19/10/24 Dec-24 16% 3.6%
(KMC) Circulating area(Relocation
of Parking Area, Compound
Wall etc.,)
2.Concourse Area
Improvements
3.Façade Works
4.Granite & VDC Works as
Part of Platform
Improvements (Under
Covered Surface)
5.New Building, Circulating
Area, Approach Roads to be
Provided as Part of Second
Entry
6.Improvements to
Passenger Amenities ( Pay
& Use Toilet Block etc.,)
7.Entrance Arch

Page 11 of 13
Sl. Station Execu. Scope of work Agency Cost Certified Original Extended Physical Financial Remarks
Agency (Rs) Variation due date duration progres Progress
of work validity s
upto
7 NIZAMABAD Div. 1.Improvements to A. Arjun Rao 146747679.00 206245352.00 26/05/24 Dec-24 26% 14% Building & Façade
(NZB) Circulating area(Relocation drawings not provided
of Parking Area, Compound
Wall etc.,) Provisional drawings signed
2.Concourse Area by ADRM will be provided
Improvements and any variation will be
3.Façade Works carried out later in concurrent
4.Granite & VDC Works as with certified drawings.
Part of Platform
Improvements (Under
Covered Surface)
5.New Building, Circulating
Area, Approach Roads to be
Provided as Part of Second
Entry
6.Improvements to
Passenger Amenities ( Pay
& Use Toilet Block etc.,)
7.Entrance Arch

8 BASAR Div. 1.Improvements to N. Bhaskar 50923944.74 50923544.74 07/02/24 Nov-24 24% 27%
(BSX) Circulating area(Relocation
of Parking Area, Compound
Wall etc.,)
2.Concourse Area
Improvements
3.Façade Works
4.Granite & VDC Works as
Part of Platform
Improvements (Under
Covered Surface)
5.Improvements to
Passenger Amenities ( Pay
& Use Toilet Block etc.,)
6.Entrance Arch

Page 12 of 13
Sl. Station Execu. Scope of work Agency Cost Certified Original Extended Physical Financial Remarks
Agency (Rs) Variation due date duration progres Progress
of work validity s
upto
9 DARMABAD Div. 1.Improvements to F-Tech 52969589.92 74300799.00 19/02/24 Nov-24 16% 9.48%
(DAB) Circulating area(Relocation
of Parking Area, Compound
Wall etc.,)
2.Concourse Area
Improvements
3.Façade Works
4.Granite & VDC Works as
Part of Platform
Improvements (Under
Covered Surface)
5.New Building, Circulating
Area, Approach Roads to be
Provided as Part of Second
Entry
6.Improvements to
Passenger Amenities ( Pay
& Use Toilet Block etc.,)
7.Entrance Arch
10 UMRI Div. 1.Improvements to F-Tech 40391490.00 56514614.71 12/02/24 Nov-24 20% 20%
(UMRI) Circulating area(Relocation
of Parking Area, Compound
Wall etc.,)
2.Concourse Area
Improvements
3.Façade Works
4.Granite & VDC Works as
Part of Platform
Improvements (Under
Covered Surface)
5.New Building, Circulating
Area, Approach Roads to be
Provided as Part of Second
Entry
6.Improvements to
Passenger Amenities ( Pay
& Use Toilet Block etc.,)
7.Entrance Arch

Page 13 of 13