Level-01-02 Slab Pour Plan
Level-01-02 Slab Pour Plan
2B3
S4 S3 B.O.W.= Bottom of Wall T.O.RB.= Top of Ring Beam
SSL +12.250 m 125 S4 50 SSL +12.900 m S3 M
S3 2
475 T.O.B.= Top of Beam B.O.RB.= Bottom of Ring Beam
S3 SSL +12.900 m
TOW +12.900 m
SSL +12.725 m SSL +12.850 m 50
S3
29
VR.= Vertical Bars Reinforcement F.F.= Far Face
C
3
3
C4
4
7
FC
C4
4
2B3
FC
4
2B3 2B3 W2 W2 2B3 2B3 W2 W2 2B3 2B3 2B4 2B4 2B3 S.BAR= Side Bars Reinforcement I.L.= Invert Level
29
4
C
C
C
C
4
C
C
C
H17 475 Shop Drawings References :
W10
W10
W10
2B3 2B3 2B3 4
TOC +12.850 m 2B3 W2 C
10
2B3 2B3 W2 W2 4
10
2B3 4 2B3 4 2B4 2B4 2B3 4
4
2B3
4
4 1. For Form Work Layout Plan Refer to Shop Drawing No.
7
C
4
C C
C
4
4
C
C
C
C
S3 S3
C
C
C
1
150mm E.J R07-HC1C20-SBG-XX-02-SDW-ST-11001,11002,11003......
C
TOB +12.650 m
W2
W3
W2
SSL +12.250 m TOB +12.900 m
SSL +12.900 m 2. For Form Work Section Details Refer to Shop Drawing No.
EXTERNAL CANOPY S3
LIGHT WEIGHT FILL TOB +12.900 m DP11 Start From R07-HC1C20-SBG-XX-02-SDW-ST-32011,32012,32013.......
COLUMN S3 S3
2B3
S3
SSL +12.900 m 3. For General Notes Refer to Shop Drawing No.
2B3
2B3
RW110(U)
TOW +12.850 m 250mm UPSTAND WALL SSL +12.900 m SSL +12.900 m R07-HC1C20-SBG-XX-00-SDW-ST-00001, 00002, 00003.
SSL +12.900 m
59
FROM LOW LEVEL W3 4. For Standard Details Refer to Shop Drawing No.
W2
W2
C
R07-HC1C20-SBG-XX-00-SDW-ST-50001 to 50016.
4
C
DP1 DP1 DP1 DP1 DP1 DP1 DP1 4 5. For Construction Joint Plan at Level 02 Refer to Shop Drawing No.
C
R07-HC1C20-SBG-XX-02-SDW-ST-10101, 10102, 10103.....
11
13
14
1 1
FC
6. For E/M Embedded Items in Foundation Refer to Shop Drawing No.
W3
6
1
2B3
2
C C C
C
DP1
C
H18 Start From R07-HC1C20-SBG-XX-00-SDW-ST-10801 to 108.....
2B3
Design Drawing References
W2
4
C
NO DWG No. REV. NO DWG No. REV.
6
C
M2
RW
DP1 DP1 DP4 DP1 DP1 DP1 DP1 DP1 DP1
11
0
2B3
2
58
58
13
59
13
59
FC
1
1
2
C
C
C
C
H19 DOCUMENTS & RFI'S REFERENCES
DOC .NO. DOC .NO. DOC .NO.
250mm THK PLANTER
4
C
WALL,TOW +13.530m
2
RW C
DP9
11
0 M2
TOW +12.400 m M2
EXTERNAL CANOPY DP1 DP1 DP1
COLUMN DP1 DP1 DP1
2B3
2B8 2B8
W9
13
13
13
13
60
2
1
C
C
H20
14
C
FOR DETAILS REFER TO SPA W9
58
C
4
DRAWINGS
C
EXTERNAL CANOPY
R07-HC1C20-SBG-XX-02-SDW-ST-10103
COLUMN EXTERNAL CANOPY DP1
COLUMN
M2
S3
W4
2B
8
W9
SSL +12.900 m DP1
2B3
Rev. Date Reason For Issue Chk
1
C
21
13
60
60
1
C
6
8
C
W3
C
C
C
SHOP DRAWING REV.
H21
FOR DETAILS REFER TO SPA Key Plan.
12
C
200mm THK UPSTAND
WALL (W10),
TOW +9.000 m (TYP)
TOW +9.000 m
TOW +7.850 m
BLL +7.100 m 200mm THK UPSTAND WALL
(W10), TOW +9.000 m (TYP)
S1
150mm DEEP
SSL +7.850 m
TOW +7.850 m
W10
FS6
200mm THK UPSTAND
TOWTOW
WALL, +7.850 m m
+9.000 FS6 SSL +7.900 m EXTERNAL CANOPY
(TYP) FS6 COLUMN ABOVE
SSL +7.900 m S1 TOW +9.000 m
01 02 03 04 05 06
SSL +7.900 m
TOW +7.850 m
FS6
SSL +7.900 m
FS6
SSL +7.900 m
S2 S1 FS6
1B4
FOR ADDITIONAL COLUMN
EXTERNAL REINFORCEMENT DETAIL 3. BASE PLATE DIMENSIONS TO BE PROVIDED BY CRANE SUPPLIER
CANOPY REFER TO R07-HC1D02-
COLUMN MML-XX-XX-DWG-ST-00906 4. MAX BEARING STRESS CONSIDERED: 200 kPa
(TYP)
5. "CONTRACTOR TO CARRY OUT PLATE LOAD TEST TO CONFIRM
150mm E.J THE CAPACITY OF THE SOIL PRIOR TO CONSTRUCTION OF THE
TOW +7.900 m
TOWER CRANE FOUNDATION"
TOC +9.000 m
200mm THK UPSTAND WALL,
TOW +9.000 m (TYP)
CJ
TOW +12.650M 60PF2
RW
60PF4
CJ
BASE PLATE DIMENSION TO BE EXTERNAL CANOPY FS6 60PF2
PROVIDED BY CRANE SUPPLIER COLUMN ABOVE
SSL +7.900 m
TOW VARIES
FS9 TOF +7.900 m
SSL +7.900 m
S2 S1
TOW +7.900 m TOW +7.900 m
SSL +7.900 m SSL +7.900 m TOW +7.900 m
DRAWINGS
TOC +7.850 m
SSL +7.900 m
EXTERNAL CANOPY
COLUMN
1
TOW +7.850 m
FS6 FS6
07 08 09 10 11 12
SSL +7.900 m
SSL +7.900 m
TOC +9.100 m
FS3
10
SSL +7.900 m
DP1 DP1
SSL +7.900 m
DP1 DP1
800x800mm WALL
FS6 EXTERNAL CANOPY
FS3 COLUMN
SSL +7.900 m
SSL +7.900 m
DP1
EXTERNAL CANOPY
COLUMN
600x600x300 PIT
200mm THK UPSTAND
FS6 WALL (W10), TOW VARIES
FS3
REFER TO LS
SSL +7.900 m TOC +10700 m
SSL +7.900 m 200mm THK UPSTAND WALL TOW VARIES
S1 (W10), TOW +9.000 m (TYP) REFER TO LS
TOF +7.900 m
SSL +7.900 m
FS3
1B1
FS2 800x800mm WALL SLEEVE
FOR ADDITIONAL REINFORCEMENT SSL +7.900 m AT 3650 FROM FFL S1
S1 TOC +7.300 m
DETAIL REFER TO R07-HC1D02- SSL +7.900 m
MML-XX-XX-DWG-ST-00906 (TYP)
SSL +7.900 m
SSL +7.900 m
300
EXTERNAL CANOPY
FS3 COLUMN
2B1
(CANOPY FINAL LOCATION IS SUBJECT TO
FS3 SSL +7.900 m COORDINATION WITH TAIL SCOPE)
CJ 300 300
200mm THK UPSTAND WALL OUTLINE INDICATE FOR NFT TOWER CRANE -TC5 SSL +7.900 m
(W10), TOW +9.000 m (TYP) FS3 FOR PILECAP DETAIL REFER FS8
FS8
BASE PLATE DIMENSION TO BE PROVIDED BY TO R07-HC1D02-MML-XX-00-
CRANE SUPPLIER SSL +7.600 m DWG-ST-11005(UNO) SSL VARIES
TOW +9.000 m SSL VARIES
2B3
450
11
TOW +12.650M 150
SSL VARIES
TOW +7.850 m
CJ
300
FS8
13 13 14 15 16 17 18
11
FS8 FS8
FS2 FS8 FS8
SSL VARIES RAMP LEVEL VARIES
FS4 SSL +6.250 m
SSL +7.900 m SSL VARIES
TOF +7.450 m SSL +5.286 m
13
FS3 FS4 SSL +7.900 m
13
TOF +6.250 m
61
13
61
13
SSL +7.450 m 450 SSL +7.900 m TOF +6.250 m
450
2B6 2B6
TOF +5.950 m
CJ
C
TOF +7.900 m
CJ
FS3
60PF7 TOF +5.250 m
C
S1 TOF +5.130 m
SSL +7.900 m
C
EXTERNAL CANOPY
COLUMN SSL +7.900 m TOF +7.550 m
TOF +6.250 m
450
C
C
C
C
C
FS3 60PF1
20mm I.J
FS3
SSL +7.900 m
H22 0
SSL +7.900 m 20mm I.J PAD FOOTING BELOW
(TYP)
W1
S1
60PF1
19 FS6
SSL +7.900 m
EXTERNAL CANOPY
COLUMN
FS2
SSL +7.900 m
FS3
SSL +7.900 m
20 FS3
SSL +7.900 m
FS4
SSL +7.900 m
21
FS3
SSL +7.900 m
FS3
SSL +7.900 m
22 23 FS9
SSL +5.900 m
60PF1
24
COLUMN
60PF8 TOF +6.100 m FS3
TOW +7.850 m SSL +7.900 m
CJ
S1 FS6
FOR ADDITIONAL REINFORCEMENT
SSL +7.900 m DETAIL REFER TO R07-HC1D02-
SSL +7.900 m MML-XX-XX-DWG-ST-00906 (TYP) SCISSOR LIFTS
FS4 FS4
1B1
REFER TO R07-HC1D02-MML-XX-XX-DWG-ST-00903
BLL +7.100 m TREE PIT
40
EJ
S1 S1 FS2
50 S1 SSL +5.900 m
150mm
SSLSSL +7.900
+7.900 m m FS3
S1 SSL +7.900 m SSL +7.900 m
SSL +7.900 m TREE PIT
SSL +7.900 m SSL +7.900 m
SSL +7.850 m
150mm EJ.
TOW +9.000 m
FS6
BLL +7.100 m FS6
SSL +7.825 m EXTERNAL CANOPY
C
SSL +7.825 m OUTLINE INDICATE FOR WOLFF TOWER COLUMN EXTERNAL CANOPY
CRANE - TC5 FS2 COLUMN
TOB +7.900 m S1
SSL +7.900 m S1
TOWER CRANE BASE TO BE PROVIDED BY TOF +7.900 m
CRANE SUPPLIER (TYP) SSL +7.900 m FS3 SLAB DEPRESSION
FS3
SSL +7.900 m
1B3
FS3
MODIFICATION BASED ON FS9
TOF +7.900
SSL +7.400 m m COORDINATION WITHm
SSL +7.400 500
SSL +5.900 m
10SB1
ONGOING SITE WORKS
10SB1
10SB1
10SB1
10SB1
10SB2
10SB2
TOF +7.900 m 10SB2 10SB2
10SB2 10SB2
1B3
SLAB DEPRESSION
FOR ADDITIONAL MODIFICATION BASED ON FS9
REINFTMENT DETAIL CJ COORDINATION
TOF +7.900 m WITH
REFER TO R07-HC1D02- 500 ONGOING SITE WORKS FS3 SSL +5.900 m
TOF +7.900 m
MML-XX-XX-DWG-ST-00906
FS3
(TYP) SSL +7.900 m
FS3
FS2 TOF +7.550 m SSL +7.400 m
SSL +7.400 m
SSL +7.900 m
FS2
25 26 27 28 29 30
S1
SSL +5.000 m
SSL +7.900 m
TOW +12.400M
FS2
SSL +7.900 m
EXTERNAL CANOPY
COLUMN OUTLINE INDICATE FOR NFT TOWER
500
CRANE - TC4 FS12
TOF +10.000 m
FS3
FS4
2B6
SSL +7.900 m
2B6
TOF +7.900 m SSL +7.900 m
60PF5
500
TOB +13.250m
SSL +7.900 m
TOF +7.900 m
FS12
650 MICE COLUMN TAG, WALL
SSL +7.250 m NOT SHOWN FOR CLARITY.
REFER TO MICE PACKAGE
FS3 FS12
TOC +12.850 m
31 32 33 34 35 36
60PF8
650 500
FS3
SSL +7.400 m
TOF +10.000 m
FS6
SSL +7.900 m
500
500
FS2
SSL +7.900 m
S
VARIE
FS3
LEVEL
SSL +7.400 m TOF +7.900 m
500
FS2
SSL +7.900 m
60PF6
2B6
M2
2B6
2B6
2B6
SSL +7.900 m
SSL +7.900 m
FS3 60PF8
TOF +10.000 m
FS2 FS3 SSL +7.900 m
FS6
TOF +7.900 m SSLFS3
+7.900 m S1 200mm THK UPSTAND
SSL +7.900 m WALL (W10),
SPA S1 S1
1B1
S1 SSL +7.900 m C56 TOW VARIES
1B1
1B1
COLUMN
TOF +7.900 m
H27
60PF5 200mm THK UPSTAND
OUTLINE INDICATE FOR NFT TOWER CRANE - TC3 WALL (W10),
TOW +9.000 m (TYP)
BASE PLATE DIMENSIONS TO BE
PROVIDED BY CRANE SUPPLIER
TOF +10.000 m
S1
60PF8 FS2
EXTER SSL +7.900 m
COLUM TOF +7.900 m
NAL
N CANOP
RW11
2B3
Y FS2
TOF +7.900 m
S1
FS6
37 38 39 40 41 42
CJ
EXTER FS7
COLUM
NAL
N CANOP
Y
TOW +7.925 m
TOW +7.850 m
SSL +7.900 m
FS7
CJ
SSL +7.900 m
TOW VARIES
TOF +10.000 m
TOF +10.000 m
C51
FS6
60PF8
60PF8 TOW = +12.650m TOF +7.900 m
SSL +7.900 m
S3
TOWER CRANE BASE TO BE PROVIDED BY SSL +7.900 m
CRANE SUPPLIER (TYP)
TOF +10.000 m TOF +10.000 m
60PF6
U)
C56(
200mm THK UPSTAND
TOW +7.850 m 150mm E.J
WALL, TOW +9.000 m
0
FS6 TOC +7.850 m (TYP)
TOF +12.350 m
SSL +7.900 m
EXTERNAL CANOPY
COLUMN
MICE DRAWINGS N
200mm THK UPSTAND
WALL (W10),
TOW +9.000 m (TYP)
FS6
S1
60PF6 M2
SSL +7.900 m
50
50
FS6
SSL +7.900 m
SSL +12.900 m
SSL +7.850 m TOWER CRANE BASE TO BE PROVIDED
BY CRANE SUPPLIER (TYP)
50
43 44 45 46 47 48
200mm THK UPSTAND 1B2
WALL (W10),
TOW +9.000 m (TYP) S1
SSL +7.850 m
1B4 1B4 200mm THK UPSTAND
WALL (W10),
TOW +9.000 m (TYP)
TOB +13.250 m
1B5
2B6 TOB +13.250 m
EXTERNAL CANOPY
COLUMN TOW +9.000 m
BLL +7.100 m
40
C
EXTERNAL CANOPY
COLUMN 14
13
13
13
13
13
61
C 2B6
13
C
C
C
C
H23
C
RW11
0
2B3
40
C
TOF +11.300 m
W
EXTERNAL CANOPY DP1 DP1 DP1 DP1
6
COLUMN
RW110
EXTERNAL CANOPY
13
14
13
13
13
13 3
13
COLUMN
C C1
C
C
C
C
H24
2B3
60PF9
DP1
W6
C51
EXTERNAL CANOPY
14
COLUMN
C
Move C.J.
40
C
M2
V7 DP1 V8 DP1
0
2B3
13 13
1144
14
13
13
13
C C
C
C
C
C
H25 C
40
W
6
SSL +12.900 m
2B3
DP1 M2 FOR DETAILS REFER TO
S3 S3
W2 2B3 W2 RW109 TOWER CRANE
RW110
MICE DRAWINGS
RW110
W6 W6 SHAFT
1144
SSLSSL +12.900
+12.900 m m
CC
2B3
RW109
W3
DP1 S1
H26 SSL +12.900 m
14
14
14
14
14
W6 SSL +12.900 m RW109
C
C
C
DP1
W3
W3
14
7
C
W2
C
W3
W2
EXTERNAL CANOPY
W2
RW113(U)
S4
W2
RW113
COLUMN RW DP1
SSL +12.725 m 11 S3
0 DP1 W3
TOW +16.850 m
EXTERNAL CANOPY SSL +12.900 m
COLUMN DP1 DP1 W3
DP1 RW113
EXTERNAL CANOPY 14
2B3
S4
2B3
W3
C
COLUMN W3 Contractor
144
14
C1
RW113(U)
2B3
SSL +12.725 m RW
C
5
H27 07
12
11 W2 W2
14
R9 0
C
DP1
RW 150mm E.J
11 TOB +12.900 m
14
0
FS5
C
7
DP1
C
SSL +12.725 m S1 SSL +12.000 m
RW
S4 DP1
DP1 DP1 SSL +12.900 m 12
1
RW M2 RW12
1
14
EXTERNAL CANOPY 11 34° DP1
2B3
COLUMN 0
2B3
14
14
14
C RW117
C
C
S4
U)
8
H28
11
9(
C
W
RW
SSL +12.725 m
0
11
RW
8
RW
C
12
8
RW
C
PLANTER WALL, 110 1
S1
REFER TO LANDSCAPE TOB +12.725 m
2B3
DRAWINGS SSL +12.900 m
S4
W
EXTERNAL CANOPY
9(U
RW11
SSL +12.725 m
)
RW
S3 M2
7
5
COLUMN 0
8
C
RW
DP1
X5 TOW +12.850 m 110
RW
115
RW 12
5
SSL +12.250 m
RW11
32
1
EXTERNAL CANOPY
14
DP1
C
COLUMN
EXTERNAL CANOPY
0
2B3
C51
COLUMN
10
EXTERNAL CANOPY 14
W
COLUMN
TOC +11.200 m C FS5
DP1
5
W9(U)
32
8
C
FS5
8
C
X6 W
9(
C
EXTERNAL CANOPY U RW
8
) 110
COLUMN EXTERNAL CANOPY TOF +12.000 m
TOW +12.900 m
S4 COLUMN Client
TOC +11.200 m
SSL +12.725 m
EXTERNAL CANOPY
EXTERNAL CANOPY
COLUMN
COLUMN
TOC +11.200 m
C56
TOC +12.500 m
2B3
EXTERNAL CANOPY S3
S1
5
COLUMN
X7
47
S4
SSL +12.725 m
SSL +12.900 m EXTERNAL CANOPY
M2 SSL +12.725 m COLUMN
Project
150mm E.J TOC +11.200 m
W1
0
RW119(U)
)
P
2B3
TOW +12.900 m SSL +12.250 m
COLUMN
Hotel Centeral 01
X8 W1
EXTERNAL CANOPY 0 TOW +12.725 m
COLUMN S4
S4
W9
RW116(U)
THE MOUND - ZONE M3
P
S4
STE
W
9(
W1
0
SSL +12.725 m M2 CONSTRUCTION JOINT LAYOUT PLAN
U W1 S3
)
LEVEL L02
475
X9 0
M2
W7(U)
SSL +12.250 m W10
W9(U) W9(U)
EXTERNAL CANOPY
COLUMN W9(U
)
General Comments:
Model File Reference
1-The Coordination between all trades is Contractor Solely responsibility. TOW +12.900 m TOW +12.850 m
2-all openings & utilities in walls must be as per approved Architectural & MEP PLANTER WALL, R07-HC1C20-SBG-60-00-MOD-ST-06001
RW
475
REFER TO LANDSCAPE
shop drawings.
11
EXTERNAL CANOPY DRAWINGS S3
9(U
COLUMN Drawn By Checked By Approved By
3- Provide valid coordinated BIM model references.
)
SSL +12.250 m
X10
475
HOTEL CLUSTER U)
W9(
W7(U)
EXTERNAL CANOPY
4- This drawing shall be updated as per latest IFC drawings & related RFI's.
W7(U
COLUMN )
SSL +12.250 m
S3
W
10 ANS H.K. H.K
5-For C.J. G. comments refer to DAR comments in shop drawings # R07-HC1C20- W7(U) Project No Issue Date Scale at ISO A0
SBG-XX-00-SDW-ST-10101-C5.
6- C.J.'s not allowed in the maximum stress, contractor to provide it @ Span/5 R07-HC1C20 24/05/2023 1:150
up to span/3 from column/wall face.
TOW +12.900 m
EXTERNAL CANOPY Drawing Number Revission
R07-HC1C20-SBG-XX-02-SDW-ST-10105
C2