SHIRE NOTE:
BOUNDARY
- Protection Of Building From Termites Is Carried Out In Accordance With Part 3.1.4 of the NCC 2019 - Vol. 2 Amendment 1
3903 Paved Level To Ridge Height
- Placement Of Durable Notice In Meterbox Is Carried Out In Accordance With B.C.A Requirements
- Footing & Slab Construction Is Carried Out As Per BCA Part 3.2.5 For Sandy Site
450 Overhang 25° Pitch Tiled Roof 450 Overhang 450 Overhang - Timber Frame Construction Is Carried Out In Accordance With AS-1684
25° Pitch Tiled Roof - Masonary Construction Is Carried Out In Accordance With AS-3700
150 Overhang
C.L. - Roof Framing Construction Is Carried Out In Accordance With AS-1684
270h Timber Frieze 270h Timber Frieze
100*100 Timber Post Timber Brackets Timber Brackets Pizza Oven - Roof Cladding Is Carried Out In Accordance With AS-1562.1
Build In BBQ Recess 100mm Conc. Capping - Glazing Is Carried Out In Accordance With AS-2047
100mm Conc. Capping 100*100 Timber Post 100mm Conc. Top
2700
100mm Conc. Top Pizza Oven - Water Proofing Of Wet Areas Are Carried Out In Accordance With AS-3740
11c 11c
Recycled Red Brick Piers @11c Recess Recycled Red Brickwork @11c
1043
1043
1043
Recycled Red Brick Piers @11c
Below
G.L. Recess Below Recycled Red Brickwork @11c G.L. Recess Below
E1 Front Elevation E2 Left Side Elevation
Scale 1:100 Scale 1:100 NOTE:
PIZZA
BOUNDARY
OVEN: 1000MM ROUND BRICK DOME
POMPEII
150 Overhang BBQ: BUILT IN BBQ, EXACT MODEL
450 Overhang 450 Overhang TBA
Barge & Capping 25° Pitch Tiled Roof 25° Pitch Tiled Roof
150 Overhang THESE PLANS ARE
450 Overhang
270h Timber Frieze Barge & Capping
270h Timber Frieze STRICTLY UNDER
Timber Brackets 100*100 Timber Post Timber Brackets COPYRIGHT
100mm Conc. Capping 100mm Conc. Top 100*100 Timber Post
Pizza Oven Pizza Oven
100mm Conc. Top
11c 11c
Recycled Red Brick Piers @11c
1043
1043
Recycled Red Brickwork @11c
G.L. G.L. Recycled Red Brickwork @11c
E3 Rear Elevation E4 Right Side Elevation
Scale 1:100 Scale 1:100
Residential Drafting Services
Phone: +61 431 155 082
E-Mail: info@wrmrds.com.au
190*45 MGP Ridge Beam
DRAWN BY: WRM DATE: October 2023
25° Pitch Tiled Roof
120*45 MGP Rafter @900crs CLIENT:
70*35 Structural Tile Battens @crs To Suit Tiles TONY MANSO
(ROOF GUTTER TO BOUNDARY SET BACK) 100 Colorbond Gutters & Downpipes
Hardiflex Lined Raked Ceiling ADDRESS:
C.L. 150 Overhang C.L. #137, FOURTH AVENUE,
264
264
MOUNT LAWLEY, WA
BOUNDARY
(GAZEBO TO BOUNDARY SET BACK) 370 264*80 Glulam Beam
6050
1393
GAZEBO
2700
100*100 Timber Post
2436
100mm Conc. Top
100mm Conc. Top ELEVATIONS & SECTION
100
100
11c 11c
Recycled Red Brickwork @11c c Copyright
Project: Scale: Sheets:
943
943
Recycled Red Brick Piers @11c 001 As indicated 3 OF 3
Paved Floor
G.L. G.L.
Section X-X REVISION:
Concrete Footing As Per Engineers Requirements
Scale 1:50
Concrete Footing As Per Engineers Requirements
• 15/09/2023 - PLAN REVISIONS
• 09/10/2023 - PLAN REVISIONS #2
• 23/10/2023 - PLAN REVISIONS #3 A3