Rig Floor Operations Guide

Uploaded by

Vasanjkr Jkr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views6 pages

Rig Floor Operations Guide

Uploaded by

Vasanjkr Jkr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

RIGTEC INTERNATIONAL

Institute of Oil & Gas Technology

Notes of Floor Man


Q No 1: What is labour/roustabout job?
Ans: Labour job is to load and unload all the material which we received on the rig
other jobs are cleaning scraping mud mixing etc.

Q No 2: What is the floor man job?


Ans: Followings are the jobs of floor man:-

1. To assist all the operations on rig floor and on well head.


2. To keep all the handling tools in good working condition and ready for the job.
3. Check clean and maintain all equipments on rig floor.
4. To assist special service companies in any test or running casing tubing and
cementing etc.
5. To check tong dies, slip dies, break line, back line, makeup chain, elevator
etc
6. Cleaning scraping and painting etc.

Q No 3: What are drill pipe size and threads?


Ans: Following are the size of drill pipe and threads:-

Drill Pipe: Thread Size:

5’’ 4-1/2’’ IF

4-1/2’’ 4’’ IF

3-1/2’’ 3-1/2’’ IF

Q No 4: What are the drill collar size and threads?


Ans: Following are the drill collar and thread sizes:-

Drill Collar: Threads:

10 to 10-1/2’’ 8-5/8’’ Reg

8-1/2 to 9-1/2’’ 7-5/8’’ Reg

7-1/2 to 8-1/4’’ 6-5/8’’ Reg

6-1/2 to 7-1/2’’ 4-1/2’’ Reg

6 to 6-1/4’’ 4’’ IF

4-1/2’’ 3-1/2’’ IF

3-1/8’’ 2-7/8’’ PAC

Q No 5: What are the bit size and threads?


Ans: Following are the bit and thread sizes:

Bit: Threads:
========================================================================
20-B, Satellite Town, Near Chambeli Institute, Rawalpindi.
Tele No. +92 51 4324424, 4572363 Fax No. +92 51 4572364
E-Mail: rigtec.international@gmail.com Web Site: www.rigtecinternational.com
RIGTEC INTERNATIONAL
Institute of Oil & Gas Technology
36’’ 7-5/8 Reg

26’’ 7-5/8 Reg

17-1/2’’ 7-5/8 Reg

12-1/4’’ 6-5/8 Reg

8-1/2’’ 4-1/2 Reg

6’’ 3-1/2 Reg

Q No 6: What is the length of one drill pipe, drill collar, heavy weight drill pipe, tubing?
Ans: About 31 feet

Q No 7: What is the length of one stand?


Ans: About 93 feet

Q No 8: What is the difference between pin and box?


Ans: Pin have outside thread also called male and box having inside thread also
called female.

Q No 9: What is the difference between drill pipe and heavy weight drill pipe?
Ans: Heavy weight drill pipes are heavier than the drill pipes and also little higher tool
joint than normal drill pipe.

Q No 10: What are the tubing size?


Ans: About 2-3/8’’, 2-7/8’’, 3-1/2’’ and 4-1/2’’.

Q No 11: What are the drill pipe types by grades?


Ans: E,G,S, X-95 etc

Q No 12: What are the casing sizes?


Ans About 7’’, 9-5/8’’, 13-3/8’’, 18-5/8’’, 20’’ and 30’’.

Q No 13: What is the length of Kelly?


Ans: About 40 feet.

Q No 14: How will you connect drill pipe and drill collar?
Ans: By using cross over.

Q No 15: What is the length of casing?


Ans: About 40 to 45 feet.

Q No 16: What is the length of Kelly hose?


Ans: About 55 feet.

Q No 17: What is length of stand pipe?


Ans. About 48 feet.

Q No 18: Which mud pump you have on the rig?


Ans:

a) National 12.p.160
========================================================================
20-B, Satellite Town, Near Chambeli Institute, Rawalpindi.
Tele No. +92 51 4324424, 4572363 Fax No. +92 51 4572364
E-Mail: rigtec.international@gmail.com Web Site: www.rigtecinternational.com
RIGTEC INTERNATIONAL
Institute of Oil & Gas Technology
b) Oil well A 1400 P.T Triplex
c) G.D PZ 11+PZ 10
d) Continental EMSCO

Q No 19: How many tanks you have on the rig?


Ans:

a) Shaker tank
b) Suction tank
c) Reserve tank
d) Trip tank

Q No 20: What is equipment on the tanks?


Ans:

a) Shale Shaker
b) Desander
c) Desilter
d) Degasser
e) Agilator

Q No 21: Why we pumps and in the hole?


Ans:

(1) To bring the cuttings to the surface


(2) To prevent the entry of oil, gas water etc in the well bore
(3) To cool and lubricate the drill bit
(4) To avoid the bit to balled up
(5) To support the wall of the hole
(6) To keep the hole full during pulling out.

Q No 22: What is the function of trip tank?


Ans: It is used to check the well for losses or gain during tripping or wire line
operation.

Q No 23: What is the function of the shale shaker?


Ans: Shale shaker separate the cuttings from the mud.

Q No 24: What is the function of the desander?


Ans: Desander separates the sand from the mud.

Q No 25: What is the function of the desilter?


Ans: Desilter separates the very small particles from the mud.

Q No 26: What is the function of the degasser?


Ans: If the gas comes out from the hole with mud, degasser purifies the mud by
separating and wasting the gas from the mud.

Q No 27: What is the function of the agitator?


Ans: Agitator keeps the mud circulating in the manner that chemical should not held
down that’s why it agitates the mud all the times.

Q No 28: How many hoppers on the mud tanks and what for?
========================================================================
20-B, Satellite Town, Near Chambeli Institute, Rawalpindi.
Tele No. +92 51 4324424, 4572363 Fax No. +92 51 4572364
E-Mail: rigtec.international@gmail.com Web Site: www.rigtecinternational.com
RIGTEC INTERNATIONAL
Institute of Oil & Gas Technology
Ans: There are three hoppers on the mud tanks for mixing the mud.

Q No 29: How many mud pumps you have?


Ans: We have two mud pumps on the rig.

Q No 30: What are the liner sizes?


Ans: That are 6’’, 6-1/2’’, 7’’.

Q No 31: What do you meant by douplex and triplex?


Ans: Douplex pumps have two piston it is also called Single acting pump. It has two dc
motor.
Triplex pumps have three piston it is also called double acting pump. It moved
mud per stroke at low rate. It has two dc motor.

Q No 32: You have worked on which rig?


Ans: Oil well 760 electrical rig.

Q No 33: Which travelling block you have?


Ans: Oil well 350 ton, 350 block hook.

Q No 34: Which rotary table you have?


Ans: Oil well 27½ ’’, National 20½’’, GD 37½’’.

Q No 35: Which engine you have on the rig?


Ans: Cater pillar D 398.

Q No 36: How many engines do you have on the rig?


Ans: We have 04 engines on the rig.

Q No 37: Which company you have derrick or mast?


Ans: Pyramid.

Q No 38: What is your derrick height?


Ans: About 142 feet.

Q No 39: What are the names of different instruments being used on rig?
Ans: Shawel, Basket, Scarping brush, Crow-bar, Hammer, Spanner, Churu pipe,
Washing gun, chain tong etc.

Q No 40: What is drill string?


Ans: String is the combination of following things that are given below:

Bit, Bit sub, Drill collar, Stabilizer, Cross over, heavy weight drill pipe, Drill pipe,
Kelly.

Q No 41: How many crew members you have on the rig in one shift?
Ans: About 13 persons.

Q No 42: How will you load or unload equipments of different type?


Ans: With the help of crane or fork lifter.

Q No 43: Where is BOP fixed?


Ans: BOP fixed on the well head.
========================================================================
20-B, Satellite Town, Near Chambeli Institute, Rawalpindi.
Tele No. +92 51 4324424, 4572363 Fax No. +92 51 4572364
E-Mail: rigtec.international@gmail.com Web Site: www.rigtecinternational.com
RIGTEC INTERNATIONAL
Institute of Oil & Gas Technology
Q No 44: What for BOP?
Ans: BOP is used to control the pressure of oil, gas and water etc from inside the well
bore.

Q No 45: How many tongs you have on the rig floor?


Ans: There are three tongs on the rig floor that are:

(1) Make up tong (On driller side)

(2) Brake out tong (Off driller side)

(3) Power or spinner tong (Spin in or spin out)

Q No 46: What for mouse hole?


Ans: Mouse hole is for drill pipes etc.

Q No 47: What for rat hole?


Ans: Rat hole is for Kelly.

Q No 48: What is Bottom Hole Assembly (BHA)?


Ans: BHA is Bit, Bit Sub, Drill collar, Stabilizer, Cross over, jumping jar, heavy weight
etc.

Q No 49: What are the names of manufacturer of drilling equipments?


Ans: Equipment Name Company Name

Tongs B.J

Spinner Tong B.J

Elevator B.J

Hook B.J

Slips, Safety clamps Varco or Bash hose

BOP Cameron or Hydril

Draw works National, Oil Well, and Gardner Denver

Mud pumps Gardner denver, National, Oil well, Continental


emsco

Travelling Block Gardner denver, National, Oil well

Swivel Oil well, National

Q No 50: Define the large liner & small liner sizes?


Ans: Large liner piston = High volume low pressure

Small liner piston = Low volume High pressure

Liner size = 7½’’, 6½’’, 6’’, 5½’’, 5’’.

========================================================================
20-B, Satellite Town, Near Chambeli Institute, Rawalpindi.
Tele No. +92 51 4324424, 4572363 Fax No. +92 51 4572364
E-Mail: rigtec.international@gmail.com Web Site: www.rigtecinternational.com
RIGTEC INTERNATIONAL
Institute of Oil & Gas Technology
Q No 51: Write down the advantages of TDS?
Ans: (1) Rotated drill string efficiently

(2) Holding pipe

(3) Variable rotating any time

(4) Allow rotation any time

(5) Reaming & Back Reaming (Slow Circulation)

(6) Rapid response during kick.

Q No 52: Write down the Equipment on rig floor relates to floor man?
Ans: (1) Draw works (2) Lifting sub

(3) Make up & Brake out tong (4) spinner tong

(5) Power tong (6) Slips (D/p D/c)

(7) Safety valve (8) Mud Backet

(9) Safety clamp (Dog Clamp)

Q No 53: What is the function of super charger?


Ans: Used to transfer the fluid

Q No 54: What Is the mud pump discharge line test pressure?


Ans: M/P discharge line’s test pressure is about 5000 psi

Q No 55: Why equalize system is connected with tanks?


Ans: Equalize the tank’s volume

Q No 56: What is function of trip tank?


Ans: To fill the hole during pull out = Monitor the well for gains & losses.

Q No 57: Give details of Bit sub, X-over, stabilizer and Junk Basket?
Ans: Bit Sub: It has both side box and connects with one side bit and other side
drill collar
X-over: To connect two different type of thread
Stabilizer: Stabilize the drill string
Junk Basket: It use to fish out small pieces of Junk.

Q No 58: What is the height of rig floor & from the ground?
Ans: Minimum: From ground 20 feet.
Maximum: From ground 40 feet.

Q No 59: Write down the function of stabbing board?


Ans: During running in casing D/M _ Stabber works on it. It is adjustable. Height is 30
to 40 feet.

Q No 60: Write down the height of mast?


Ans: Min 100 feet and max 142 feet.

========================================================================
20-B, Satellite Town, Near Chambeli Institute, Rawalpindi.
Tele No. +92 51 4324424, 4572363 Fax No. +92 51 4572364
E-Mail: rigtec.international@gmail.com Web Site: www.rigtecinternational.com

You might also like