1. Where must me Receiver keep the work permit after it is issued?
a. Display at the job site or is in his possession
2. What must have four things of every scaffolding?
a. Top rail, mid rail, toe boards, ladder(stairs)
3. Welding in six feet deep excavation which work permit needed?
a. Hot work permit and confined Space Entry permit
4. Why must receiver go with Issuer to do Joint Site Inspection (JSI)?
a. To discuss hazards / scope of work and precautions to taken
5. Who will install locks and tags(LOTO) of electrical equipment by personal?
a. Issuer and each receiver
6. What type of work does the work permit system authorized?
a. Specific maintenance, construction and repair work
7. What is procedure when working on EOLB permit?
a. Drain, isolation, purge, clean and gas test
8. When we can find Stop work authority?
a. Saudi Aramco Safety handbook
b. Saudi Aramco Safety management system (SMS)
c. Saudi Aramco construction safety manual( CSM)
9. Why we are using in excavation shoring, benching, sloping?
a. To prevent the excavation cave in collapse
10. Why must receiver to understand and comply safety precautions written on the work permit?
a. To reduce unsafe condition and activities
11. How do we find out confined space?
a. Excavation is more then 4 feet
12. Who lead Joint Site Inspection and make sure gas test has been taken?
a. Issuer
13. A group lockout procedure can be employed to ensure individual protection while avoid large
number of locks and tags on an isolation point as follows?
a. True
14. Who must sign a work permit to renewed it?
a. One who Renew permit receiver and issuer
15. Who is responsible of issued work permit for work crew to follow Safety?
a. Permit Receiver
16. Which of the following are the confined space entrant's responsibility?
a. Never enter until all precautions are in place and he understands work assignment
17. Why an issuer assign stand by man?
a. To monitor the work activity
18. No permit issued even the we using breathing apparatus?
a. H2S more than 100ppm
19. What is responsibility of stand by man(SBM)?
a. Maintain log sheet, never enter confined Space
20. What is major consideration while doing equipment opening line break (EO/LB)?
a. Flammable, hazardous material release and wind direction
21. How to control slip, trip and falls?
a. Use handrail, stair and good house keeping
22. When. Joint Site Inspection is conducted?
a. Before issuing permit
23. Why we keep heavy equipment and machinery kept away from the edge of excavation?
a. To prevent excavation collapse
24. What precautions we take to install air movers and fans to the confined space?
a. Prevent external vapors enter into confined space ( doubt)?????
25. If issuer says don’t need barricade and sign boards of the excavation?
a. People or vehicle fall into excavation
26. The receiver must stop work ?
a. Work site become unsafe
27. Issuer assign the fire watch?
a. To monitor ignition source
28. What is information chemical hazard bulletin (CHB) gives to the issuer?
a. Hazards involved and precautions handling the chemicals
29. What you do when Hot work permit is renewed?
a. Tells to issuer, both receiver and receiver get signed
30. Who will determine that periodic frequent gas monitoring required?
a. Issuer
31. What the oxygen deficiency?
a. Below the minimum level of oxygen
32. What is purpose of purging equipment?
a. To remove hazardous material
33. What are important reasons for using work permit?
a. To Communicate control work