11kv Unit Drawing

Dwg

Uploaded by

Ramesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

MINI ENGINEERING WORKS

S.No. ITEM MAITERIAL QTY


13 10 1. SECONDARY BOX M.S. 1
3 2. LIFTING LUGS M.S. 4
11 P.R.V. SYSTEM M.S. 1
14 3.
4. OIL LEVEL GAUGE AL. 1
4 2 OIL DRAIN PLUG M.S. 1
5.
6. EARTHING TERMINALS M.S. 2
7. MOUNTING BASE M.S. 2
1
8. MAIN TANK BODY M.S. 1
6
15 9. CABLE GLAND M.S. 1
12
600 8 10. PRIMARY TERMINALS BRASS 6
375
7 11. PORCELIAN BUSHING PORC. 6
5 12. RATING PLATE M.S. 1
13. OIL FILLING CAP M.S. 1
14. TOP COVER M.S. 1
380 15. SECONDARY FUSE . 3
9 260 SPECIFICATIONS :-
480
325 11kV CT SINGLE PHASE 3 Nos. 11kV PT 3 PHASE 1 Nos.
Burden
Ratio Burden Class Ratio per phase Class
10VA 1.0 11kV/110V 50VA 1.0
800-600/1A
ELECTRICALS CLEARANCE :-
PHASE TO PHASE - 265mm (min.)
PHASE TO EARTH - 200mm (min.)
WEIGHT OF UNIT - 115kg (+/_10%)
WEIGHT OF OIL - 40 Ltr. (+/_10%)
400 4 Hole of 16mm Dia
260 at 350x350 +/-5mm

380

All dimensions are in mm


550 Manufacturer:- MINI ENGINEERING WORKS
Title: GA Drawing of 11kV O/D Oil Cooled CTPT Unit
Design Tolerance Scale
Drawn by Mohd Akram +/-10% 18-03-2024
Check by Drawing. No. REV.
App. by MEW-11CTPT-01 00