St Pedro lagao, General Santos city
Project: As- built, One Storey Rental Space with Storage Shed (blg B)
Location: St pedro lagao General Santos city
Company: Octo Star
Duration: CALENDAR DAYS
DESCRIPTION QTY UNIT PRICE
GENERAL REQUIREMENTS
Mobilization and Safety DESCRIPTIONQTY UNIT
Mobilization 1 lot 10,000.00
Safety Provision 1 lot 10,000.00
Temporary Facility 1 lot 15,000.00
Site Works DESCRIPTIONQTY UNIT
Clearing 1 lot 10,000.00
Layout and Staking 1 lot 5,000.00
Earth Works DESCRIPTIONQTY UNIT
Excavation 1 lot 5,000.00
Backfill and Compaction 1 lot 10,000.00
Waste Disposal 1 lot 5,000.00
General Requirements Sub-total
CIVIL WORKS
Concrete Works
Footing/Column and Pedestal
Cement 90 bags
Sand 4.2 m³
Gravel ¾ 9.9 m³
DRB Grade 40 x 12mm Ø x 6m 33 lengths
DRB Grade 40 x 10mm Ø x 6m 72 lengths
Tie wire #16 15 kgs
Flooring/ Masonry
Angle bar 5mm thk x2"x2"x6m 60 lengths
steel plate 12mm x4'x 8' 2 pcs
Cement 240 bags
Sand 13.5 m³
Gravel ¾ 18 m³
DRB 10mm Ø x 6m Grade 40 100 lengths
Chb 4" 1600 pcs
Direct Material Cost
Labor Cost
Consumables
Supervision,Miscellaneous and Equipment
Concrete Works Sub-total
METAL WORKS
METALS WORKS
Column
HP 8"x36 Flange 7 lengths
Anchor bolt 32 pcs
nut and washer 32 pcs
250MM X 250MM 8MM THK SOLE PLATE 1 pcs
Direct Material Cost
Labor Cost
Consumables
Supervision,Miscellaneous and Equipment
METALS WORKS Sub-total
FORM WORKS
FORMS
CW Nails 2 ½" 3 kgs
Finishing Nails #1 3 kgs
lumber 2x2" 80 le
Ply wood 4x8" 5 pcs
Direct Material Cost
Labor Cost
Consumables
Supervision,Miscellaneous and Equipment
Consumables Sub-total
Roofing Works
Cee purlins 1.2mm x2"x3"x6m 54 lengths
No. 26 corr. roofing 67 Lm
Angle Bar 5mmx1"x1"x6m le
Angle Bar 5mmx1 1/2"x1 1/2"x6m le
Material Cost
Labor Cost
Consumables
Supervision,Miscellaneous and Equipment
Roofing Works Sub-total
Painting Works
Epoxy Primer 1 gals
Epoxy Reducer 1 gals
Epoxy Paint (dry White ) 1 gals
Material Cost
Labor Cost
Consumables
Supervision,Miscellaneous and Equipment
Painting Works Sub-total
Direct Material Cost
Mark-up
VAT
TOTAL PROJECT COST (VAT ex)
Checked by: Approved by:
Billy Soriano Engr. Edito P. Sevilla
Sales Engineer General Manager
TOTAL
PRICE
10,000.00
10,000.00
15,000.00
PRICE
10,000.00
5,000.00
PRICE
5,000.00
10,000.00
5,000.00
65,000.00 CANVASS FOR PRICING
GSC ECCO MARCELLIN
IF READY MIX
# of VOLUME
-
-
-
-
-
-
`
-
-
-
-
-
-
15,000.00
10,000.00
25,000.00
GSC ECCO MARCELLIN
IF READY MIX
# of VOLUME
-
-
-
-
-
-
15,000.00
10,000.00
25,000.00
-
-
-
-
-
-
-
-
-
-
-
-
-
3,000.00
2,000.00
5,000.00
-
-
-
-
2,000.00
3,000.00
5,000.00
10,000.00
#REF!
#REF!
#REF!
#REF!
gr. Edito P. Sevilla
neral Manager
ICING
SUHC
SUHC