SAUDI BINLADIN GROUP – PCM DIVISION
SHARQ 3RD EXPANSION PROJECT ( U & O)
JOB SAFETY ANALYSIS
Concrete breaking Date: Mar 1 – 15,
2008
No. Activity Potential Consequences Risk Control Barrier Counter Measure Residual
Hazard Level Risk
1. Concrete High noise Ear damage Medium Ear protection Ear protection must
breaking using be worn by all
pneumatic working in jack
tools hammering area.
Earmuff shall be worn
in addition to
earplugs.
High noise level, sign
board shall be posted
in this area.
Electric shock Electrocution High Dead man switch & All electrical hand
GFCI tools shall provided ALARP
with dead man switch
& GFCI
Flying particles Eye injury High Eye protection Face shield in
addition to safety
glasses shall be worn
by jack hammering.
Dust inhalation Respiratory High Respiratory Suitable dust mask
hazard protection shall be worn by
person performing
jack hammering.
1-1
No. Activity Potential Consequences Risk Control Barrier Counter Measure Residual
Hazard Level Risk
Fall from Personnel injury Medium Safe platform 100% fall protected
heights scaffold platform shall
be provided for doing
jack hammering.
Compressed High pressure Personnel injury Medium Whips lash arrestor. Al connection shall fix
air supply air hose with high duty clamps
connection and connected with
disconnected whips lash arrestor.
Fire Personnel Medium Fire protection Fire extinguisher shall
injury / property be located at work
damage site.
ALARP
interference Personnel injury Medium Barrier Demolishing area
shall be barricaded &
sign board posted.
slip, Trip & Fall Personnel injury Medium Barrier Demolishing
materials shall be
removed from work
area & maintain good
house keeping.
Prepared by: Task Supervisor Approved by: FW HSE Adviser