0% found this document useful (0 votes)
26 views10 pages

Schedule A

Uploaded by

swanya_kul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views10 pages

Schedule A

Uploaded by

swanya_kul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

National Highways Authority of India Request for Proposal – Bid Document

Volume-III: Schedules

SCHEDULE-A

(See Clause 10.1)

SITE OF THE PROJECT

1 The Site

1.1 Site of the Four-Lane Project Highway shall include the land, buildings, structures
and road works as described in Annex-I of this Schedule-A.

1.2 An inventory of the Site including the land, buildings, structures, road works, trees and
any other immovable property on, or attached to, the Site shall be prepared jointly by the
Authority Representative and the Concessionaire, and such inventory shall form part of
the memorandum referred to in Clause 10.3.1 of the Agreement.

1.3 Additional land required for Toll Plazas, Traffic Aid Posts, Medical Aid Posts and
vehicle rescue posts or for construction of works specified in the Change of Scope Order
issued under Clause 16.2.3 of this Agreement shall be acquired in accordance with
the provisions of Clause 10.3.6 of this Agreement. Upon acquisition, such land shall
form part of the Site and vest in the Authority.

4-laning of Lucknow-Sultanpur section of NH-56 from km 11.500 to km 134.700 in the State of Uttar Pradesh under
NHDP Phase IV through Public Private Partnership (PPP) on Design, Build, Finance, Operate and Transfer (DBFOT)
Toll Basis
National Highways Authority of India Request for Proposal – Bid Document
Volume-III: Schedules

Annex – I

(Schedule-A)

Site for Four-Laning

1. Site

The Site of the Four-Lane divided Project Highway comprises the section of National
Highway 56 commencing from Km 11.500 to Km 134.700 i.e. the Lucknow-Sultanpur
section in the State of Uttar Pradesh..

The start point is at km 11.500 of NH 56 and end point of the project is 134.700 of NH 56.

2. Land

The site of the Project Highway comprises the land described below.

Sr. No. Existing km Available ROW


From To (m)
1 11.5 18 24.48
2 18 31 24.4
3 31 102 24.48
4 102 103 34
5 103 106 26
6 106 108 24.48
7 108 109 32.5
8 109 110 30.5
9 110 113 24.48
10 113 114 36
11 114 115 28
12 115 117 25
13 117 118 21
14 118 119 25
15 119 120 24
16 120 121 25
17 121 125.6 24
18 125.6 126.4 25

4-laning of Lucknow-Sultanpur section of NH-56 from km 11.500 to km 134.700 in the State of Uttar Pradesh under
NHDP Phase IV through Public Private Partnership (PPP) on Design, Build, Finance, Operate and Transfer (DBFOT)
Toll Basis
National Highways Authority of India Request for Proposal – Bid Document
Volume-III: Schedules

Sr. No. Existing km Available ROW


From To (m)
19 126.4 126.6 21
20 126.6 126.8 25
21 126.8 127 30
22 127 128 25
23 128 128.2 20
24 128.2 128.4 25
25 128.4 128.8 28
26 128.8 129 22
27 129 129.2 20
28 129.2 129.8 24
29 129.8 130 25
30 130 131.4 24
31 131.4 131.6 20
32 131.6 131.8 21
33 131.8 132 24
34 132 132.2 28
35 132.2 133.4 24
36 133.4 133.6 21
37 133.6 134.4 24
38 134.4 134.6 21
39 134.6 134.7 24

3. Carriageway

The present carriageway of the Project Highway is a 2-lane carriageway with paved
shoulders in isolated length. Details of the existing carriageway of the project highway is
given here.

Existing Chainage Main Paved


(km) Length
Sr. No Carriageway Shoulder
(km)
From To Width (m) (m)
1 11.5 34 7 1.5 22.5
2 34 38 7 - 4
3 38 40 7 1.5 2
4 40 46 7 - 6

4-laning of Lucknow-Sultanpur section of NH-56 from km 11.500 to km 134.700 in the State of Uttar Pradesh under
NHDP Phase IV through Public Private Partnership (PPP) on Design, Build, Finance, Operate and Transfer (DBFOT)
Toll Basis
National Highways Authority of India Request for Proposal – Bid Document
Volume-III: Schedules

5 46 47 7 1.5 1
6 47 48 7 - 1
7 48 50 7 1.5 2
8 50 52 7 - 2
9 52 63 7 1.5 11
10 63 70 7 - 7
11 70 85 7 1.5 15
12 85 86 7 - 1
13 86 101 7 1.5 15
14 101 102 7 - 1
15 102 117 7 1.5 15
16 117 118 7 - 1
17 118 119 7 1.5 1
18 119 133 7 - 14
19 133 134.70 7 1.5 1.7
Total Length 123.2

4. Major Bridges
The Site includes the following Major Bridges:
Existing Span Type of structure
S. Width
Chainage arrangement Super
No. (m) Foundation Sub structure
(km) (m) structure
Spill Through
PSC T-Beam
1 31+601 9.0 3 x 26.5(m) Well Abutment &
Girder
Circular Pier

5. Railway Over Bridges

The Site includes the following Railway Over Bridges:

Type of structure
Existing Span
S. ROB / Width
Chainage arrangement
No. RUB (m) Sub Super
(km) (m) Foundation
structure structure
NIL

5.1 Railway Level Crossing

S. No. Existing Chainage (km) Existing Condition

1 43.990 Level Crossing

4-laning of Lucknow-Sultanpur section of NH-56 from km 11.500 to km 134.700 in the State of Uttar Pradesh under
NHDP Phase IV through Public Private Partnership (PPP) on Design, Build, Finance, Operate and Transfer (DBFOT)
Toll Basis
National Highways Authority of India Request for Proposal – Bid Document
Volume-III: Schedules

2 79.323 Level Crossing

3 90.850 Level Crossing

4 96.795 Level Crossing

6. Grade Separators
The Site includes the following Grade Separators:

S. Chainage
Type of structure No. of Spans Width (m)
No. km)
Nil

7. Minor Bridges
The Site includes the following Minor Bridges:

Span Type of structure


S. Chainage
Width (m) arrangement Sub
No. (km) Foundation Super structure
(m) structure
Brick
RCC T-Beam
1 17+345 8.50 4 x 13.2 - Masonry
Girder
Wall Type
Spill through
2 45+317 12.00 1 x 26.3 - Voided Slab
Type
Brick
1x3.6+ 1x3.7 +
3 53+360 10.8 - Masonry RCC Solid Slab
1x3.6
Wall Type
Brick
4 56+086 9.00 3 x 6.0 (Skew) - Masonry RCC Solid Slab
Wall Type
Brick
5 65+341 8.50 3 x 4.9 - Masonry RCC Solid Slab
Wall Type
Brick
1x4.0+ 1x4.15
6 69+942 8.80 - Masonry RCC Solid Slab
+ 1x4.0
Wall Type
Brick
7 82+953 8.50 4 x 6.75 - Masonry RCC Solid Slab
Wall Type
9.65m (arch 1x6.0 + Brick Arch +
8 90+659 - Wall Type
portion)10.8m 1x3.27+ RCC Solid Slab

4-laning of Lucknow-Sultanpur section of NH-56 from km 11.500 to km 134.700 in the State of Uttar Pradesh under
NHDP Phase IV through Public Private Partnership (PPP) on Design, Build, Finance, Operate and Transfer (DBFOT)
Toll Basis
National Highways Authority of India Request for Proposal – Bid Document
Volume-III: Schedules

Span Type of structure


S. Chainage
Width (m) arrangement Sub
No. (km) Foundation Super structure
(m) structure
(Slab portion) 1x5.0+
1x3.27+ 1x6.0
(Clear)
1x11.3 + Brick
RCC T-BEAM
9 101+522 7.50 1x12.6 + - Masonry
GIRDER
1x11.75 Wall Type
Brick
10 107+791 12.00 3 x 4.0 - Masonry RCC Solid Slab
Wall Type
Brick
11 125+645 10.70 4 x 3.1 - Masonry RCC Solid Slab
Wall Type

8. Total number of structures

The total number of structures on the Site is noted below:

(a) No. of Major Bridges - 1 No.


(b) No. of Railway Over Bridges - Nil
No. of Railway Level Crossings - 04

(c) No. of Grade Separators - Nil

(d) No. of Minor Bridges - 11 Nos.

(e) No. of Box Culvert - Nil

(f) No. of Pipe Culvert - 142 No.

(g) No. of Slab Culvert - 64 No.

(h) No. of Arch Culvert - 25 No.

(i) Not visible (type of Culvert) - 4 No.

9. Bus bays and Truck Lay byes

The total number of bus bays and truck lay byes on the Project Highway is noted
below:

(a) No. of Bus bays on LHS - Nil

4-laning of Lucknow-Sultanpur section of NH-56 from km 11.500 to km 134.700 in the State of Uttar Pradesh under
NHDP Phase IV through Public Private Partnership (PPP) on Design, Build, Finance, Operate and Transfer (DBFOT)
Toll Basis
National Highways Authority of India Request for Proposal – Bid Document
Volume-III: Schedules

(b) No. of Bus bays on RHS - Nil

(c) No. of Truck lay-byes on LHS - Nil

(d) No. of Truck lay-byes on RHS - Nil

10. Permanent Bridge, Bypass or Tunnel costing Rs. 50 crore or more

The Site includes the following permanent bridge/ bypass/ tunnel which was
constructed at the cost noted below:
NIL

11. Design Chainage corresponding to Existing Chainage are as given:

Existing Chainage New Chainage


S. No. (NH-56) (NH 731) Design Chainage
1 12 211 11.980
2 13 210 12.980
3 14 209 13.980
4 15 208 14.980
5 16 207 15.970
6 17 206 16.970
7 18 205 17.970
8 19 204 18.970
9 20 203 19.970
10 21 202 20.970
11 22 201 21.970
12 23 200 22.970
13 24 199 23.960
14 25 198 24.960
15 26 197 25.980
16 27 196 26.965
17 28 195 27.960
18 29 194 28.970
19 30 193 29.960
20 31 192 30.960

4-laning of Lucknow-Sultanpur section of NH-56 from km 11.500 to km 134.700 in the State of Uttar Pradesh under
NHDP Phase IV through Public Private Partnership (PPP) on Design, Build, Finance, Operate and Transfer (DBFOT)
Toll Basis
National Highways Authority of India Request for Proposal – Bid Document
Volume-III: Schedules

Existing Chainage New Chainage


S. No. (NH-56) (NH 731) Design Chainage
21 32 191 31.950
22 33 190 32.940
23 34 189 33.950
24 35 188 34.980
25 35.165 35.100
26 Realignment
27 36.44 36.300
28 37 185 36.850
29 38 184 37.850
30 39 183 38.850
31 40 182 39.850
32 41 181 40.850
33 41.5 41.350
34 Realignment
35 45.515 45.8
36 46 176 46.28
37 47 175 47.28
38 48 174 48.28
39 49 173 49.27
40 50 172 50.27
41 51 171 51.28
42 52 170 52.27
43 53 169 53.27
44 54 168 54.27
45 55 167 55.25
46 56 166 56.26
47 57 165 57.26
48 58 164 58.26
49 59 163 59.25
50 60 162 60.26
51 61 161 61.26
52 62 160 62.25
53 63 159 63.25
54 64 158 64.25
55 65 157 65.25
56 66 156 66.25
57 67 155 67.25

4-laning of Lucknow-Sultanpur section of NH-56 from km 11.500 to km 134.700 in the State of Uttar Pradesh under
NHDP Phase IV through Public Private Partnership (PPP) on Design, Build, Finance, Operate and Transfer (DBFOT)
Toll Basis
National Highways Authority of India Request for Proposal – Bid Document
Volume-III: Schedules

Existing Chainage New Chainage


S. No. (NH-56) (NH 731) Design Chainage
58 68 154 68.25
59 69 153 69.25
60 70 152 70.26
61 71 151 71.25
62 72 150 72.25
63 73 149 73.25
64 74 148 74.25
65 75 147 75.25
66 76 146 76.25
67 77 145 77.25
68 78 144 77.75
69 79 143 78.75
70 80 142 79.750
71 81 141 80.748
72 81.875 81.625
Jagdishpur Bypass+Realignment
73 97. 825 100.125
74 98 124 100.284
75 99 123 101.285
76 100 122 102.281
77 100.6 102.882
Realignment
78 102.05 104.286
79 103 119 105.235
80 104 118 106.230
81 104.225 106.456
Mushafir Khana Bypass
82 109.7 113.118
83 110 112 113.445
84 111 111 114.452
85 112 110 115.452
86 113 109 116.452
87 114 108 117.452
88 114.695 118.163
Alignaj Bypass
89 119.34 123.333

4-laning of Lucknow-Sultanpur section of NH-56 from km 11.500 to km 134.700 in the State of Uttar Pradesh under
NHDP Phase IV through Public Private Partnership (PPP) on Design, Build, Finance, Operate and Transfer (DBFOT)
Toll Basis
National Highways Authority of India Request for Proposal – Bid Document
Volume-III: Schedules

Existing Chainage New Chainage


S. No. (NH-56) (NH 731) Design Chainage
90 120 102 124.000
91 121 101 124.989
92 122 100 125.990
93 123 99 126.993
94 124 98 127.992
95 125 97 128.991
96 126 96 129.989
97 127 95 130.989
98 128.05 132.039
Shabhaganj & Badaunkalan
Bypass
99 131.24 135.463
100 132 90 136.224
101 133 89 137.224
102 134 88 138.226
103 134.7 138.925

4-laning of Lucknow-Sultanpur section of NH-56 from km 11.500 to km 134.700 in the State of Uttar Pradesh under
NHDP Phase IV through Public Private Partnership (PPP) on Design, Build, Finance, Operate and Transfer (DBFOT)
Toll Basis