WESTERN HOTEL LIWA BUILDING/ REPAIR AND FUR
DATE,
Last Updated 01-01-2024
Start Date Room/Area Snag Description Photo
Main Lobby and Full floor grouting, Black spots and
Resturant area gaps need to be seal off
Main Lobby Damaged Tile need to be replaced
Water mark at the ceiling near the
Main Lobby
olive tree café, need paint touch up
Main Booster pump
Area, Mirage pumps
Shelter for the pumps
and Kitchen Pump
area
Wall painting for both the rooms and
Rooms
washrooms.
Engineering Outside Engineering work need to be
Workshop put up near the booster pumps.
Finishing work at the pump room
Mirage/star Building chember and need cover for the
inspection intrance.
Mirage/star Building Pump shelter/Pump room
Mirage/star Building Need small ladders for the pump room
Block A Corridor Paint bubles on the right hand side.
All Area Main door Gaps between the door frames need
frames to seal
Block A and B all Lighting design doors need to fix
Corridor magnets
All Room Main Door Exposed silicon need to be cut off and
entrace. polishing to be done on all doors
Access to the roof top, need one
Block B
access point / stairs.
Finishing and painting work needed on
First Floor Block A the stair skirting and 2 tile skirting
and B missing
Room No.101,124,
Gypsum Board Modification
127, 201,202,225,226
Door Closer need to be installed on
Offices executive office, chef office, F&B
office, Salaad area and dry store
Engineering Office Final wall painting need to be done
Gypsum work on the ceiling, Ac water
Washroom 211
leak damaged the ceiling
Swimming pool pump Weather proof painting inside the
room pump rooms need to be done
Hole sealing and paint finishing need
Resturant area
to be done
Ladies washroom area, gap need to
Public Area
bw covered
Male urinal area, pertition need to be
Public Area
put between the 2 urinals
/ REPAIR AND FURNITURE FOLLOW-UP
COMPLETED BY,
Resposible/Company Status Remarks
Date Comment
TCGC Please Update the start date
TCGC Please Update the start date
TCGC Please Update the start date
TCGC Please Update the start date
TCGC Please Update the start date
TCGC Please Update the start date
TCGC Please Update the start date
TCGC
TCGC Please Update the start date
TCGC Please Update the start date
TCGC Please Update the start date
TCGC Please Update the start date
TCGC Please Update the start date
TCGC Please Update the start date
Please Update the start date
TCGC
TCGC Please Update the start date
TCGC Please Update the start date
TCGC Please Update the start date
TCGC Please Update the start date
TCGC Please Update the start date
TCGC Please Update the start date
TCGC Please Update the start date
TCGC Please Update the start date
WESTERN HOTEL LIWA MEP/HVAC FOL
DATE, Last Updated 01-01-2024
Start Date Room/Area Snag Description
First week in Jan Handicap room, need to pull the alarm cables
101 and Public Area
2024 from the room to the recieption
First week in Jan Block A and Block B Pull the cable of the Generator and
2024 electrical room installation of change over switch
First week in Jan
Kitchen Installation of permanante gas isolator switch
2024
23.12.2023 Kitchen Circute testing and tagging
22.12.2024 Electrical Room A GF Painting work and finishing work
DB dressing and earth granding and
24.12.2023 Electrical Room B GF
termination
First week in Jan
Resturant Resturant hanging lights
2024
First week in Jan Food pickup warmer counter, needs power
Kitchen
2024 conection
As per Eng. Lijo we
still have pending
payments we need
Main Tank Water leakage from the bottom
to clear then they
will send the
technician.
Open Water Heater Heater cable dressing and arrangement
Open Main Tank Main refilling line
Please plan how we can hide this pipe being
Open Vent Pipe that it’s in the front and open guest area.
And also make it long if necessary
First week in Jan
Block A back stairs switch to control the lights.
2024
Mirror hangging lights in block A need to be
Washroom
installed,
Mirage/ star building Reserve tank over flowing, fixed temporary
Wc leaking water, this the second time its
Public Area
happening.
Balcony light fell off, This is now the third
206 light falling off the wall. pLease do the
needfull and solve this issue.
225,303, 105,
Bad smell from the washroom, Its coming up
227,115,110, 117,
room per room
232,204 anmd 201
Parking Area Electric car charging ports
All Area Exit Signages not lighting
Rooms Light contactors need to be installed
Swimming Pool Leakage in the pump room
CCTV Control Room Power suply
Under ground conduit ( 4m long and at least
Main gate 15mm diameter ) To connect the two man
holes near the gate.
Camera pole installation at the pool bart
Pool Bar
area.
Electrical rooms Breaker tagging for easy allocating
Exhaust fan not working, whenever the open
Kitchen, Stewarding the dish washing machine, a lot of steam
area comes out which most of the time starts the
alarm
All area, Except 104,
Plug points modification,
106 and 234
Washroom 124 and Glass pertition need to be installed in the
127 washroom.
Ac need to be chacked for leakage, because it
210
has less gass, Kept off till its fixed
Ice cube machine was taken by paramount
Restaurant
for repair because it was not making ice
229
Need to install emergence light, Spot light
just kept to cover the hole
Office
All lights should be white light, in the offices
Block B Stairs
Exposed cables at the top. Need to be
covered.
Slop issue, water flooding inside the room.
SPA
Not going to the trap side.
Drain stainer/ Floor trape need to be
SPA
installed.
Exposed pipes around the property need to
Out Door
be arranged and covered
Lift/Elevator Ceiling need to be fixed
Recieving Area Out door light need to be installed
Pool shower nob tape, sometimes not
Swimming pool
stoping water automatically.
All pending works need to be finished, Glass
pertition need to install , darinage flow need
Female Spa
to be checked, Gap need to cover and silicon
work need to be done.
ESTERN HOTEL LIWA MEP/HVAC FOLLOW-UP
COMPLETED BY,
Photo Resposible/Company Status
Date Comment
As per hotel team
TCGC
Permission
As per hotel team
TCGC
Permission
As per hotel team
TCGC
Permission
TCGC Ongoing
TCGC Ongoing
TCGC Ongoing
Tamporary fixed
TCGC the spot lights to
cover the holes.
As per hotel team
Permission (Please
TCGC coordinate with
Eng.Rahman for
remove tile)
Please coordinate
TCGC
with Eng.Lijo
TCGC Will Start
We don’t have
addc approval so
TCGC
will try hide the
pipe
TCGC Will Update
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
Request By the
TCGC
CCTV team
Request By the
TCGC
CCTV team
Request By the
TCGC
CCTV team
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
Remarks
It happened one day and
the painter didn’t come
back, please floowup
Please Update starting
date
Please Update starting
date and how the power
will be connected.
( ASASP )
Will update soon
Please Update the
starting date
Please Update the
starting date
Please Update the
starting date
Please Update the
starting date
Please Update the
starting date
Please Update the
starting date
Please Update the
starting date
Please Update the
starting date
Please Update the
starting date
Please Update the
starting date
Please Update the
starting date
Please update the start
date
Please update the start
date
Please update the start
date
Please update the start
date
Please update the start
date
Please update the start
date
Please update the start
date
Please update the start
date
Please update the start
date
Please updsate the start
date
Please followup from
your side too.
Please update the start
date
Please update the start
date
Please update the start
date
Please update the start
date
Please update the start
date
Please update the start
date
Please update the start
date
Please updsate the start
date
Please update the start
date
Please update the start
WESTERN HOTEL LIWA MEP/HVAC F
DATE, Last Updated 01-01-2024
Start Date Room/Area Snag Description
Entrace doors Entrace doors need to be installed
All area security lights need to be
Out door lightings
installed
Installation of all necessary sanitary
Sanitary Ware ware in both ladies and male staff
cafeteria washroom.
All man holes need to put covers
Man Hole covers
around the staff cafeteria
Power Controls Switch gears need to be installed
SMDB Installation of the power smdb
Ceiling work for all area need to be
Ceiling Work
done
Pending plastering work, Tiling and
Finishing work
grouting works,
Inter lock works Pending area need to be done.
Inside DB Inside DB need to be installed
installation of ac and exhaust fan need
AC/Air circulation
to be done
Gypsum Work to cover the exposed
Inside Conners
pipes
SHEESHA ROOM
Doors Doors need to be installed
power need to be finalized and
Power and switch gears
installation of all controllers
Grouting work Pending grouting wor need to be done.
Water and drainage All pending piping need to be finalised
Roof Roofing finishing has to be completed
Pending painting works indoor and out
Painting
door need to be done
WESTERN HOTEL LIWA MEP/HVAC FOLLOW-UP
COMPLETED BY,
Photo Resposible/Company Status
Date Comment
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
SHEESHA ROOM
TCGC
TCGC
TCGC
TCGC
TCGC
TCGC
Remarks
Please Update the
start date
Please Update the
start date
Please Update the
start date
Please Update the
start date
Please Update the
start date
Please Update the
start date
Please Update the
start date
Please Update the
start date
Please Uppate the
start date
Please Update the
start date
Please Update the
start date
Please Update the
start date
Please Update the
start date
Please Update the
start date
Please Update the
start date
Please Update the
start date
Please Update the
start date