Major Snag Log and Follow-Ups

Uploaded by

hareemhassan1310
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 43

WESTERN HOTEL LIWA BUILDING/ REPAIR AND FUR

DATE,
Last Updated 01-01-2024
Start Date Room/Area Snag Description Photo

Main Lobby and Full floor grouting, Black spots and


Resturant area gaps need to be seal off

Main Lobby Damaged Tile need to be replaced

Water mark at the ceiling near the


Main Lobby
olive tree café, need paint touch up

Main Booster pump


Area, Mirage pumps
Shelter for the pumps
and Kitchen Pump
area
Wall painting for both the rooms and
Rooms
washrooms.

Engineering Outside Engineering work need to be


Workshop put up near the booster pumps.

Finishing work at the pump room


Mirage/star Building chember and need cover for the
inspection intrance.

Mirage/star Building Pump shelter/Pump room

Mirage/star Building Need small ladders for the pump room

Block A Corridor Paint bubles on the right hand side.


All Area Main door Gaps between the door frames need
frames to seal

Block A and B all Lighting design doors need to fix


Corridor magnets

All Room Main Door Exposed silicon need to be cut off and
entrace. polishing to be done on all doors

Access to the roof top, need one


Block B
access point / stairs.

Finishing and painting work needed on


First Floor Block A the stair skirting and 2 tile skirting
and B missing
Room No.101,124,
Gypsum Board Modification
127, 201,202,225,226

Door Closer need to be installed on


Offices executive office, chef office, F&B
office, Salaad area and dry store

Engineering Office Final wall painting need to be done

Gypsum work on the ceiling, Ac water


Washroom 211
leak damaged the ceiling

Swimming pool pump Weather proof painting inside the


room pump rooms need to be done

Hole sealing and paint finishing need


Resturant area
to be done

Ladies washroom area, gap need to


Public Area
bw covered

Male urinal area, pertition need to be


Public Area
put between the 2 urinals
/ REPAIR AND FURNITURE FOLLOW-UP
COMPLETED BY,
Resposible/Company Status Remarks
Date Comment

TCGC Please Update the start date

TCGC Please Update the start date

TCGC Please Update the start date

TCGC Please Update the start date


TCGC Please Update the start date

TCGC Please Update the start date

TCGC Please Update the start date

TCGC

TCGC Please Update the start date

TCGC Please Update the start date


TCGC Please Update the start date

TCGC Please Update the start date

TCGC Please Update the start date

TCGC Please Update the start date

Please Update the start date

TCGC
TCGC Please Update the start date

TCGC Please Update the start date

TCGC Please Update the start date

TCGC Please Update the start date

TCGC Please Update the start date

TCGC Please Update the start date

TCGC Please Update the start date

TCGC Please Update the start date


WESTERN HOTEL LIWA MEP/HVAC FOL
DATE, Last Updated 01-01-2024
Start Date Room/Area Snag Description

First week in Jan Handicap room, need to pull the alarm cables
101 and Public Area
2024 from the room to the recieption

First week in Jan Block A and Block B Pull the cable of the Generator and
2024 electrical room installation of change over switch

First week in Jan


Kitchen Installation of permanante gas isolator switch
2024
23.12.2023 Kitchen Circute testing and tagging

22.12.2024 Electrical Room A GF Painting work and finishing work

DB dressing and earth granding and


24.12.2023 Electrical Room B GF
termination

First week in Jan


Resturant Resturant hanging lights
2024

First week in Jan Food pickup warmer counter, needs power


Kitchen
2024 conection
As per Eng. Lijo we
still have pending
payments we need
Main Tank Water leakage from the bottom
to clear then they
will send the
technician.

Open Water Heater Heater cable dressing and arrangement

Open Main Tank Main refilling line

Please plan how we can hide this pipe being


Open Vent Pipe that it’s in the front and open guest area.
And also make it long if necessary

First week in Jan


Block A back stairs switch to control the lights.
2024
Mirror hangging lights in block A need to be
Washroom
installed,

Mirage/ star building Reserve tank over flowing, fixed temporary

Wc leaking water, this the second time its


Public Area
happening.

Balcony light fell off, This is now the third


206 light falling off the wall. pLease do the
needfull and solve this issue.

225,303, 105,
Bad smell from the washroom, Its coming up
227,115,110, 117,
room per room
232,204 anmd 201
Parking Area Electric car charging ports

All Area Exit Signages not lighting

Rooms Light contactors need to be installed

Swimming Pool Leakage in the pump room

CCTV Control Room Power suply

Under ground conduit ( 4m long and at least


Main gate 15mm diameter ) To connect the two man
holes near the gate.

Camera pole installation at the pool bart


Pool Bar
area.

Electrical rooms Breaker tagging for easy allocating

Exhaust fan not working, whenever the open


Kitchen, Stewarding the dish washing machine, a lot of steam
area comes out which most of the time starts the
alarm

All area, Except 104,


Plug points modification,
106 and 234
Washroom 124 and Glass pertition need to be installed in the
127 washroom.

Ac need to be chacked for leakage, because it


210
has less gass, Kept off till its fixed

Ice cube machine was taken by paramount


Restaurant
for repair because it was not making ice

229
Need to install emergence light, Spot light
just kept to cover the hole

Office
All lights should be white light, in the offices

Block B Stairs
Exposed cables at the top. Need to be
covered.

Slop issue, water flooding inside the room.


SPA
Not going to the trap side.

Drain stainer/ Floor trape need to be


SPA
installed.
Exposed pipes around the property need to
Out Door
be arranged and covered

Lift/Elevator Ceiling need to be fixed

Recieving Area Out door light need to be installed

Pool shower nob tape, sometimes not


Swimming pool
stoping water automatically.

All pending works need to be finished, Glass


pertition need to install , darinage flow need
Female Spa
to be checked, Gap need to cover and silicon
work need to be done.
ESTERN HOTEL LIWA MEP/HVAC FOLLOW-UP
COMPLETED BY,
Photo Resposible/Company Status
Date Comment
As per hotel team
TCGC
Permission

As per hotel team


TCGC
Permission

As per hotel team


TCGC
Permission
TCGC Ongoing

TCGC Ongoing

TCGC Ongoing

Tamporary fixed
TCGC the spot lights to
cover the holes.

As per hotel team


Permission (Please
TCGC coordinate with
Eng.Rahman for
remove tile)
Please coordinate
TCGC
with Eng.Lijo

TCGC Will Start

We don’t have
addc approval so
TCGC
will try hide the
pipe

TCGC Will Update

TCGC
TCGC

TCGC

TCGC

TCGC

TCGC
TCGC

TCGC

TCGC

TCGC

Request By the
TCGC
CCTV team

Request By the
TCGC
CCTV team

Request By the
TCGC
CCTV team

TCGC

TCGC

TCGC
TCGC

TCGC

TCGC

TCGC

TCGC

TCGC

TCGC

TCGC
TCGC

TCGC

TCGC

TCGC

TCGC
Remarks

It happened one day and


the painter didn’t come
back, please floowup

Please Update starting


date

Please Update starting


date and how the power
will be connected.
( ASASP )
Will update soon

Please Update the


starting date

Please Update the


starting date

Please Update the


starting date

Please Update the


starting date
Please Update the
starting date

Please Update the


starting date

Please Update the


starting date

Please Update the


starting date

Please Update the


starting date
Please Update the
starting date

Please Update the


starting date

Please update the start


date

Please update the start


date

Please update the start


date

Please update the start


date

Please update the start


date

Please update the start


date

Please update the start


date

Please update the start


date
Please update the start
date

Please updsate the start


date

Please followup from


your side too.

Please update the start


date

Please update the start


date

Please update the start


date

Please update the start


date

Please update the start


date
Please update the start
date

Please update the start


date

Please updsate the start


date

Please update the start


date

Please update the start


WESTERN HOTEL LIWA MEP/HVAC F
DATE, Last Updated 01-01-2024
Start Date Room/Area Snag Description

Entrace doors Entrace doors need to be installed

All area security lights need to be


Out door lightings
installed

Installation of all necessary sanitary


Sanitary Ware ware in both ladies and male staff
cafeteria washroom.

All man holes need to put covers


Man Hole covers
around the staff cafeteria

Power Controls Switch gears need to be installed


SMDB Installation of the power smdb

Ceiling work for all area need to be


Ceiling Work
done

Pending plastering work, Tiling and


Finishing work
grouting works,

Inter lock works Pending area need to be done.

Inside DB Inside DB need to be installed


installation of ac and exhaust fan need
AC/Air circulation
to be done

Gypsum Work to cover the exposed


Inside Conners
pipes

SHEESHA ROOM

Doors Doors need to be installed

power need to be finalized and


Power and switch gears
installation of all controllers

Grouting work Pending grouting wor need to be done.

Water and drainage All pending piping need to be finalised


Roof Roofing finishing has to be completed

Pending painting works indoor and out


Painting
door need to be done
WESTERN HOTEL LIWA MEP/HVAC FOLLOW-UP
COMPLETED BY,
Photo Resposible/Company Status
Date Comment

TCGC

TCGC

TCGC

TCGC

TCGC
TCGC

TCGC

TCGC

TCGC

TCGC
TCGC

TCGC

SHEESHA ROOM

TCGC

TCGC

TCGC

TCGC
TCGC

TCGC
Remarks

Please Update the


start date

Please Update the


start date

Please Update the


start date

Please Update the


start date
Please Update the
start date

Please Update the


start date

Please Update the


start date

Please Update the


start date

Please Uppate the


start date
Please Update the
start date

Please Update the


start date

Please Update the


start date

Please Update the


start date

Please Update the


start date

Please Update the


start date
Please Update the
start date

Please Update the


start date